SATPC0041757 Tab 04 4 SOW.pdf
PDF 118 KB Posted
- Attached to
- ETAP Renewal Federal contract opportunity
- Solicitation number
- 80NSSC26938026Q-1
About this file
This is a Statement of Work for NASA Langley Research Center's requirement to renew ETAP Software maintenance for a one-year period from September 1, 2026, through September 1, 2027. The deliverable consists of one ETAP Software Maintenance Agreement that includes an Upgrade & User Support Agreement providing annual maintenance encompassing program upgrades, updates, technical support, and engineering support.
The maintenance agreement covers a comprehensive suite of electrical power system analysis modules and features including: Base Module Multi-Dimension Digital-Twin Platform with revisions, libraries, and wizards; IEEE, ICEA, and NEC cable ampacity and sizing calculations; load flow and AC power flow analysis for three-phase and single-phase systems; panel schedule calculations; renewable energy modules for wind turbine generators and PV arrays; HVDC control schemes; network and cloud project modeling through NetPM; short circuit analysis per AC ANSI and IEC standards; GIS interface capabilities; arc flash analysis per IEEE 1584 2018 and NFPA 70E 2021 standards; arc fault analysis for 15kV and above systems; protective device selectivity and sequence of operation; motor starting analysis; harmonics analysis; underground cable thermal analysis per Neher-McGrath and IEC 60287 standards; DC system short circuit analysis per IEEE 946; transient stability dynamics; motor parameter estimation; unbalanced power flow analysis; optimal power flow with energy cost optimization; intelligent geospatial electrical one-line diagrams; and MS Excel import/export capabilities with global data change management. Performance of all work will occur at NASA Langley Research Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0041757 Tab 10 RFQ Open Market Template.pdf | ||
| SATPC0041757 Tab 06 BNJ..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements NASA Langley Research Center (LaRC) has a requirement to renew ETAP Software maintenance.
2. Characteristics, Scope, and Specs
QTY Description
1 ETAP Software Maintenance Agreement
Upgrade & User Support Agreement
Annual Maintenance consists of program upgrades, updates, technical support and engineering support.
• Base Module Multi-Dimension Digital-Twin Platform, Revisions, Libraries, Wizards
• IEEE, ICEA, NEC Cable Ampacity & Sizing - IEEE, ICEA, NEC
• Load Flow, AC Power Flow, 3-Phase & 1-Phase Systems, Voltage Drop, Result Analyzer
• Panel Schedule Schedules, Calculations, 3-Phase, 1-Phase, NEC, IEC
• Renewables Wind Turbine Generator, PV Array - PV Pro, Controls, Libraries, Profiles
• HVDC Control Schemes, Dynamic Modes, Rectification, Inversion
• NetPM Network/Cloud Project Modeling & Management, Centralized, Simultaneous Users
• Short Circuit, AC ANSI & IEC, Balanced 3-Phase & 1-Phase, Duty Evaluation, Analyzer
• GIS Interface GIS Interface (Requires Intelligent Geospatial Diagram)
• Arc Flash, AC IEEE 1584 2018 & NFPA 70E 2021 - Analyzer, Work Permit, Safety Labels
• ArcFault 15kV & Above, OSHA 1910 Appendix E, LG, LL, 3-Phase Arc Faults
• Arc Flash, DC Max Power, Stokes & Oppenlander, Paukert, NFPA 70E
• Star Protection, Selectivity, Sequence of Operation, Protective Devices
• Motor Starting Dynamic & Static, Seq of Op, Scripts, Result Analyzer
• Harmonics Harmonic Load Flow, Frequency Scan, Harmonic Filters & Sizing
• Cable UG Thermal UG Raceways, Direct Buried, Neher-McGrath, IEC 60287
• Short Circuit, DC System Faults, Device Duty Evaluation, Reports, IEEE 946
• Transient Stability Dynamics, Inrush, Short & Long-Term, Analyzer
• Motor Param Est. Induction Motor Parameter Estimation & Tuning, Nameplate, Characteristic Data
• Load Flow, UB Unbalanced Power Flow, AC Networks, 3-Phase & 1- Phase
• Opt Power Flow Optimize Power Flow, Energy Costs, Fuel Costs, Security Indices, Power Exchange
• GIS, Elect. Intelligent Geospatial Electrical One-Line, Network Wide, Incremental Updates
• DataX, Excel Import / Export MS Excel - Global Data Changes, Consistency Checks, Create Reports
3. Place of Performance NASA, Langley Research Center
4. Period of Performance 09/01/2026-09/01/2027
File details come from the government source that posted it. Updated .