SATPC0040973 Tab 04 4 SOW.pdf

PDF 339 KB Posted

Attached to
SL500 Hardware and Install Federal contract opportunity
Solicitation number
80NSSC26931558Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This is a Statement of Work for the acquisition and installation of the SL500 Hardware system for NASA Ames Research Center (ARC) at Nuiqsut Village, Colville River Delta, North Slope of Alaska.

The procurement requires installation of a real-time system with SonTek SL500 and YSI EXO sonde, necessitating one experienced YSI Field Engineer on site for 5 days with provision for up to 3 additional days if needed. Deliverables include one 40-meter power and RS232/SDI-12 communications cable (Part #36-0003-040), one 33-meter EXO Flying Lead Cable (Part #599008-33), all necessary installation hardware including 4"x10' Schedule 40 aluminum well, 2"x20' Schedule 80 aluminum pipe, Hollander fittings, aluminum plates, U-Bolts, stainless steel Unistrut, custom clamps, and stainless steel hardware. Additional items include a custom shipping crate for all materials, channel survey services using an M9 and Surfbee, travel and living expenses for the field engineer, replacement cables, and one year warranty on standard sensors and accessories. The Period of Performance runs from May 13, 2026 through July 30, 2026. Equipment shall be shipped/compiled by the chosen vendor at a central location with final shipping to Alaska arranged by NASA Ames ESPO. Invoice approval and TPOC coordination will be handled by NASA Goddard Space Flight Center (GSFC), with Antonio Mannino (Mail Code 130, Greenbelt, MD 20771) designated as the contact.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements

This requirement is for the acquisition of the SL500 Hardware and Install for NASA Ames Research Center (ARC). The information listed below is required to complete this purchase.

2. Characteristics, Scope, and Specs

Installation of Real-time system with SonTek SL500 and YSI EXO sonde. This requires the expertise of one experienced YSI Field Engineer on site for 5-8 days. The time needed for successful installation and deployment depends on the environmental conditions.

This procurement will include the following:

One YSI Field Engineer on site for 5 days (+ 3 additional days, if needed) to work on the installation of Real-time system with SonTek SL500 and YSI EXO sonde.

Channel Survey Travel expenses All necessary installation hardware Replacement cables Custom shipping crate One year warranty of standard sensor and accessories

QTY PART # DESCRIPTION

- - Replacement cables for EXO sonde and

SL500:

1 36-0003-040 40-m power and RS232/SDI-12 communications cable, Flow Display capable, 8-pin male wet-pluggable to 9-pin D-sub

1 599008-33 EXO 33-m Flying Lead Cable

- Connects EXO sonde to DCP Signal Output Adapter

- - Installation Hardware:

1 EXPENSE-ISS All necessary installation hardware for the following installation:

- 4"x10' Schedule 40 aluminum well

- 2"x20' Schedule 80 aluminum pipe

- Hollander fittings

- aluminum plates

- UBolts

- SS Unistrut

- Unistrut clamps

- Custom clamps for mounting around bridge pilings -SS hardware

1 EXPENSE-ISS Custom shipping crate for all materials.

- - On site services:

2 370449 One YSI Field Engineer on site for up to 5 days to install EXO2 and SonTek SL real-time system. Includes all necessary travel and living expenses for travel to Nuiqsut, AK.

YSI will also provide an M9 and Surfbee to provide channel survey for entry into SL500.

3. Place of Performance

TPOC/ Invoice Approver:

NASA Goddard Space Flight Center (GSFC) ATTN: Antonio Mannino Mail Code 130 Greenbelt, MD 20771

Physical Delivery:

The equipment procured shall be shipped/compiled by the chosen vendor at a vendor central location with shipping to Alaska to be arranged by NASA Ames ESPO.

Nuiqsut Village, Colville River Delta, North Slope of Alaska

4. Period of Performance

05/13/26 – 07/30/26

File details come from the government source that posted it. Updated .