This document is a NASA Shared Services Center Recommendation and Determination to Solicit from One Source form for a sole source procurement. NASA seeks to acquire an MTS FlexTest 40 Controller and Input Card for the Materials Research Lab within the Research Directorate's Durability Damage Tolerance and Reliability Branch (DDTRB). The procurement is specifically for replacing a failed controller with a new system that ensures compatibility with existing MTS hardware and software supporting multiple organizational branches.
The total estimated cost and lead-time for delivery is 155 days after receipt of order (ARO). NASA justifies the sole source selection by emphasizing the critical need for manufacturer-specific parts, specialized equipment knowledge, and warranty requirements. The document explicitly states that selecting any vendor other than MTS Systems Corporation would negatively impact the schedule of planned work, potentially cause equipment operational losses, and require postponement of projects and critical flight-related activities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0039890 Tab 04 4 SOW..pdf | ||
| SATPC0039890 Tab 07 Capability Statement SAM.gov.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 V2.0 3-15-2017
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
NASA SHARED SERVICES CENTER
RECOMMENDATION AND DETERMINATION TO SOLICIT FROM ONE SOURCE
OR BRAND NAME
PICK ONE
Sole Source:
☒I recommend that NASA, NASA Shared Services Center negotiate with MTS Systems Corporation only for MTS FlexTest 40 Controller and Input Card. The total estimated cost of this effort is and the estimated period of performance or lead-time for delivery is 155 Days ARO.
OR
Brand Name Justification:
☐I recommend that NASA, NASA Shared Services Center negotiate only with vendors who can provide the subject brand name from Manufacture Name for Enter Supply or Service to be procured. The total estimated cost of this effort is Enter Dollar amount and the estimated period of performance or lead-time for delivery is Date.
This recommendation is for the acquisition of supplies or services determined to be reasonably available from only one source/only one manufacture. Competition is impractical for the following reasons (please answer the questions below):
1. What are the reasons for soliciting only the suggested source/suggested brand name? Please provide the unique characteristics of the items or services along with the supporting rationale and the market research performed to substantiate your reason for the suggested source/brand name.
The replacement of an existing MTS Controller is needed for equipment located in the Materials Research Lab within the Research Directorate for the Durability Damage Tolerance and Reliability Branch (DDTRB). MTS equipment systems are an important part of laboratory testing. As these systems get older and fail, it is important to upgrade the systems to increase maintain functionality. We are replacing a failed controller with these new system. Compatibility and interchangeability are needed for use with existing MTS hardware and software that are currently in use supporting the NESC, and multiple branches. The specified systems and vendor will ensure compatibility which is critical to ongoing work in the lab. Re-installation, calibration, and repair are needed on this equipment which is distributed across both buildings and organizations to maintain functioning of the laboratories. Due to the complexity, need for manufacturer specific parts, knowledge of equipment, and need of warranty, MTS is the only source for these services.
2. What is the impact to the government if another vendor/brand is used? Include any dollar, schedule, or compatibility impacts if possible.
The selection of any vendor other than MTS will affect the schedule of planned work, cause possible loss of operation of the equipment, and require a postponement of projects and critical flight required activities.
ADDITIONAL COMMENTS:
File details come from the government source that posted it. Updated .