SATPC0039005 Tab 04 4 SOW..pdf
PDF 215 KB Posted
- Attached to
- RF Cables Federal contract opportunity
- Solicitation number
- 80NSSC25908907Q
About this file
This Statement of Work (SOW) outlines requirements for purchasing high-performance cable assemblies for the LCRNS Interoperability and Performance Testbed (IPT) to support Interoperability Check-Hardware (IC-H) tests. The contractor must fabricate and deliver cable assemblies specified in Quote 00119509-1, Version 1 dated 26 June 2025, and provide a Gore-standard test report including insertion loss and VSWR measurements for each assembly.
The performance period is 8 weeks from purchase order acceptance. The cable assemblies require specific technical characteristics, including amplitude and phase stability and high-level power handling capability. These assemblies must be integrated with the Testset prior to deployment for the IC-H tests, indicating a precise technical requirement for a specialized testing environment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0039005 Tab 04 4 SOW..pdf | ||
| SATPC0039005 Tab 10 RFQ Open Market Template.pdf | ||
| SATPC0039005 Tab 06 BNJ..pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements To purchase high-performance cable assemblies with amplitude and phase stability and high-level power handling capability which are needed for the LCRNS Interoperability and Performance Testbed (IPT) to support the Interoperability Check-Hardware (IC-H) tests. Prior to the deployment of the IPT for the IC-H tests, these cable assemblies need to be integrated with the Testset.
2. Characteristics, Scope, and Specs
The contractor shall perform the following duties:
• Provide materials and labor to fabricate and deliver the cable assemblies listed in Quote 00119509-1, Version 1, dated 26 June 2025.
• Provide a Gore-standard test report that includes insertion loss and VSWR measurements with each cable assembly.
3. Period of Performance
Purchase order acceptance plus 8 weeks.
File details come from the government source that posted it. Updated .