SATPC0037763 Tab 04 4 SOW_Redacted.pdf
PDF 119 KB Posted
- Attached to
- MXR-100HP20 X-Ray System Purchase Federal contract opportunity
- Solicitation number
- 80NSSC25896970Q
About this file
This Statement of Work details NASA Kennedy Space Center's requirements for purchasing a Gulmay MXR-100HP20 X-Ray system and associated components. The procurement includes 12 specific line items: a Gulmay FC160HP Cathode Generator, a four-digit microprocessor controller, enclosure box, Lab I/O box with cables, data cable, air-water cooler, X-ray tube assembly, water hoses, high voltage cable, tube flange, generator flange, and installation services. All items have a quantity of one unit each.
The place of performance is specified as the BOSS Warehouse (M6-0744) at NASA Kennedy Space Center in Florida. The estimated delivery lead time is 6-8 weeks after receipt of order (ARO). This appears to be a brand name requirement from Gulmay Incorporated, as indicated in the associated contract opportunity details, and is set aside for small businesses who are authorized resellers.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SATPC0037763 Tab 10 BNJ_CO_Redacted.pdf | ||
| SATPC0037763 Tab 10 RFQ OM.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements
The information listed below is required to complete this purchase.
2. Characteristics, Scope, and Specs
LINE PART NO. DESCRIPTION QTY.
1 FC160HP Gulmay FC160HP Cathode Generator 1 2 MP1/23 Four-Digit Micro Processor Controller Type III Use 1 3 GIMPE MP1 Black Enclosure Box 1 4 LAB I/O 3 kVA Lab I/O Box 3m cables 1 5 GIDB30 MP1 Data Cable 30' 1 6 WL3000S 3KW air-water cooler 1 7 915377.62 MXR-100HP/20 X-Ray Tube assembly 1 8 ASWOF10M 10 meter water hoses (Pair) 1 9 CA1121/10M/ L3 - 100kV - CA11 - R24 HV CABLE 10M 1 10 A1513-06 R24 Tube Flange 1 11 A1513-O5E R24 Generator Flange 1 12 INSTALL/SERV Installation Service 1
3. Place of Performance
NASA/ Kennedy Space Center BOSS Warehouse - M6-0744
Kennedy Space Center, FL 32899
4. Period of Performance
Estimated delivery lead-time is 6-8 weeks ARO.
File details come from the government source that posted it. Updated .