SATPC0037237 Tab 04 4 SOW.pdf

PDF 127 KB Posted

Attached to
New Clausing Lathe C22 Geared Head Gap Bed Head Federal contract opportunity
Solicitation number
80NSSC25891149Q
Issued by
National Aeronautics and Space Administration Shared Services Center

About this file

This Statement of Work (SOW) outlines NASA Environmental Control and Life Support Systems (ECLSS)'s requirements for manufacturing a New Clausing Lathe C22 Geared Head Gap Bed Head to replace functionality of an existing lathe in the 4755 test stand.

The contractor, Worldwide Machine Tool in Lewis Center, Ohio, must manufacture the lathe components using correct series and grade materials, validate dimensions and tolerances according to drawing specifications, and complete manufacturing by March 31, 2025. The work involves creating a functional duplicate with upgrades that fit within NASA's current footprint. This appears to be a sole-source requirement based on the associated contract opportunity information.

View the file

Other files for this federal contract opportunity

Other files attached to New Clausing Lathe C22 Geared Head Gap Bed Head, newest first.
File Type Posted
SATPC0037237 Tab 06 RDSS..pdf PDF
SATPC0037237 Tab 07 Capability Statement SAM.gov.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

1. Objective/Requirements Worldwide Machine Tool has the capability to manufacture components that replace functionality of the Lathe that is currently in the 4755 test stand. NASA Environmental Control and Life Support Systems (ECLSS) has interest in creating a functional duplicate with upgrades that fit into our current footprint.

2. Characteristics, Scope, and Specs

The contractor shall perform the following duties:

• Complete the manufacturing of New Clausing Lathe C22 Geared Head Gap Bed

Head.

• Ensure that the stock material used to make the components is the correct series and grade.

• Validate that the dimensions and tolerance are within the specifications on the respective drawing instructions.

• Complete manufacturing in a timely manner to support the test stand.

3. Place of Performance

Worldwide Machine Tool located at 9000 Cotter St Lewis Center, Ohio 43035.

4. Period of Performance Manufacturing shall be performed from the earliest applicable date through March 31, 2025.