| File | Type | Posted |
|---|---|---|
| S21-026 Brand Name Justification Honeywell Vindicator 4-2_Redacted.pdf | ||
| Solicitation - FA812621Q0030.pdf | ||
| S21-026 ACS_SOW.pdf | ||
| CCTV Layout_E45_20201125.pptx | PPTX presentation |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
OKLAHOMA CITY AIR LOGISTICS COMPLEX (OC-ALC)
TINKER AIR FORCE BASE OKLAHOMA
Statement of Requirement / Item Description
76 SWEG requires design, purchase, and installation of one Honeywell Vindicator Access Control System (ACS), one (1) Intrusion Detection Systems (IDS), and Closed-Circuit Television (CCTV) This requirement must have the following:
• One (1) Honeywell Vindicator Access Control System (ACS), one (1) Intrusion Detection Systems (IDS), and Closed-Circuit Television (CCTV)
- One (1) Vindicator V5 IDS Controller
- Five (5) Sim Modules
- One (1) Rom Module
- Five (5) HID PIV Class Readers
- One (1) HID PIV Class Keypad Reader
- Fourteen (14) 360 PIRs
- Six (6) Rex Motions
- Five (5) Level 1 BMS Door Contacts
- Three (3) Level 2 BMS Door Contacts
- One (1) Key Override Switch for ACS and IDS
- One (1) Genetec Synergis Enterprise Base Software
- One (1) Genetec Cloudlink
- Six (6) Single Door Mercury Door Controllers
- One (1) Client Workstation
- One (1) Dual-Sided Badge Printer w/ Replacement Ribbon and Overlaminate
- One (1) Network Video Recorder w/ 4TB Expansion Pack
- Five (5) 2MP Cameras w/ Mounting Brackets
- One (1) Uninterruptible Power Supply w/ 24 Hour Backup Capability
- One (1) Cisco Switch
- One (1) Aiphone Entry System
- One (1) 25U Half Rack w/ Cable Management
- One (1) 24-Port Loaded Patch Panel
- Four (4) 22” Client Workstation Monitors
• Contractor shall provide the design for the ACS, IDS and CCTV system
• Contractor shall provide Installation
• Contractor shall provide Performance Verification of all installed systems.
• Contractor shall provide training