S02 - RFI Form.pdf
PDF 137 KB Posted
- Attached to
- C223--405-19-018: Bldg 31 Elevator Upgrade Federal contract opportunity
- Solicitation number
- 36C24122B0005
About this file
This document is a request for information form related to building elevator upgrades for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The RFI requests responses by April 25, 2022 for Project Title: Location: with Contract No. VA Project No. The related federal contract opportunity is solicitation number 36C24122B0005 for C223--405-19-018: Bldg 31 Elevator Upgrade to upgrade elevators in Building 31. No other details are provided on products, services, pricing, or response deadlines in the RFI or federal contract opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24122B0005 0002.docx | DOCX document | |
| 36C24122B0005 0001.docx | DOCX document | |
| S06 - SOW - BLDG 31 Elevator Upgrade - Rev 1.pdf | ||
| S02 - PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| 36C24122B0005_1.docx | DOCX document | |
| S02 - VA Elevator Design Manual - 01 NOV 2021.pdf | ||
| S02 - Wage Determination - VT20220023 - 03182022.pdf | ||
| S02 - VHA Master Specification Sections.pdf | ||
| S02 - SOW - BLDG 31 Elevator Upgrade.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA
REQUEST FOR INFORMATION
NO.
PROJECT TITLE:
LOCATION:
CONTRACT NO.:
VA PROJECT NO.:
DATE REQUIRED:
TO: CC:
Date:
REQUEST SUBJECT:
Requested By:
Signed
RESPONSE:
This response does not constitute a change to the contract and is not an authorization to the contractor to proceed with any work that modifies the contract price or the time of performance. If the contractor believes that this response modifies any portion of the contract, the contractor shall make timely notice to the Contracting Officer and await the Contracting Officer’s direction before proceeding with any work that the contractor believes is a modification to the contract.
This response may constitute a change to the contract documents. Do not proceed with any work indicated in this response that changes the contract documents until directed in writing by the Contracting Officer.
Response By: Concur:
Signed: Signed:
Date: Date:
MON, APR 25, 2022 @ 1:00PM EST