S02 - Attachment 02 - Specifications (462 pages).docx
DOCX document 4 MB Posted
- Attached to
- Z2DA--Correct Tunnel Water Protection Federal contract opportunity
- Solicitation number
- 36C24822R0156
About this file
This document provides specifications for a federal construction contract opportunity to perform groundwater intrusion protection work in a pedestrian tunnel at the Malcom Randall VA Medical Center in Gainesville, Florida. The specifications include 462 pages detailing the scope of work, which involves general construction, alterations, drainage improvements, below-grade waterproofing and joint sealing, interior finish replacement, and necessary demolition. The specifications also require electrical work, civil work including a wellpoint system and storm drainage modifications, and provide pricing alternatives that could delete or replace certain flooring and roofing materials. Bidders are invited to an on-site project visit scheduled for August 15, 2022 at 10:00 AM to meet at the listed medical center address.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - Attachment 09 - Past Performance Survey (3 pages).docx | DOCX document | |
| S02 - Attachment 07 - Experience Modification Rate (EMR) (1 page).docx | DOCX document | |
| S02 - Attachment 10 - Letter of Commitment Key Subcontractors (1 page).pdf | ||
| S02 - Attachment 08 - Past Performance Questionnaire (3 pages).docx | DOCX document | |
| S02 - Attachment 06 - Price Matrix (1 page).xlsx | XLSX spreadsheet | |
| S02 - Attachment 01 - Drawings (26 pages).pdf | ||
| S02 - Attachment 11 - Subcontractor Past Performance Consent Form (1 page).docx | DOCX document | |
| S02 - Attachment 05 - Wage Determination (5 pages).pdf | ||
| S02 - Attachment 04 - VHA Supplemental Contract Requirements for Combatting COVID-19 (2 pages).docx | DOCX document | |
| S02 - Attachment 03 - LOS Certification (1 page).docx | DOCX document | |
| 36C24822R0156 (BB Correct Tunnel).docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Groundwater Intrusion Protection of Tunnel at the Malcom Randall VA Medical Center Gainesville, Florida
100% Specifications
February 28, 2022 Project Number: 573-18-604
DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
DIVISION 00 - SPECIAL SECTIONS
| 00 01 15 |
| List of Drawing |
| 05-20 |
DIVISION 01 - GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 03-20 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 05-17 |
| 01 35 26 |
| Safety Requirements |
| 07-20 |
| 01 42 19 |
| Reference Standards |
| 09-19 |
| 01 45 00 |
| Quality Control |
| 05-20 |
| 01 45 29 |
| Testing Laboratory Services |
| 11-18 |
| 01 45 35 |
| Special Inspections |
| 03-19 |
| 01 57 19 |
| Temporary Environmental Controls |
| 01-11 |
| 01 58 16 |
| Temporary Interior Signage |
| 07-15 |
| 01 74 19 |
| Construction Waste Management |
| 09-13 |
| 01 81 13 |
| Sustainable Construction Requirements |
| 10-17 |
| 01 91 00 |
| General Commissioning Requirements |
| 10-15 |
DIVISION 02 – EXISTING CONDITIONS
| 02 41 00 |
| Demolition |
| 08-17 |
| 02 82 13.19 |
| Asbestos Floor Tile and Mastic Abatement |
| 09-15 |
| 02 82 13.19.1 |
| Asbestos Abatement Drawing |
DIVISION 03 – CONCRETE
| 03 30 50 |
| Surface Preparation for Patching |
| 03 30 53 |
| (Short-Form) Cast-in-Place Concrete |
| 02-16 |
| 03 32 00 |
| Concrete Repair Materials |
| 03 64 00 |
| Hydrophilic Injection Grouting |
| 03 74 00 |
| Epoxy Injection |
DIVISION 04 – MASONRY
NOT REQUIRED
DIVISION 05 – METALS
NOT REQUIRED
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
NOT REQUIRED
Project No.: 573-18-604 06-01-20
Groundwater Intrusion Protection of Tunnel Malcom Randall VA Medical Center Gainesville, FL 00 01 10 - 1
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
| 07 01 50.19 |
| Preparation for Re-Roofing |
| 02-16 |
| 07 05 00 |
| Exterior Cleaning |
| 07 14 16 |
| Cold Fluid-Applied Waterproofing |
| 07 18 13 |
| Pedestrian Traffic Coatings |
| 05-15 |
| 07 22 00 |
| Roof and Deck Insulation |
| 02-16 |
| 07 52 16.11 |
| Cold Adhesive Styrene-Butadiene-Styrene Modified |
Bituminous Membrane Roofing 08-16
| 07 54 23 |
| Thermoplastic Polyolefin (TPO) Roofing (Alternate) |
| 01-21 |
| 07 60 00 |
| Flashing and Sheet Metal |
| 09-18 |
| 07 84 00 |
| Firestopping |
| 02-16 |
| 07 92 00 |
| Joint Sealants |
| 10-17 |
| 07 95 13 |
| Expansion Joint Cover Assemblies |
| 02-16 |
DIVISION 08 - OPENINGS
| 08 71 00 |
| Door Hardware |
| 01-21 |
DIVISION 09 – FINISHES
| 09 05 16 |
| Subsurface Preparation for Floor Finishes |
| 02-15 |
| 09 06 00 |
| Schedule for Finishes |
| 04-15 |
| 09 22 16 |
| Non-Structural Metal Framing |
| 06-18 |
| 09 23 00 |
| Gypsum Plastering |
| 10-15 |
| 09 24 00 |
| Portland Cement Plastering |
| 10-15 |
| 09 29 00 |
| Gypsum Board |
| 04-20 |
| 09 51 00 |
| Acoustical Ceilings |
| 12-18 |
| 09 65 13 |
| Resilient Base and Accessories (Alternate) |
| 02-16 |
| 09 65 19 |
| Resilient Tile Flooring (Alternate) |
| 05-18 |
| 09 67 23.50 |
| Resinous (Epoxy Terrazzo) Flooring (RES-5) |
| 07-14 |
| 09 91 00 |
| Painting |
| 01-16 |
| 09 96 53 |
| Elastomeric Coatings |
DIVISION 10 – SPECIALTIES
NOT REQUIRED
DIVISION 11 – EQUIPMENT
NOT REQUIRED
DIVISION 12 – FURNISHINGS
NOT REQUIRED
DIVISION 13 - SPECIAL CONSTRUCTION
NOT REQUIRED
DIVISION 14– CONVEYING EQUIPEMENT
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
NOT REQUIRED
DIVISION 21- FIRE SUPPRESSION
NOT REQUIRED
DIVISION 22 – PLUMBING
NOT REQUIRED
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
NOT REQUIRED
DIVISION 25 – INTEGRATED AUTOMATION
NOT REQUIRED
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 01-16 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 01-17 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 01-17 |
| 26 05 33 |
| Raceway and Boxes for Electrical Systems |
| 01-18 |
| 26 05 41 |
| Underground Electrical Construction |
| 01-17 |
| 26 29 21 |
| Enclosed Switches and Circuit Breakers |
| 01-17 |
| 26 51 00 |
| Interior Lighting |
| 01-18 |
DIVISION 27 – COMMUNICATIONS
NOT REQUIRED
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
NOT REQUIRED
DIVISION 31 – EARTHWORK
| 31 20 11 |
| Earthwork (Short Form) |
| 10-12 |
| 31 23 19 |
| Dewatering |
| 10-12 |
DIVISION 32 – EXTERIOR IMPROVEMENTS
| 32 05 23 |
| Cement and Concrete for Exterior Improvements |
| 08-16 |
| 32 12 16 |
| Asphalt Paving |
| 09-15 |
| 32 17 23 |
| Pavement Markings |
| 08-16 |
DIVISION 33 – UTILITIES
| 33 08 00 |
| Commissioning of Site Utility Systems |
| 11-16 |
| SECTION NO. |
| DIVISION AND SECTION TITLES |
| DATE |
| 33 40 00 |
| Storm Sewer Utilities |
| 12-17 |
DIVISION 34 – TRANSPORTATION
NOT REQUIRED
DIVISION 48 – Electrical Power Generation
NOT REQUIRED
SECTION 00 01 15 LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
| G001 | COVER SHEET |
| G002 | LEGENDS, ABBREVIATIONS AND NOTES |
| G003 | PHASING PLAN |
| LS101 | LIFE SAFETY PLAN |
SURVEY
RLS101 TUNNEL SURVEY
CIVIL
| C-010 | GENERAL NOTES AND LEGEND |
| C-050 | DEMOLITION & EROSION CONTROL PLAN |
| C-090 | MASTER SITE PLAN |
| C-200 | GRADING, DRAINAGE & UTILTY PLAN |
ARCHITECTURAL
| AD101 | TUNNEL DEMOLITION PLAN |
| AD102 | MRI BUILDING 28 UPPER LEVEL/ROOF AND LOWER LEVEL DEMOLITION PLANS |
| AD111 | TUNNEL REFLECTED CEILING DEMOLITION PLAN |
| AE101 | OVERALL TUNNEL PLAN AND SECTIONS |
| AE101.A | SOUTH TUNNEL PLAN AND SECTIONS |
| AE101.B | NORTH TUNNEL PLAN AND SECTIONS |
| AE111 | TUNNEL REFLECTED CEILING PLAN |
| AE201 | MRI BUILDING NORTH & EAST EXTERIOR ELEVATIONS |
| AE202 | MRI BUILDING SOUTH & WEST EXTERIOR ELEVATIONS |
| AE301 | MRI BUILDING SECTIONS |
| AE351 | MRI BUILDING WALL SECTIONS |
| AE401 | ENLARGED MRI BUILDING 28 UPPER LEVEL/ROOF PLAN |
| AE501 | TUNNEL AND MRI BUILDING DETAILS |
| AE502 | MRI BUILDING ROOF DETAILS |
05-01-20
00 01 15 - 1
ELECTRICAL
| E001 | LEGEND, NOTES AND SCHEDULES |
| E101 | ELECTRICAL SITE PLAN |
| E102 | TUNNEL DEMOLITION PLAN – ELECTRICAL |
| E103 | TUNNEL NEW WORK PLAN – ELECTRICAL |
- - - E N D - - -
SECTION 01 00 00 GENERAL REQUIREMENTS
TABLE OF CONTENTS
| 1.1 SAFETY REQUIREMENTS | 1 |
| 1.2 GENERAL INTENTION | 1 |
| 1.3 STATEMENT OF BID ITEM(S) | 1 |
| 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR | 2 |
| 1.5 CONSTRUCTION SECURITY REQUIREMENTS | 2 |
| 1.6 OPERATIONS AND STORAGE AREAS | 4 |
| 1.7 ALTERATIONS | 11 |
| 1.8 DISPOSAL AND RETENTION | 12 |
| 1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS | 13 |
| 1.10 RESTORATION | 13 |
| 1.11 PHYSICAL DATA | 15 |
| 1.12 PROFESSIONAL SURVEYING SERVICES | 15 |
| 1.13 LAYOUT OF WORK | 15 |
| 1.14 AS-BUILT DRAWINGS | 17 |
| 1.15 WARRANTY MANAGEMENT | 17 |
| 1.16 USE OF ROADWAYS | 23 |
| 1.17 TEMPORARY TOILETS | 23 |
| 1.18 AVAILABILITY AND USE OF UTILITY SERVICES | 23 |
| 1.19 INSTRUCTIONS | 25 |
Groundwater Intrusion Protection of Tunnel Malcom Randall VA Medical Center Gainesville, FL i
03-01-20
1.1 SAFETY REQUIREMENTS
SECTION 01 00 00 GENERAL REQUIREMENTS
3-01-20
01 00 00 - 10
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for _Groundwater Intrusion Protection of Tunnel, Malcom Randall VA Medical Center, Gainesville, Florida as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
C. Offices of _Toland Mizell Molnar, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the Contracting Officer Representative in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the Contracting Officer Representative.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Malcom Randall VA Medical Center, Groundwater Intrusion Protection of Tunnel. Work includes general construction, alterations, walks, grading, drainage, building envelope and below grade waterproofing and joint sealing, interior finish replacement and necessary removal of existing construction and certain other items.
B. ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including wellpoint system power and pedestrian tunnel light fixture replacement.
C. ITEM III, Civil Work: Work includes all labor, material, equipment and supervision to perform the required civil construction work on this project including wellpoints, storm draining modification and connection to the campus stormwater managements system and finish grading.
D. ALTERNATE NO. 1: Delete all costs of work to install Resinous (Epoxy Terrazzo) Flooring (RES-5) in the tunnel and MRI entrance alcove and add all cost of work to install LVT flooring.
E. ALTERNATE NO. 2: Delete all costs of work to install Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing and add all costs of work to install Thermoplastic Polyolefin (TOP) Roofing.
F. ALTERNATE NO. 3: Delete all costs to install the permanent wellpoint system.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub- contractors working on the project and their employees also comply with these regulations.
B. Security Procedures
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting Officer Representative for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General Contractor and its employees for parking in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing materials shall be as determined by the Contracting Officer Representative.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by Contracting Officer Representative where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the Contracting Officer Representative to ensure that no lapses in operation occur. The phasing plan is conceptual. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measures to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
a. Work within the Tunnel.
b. Work within the Tunnel emergency stairwell.
c. Work within the MRI Building entrance alcove off the tunnel.
d. Interior and exterior work for the MRI Building.
e. Site drainage, grading and wellpoint system work.
2. To ensure such executions, Contractor shall furnish the Contracting Officer Representative (COR) with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the Contracting Officer Representative two weeks in advance of the proposed date of starting work in each specific area of the site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, Contracting Officer Representative and Contractor, as follows:
a. Phase I: All work within the tunnel in four separate areas between the VA main hospital building and the MRI building entrance.
1) Phase IA: from the south tunnel entrance up to 12 feet south of and 12 feet north of the existing south sliding glass doors. Remove and store existing furniture for reinstallation following completion of Phase 1A work. Coordinate with the COR.
2) Phase IB: From 35 feet south of and 12 feet north of the existing south fire barrier.
3) Phase IC: From 12 feet north and south of the existing 1/2- inch floor joint between the south fire door and the MRI building entrance.
4) Phase ID: From the MRI entrance to the emergency exit stair. work will also include the repair of the water damaged gypsum board ceiling in the MRI waiting room.
5) Commence Phase II work upon completion of Phase I work and acceptance and written release from the COR to proceed.
6) Temporary Construction barriers erected at the north and south limits of the Phase I work areas will remain in place until completion of the Phase II north tunnel work and Phase III work.
b. Phase II: All work within the tunnel from the tunnel emergency exit stair to the north exit into UF Shands and all work within and along the west half of the tunnel south of the MRI entrance between completed Phase I work areas.
1) The construction barrier between Phase II and Phase III work area will be erected as located on the Phasing Plan to allow the existing light fixtures to remain in place outside the phase 2 work area and provide for patient, staff and visitor traffic between the VA main hospital building and the MRI building entrance.
2) Commence Phase III work upon completion of Phase II work and acceptance and written release from the COR to proceed.
c. Phase III: All work within and along the east half of the tunnel south of the MRI entrance between completed Phase 1 work areas.
1) Upon completion of Phase III tunnel work and acceptance by the VA, the temporary construction barriers and doors separating Phase 3 work areas from Phase I and Phase II work areas will be removed.
2) Flooring and ceiling work under and above the barrier will be installed and finished to match adjacent finishes. Existing walls intersecting with temporary construction barriers will be repaired and refinished to match adjacent finishes.
3. Staff, patient and visitor access through the tunnel from the basement level of the medical center’s main hospital building to the MRI building entrance shall be maintained Monday through Friday from 6:30 am to 9:30 pm.
4. The conceptual phasing plan indicates four °areas in Phase 1. Abatement work in Phase 1 will be performed during weekends from 11 pm Friday until 5 am Monday. Abatement work in Phase 2 and Phase 3 will be performed during weekends from 11 pm Friday until 5 am Monday or Monday through Friday from 11 pm until 5 am. Abatement work schedules will be reviewed and approved by the COR. Temporary construction barriers and doors separating staff, visitor and patient areas from construction areas, will be erected and sealed prior to asbestos abatement commencement.
H. Part of the pedestrian tunnel will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to Proceed and turned over to Contractor.
I. The MRI building will be occupied during performance of work. Staff and patient access to the MRI Building will be provided through the pedestrian tunnel Monday through Friday from 6:30 am until 9:30 pm.
1. MRI Building No. 28 and the pedestrian tunnel connecting the VA Medical Center and UF Shand and providing access to the MRI Building will be occupied by Medical Center personnel for various periods as listed below:
| AREA | PERIOD | |
| (a)MRI Building | 6:30 am – 9:30 pm (b)MRI tunnel entrance | 6:30 am – 9:30 pm |
Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting, etc., to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.
J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm
(one inch) above grade. Remove the fence when directed by Contracting Officer Representative.
K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4°C (40°F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
L. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Contracting Officer Representative.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of Contracting Officer Representative. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS for additional requirements.
2. Contractor shall submit a request to interrupt any such services to Contracting Officer Representative, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the Contracting Officer Representative.
5. In case of a contract construction emergency, service will be interrupted on approval of Contracting Officer Representative. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the Contracting Officer Representative.
O. Coordinate the work for this contract with other construction operations as directed by Contracting Officer Representative. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the Contracting Officer Representative of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of buildings.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and Contracting Officer Representative.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of Contracting Officer Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and Contracting Officer Representative together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by Contracting Officer Representative.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer. The Contractor shall remove all tree stumps within excavation areas.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the Contracting Officer Representative. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the Contracting Officer Representative before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 PHYSICAL DATA
A. Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of, or conclusion drawn from the data or information by the Contractor.
1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by ECS Florida, LLC.
(FAR 52.236-4)
B. A copy of the ground water levels and general soil profile report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical Center, 1601 Archer Road, Gainesville, FL and shall be considered part of the contract documents.
C. Government does not guarantee that other materials will not be encountered, nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of
Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.12 PROFESSIONAL SURVEYING SERVICES
A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.13 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
B. Establish and plainly mark lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for the work are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the Contracting Officer Representative before any work (such as utilities and other major controlling features) is placed.
D. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to Resident Engineer Contracting Officer Representative.
E. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of Article "Professional Surveying Services".
1.14 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the Contracting Officer Representative’s review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the Contracting Officer Representative within 15 calendar days after each completed phase and after the acceptance of the project by the Contracting Officer Representative.
D. Paragraphs A, B, and C shall also apply to all shop drawings.
1.15 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance Bond: The Performance Bond must remain effective throughout the construction period.
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.
This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service Requirements:
E. Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
4. The “Construction Warranty Service Priority List” is as follows:
a. Code 1-Life Safety Systems
1) Fire suppression systems.
2) Fire alarm system(s).
b. Code 1-Air Conditioning Systems
1) Air conditioning leak in part of the building, if causing damage.
c. Code 1 Doors
1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
d. Code 3-Doors
1) Interior/exterior personnel doors or hardware not functioning properly.
e. Code 1-Electrical
1) Power failure (entire area or any building operational after 1600 hours).
2) Security lights.
3) Smoke detectors.
f. Code 2-Electrical
1) Power failure (no power to a room or part of building).
2) Receptacles and lights not operational (in a room or part of building).
g. Code 3-Electrical
1) Exterior lights not operational.
h. Code 1-Gas
1) Leaks and pipeline breaks.
i. Code 1-Heat
1) Power failure affecting heat.
j. Code 1-Plumbing
1) Hot water heater failure.
2) Leaking water supply pipes.
k. Code 3-Interior
1) Floors damaged.
2) Paint chipping or peeling.
l. Code 1-Roof Leaks
1) Damage to property is occurring.
m. Code 3
1) All work not listed above.
F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.
Type of Product/Material
Model Number
Serial Number
Contract Number
Warranty Period
Inspector’s Signature
Construction Contractor
Address
Telephone Number
Warranty Contact
Address
Telephone Number
Warranty Response Time Priority Code
1.16 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical Center property and, when authorized by the Contracting Officer Representative, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
1.17 TEMPORARY TOILETS
A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by Contracting Officer Representative, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.
1.18 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges.
This is the start of the file's text. The full file is on GovTribe.