S02 - Attachment 01 - Drawings (26 pages).pdf
PDF 13 MB Posted
- Attached to
- Z2DA--Correct Tunnel Water Protection Federal contract opportunity
- Solicitation number
- 36C24822R0156
About this file
This document contains details for a federal contract solicitation for construction services. The solicitation seeks bids for a project to correct tunnel water protection at the Gainesville Veterans Affairs Medical Center. Interested parties should attend a mandatory site visit on August 15, 2022 at 10:00am at the specified address. Bidders will need to park in one of the medical center's parking garages and check in at the basement entrance screening area. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The solicitation number is 36C24822R0156 and includes 26 pages of associated drawings as an attachment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 - Attachment 09 - Past Performance Survey (3 pages).docx | DOCX document | |
| S02 - Attachment 07 - Experience Modification Rate (EMR) (1 page).docx | DOCX document | |
| S02 - Attachment 02 - Specifications (462 pages).docx | DOCX document | |
| S02 - Attachment 10 - Letter of Commitment Key Subcontractors (1 page).pdf | ||
| S02 - Attachment 08 - Past Performance Questionnaire (3 pages).docx | DOCX document | |
| S02 - Attachment 06 - Price Matrix (1 page).xlsx | XLSX spreadsheet | |
| S02 - Attachment 11 - Subcontractor Past Performance Consent Form (1 page).docx | DOCX document | |
| S02 - Attachment 05 - Wage Determination (5 pages).pdf | ||
| S02 - Attachment 04 - VHA Supplemental Contract Requirements for Combatting COVID-19 (2 pages).docx | DOCX document | |
| S02 - Attachment 03 - LOS Certification (1 page).docx | DOCX document | |
| 36C24822R0156 (BB Correct Tunnel).docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING TITLEDWG
NO.
INDEX OF DRAWINGS
DRAWING TITLE
GROUNDWATER INTRUSION
PROTECTION OF TUNNEL
PROJECT NO. 573-18-604
100% SUBMITTAL
MALCOLM RANDALL VAMC
GAINESVILLE, FLORIDA
FEBRAURY 28, 2022
DWG
NO.
BLDG 28
MRI
MALCOLM
RANDALL
VAMC
UF SHANDS
HOSPITAL
EXIT
STAIRS
U N D E R G R O U N D T
U N N E L
ARCHER ROAD
COVER SHEET
G001
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
100% SUBMITTAL
NON-SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
GROUNDWATER INTRUSION
PROTECTION OF TUNNEL
Malcolm Randall VAMC Gainesville, FL
573-18-604
TUNNEL & BLDG 28
Project Director
FEBRUARY 28, 2022Revisions: Date:
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
AREA MAP
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
AE101
AutoCAD SHX Text
AE301
AutoCAD SHX Text G001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text
APPROX NORTH
AutoCAD SHX Text G002
AutoCAD SHX Text
LEGENDS, ABBREVIATIONS AND NOTES
AutoCAD SHX Text
AE101.A
AutoCAD SHX Text
AE101.B
AutoCAD SHX Text
SOUTH TUNNEL PLAN AND SECTIONS
AutoCAD SHX Text
ROOFING DETAILS
AutoCAD SHX Text
OVERALL TUNNEL PLAN AND SECTIONS
AutoCAD SHX Text
AE201
AutoCAD SHX Text
NORTH TUNNEL PLAN AND SECTIONS
AutoCAD SHX Text
MRI BUILDING NORTH & EAST EXTERIOR ELEVATIONS
AutoCAD SHX Text
MRI BUILDING SECTIONS
AutoCAD SHX Text
AE501
AutoCAD SHX Text
AE502
AutoCAD SHX Text
AE351
AutoCAD SHX Text
MRI BUILDING WALL SECTIONS
AutoCAD SHX Text
DETAILS
AutoCAD SHX Text
AE401
AutoCAD SHX Text
MRI BUILDING - ROOF PLAN AND MECHANICAL ROOM PLAN
AutoCAD SHX Text
AE202
AutoCAD SHX Text
MRI BUILDING SOUTH & WEST EXTERIOR ELEVATIONS
AutoCAD SHX Text
LS101
AutoCAD SHX Text
LIFE SAFETY PLAN
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text E001
AutoCAD SHX Text
LEGEND, SCHEDULES, AND DETAILS
AutoCAD SHX Text E101
AutoCAD SHX Text
ELECTRICAL SITE PLAN
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text E102
AutoCAD SHX Text
TUNNEL DEMOLITION PLAN - ELECTRICAL
AutoCAD SHX Text E103
AutoCAD SHX Text
TUNNEL NEW WORK PLAN - ELECTRICAL
AutoCAD SHX Text G003
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text
AD101
AutoCAD SHX Text
TUNNEL DEMOLITION PLAN
AutoCAD SHX Text
AE111
AutoCAD SHX Text
TUNNEL REFLECTED CEILING PLAN
AutoCAD SHX Text
AD111
AutoCAD SHX Text
TUNNEL REFLECTED CEILING DEMOLITION PLAN
AutoCAD SHX Text
AD102
AutoCAD SHX Text
MRI BUILDING 28 DEMOLITION PLANS
AutoCAD SHX Text C-200
AutoCAD SHX Text
GRADING, DRAINAGE, & UTILITY PLAN
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text C-010
AutoCAD SHX Text
GENERAL NOTES AND LEGEND
AutoCAD SHX Text C-090
AutoCAD SHX Text
MASTER SITE PLAN
AutoCAD SHX Text C-050
AutoCAD SHX Text
DEMOLITION & EROSION CONTROL PLAN
ARCHITECTURAL LEGENDMATERIAL LEGEND ARCHITECTURAL GENERAL NOTESGENERAL PROJECT NOTES ARCHITECTURAL ABBREVIATIONS
LEGENDS, ABBREVIATIONS AND
NOTES
G002
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
100% SUBMITTAL
NON-SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
GROUNDWATER INTRUSION
PROTECTION OF TUNNEL
Malcolm Randall VAMC Gainesville, FL
573-18-604
TUNNEL & BLDG 28
Project Director
FEBRUARY 28, 2022Revisions: Date:
AutoCAD SHX Text A
AutoCAD SHX Text + 0'-6"
AutoCAD SHX Text F.E.C.
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
ROOM NAME AND NUMBER
AutoCAD SHX Text
DOOR NUMBER
AutoCAD SHX Text
KEY NOTE
AutoCAD SHX Text
WINDOW TYPE
AutoCAD SHX Text
PARTITION TYPE
AutoCAD SHX Text
DETAIL CALLOUT
AutoCAD SHX Text
DETAIL NUMBER
AutoCAD SHX Text
SHEET WHERE DETAIL IS DRAWN
AutoCAD SHX Text
SECTION CALLOUT
AutoCAD SHX Text
VERTICAL ELEVATION
AutoCAD SHX Text
COLUMN CENTERLINE DESIGNATION
AutoCAD SHX Text
DEMOLITION NOTE
AutoCAD SHX Text
SECTION NUMBER
AutoCAD SHX Text
SHEET WHERE SECTION IS DRAWN
AutoCAD SHX Text
EXTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text
AutoCAD SHX Text
ROOM
AutoCAD SHX Text
NAME
AutoCAD SHX Text
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text A301
AutoCAD SHX Text
AutoCAD SHX Text A201
AutoCAD SHX Text
AutoCAD SHX Text
GA4
AutoCAD SHX Text
EARTH
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
MORTAR, STUCCO CEMENT PLASTER
AutoCAD SHX Text
CONCRETE MASONRY UNIT
AutoCAD SHX Text
SECTION
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
INSULATION RIGID
AutoCAD SHX Text
BRICK
AutoCAD SHX Text
WOOD (ROUGH)
AutoCAD SHX Text
WOOD FINISH
AutoCAD SHX Text
INTERIOR ELEVATION CALLOUT
AutoCAD SHX Text
ELEVATION NUMBER
AutoCAD SHX Text
SHEET WHERE ELEVATION IS DRAWN
AutoCAD SHX Text A401
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A. DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: DIMENSIONS, UNLESS OTHERWISE INDICATED, ARE TO: FACE OF EXISTING WALL SURFACE FACE OF MASONRY FACE OF WALL STUDS TOP OF SLAB TOP OF MASONRY ALIGN WALLS WITH EXISTING WALLS WHERE NOT OTHERWISE INDICATED. B. COORDINATE WITH ELECTRICAL, AND CIVIL DRAWINGS FOR COORDINATE WITH ELECTRICAL, AND CIVIL DRAWINGS FOR ADDITIONAL REQUIREMENTS. COORDINATE CONDUIT ROUTING ABOVE CEILINGS. PATCH HOLES CAUSED BY THE REMOVAL OF PIPING, CONDUIT, ETC. WITH MATERIALS MATCHING EXISTING SLAB OR WALL IN STRUCTURE, MATERIAL, THICKNESS, ALIGNMENT, GRADES, AND QUALITY. C. `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, `PROVIDE' IS DEFINED AS PROVIDING MATERIALS, DELIVERY, STORAGE, HANDLING, INSTALLATION, ADJUSTMENT, AND CLEANING FOR THE ITEM INDICATED. D. SEAL PIPE PENETRATIONS THROUGH SLABS, SMOKE SEAL PIPE PENETRATIONS THROUGH SLABS, SMOKE PARTITIONS AND FIRE BARRIER WITH THE APPROPRIATE FIRESTOP TO MAINTAIN THE RATING OF THE WALL OR SLAB. SUBMIT CUT SHEETS AND SPECIFICATIONS TO THE COR FOR APPROVAL PRIOR TO INSTALLATION. PROVIDE UL LISTED ASSEMBLIES. E. COORDINATE CONTRACTOR DUMPSTER LOCATION WITH COORDINATE CONTRACTOR DUMPSTER LOCATION WITH GOVERNMENT. DUMPSTER LOCATION TO BE IDENTIFIED PRIOR TO BIDDING. F. SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT SKIM COAT ALL DAMAGED EXISTING WALL SURFACES THAT REQUIRE PAINTING. G. CONTRACTOR TO HIRE AN ABATEMENT SUB-CONTRACTOR TO CONTRACTOR TO HIRE AN ABATEMENT SUB-CONTRACTOR TO PERFORM ASBESTOS ABATEMENT WORK. ABATEMENT WORK MUST BE COORDINATED WITH THE COR PRIOR TO START OF ABATEMENT. GIVE THE COR A MINIMUM OF 14 DAYS NOTICE BEFORE START OF PLANNED ABATEMENT ACTIVITIES. SEE ABATEMENT SPECIFICATIONS AND DRAWINGS. H. COORDINATE DEMOLITION AND CONSTRUCTION WORK AMONG COORDINATE DEMOLITION AND CONSTRUCTION WORK AMONG DISCIPLINES. I. REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED REMOVED MATERIALS WHICH ARE INDICATED TO BE TURNED OVER TO THE COR SHALL BE DELIVERED BY THE CONTRACTOR TO A PLACE INDICATED BY THE COR IF APPLICABLE. J. REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE REMOVE COMPLETELY ALL MATERIALS AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR CONSTRUCTION. EDGES AND FACES OF DEMOLISHED AREAS SHALL BE REPAIRED TO ACCEPT NEAT INSTALLATION OF CONSTRUCTION OR FINISHES. WHERE EXISTING MATERIALS ARE TO BE REPLACED (WALLS, INSULATION, FLOORING, ETC.), EXISTING MATERIALS, ADHESIVES, ETC. SHALL BE REMOVED AND EXPOSED SURFACES SHALL BE PREPARED AS RECOMMENDED BY MANUFACTURER PRIOR TO INSTALLATION OF NEW MATERIALS. K. PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN PREVENT DAMAGE TO MATERIALS AND FINISHES TO REMAIN (PAINT, WALL, DOORS, ETC.). REPAIR DAMAGES FROM CONSTRUCTION ACTIVITIES TO EXISTING ITEMS TO REMAIN AT NO ADDITIONAL COST TO THE OWNER. WHERE SUCH EXPOSED MATERIALS OR FINISHES TO REMAIN ARE DAMAGED OR LEFT WITH HOLES BY CONSTRUCTION ACTIVITIES, REPAIR, REPLACE, OR INFILL SUCH MATERIALS AND FINISHES TO MATCH EXISTING IN MATERIAL, SIZE, ALIGNMENT, FINISH, COLOR, TEXTURE, AND QUALITY. EXTEND FINISHES TO LOGICAL EDGES (CHANGE OF MATERIAL OR CORNERS). ALL SHALL BE REPLACED OR REPAIRED TO MATCH OR EXCEED THE QUALITY THAT EXISTED BEFORE DAMAGE.
AutoCAD SHX Text A. THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY THE CONTRACTOR SHALL NOT ORDER OR INSTALL ANY MATERIALS OR EQUIPMENT UNTIL SUBMITTALS FOR SUCH HAVE BEEN APPROVED. B. THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING THE CONTRACTOR WILL BE RESPONSIBLE FOR ACQUIRING I.D. BADGES FOR EACH MEMBER OF HIS WORK FORCE. VALID FORMS OF I.D. ARE REQUIRED TO RECEIVE BADGES. COORDINATE WITH COR. C. ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR ANY SMOKE DETECTORS HAVING ANY POTENTIAL FOR EXPOSURE TO CONSTRUCTION SMOKE, DUST, AND DEBRIS SHALL BE SUITABLY PROTECTED TO PREVENT ACCIDENTAL ALARM. ALL SUCH ACTION MUST BE FIRST COORDINATED AND CLEARED WITH COR. ALL FIRE ALARM DEVICES SHALL BE ACTIVE WHENEVER CONTRACTOR'S FORCES ARE NOT PRESENT IN WORK AREA. D. THE CONTRACTOR MUST PROVIDE A WRITTEN FIRE SAFETY THE CONTRACTOR MUST PROVIDE A WRITTEN FIRE SAFETY CHECKLIST AT THE END OF EVERY WORK DAY TO THE COR CERTIFYING THAT ALL WORK AREAS HAVE BEEN SURVEYED AND FOUND TO BE SECURE, SAFE, AND FREE OF ANY FLAMMABLE LIQUIDS. E. CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTOR SHALL COORDINATE ONLY WITH THE COR AND CONTRACTING OFFICER. F. SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 SEE SPECIFICATION SECTIONS 01 00 00 AND 01 35 26 FOR INTERIM LIFE SAFETY MEASURES. G. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS AND ALL CONTRACTOR SHALL FIELD VERIFY DIMENSIONS AND ALL EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK. EXISTING CONDITIONS ARE BASED ON GOVERNMENT FURNISHED RECORD DRAWINGS AND LIMITED FIELD INVESTIGATION. NOTIFY COR OF ANY DISCREPANCIES. H. ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT ALL FINISH COLORS TO BE SELECTED BY COR WHERE NOT OTHERWISE INDICATED. I. SEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL SEAL ALL PLATES, COVERS, DEVICES, AND GENERAL WALL AND CEILING PENETRATIONS IN ALL SPACES, TYPICAL.
AutoCAD SHX Text
AIR CONDITIONING
AutoCAD SHX Text
ACOUSTICAL CEILING TILE
AutoCAD SHX Text
ABOVE FINISH FLOOR
AutoCAD SHX Text
ALUMINUM
AutoCAD SHX Text
BATT INSULATION
AutoCAD SHX Text
BOTTOM OF
AutoCAD SHX Text
CEMENTITIOUS BACKER BOARD
AutoCAD SHX Text
CEMENTITIOUS CRYSTALLINE WATERPROOFING
AutoCAD SHX Text
COLD-FORMED METAL FRAMING
AutoCAD SHX Text
CORNER GUARD
AutoCAD SHX Text
CENTERLINE
AutoCAD SHX Text
CERAMIC MOSAIC TILE
AutoCAD SHX Text
CONCRETE MASONRY UNIT
AutoCAD SHX Text
CASED OPENING
AutoCAD SHX Text
COMMUNICATION
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONTINUOUS
AutoCAD SHX Text
CONTRACTING OFFICER'S REPRESENTATIVE
AutoCAD SHX Text
CERAMIC TILE
AutoCAD SHX Text
CERAMIC TILE BASE
AutoCAD SHX Text
CARPET
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
ELECTRIC DRINKING FOUNTAIN
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text
EQUAL
AutoCAD SHX Text
EXPOSED STRUCTURE
AutoCAD SHX Text
ET CETERA
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
EXPOSED
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FIRE EXTINGUISHER CABINET
AutoCAD SHX Text
FIRE HOSE CABINET
AutoCAD SHX Text
FINISHED FLOOR
AutoCAD SHX Text
FINISH
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FACE OF
AutoCAD SHX Text
FIELD VERIFY (PRIOR TO ORDERING OR CUTTING)
AutoCAD SHX Text
FABRIC WALLCOVERING
AutoCAD SHX Text
GAGE
AutoCAD SHX Text
GRANITE
AutoCAD SHX Text
GYPSUM WALL BOARD
AutoCAD SHX Text
HANDICAPPED
AutoCAD SHX Text
HOLLOW METAL
AutoCAD SHX Text
HIGH-PRESSURE DECORATIVE LAMINATE
AutoCAD SHX Text
HEATING VENTILATION AND AIR-CONDITIONING
AutoCAD SHX Text
MATERIAL
AutoCAD SHX Text
MAXIMUM
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
MASONRY OPENING
AutoCAD SHX Text
METAL
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
ON CENTER
AutoCAD SHX Text
OPPOSITE HAND
AutoCAD SHX Text
PLASTER
AutoCAD SHX Text
PLASTIC LAMINATE
AutoCAD SHX Text
PRESSURE TREATED
AutoCAD SHX Text
PAIR
AutoCAD SHX Text
PAINT
AutoCAD SHX Text
QUARRY TILE
AutoCAD SHX Text
RESILIENT BASE
AutoCAD SHX Text
REFRIGERATOR
AutoCAD SHX Text
REQUIRED
AutoCAD SHX Text
RESINOUS FLOORING
AutoCAD SHX Text
RESINOUS EPOXY WALL - CEILING
AutoCAD SHX Text
ROUGH OPENING
AutoCAD SHX Text
RUBBER FLOORING
AutoCAD SHX Text
RECESSED PAPER HOLDER
AutoCAD SHX Text
SEALED HIGH BUILD GLAZED COATING
AutoCAD SHX Text
SOAP DISPENSER
AutoCAD SHX Text
SOLID CORE WOOD
AutoCAD SHX Text
SIMILAR
AutoCAD SHX Text
SANITARY NAPKIN DISPENSER
AutoCAD SHX Text
SPECIAL FACED
AutoCAD SHX Text
STAINLESS STEEL
AutoCAD SHX Text
STEEL
AutoCAD SHX Text
SHEET VINYL
AutoCAD SHX Text
SOLID VINYL TILE
AutoCAD SHX Text
TO BE DETERMINED
AutoCAD SHX Text
TELEPHONE
AutoCAD SHX Text
TOP OF
AutoCAD SHX Text
TOILET PAPER
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
UNLESS NOTED OTHERWISE
AutoCAD SHX Text
VINYL COMPOSITION TILE
AutoCAD SHX Text
VINYL WALL COVERING
AutoCAD SHX Text
WALL COVERING
AutoCAD SHX Text
WATERPROOFING
AutoCAD SHX Text
WOOD
AutoCAD SHX Text
AC
AutoCAD SHX Text
ACT
AutoCAD SHX Text
AFF
AutoCAD SHX Text
ALUM
AutoCAD SHX Text
BATT
AutoCAD SHX Text
BO
AutoCAD SHX Text
CBB
AutoCAD SHX Text
CCW
AutoCAD SHX Text
CFMF
AutoCAD SHX Text
CG
AutoCAD SHX Text C
AutoCAD SHX Text
CMT
AutoCAD SHX Text
CMU
AutoCAD SHX Text
CO
AutoCAD SHX Text
COMM
AutoCAD SHX Text
CONC
AutoCAD SHX Text
CONT
AutoCAD SHX Text
COR
AutoCAD SHX Text
CT
AutoCAD SHX Text
CTB
AutoCAD SHX Text
CP
AutoCAD SHX Text
DIA
AutoCAD SHX Text
EDF
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
EQ
AutoCAD SHX Text
ES
AutoCAD SHX Text
ETC
AutoCAD SHX Text
EXIST
AutoCAD SHX Text
EXP
AutoCAD SHX Text
FD
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FHC
AutoCAD SHX Text
FF
AutoCAD SHX Text
FIN
AutoCAD SHX Text
FLR
AutoCAD SHX Text
FO
AutoCAD SHX Text
FV
AutoCAD SHX Text
FWC
AutoCAD SHX Text
GA
AutoCAD SHX Text
GRA
AutoCAD SHX Text
GWB
AutoCAD SHX Text
HC
AutoCAD SHX Text
HM
AutoCAD SHX Text
HPDL
AutoCAD SHX Text
HVAC
AutoCAD SHX Text
MATL
AutoCAD SHX Text
MAX
AutoCAD SHX Text
MECH
AutoCAD SHX Text
MFR
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MO
AutoCAD SHX Text
MTL
AutoCAD SHX Text
NIC
AutoCAD SHX Text
NTS
AutoCAD SHX Text
OC
AutoCAD SHX Text
OH
AutoCAD SHX Text
PLS
AutoCAD SHX Text
PLAM
AutoCAD SHX Text
PT
AutoCAD SHX Text
PR
AutoCAD SHX Text P
AutoCAD SHX Text
QT
AutoCAD SHX Text
RB
AutoCAD SHX Text
REF
AutoCAD SHX Text
REQD
AutoCAD SHX Text
RES
AutoCAD SHX Text
RES-W
AutoCAD SHX Text
RO
AutoCAD SHX Text
RF
AutoCAD SHX Text
RPH
AutoCAD SHX Text
SC
AutoCAD SHX Text
SD
AutoCAD SHX Text
SCW
AutoCAD SHX Text
SIM
AutoCAD SHX Text
SND
AutoCAD SHX Text
SP
AutoCAD SHX Text
SS
AutoCAD SHX Text
ST
AutoCAD SHX Text
SV
AutoCAD SHX Text
SVT
AutoCAD SHX Text
TBD
AutoCAD SHX Text
TELE
AutoCAD SHX Text
TO
AutoCAD SHX Text
TP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
UNO
AutoCAD SHX Text
VCT
AutoCAD SHX Text
VWC
AutoCAD SHX Text
WC
AutoCAD SHX Text
WP
AutoCAD SHX Text
WD
AutoCAD SHX Text L
AutoCAD SHX Text
SEALED CONCRETE
AutoCAD SHX Text
SCONC
AutoCAD SHX Text
PORCELAIN TILE
AutoCAD SHX Text
POR
AutoCAD SHX Text
CONTROL JOINT
AutoCAD SHX Text
CJ
AutoCAD SHX Text
GALVANIZED METAL STUD(S)
AutoCAD SHX Text
GMS
AutoCAD SHX Text
OPEN TO STRUCTURE
AutoCAD SHX Text
OTS
AutoCAD SHX Text
SOLID SURFACE MATERIAL
AutoCAD SHX Text
SSM
AutoCAD SHX Text
CARPET TILE
AutoCAD SHX Text
CPT
AutoCAD SHX Text
FIRE EXTINGUISHER
AutoCAD SHX Text
FE
AutoCAD SHX Text
UNDERGROUND
AutoCAD SHX Text
UG
AutoCAD SHX Text
CEMENT
AutoCAD SHX Text
CEM
AutoCAD SHX Text
WATER RESISTANT
AutoCAD SHX Text
WR
AutoCAD SHX Text
DEMOLISH/DEMOLITION
AutoCAD SHX Text
DEMO
AutoCAD SHX Text
APPROXIMATE/APPROXIMATELY
AutoCAD SHX Text
APPROX
AutoCAD SHX Text
MODIFIED BITUMEN
AutoCAD SHX Text
MOD-BIT
AutoCAD SHX Text
SPECIFICATIONS
AutoCAD SHX Text
SPECS
AutoCAD SHX Text
EXPANSION JOINT
AutoCAD SHX Text
EJ
AutoCAD SHX Text
JOINT
AutoCAD SHX Text
JT
AutoCAD SHX Text
ADJACENT
AutoCAD SHX Text
ADJ
AutoCAD SHX Text
ABOVE
AutoCAD SHX Text
ABV
AutoCAD SHX Text
DOWNSPOUT
AutoCAD SHX Text
DS
AutoCAD SHX Text
MOUNTED
MTD
UF
SHANDS
N O
R T H
T U
N N
E L
S O
U T H
T U
N N
E L
M A T C
H L
IN
E
PHASE 2
PHASE 2PHASE 2
N O
R T H
T U
N N
E L
S O
U T H
T U
N N
E L
M A T C
H L
IN
E
VAMC MAIN
HOSPITAL
MRI BLDG
28 LOWER
LEVEL
PHASE
1B
PHASE 1A PHASE 1D
PHASE 2
PHASE 3
PHASE 2
PHASE 3
PHASE 2
PHASE 3
PHASE
1C
VAMC
MRI
BLDG
UF
SHANDS
ARCHER
ROAD
N O
R T H
T U
N N
E L
S O
U T H
T U
N N
E L
KEY
PLAN
match line
PHASING PLAN LEGEND
TUNNEL PHASING KEYNOTES
GENERAL PHASING NOTES TUNNEL PHASING NOTES
PHASING PLAN
G003
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
100% SUBMITTAL
NON-SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
GROUNDWATER INTRUSION
PROTECTION OF TUNNEL
Malcolm Randall VAMC Gainesville, FL
573-18-604
TUNNEL & BLDG 28
Project Director
FEBRUARY 28, 2022Revisions: Date:
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
EXIST AC UNIT A-1 ON GRADE ABOVE
AutoCAD SHX Text G003
AutoCAD SHX Text
AutoCAD SHX Text 3/32" = 1'-0"
AutoCAD SHX Text
PHASING PLAN - NORTH TUNNEL
AutoCAD SHX Text
EXIST AC UNIT A-2 ON GRADE ABOVE
AutoCAD SHX Text G003
AutoCAD SHX Text
AutoCAD SHX Text 3/32" = 1'-0"
AutoCAD SHX Text
PHASING PLAN - SOUTH TUNNEL
AutoCAD SHX Text
EXISTING TUNNEL EMERGENCY EXIT STAIRS
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
PHASE 1
AutoCAD SHX Text
EXISTING 2-HR FIRE BARRIER
AutoCAD SHX Text
PHASE 2
AutoCAD SHX Text
EXISTING CONSTRUCTION TO REMAIN
AutoCAD SHX Text
12" TUNNEL JOINT
AutoCAD SHX Text
PHASE 3
AutoCAD SHX Text
PLAN NORTH
AutoCAD SHX Text
TRUE NORTH
AutoCAD SHX Text 1-HR FIRE RATED TEMPORARY CONSTRUCTION BARRIER AND TEMPORARY 48" x 48" C LABEL/45 MINUTE DOORS
AutoCAD SHX Text 1-HR FIRE RATED TEMPORARY CONSTRUCTION BARRIER AND TEMPORARY 36"x84" PAIR C LABEL/ 45 MINUTE DOOR
AutoCAD SHX Text 1 HR FIRE RATED TEMPORARY CONSTRUCTION BARRIER 45 MINUTE C LABEL 3'-8” X 7'-0” DOOR, FRAME, X 7'-0” DOOR, FRAME, DOOR, FRAME, AND HARDWARE
AutoCAD SHX Text A. THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE THIS IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE IS A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE A CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE CONCEPTUAL PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE PHASING PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE PLAN. CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE CONTRACTOR SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE SHALL REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE REVIEW THE DRAWINGS AND SPECIFICATIONS AND INCLUDE THE DRAWINGS AND SPECIFICATIONS AND INCLUDE THE DRAWINGS AND SPECIFICATIONS AND INCLUDE DRAWINGS AND SPECIFICATIONS AND INCLUDE DRAWINGS AND SPECIFICATIONS AND INCLUDE AND SPECIFICATIONS AND INCLUDE AND SPECIFICATIONS AND INCLUDE SPECIFICATIONS AND INCLUDE SPECIFICATIONS AND INCLUDE AND INCLUDE AND INCLUDE INCLUDE INCLUDE PHASING IN HIS/HER BID IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. B. COORDINATE AND SCHEDULE ALL WORK WITH THE COR. COORDINATE AND SCHEDULE ALL WORK WITH THE COR. C. ANTICIPATED WORK AREAS ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING ANTICIPATED WORK AREAS ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING WORK AREAS ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING WORK AREAS ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING AREAS ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING AREAS ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING ARE INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING INDICATED TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING TO PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING PROVIDE FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING FOR UNINTERRUPTED VAMC MRI OPERATIONS DURING UNINTERRUPTED VAMC MRI OPERATIONS DURING UNINTERRUPTED VAMC MRI OPERATIONS DURING VAMC MRI OPERATIONS DURING VAMC MRI OPERATIONS DURING MRI OPERATIONS DURING MRI OPERATIONS DURING OPERATIONS DURING OPERATIONS DURING DURING DURING CONSTRUCTION. STAFF, PATIENT, AND VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC STAFF, PATIENT, AND VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC STAFF, PATIENT, AND VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC PATIENT, AND VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC PATIENT, AND VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC AND VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC AND VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC VISITOR ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC ACCESS MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC MUST BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC BE MAINTAINED THROUGH THE TUNNEL FROM THE VAMC MAINTAINED THROUGH THE TUNNEL FROM THE VAMC MAINTAINED THROUGH THE TUNNEL FROM THE VAMC THROUGH THE TUNNEL FROM THE VAMC THROUGH THE TUNNEL FROM THE VAMC THE TUNNEL FROM THE VAMC THE TUNNEL FROM THE VAMC TUNNEL FROM THE VAMC TUNNEL FROM THE VAMC FROM THE VAMC FROM THE VAMC THE VAMC THE VAMC VAMC VAMC MAIN BUILDING TO THE MRI BUILDING MONDAY THROUGH FRIDAY FROM 6:30 AM TO 9:30 PM. D. CONSTRUCTION WORK WITHIN PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR CONSTRUCTION WORK WITHIN PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR WORK WITHIN PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR WORK WITHIN PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR WITHIN PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR WITHIN PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR PHASES I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR I A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR A, I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR I B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR B, I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR I C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR C AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR AND I D WILL BE RESTRICTED TO WEEKEND HOURS OR I D WILL BE RESTRICTED TO WEEKEND HOURS OR I D WILL BE RESTRICTED TO WEEKEND HOURS OR D WILL BE RESTRICTED TO WEEKEND HOURS OR D WILL BE RESTRICTED TO WEEKEND HOURS OR WILL BE RESTRICTED TO WEEKEND HOURS OR WILL BE RESTRICTED TO WEEKEND HOURS OR BE RESTRICTED TO WEEKEND HOURS OR BE RESTRICTED TO WEEKEND HOURS OR RESTRICTED TO WEEKEND HOURS OR RESTRICTED TO WEEKEND HOURS OR TO WEEKEND HOURS OR TO WEEKEND HOURS OR WEEKEND HOURS OR WEEKEND HOURS OR HOURS OR HOURS OR OR OR OVERNIGHT HOURS MONDAY THROUGH FRIDAY AS STATED IN THE SPECIFICATIONS. E. CONSTRUCTION WORK WITHIN PHASES II, AND III WILL BE SCHEDULED WEEKDAYS. CONSTRUCTION WORK WITHIN PHASES II, AND III WILL BE SCHEDULED WEEKDAYS. F. EXTERIOR MRI BUILDING, TUNNEL EMERGENCY STAIR AND SITE WORK WILL RUN CONCURRENT WITH PHASES II AND III. EXTERIOR MRI BUILDING, TUNNEL EMERGENCY STAIR AND SITE WORK WILL RUN CONCURRENT WITH PHASES II AND III. G. TEMPORARY CONSTRUCTION BARRIERS AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND TEMPORARY CONSTRUCTION BARRIERS AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND CONSTRUCTION BARRIERS AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND CONSTRUCTION BARRIERS AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND BARRIERS AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND BARRIERS AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND DOORS SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND SEPARATING CONSTRUCTION AREAS FROM PATIENT, STAFF AND CONSTRUCTION AREAS FROM PATIENT, STAFF AND CONSTRUCTION AREAS FROM PATIENT, STAFF AND AREAS FROM PATIENT, STAFF AND AREAS FROM PATIENT, STAFF AND FROM PATIENT, STAFF AND FROM PATIENT, STAFF AND PATIENT, STAFF AND PATIENT, STAFF AND STAFF AND STAFF AND AND AND VISITOR OCCUPIED AREAS WITHIN THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT OCCUPIED AREAS WITHIN THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT OCCUPIED AREAS WITHIN THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT AREAS WITHIN THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT AREAS WITHIN THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT WITHIN THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT WITHIN THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT THE TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT TUNNEL AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT AND MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT MRI BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT BUILDING WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT WILL BE ERECTED IN ADVANCE OF ALL ABATEMENT BE ERECTED IN ADVANCE OF ALL ABATEMENT BE ERECTED IN ADVANCE OF ALL ABATEMENT ERECTED IN ADVANCE OF ALL ABATEMENT ERECTED IN ADVANCE OF ALL ABATEMENT IN ADVANCE OF ALL ABATEMENT IN ADVANCE OF ALL ABATEMENT ADVANCE OF ALL ABATEMENT ADVANCE OF ALL ABATEMENT OF ALL ABATEMENT OF ALL ABATEMENT ALL ABATEMENT ALL ABATEMENT ABATEMENT ABATEMENT WORK. H. ABATEMENT WORK WILL INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE ABATEMENT WORK WILL INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE WORK WILL INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE WORK WILL INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE WILL INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE WILL INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE INCLUDE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE EXISTING FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE FLOOR TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE TILE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE AND MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE MASTIC WITHIN THE TUNNEL AND AT THE MRI ENTRANCE WITHIN THE TUNNEL AND AT THE MRI ENTRANCE WITHIN THE TUNNEL AND AT THE MRI ENTRANCE THE TUNNEL AND AT THE MRI ENTRANCE THE TUNNEL AND AT THE MRI ENTRANCE TUNNEL AND AT THE MRI ENTRANCE TUNNEL AND AT THE MRI ENTRANCE AND AT THE MRI ENTRANCE AND AT THE MRI ENTRANCE AT THE MRI ENTRANCE AT THE MRI ENTRANCE THE MRI ENTRANCE THE MRI ENTRANCE MRI ENTRANCE MRI ENTRANCE ENTRANCE ENTRANCE ALCOVE. REFER TO THE SPECIFICATIONS. I. ORDER OF WORK PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION ORDER OF WORK PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION OF WORK PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION OF WORK PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION WORK PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION WORK PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION PER PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION PHASE WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION WILL BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION BE (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION (1) ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION ABATEMENT, (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION (2) DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION DEMOLITION (3) CONSTRUCTION. FOLLOWING INSPECTION (3) CONSTRUCTION. FOLLOWING INSPECTION (3) CONSTRUCTION. FOLLOWING INSPECTION CONSTRUCTION. FOLLOWING INSPECTION CONSTRUCTION. FOLLOWING INSPECTION FOLLOWING INSPECTION FOLLOWING INSPECTION INSPECTION INSPECTION AND ACCEPTANCE OF THE ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR ACCEPTANCE OF THE ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR ACCEPTANCE OF THE ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR OF THE ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR OF THE ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR THE ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR THE ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR ABATED SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR SPACE BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR BY THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR THE VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR VA SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR SAFETY OFFICER AND COR, DEMOLITION WILL COMMENCE FOR OFFICER AND COR, DEMOLITION WILL COMMENCE FOR OFFICER AND COR, DEMOLITION WILL COMMENCE FOR AND COR, DEMOLITION WILL COMMENCE FOR AND COR, DEMOLITION WILL COMMENCE FOR COR, DEMOLITION WILL COMMENCE FOR COR, DEMOLITION WILL COMMENCE FOR DEMOLITION WILL COMMENCE FOR DEMOLITION WILL COMMENCE FOR WILL COMMENCE FOR WILL COMMENCE FOR COMMENCE FOR COMMENCE FOR FOR FOR THE PHASE.
AutoCAD SHX Text PHASING I NOTES 1. PHASE I WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE PHASE I WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE I WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE I WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WILL INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE INCLUDE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE ALL WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WORK WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE WITHIN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE TUNNEL IN FOUR SEPARATE AREAS BETWEEN THE IN FOUR SEPARATE AREAS BETWEEN THE IN FOUR SEPARATE AREAS BETWEEN THE FOUR SEPARATE AREAS BETWEEN THE FOUR SEPARATE AREAS BETWEEN THE SEPARATE AREAS BETWEEN THE SEPARATE AREAS BETWEEN THE AREAS BETWEEN THE AREAS BETWEEN THE BETWEEN THE BETWEEN THE THE THE VA MAIN HOSPITAL BUILDING AND THE MRI BUILDING ENTRANCE. 2. PHASE I A: FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF PHASE I A: FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF I A: FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF I A: FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF A: FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF A: FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF FROM THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF THE SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF SOUTH TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF TUNNEL ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF ENTRANCE UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF UP TO 12 FEET SOUTH OF AND 12 FEET NORTH OF TO 12 FEET SOUTH OF AND 12 FEET NORTH OF TO 12 FEET SOUTH OF AND 12 FEET NORTH OF 12 FEET SOUTH OF AND 12 FEET NORTH OF 12 FEET SOUTH OF AND 12 FEET NORTH OF FEET SOUTH OF AND 12 FEET NORTH OF FEET SOUTH OF AND 12 FEET NORTH OF SOUTH OF AND 12 FEET NORTH OF SOUTH OF AND 12 FEET NORTH OF OF AND 12 FEET NORTH OF OF AND 12 FEET NORTH OF AND 12 FEET NORTH OF AND 12 FEET NORTH OF 12 FEET NORTH OF 12 FEET NORTH OF FEET NORTH OF FEET NORTH OF NORTH OF NORTH OF OF OF THE EXISTING SOUTH SLIDING GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR EXISTING SOUTH SLIDING GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR EXISTING SOUTH SLIDING GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR SOUTH SLIDING GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR SOUTH SLIDING GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR SLIDING GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR SLIDING GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR GLASS DOORS. REMOVE AND STORE EXISTING FURNITURE FOR DOORS. REMOVE AND STORE EXISTING FURNITURE FOR DOORS. REMOVE AND STORE EXISTING FURNITURE FOR REMOVE AND STORE EXISTING FURNITURE FOR REMOVE AND STORE EXISTING FURNITURE FOR AND STORE EXISTING FURNITURE FOR AND STORE EXISTING FURNITURE FOR STORE EXISTING FURNITURE FOR STORE EXISTING FURNITURE FOR EXISTING FURNITURE FOR EXISTING FURNITURE FOR FURNITURE FOR FURNITURE FOR FOR FOR REINSTALLATION FOLLOWING COMPLETION OF PHASE I A WORK. COORDINATE WITH THE COR. 3. PHASE I B: FROM 35 FEET SOUTH OF AND 12 FEET NORTH OF THE EXISTING SOUTH FIRE BARRIER. PHASE I B: FROM 35 FEET SOUTH OF AND 12 FEET NORTH OF THE EXISTING SOUTH FIRE BARRIER. 4. PHASE I C: FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN PHASE I C: FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN I C: FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN I C: FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN C: FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN C: FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN FROM 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN 12 FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN FEET NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN NORTH AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN AND SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN SOUTH OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN OF THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN THE EXISTING 1/2-INCH FLOOR JOINT BETWEEN EXISTING 1/2-INCH FLOOR JOINT BETWEEN EXISTING 1/2-INCH FLOOR JOINT BETWEEN 1/2-INCH FLOOR JOINT BETWEEN 1/2-INCH FLOOR JOINT BETWEEN FLOOR JOINT BETWEEN FLOOR JOINT BETWEEN JOINT BETWEEN JOINT BETWEEN BETWEEN BETWEEN THE SOUTH FIRE DOOR AND THE MRI BUILDING ENTRANCE. 5. PHASE I D: FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE PHASE I D: FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE I D: FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE I D: FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE D: FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE D: FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE FROM THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE MRI ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE ENTRANCE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE TO THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE EMERGENCY EXIT STAIR. WORK WILL ALSO INCLUDE THE EXIT STAIR. WORK WILL ALSO INCLUDE THE EXIT STAIR. WORK WILL ALSO INCLUDE THE STAIR. WORK WILL ALSO INCLUDE THE STAIR. WORK WILL ALSO INCLUDE THE WORK WILL ALSO INCLUDE THE WORK WILL ALSO INCLUDE THE WILL ALSO INCLUDE THE WILL ALSO INCLUDE THE ALSO INCLUDE THE ALSO INCLUDE THE INCLUDE THE INCLUDE THE THE THE REPAIR OF THE WATER DAMAGED GYPSUM BOARD CEILING IN THE MRI WAITING ROOM. 6. COMMENCE PHASE II WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN COMMENCE PHASE II WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN PHASE II WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN PHASE II WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN II WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN II WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN WORK UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN UPON COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN COMPLETION OF PHASE I WORK AND ACCEPTANCE AND WRITTEN OF PHASE I WORK AND ACCEPTANCE AND WRITTEN OF PHASE I WORK AND ACCEPTANCE AND WRITTEN PHASE I WORK AND ACCEPTANCE AND WRITTEN PHASE I WORK AND ACCEPTANCE AND WRITTEN I WORK AND ACCEPTANCE AND WRITTEN I WORK AND ACCEPTANCE AND WRITTEN WORK AND ACCEPTANCE AND WRITTEN WORK AND ACCEPTANCE AND WRITTEN AND ACCEPTANCE AND WRITTEN AND ACCEPTANCE AND WRITTEN ACCEPTANCE AND WRITTEN ACCEPTANCE AND WRITTEN AND WRITTEN AND WRITTEN WRITTEN WRITTEN RELEASE TO PROCEED BY THE VA. PHASE II NOTES 1. PHASE II TUNNEL WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY PHASE II TUNNEL WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY II TUNNEL WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY II TUNNEL WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY TUNNEL WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY TUNNEL WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WORK WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WILL INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY INCLUDE ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY ALL WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WORK WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY WITHIN THE TUNNEL FROM THE TUNNEL EMERGENCY THE TUNNEL FROM THE TUNNEL EMERGENCY THE TUNNEL FROM THE TUNNEL EMERGENCY TUNNEL FROM THE TUNNEL EMERGENCY TUNNEL FROM THE TUNNEL EMERGENCY FROM THE TUNNEL EMERGENCY FROM THE TUNNEL EMERGENCY THE TUNNEL EMERGENCY THE TUNNEL EMERGENCY TUNNEL EMERGENCY TUNNEL EMERGENCY EMERGENCY EMERGENCY EXIT STAIR TO THE NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF STAIR TO THE NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF STAIR TO THE NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF TO THE NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF TO THE NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF THE NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF THE NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF NORTH EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF EXIT INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF INTO UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF UF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF SHANDS AND ALL WORK WITHIN AND ALONG THE WEST HALF AND ALL WORK WITHIN AND ALONG THE WEST HALF AND ALL WORK WITHIN AND ALONG THE WEST HALF ALL WORK WITHIN AND ALONG THE WEST HALF ALL WORK WITHIN AND ALONG THE WEST HALF WORK WITHIN AND ALONG THE WEST HALF WORK WITHIN AND ALONG THE WEST HALF WITHIN AND ALONG THE WEST HALF WITHIN AND ALONG THE WEST HALF AND ALONG THE WEST HALF AND ALONG THE WEST HALF ALONG THE WEST HALF ALONG THE WEST HALF THE WEST HALF THE WEST HALF WEST HALF WEST HALF HALF HALF OF THE TUNNEL SOUTH OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE THE TUNNEL SOUTH OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE THE TUNNEL SOUTH OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE TUNNEL SOUTH OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE TUNNEL SOUTH OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE SOUTH OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE SOUTH OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE OF THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE MRI ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE ENTRANCE BETWEEN COMPLETED PHASE I WORK AREAS. THE BETWEEN COMPLETED PHASE I WORK AREAS. THE BETWEEN COMPLETED PHASE I WORK AREAS. THE COMPLETED PHASE I WORK AREAS. THE COMPLETED PHASE I WORK AREAS. THE PHASE I WORK AREAS. THE PHASE I WORK AREAS. THE I WORK AREAS. THE I WORK AREAS. THE WORK AREAS. THE WORK AREAS. THE AREAS. THE AREAS. THE THE THE CONSTRUCTION BARRIER BETWEEN PHASE II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED BARRIER BETWEEN PHASE II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED BARRIER BETWEEN PHASE II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED BETWEEN PHASE II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED BETWEEN PHASE II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED PHASE II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED PHASE II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED II AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED AND PHASE III WORK AREA WILL BE ERECTED AS LOCATED PHASE III WORK AREA WILL BE ERECTED AS LOCATED PHASE III WORK AREA WILL BE ERECTED AS LOCATED III WORK AREA WILL BE ERECTED AS LOCATED III WORK AREA WILL BE ERECTED AS LOCATED WORK AREA WILL BE ERECTED AS LOCATED WORK AREA WILL BE ERECTED AS LOCATED AREA WILL BE ERECTED AS LOCATED AREA WILL BE ERECTED AS LOCATED WILL BE ERECTED AS LOCATED WILL BE ERECTED AS LOCATED BE ERECTED AS LOCATED BE ERECTED AS LOCATED ERECTED AS LOCATED ERECTED AS LOCATED AS LOCATED AS LOCATED LOCATED LOCATED ON THE PHASING PLAN TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE THE PHASING PLAN TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE THE PHASING PLAN TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE PHASING PLAN TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE PHASING PLAN TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE PLAN TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE PLAN TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE TO ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE ALLOW THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE EXISTING LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE LIGHT FIXTURES TO REMAIN IN PLACE OUTSIDE THE FIXTURES TO REMAIN IN PLACE OUTSIDE THE FIXTURES TO REMAIN IN PLACE OUTSIDE THE TO REMAIN IN PLACE OUTSIDE THE TO REMAIN IN PLACE OUTSIDE THE REMAIN IN PLACE OUTSIDE THE REMAIN IN PLACE OUTSIDE THE IN PLACE OUTSIDE THE IN PLACE OUTSIDE THE PLACE OUTSIDE THE PLACE OUTSIDE THE OUTSIDE THE OUTSIDE THE THE THE PHASE II WORK AREA. 2.