S01 Attachment 2 Drawings - Giblert Creek 2021 Drawings 03-08-23.pdf
PDF 9 MB Posted
- Attached to
- Amendment 3 - EWP Streambank Stabilization NRCS - Mingo County, WV Federal contract opportunity
- Solicitation number
- 12FPC323B0007
About this file
This document package contains engineering drawings and specifications for an emergency watershed protection streambank stabilization project in Mingo County, West Virginia. The project involves installing gabion baskets, riprap, and other structures along approximately 1,530 linear feet of streambank at three sites—the Alice Blankenship, James Lester, and Timothy Thompson properties. The drawings depict existing conditions and proposed work, including layouts, sections, details, notes, and a location map. The specifications provide requirements for geotextiles, riprap, gabion baskets, excavation and backfill limits, drainage, and other technical aspects of the design. The related federal contract opportunity is solicitation number 12FPC323B0007 issued by the Department of Agriculture Under Secretary for Farm Production and Conservation to stabilize streambanks damaged by flooding under the Emergency Watershed Protection Program.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01 Amendment 003 - 12FPC323B0007 - Mingo County EWP.pdf | ||
| S01 Amendment 002 - 12FPC323B0007 - Mingo County EWP.pdf | ||
| S01 12FPC323B0007 M01 - Mingo County EWP.pdf | ||
| S01 Attachment 4 - EWP Streambank Stabilization Mingo County - QandA - 12FPC323B0007.pdf | ||
| S01 12FPC323B0007 Mingo County EWP 7.12.2023.pdf | ||
| S01 Attachment 1- Mingo EWP 2021 Specifications.pdf | ||
| S01 Attachment 3 Wage Determination Davis-Bacon Act WD WV20230061.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
Mingo County
UTILITY NOTIFICATION
"The Natural Resources Conservation Service makes no representation as to the existence or non-existence of any utilities at the construction site. Shown on these construction drawings are those utilities which have been identified. It is the responsibility of the contractor(s) to assure themselves that no hazard exists or damage will occur to utilities."
LS
/2
LS
JW PM
/2
/2
/2
1 Cover Sheet 2 Quantities and Construction Notes 3 Location Map 4 Alice Blankenship Site 2 5 James Lester Site 3 6 Timothy Thompson Site 4 7 7.5' Gabion Typical Section 8 7.5' Gabion with Vertical Front Face 9 Counterfort 10 Gabion Details 11 Foundation Preparation on Shallow
Bedrock 12 Gabion Typical Section with Rock
Foundation 13 Typical Channel Configuration Gabions
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
AutoCAD SHX Text
%%ULOCATION MAP
AutoCAD SHX Text K E N T U C K Y
AutoCAD SHX Text O H I O
AutoCAD SHX Text V I R G I N I A
AutoCAD SHX Text P E N N S Y L V A N I A
AutoCAD SHX Text M A R Y
AutoCAD SHX Text L A N D
AutoCAD SHX Text
JOB APPROVAL
AutoCAD SHX Text
CLASS V
AutoCAD SHX Text DRAWINGS PREPARED UNDER THE AUTHORITY OF THE EMERGENCY WATERSHED PROTECTION ACT by the Natural Resources Conservation Natural Resources Conservation Service of the United States Department of the United States Department United States Department of Agriculture Gilbert Creek EWP Cline, Blankenship, Lester, and Thompson Sites Mingo County, West Virginia
AutoCAD SHX Text 2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES COVER SHEET
AutoCAD SHX Text Index
AutoCAD SHX Text Sheet Number
AutoCAD SHX Text Sheet Title
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
* The area required for overlaps is not included in the quantity for geotextile.
Alice Blankenship 162 - 153 As Needed 630 210 259 James Lester 108 - 101 As Needed 396 132 168
Timothy Thompson 133 - 125 As Needed 504 168 210 Total 403 - 379 As Needed 1530 510 637
LS
/2
LS
JW PM
/2
/2
/2
13CONSTRUCTION NOTES
1. Call 811 to locate utilities prior to mobilization and excavation.
2. Access roads shall be restored to pre-construction condition or better.
3. All fences removed and/or damaged as a result of the contractor's operations shall be restored to a condition equal to or better than they existed before the start of work.
4. Soil compacted as a result of construction operations shall be loosened for a depth of 6-inches below the compacted soil layer and re-graded to blend with existing ground.
5. Provide sub-channel as shown on Typical Channel Bottom Configuration drawings.
6. While working in the stream all efforts will be made to reduce downstream impacts including keeping the excavator tracks elevated above flowing water. A diversion berm shall be established at the top of each stream access point to minimize surface water from flowing toward the stream.
7. Required pollution control measures shall be installed as needed in accordance with Pollution Control Specification 5.
8. Site access shall be off the main road and shall be in accordance with all West Virginia Department of Highways rules and guidelines. The contractor shall provide signage and flagmen for traffic control as required.
9. Excess material from the excavation & obstruction removal shall be wasted off-site in accordance with all local, state, & federal regulations and as approved by the NRCS representative in the field. Floodplains will not be allowed as waste areas under any circumstances. Waste areas shall be seeded according to construction specification 6, Seeding, Sprigging and Mulching.
10. The contractor shall provide approved fill as required to complete the work.
11. Trash, tires, & woody debris within the work limits shall be disposed of off-site in an approved landfill. The contractor shall be responsible for the landfill tipping fees.
12. All pipes encountered in the embankment shall be extended through the riprap and/or gabions with the same pipe material or better to the face of the slope or baskets.
13. Pipes 12" diameter and larger shall be encased in a minimum of 6" of concrete when passing through rock riprap. Concrete shall have a minimum compressive strength of 2500 psi.
14. The contractor shall maintain the cleanliness of public and private roads impacted by hauling operations during the duration of the work.
15. Starting location of baskets will be marked in the field.
16. Reshape stream banks at the upstream and downstream ends of gabion walls to transition to baskets.
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
AutoCAD SHX Text Table of Estimated Quantities
AutoCAD SHX Text Site
AutoCAD SHX Text Geotextile SY*
AutoCAD SHX Text Riprap Tons
AutoCAD SHX Text Gabions CY
AutoCAD SHX Text Earth Fill CY
AutoCAD SHX Text Foundation Prep Shallow Bedrock SF
AutoCAD SHX Text Foundation Prep Rock Riprap Tns
AutoCAD SHX Text Foundation Prep Geotextile SY
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES QUANTITIES AND CONSTRUCTION NOTES
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2021 Microsoft Corporation © 2021 Maxar ©CNES (2021) Distribution Airbus DS
Reconstructed Streambank
45' Gabion Wall 7.5' High
Exposed Section of Sewer Line
Access
13' Stream Bottom Width Min
84' Gabion Wall 7.5' High
19' Stream Width
Bridge to be Removed by Landowner Prior to the Start of Construction
Remove Existing Wall and Properly Dispose of Materials Landowner Does Not Want
See Note 11 on Sheet 2
Start Gabion Wall at Existing Masonary Wall Do not Disturb Existing Wall or Footer.
Modify End of Gabion as Needed.
Install Counterfort at Upstream and Downstream Ends
Location to be Determined in the Field by Engineer
Landowner to Remove Porch Prior to the Start of Construction
Access Off Main Road
16' Stream Width Min.
Access
Counterfort
Asphalt to be Removed Shall be Saw Cut
Extend All Pipes Through Wall
Remove Concrete Slabs from Creek See Note 11 on Sheet 2
17' Stream Width
AccessOff Main Road
CounterfortsLocation to be Determined in the Field by NRCS Representative
Planned Baskets to Adjoin Existing Gabion WallLace Planned Baskets to Existing Baskets Modify Top Row of Planned Baskets as Needed to
Match Height of Existing Baskets
Saw Cut Concrete Prior to Removal
Bridge to be Removed by LandownerPrior to Construction
Start Gabion Wall at Masonary Wall Do Not Disturb Masonary Wall or Footer
Alice Blankenship Site 2 N37.57010° W81.88788°
James Lester Site 3 N37.57321° W81.89038°
Timothy Thompson Site 4 N37.57372° W81.89071°
Install Gabion Wall with a Vertical Front Face
Install Counterfort at Upstream and Downstream Ends
Location to be Determined in the Field by Engineer
Install Gabions with Vertical Front Face and Transtion to Stepped Front Face Upstream ofBridge
Install Counterfort at Upstream andDownstream Ends Location to be Determined in the Field by Engineer
Existing Failed Gabions to be RemovedSee Note 11 on Sheet 2 Approximately 20 cy
Giblert Creek
Gilbert Creek Road
Route 13
Giblert Creek
Gilbert Creek Road
Route 13
Disconnected Gas Line
Pool to be Removed by Landowner Prior toConstruction
Gilbert Creek Road
Route 13
Thompson
Lester
Blankenship
Giblert Creek
Gilbert Creek Road
Route 13Gilbert Creek
105' Gabion Wall 7.5' High
Remove Concrete Sidewalk as Needed for Installation Saw Cut Concrete Prior to Removal
Cline
6.6'
6.7'
6.4'
6.1'
6'x3'4.5'x3' 3'x1.5'
2.0'
11.0'
Align Gabions as Staked in the Field by the NRCS Representative.
Do Not Disturb Existing Structure(s) See 7.5' Gabion Typical Section for Excavation Limits
66' Gabion Wall 7.5' High
Remove Existing Masonry Wall Within Planned Gabion Wall Footprint.See Note 11 on Sheet 2
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LS
/2
LS
JW PM
/2
/2
/2
Feet 0 2000 4000
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES LOCATION MAP
16' Stream Width Min.
Access
Counterfort
Asphalt to be Removed Shall be Saw Cut
Extend All Pipes Through Wall
Remove Concrete Slabs from Creek See Note 11 on Sheet 2
Install Counterfort at Upstream and Downstream Ends
Location to be Determined in the Field by Engineer
Giblert Creek
Gilbert Creek Road
Route 13
105' Gabion Wall 7.5' High
Do Not Disturb Existing Structure(s) See 7.5' Gabion Typical Section for Excavation Limits
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LEGEND
Construction Limits Toe of Stream Bank Water Line Sewer Line Gas Line Electric Line
*Features in this legend may or may not be present in the drawing.
E E E
W W W S S S G G G
LS
/2
LS
JW PM
/2
/2
/2
Site 2 Plan View N37.57010° W81.88788°
0 30 60
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES ALICE BLANKENSHIP SITE 2
17' Stream Width
Access Off Main Road
Counterforts Location to be Determined in the
Field by NRCS Representative
Planned Baskets to Adjoin Existing Gabion Wall Lace Planned Baskets to Existing Baskets
Modify Top Row of Planned Baskets as Needed to Match Height of Existing Baskets
Saw Cut Concrete Prior to Removal
Bridge to be Removed by Landowner Prior to Construction
G
Start Gabion Wall at Masonary Wall Do Not Disturb Masonary Wall or Footer
Install Gabions with Vertical Front Face and Transtion to Stepped Front Face Upstream of Bridge
Disconnected Gas Line
Pool to be Removed by Landowner Prior to Construction
G ilbert Creek Road
Route 13
G iblert Creek
66' Gabion Wall 7.5' High
Remove Existing Masonry Wall Within Planned Gabion Wall Footprint.
See Note 11 on Sheet 2
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LS
/2
LS
JW PM
/2
/2
/2
Site 3 Plan View N37.57321° W81.89038°
LEGEND
Construction Limits Toe of Stream Bank Water Line Sewer Line Gas Line Electric Line
*Features in this legend may or may not be present in the drawing.
E E E
W W W S S S G G G
Feet 0 20 40
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
AutoCAD SHX Text 2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES JAMES LESTER SITE 3
Drawing Name
84' Gabion Wall 7.5' High
19' Stream Width
Bridge to be Removed by Landowner Prior to the Start of Construction
Remove Existing Wall and Properly Dispose of Materials Landowner Does Not Want
See Note 11 on Sheet 2
Start Gabion Wall at Existing Masonary Wall Do not Disturb Existing Wall or Footer.
Modify End of Gabion as Needed.
Install Counterfort at Upstream and Downstream Ends
Location to be Determined in the Field by Engineer
Landowner to Remove Porch Prior to the Start of Construction
Access Off Main Road
Bridge to be Removed by Landowner
Install Gabion Wall with a Vertical Front Face
G ilbert Creek Road
Route 13G ilbert Creek
Remove Concrete Sidewalk as Needed for Installation Saw Cut Concrete Prior to Removal
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LEGEND
Construction Limits Toe of Stream Bank Water Line Sewer Line Gas Line Electric Line
*Features in this legend may or may not be present in the drawing.
E E E
W W W S S S G G G
LS
/2
LS
JW PM
/2
/2
/2
Site 4 Plan View N37.57372° W81.89071°
0 30 60
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES TIMOTHY THOMPSON SITE 4
5.5' 9.5
6°
Geotextile
Provide Positive Drainage
Finished Grade Stream Bottom
2' Min. Embedment or to Bedrock, Whichever is Less
If Bedrock is Less than Two Feet, then See Foundation Preparation on Shallow
Bedrock ( Rebar Anchoring Detail)
6'x3'
4.5'x3'
1.5'
1.5'
1' Minimum
7"
Excavation Limits, Backfill After Gabion
Installation
12x3x1.5
2.0' Min.
Excavation Limits Backfill After Gabion Installation
Top Row May Need to be Removed in Situations Where Stream Bottom Prevents Embedment
TYPICAL GABION WALL 7.5 FEET HIGH
(Not to Scale)
Wrap Top of Baskets with Geotextile and Cover with Top Soil when Top of Wall is Low Enough to Provide Positive Drainage
Finished Grade
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
1. See typical channel bottom configuration sheet
2. Refer to sheet 2 for estimated quantities
3. After the foundation is excavated, NRCS representative will determine required foundation treatment. See foundation details on other sheets.
LS
/2
LS
JW PM
/2
/2
/2
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES 7.5' GABION TYPICAL SECTION
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
Date
5.5' 9.5
6°
Geotextile
Provide Positive
Drainage
Finished Grade Stream Bottom
2' Min. Embedment or to Bedrock, Whichever is Less
If Bedrock is Less than Two Feet, then See Foundation Preparation on Shallow
Bedrock ( Rebar Anchoring Detail)
6'x3'
4.5'x3'
1.5'
1.5'
1' Minimum
7"
Excavation Limits, Backfill After Gabion
Installation
3'x1.5'
7.5' GABION WALL WITH VERTICAL FRONT FACE
LESTER AND THOMPSON SITES
SEE PLAN VIEWS
(Not to Scale)
Excavation Limits Backfill After Gabion Installation
Top Row May Need to be Removed in Situations Where Stream Bottom Prevents Embedment
2.0' Min.
Wrap Top of Baskets with Geotextile and Cover with Top Soil when Top of Wall is Low Enough to Still Provide Positive Drainage
Finished Grade
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
1. See typical channel bottom configuration sheet
2. Refer to sheet 2 for estimated quantities
3. After the foundation is excavated, NRCS representative will determine required foundation treatment. See foundation details on other sheets.
LS
/2
LS
JW PM
/2
/2
/2
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES 7.5' GABION WITH VERTICAL FRONT FACE
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
Date
6'
12'
9'
TYPICAL COUNTERFORT DETAILS
7.5 FT. GABION WALL
(Not to Scale)
1.5'
1.5'
1.5' 9'
Counterfort
1.5'
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
1. Refer to Quantities & Notes Sheet for estimated quantities
2. 8 counterfort(s) required at approximate locations shown on the plan view(s). The final locations of counterforts will be determined in the field by Engineer.
3. See gabion typical section for additional details
LS
/2
LS
JW PM
/2
/2
/2
Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES COUNTERFORT
3'
4.5'
6'
Layer 1
Layer 2
Layer 3
Layer 3 Layer 2 Layer 1
6' 4.5' 3'
Fr on t F ac e
Fr on t F ac e
Fr on t F ac e
6' 4.5' 3'
12' 12' 12'
6x3x1.5
6x3x3
7.5' Wall as Example
3' Wall Base6' Wall Base9' Wall Base
Gabion Wall Base Layout No Scale
Gabion Wall Isometric No Scale
12x4.5x3
(1 2, 9, or
)x
3x 1.
5'
(1 2, or
)x
4.
5x
3'
1/3 H
1/3 H
1/3 H
1/3 L 1/3 L
1/3 L 1/3 W
1/3 W 1/3 W
INTERIOR SUPPORT DETAIL
LACING DETAIL
1. Each vertical seam shall be laced prior to setting basket in place and prior to lacing to adjoining baskets.
2. Each basket shall be laced to the adjoining basket at all vertical edges and horizontal edges.
3. Each diaphragm shall be laced to the lid of the basket after closing. Diaphragm shall be laced along all sides.
4. All lacing shall be done with 13.5 gauge wire using the two, one, two, looping procedure as shown in the lacing detail.
5. All wire shall be tightly laced and the ends of the lacing wire shall be doubled back and twisted not less than three turns around itself in a length not greater than one inch.
6. Welded wire baskets shall be laced with spiral binders according to manufacturers recomendations.
7. Install according to manufacturers recommendations.
5" 5"
Wire Doubled Back and Twisted
Horizontal Edge
Vertical Seam
Horizontal Edge
6x3x3'
6x3x3'
6x3x3'
6x3x3'
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LS
/2
LS
JW PM
/2
/2
/2
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES GABION DETAILS
Bedrock
Foot Print of Planned Gabions & Rebar/Drillhole Pattern
1' Max
Varies
Front Face of Proposed Gabions with Rebar Spacing
1' Max
1' Min to 1.5' Max
1' Min to 1.5' Max Typical Each Side
Side View of Proposed Gabions with Rebar Spacing
Maximum Angle of Rebar/Drillhole Pattern
15°'
Back of BasketFront of Basket
Bedrock
Bedrock
Vertical No. 10 Rebar Max Tilt of Rebar/Drillhole
Back of BasketFront of Basket BackfillStreamside
0' to 2' Max
Stream Bottom
0' to 2.0' Max
Notes:
1. Drill holes for Rebar shall be 1 3/8" diameter. The use of epoxy or non-shrink grout is not required. The rebar shall be driven by hammer to the required depth without bending.
2. Care shall be taken by the contractor to prevent damage to the rebar during gabion filling operations.
3. Different gabion bottom basket configurations will require additional rebar by repeating the pattern shown.
Foundation Preparation Payment Limits
Varies
Varies
Stream Bottom
1.25'No. 10 Rebar Typical
1.25' 1.25'
No. 10 Rebar Typical
2.5' Max.
1.25'
2.5' Max.
2.5' Max. 2.5' Max.
Foundation Preparation
Payment Limits4.5'
2.5'
1.5'
Varies
2.5'
No. 10 Rebar
~1.5'
~2.5'
FOUNDATION PREPARATION on SHALLOW BEDROCK (Use When Bedrock is Less than Two Feet From Stream Bottom)
(No Scale)
1' Min to 1.5' Max
1.5'
2.5'
Note: Final pattern and spacing to be directed by NRCS technician in the field.
Finished Grade
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LS
/2
LS
JW PM
/2
/2
/2
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES FOUNDATION PREPARATION ON SHALLOW BEDROCK
5.5' 9.5
6°
Geotextile
Provide Positive
Drainage
Finished Grade Stream Bottom
6'x3'
4.5'x3'
1.5'
1.5'
7"
12x3x1.5
Gabion Section on Riprap Foundation
Depth of Rock of Foundation to be Determined by NRCS Representative in Field. Max Depth of 3'.
12' Foundation Preparation
Payment Limits
Rock Riprap Foundation Preparation 6"-18" Gradation
3' Min.
Geotextile
Excavation Limits, Backfill After Gabion
Installation
3' Min.
Fill Voids on Surface of Riprap with Gabion Stone to Provide Smooth Surface for Gabions
Excavation Limits
2.0'
Finished Grade
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LS
/2
LS
JW PM
/2
/2
/2
Notes:
1. See typical channel bottom configuration sheet.
2. Refer to Sheet 2 for estimated quantities.
3. Actual gabion configuration may vary.
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO County, West Virginia County, West Virginia BLANKENSHIP, LESTER, AND THOMPSON SITES GABION TYPICAL SECTION WITH RIPRAP FOUNDATION
Notes:
1. Final location of subchannel to be located in the field by the NRCS representative. The subchannel shall be transitioned as necessary to meet existing grades at the upstream and downstream site extents.
2. Subchannels are not required for bedrock streambeds.
3. Use material from the required excavations and/or approved fill from offsite to reconstruct streambanks as necessary. Seed and mulch per construction specification 6, Seeding, Sprigging and Mulching.
4. Actual gabion configuration and height may vary.
Varies
1/3 BW
~ 1
(See Site Plan)
Provide Positive Drainage
~2
~1
~1
Final Stream Bottom Shall be Rough & Irregular Provide Positive Drainage Toward Subchannel Deposition (Varies)
Existing Groundline
Subchannel
Bottom Width (BW)
3/8 /23
:32
A M
R ev is ed
4-
-2
EW
P Si te s
C om bi ne d.
dw g
Na tu ra l R es ou rc es
Co ns er va tio n
Se rv ice
U ni te d
St at es D ep ar tm en t of
Ag ric ul tu re
LS
/2
LS
JW PM
/2
/2
/2
AutoCAD SHX Text
AutoCAD SHX Text
ALL SITES TYPICAL CHANNEL BOTTOM CONFIGURATION
AutoCAD SHX Text Checked
AutoCAD SHX Text Approved
AutoCAD SHX Text Designed
AutoCAD SHX Text Drawn
AutoCAD SHX Text Sheet of
AutoCAD SHX Text Drawing Name
AutoCAD SHX Text File Name
AutoCAD SHX Text Date
2021 EWP STREAMBANK STABILIZATION MINGO COUNTY, WEST VIRGINIA COUNTY, WEST VIRGINIA
| Sheets and Views |
| 1 Cover Sheet |
| 2 Quantities and Construction Notes |
| 3 Location Map |
| 4 Alice Blankenship Site 2 |
| 5 James Lester Site 3 |
| 6 Timothy Thompson Site 4 |
| 7 7.5' Gabion Typical Section |
| 8 7.5' Gabion with Vertical Front Face |
| 9 Counterfort |
| 10 Gabion Details |
| 11 Foundation Preparation on Shallow Bedrock |
| 12 Gabion Typical Section with Rock Foundation |
| 13 Typical Channel Configuration Gabions |
File details come from the government source that posted it. Updated .