S000000450 Technical Proposal Packet.docx

DOCX document 48 KB Posted

Attached to
Consulting and Actuarial Services State and local contract opportunity
Solicitation number
S000000450
Issued by
Arkansas

About this file

This document is a Technical Proposal Packet for a Solicitation (S000000450) for Consulting and Actuarial Services, likely for the State of Arkansas. The solicitation requires prospective contractors to submit a comprehensive proposal packet that includes a signed proposal signature page, information on proposed subcontractors, recommended options, and specific evaluation sections covering experience, solution, and risk. The proposal is limited to two pages for each evaluation section and must include required certifications regarding employment practices, boycotts, and compliance with state laws.

The proposal packet outlines specific submission requirements, including an Equal Opportunity Policy, official price sheet, and optional forms such as the Voluntary Product Accessibility Template. Prospective contractors must certify they are not a "Scrutinized Company" and will not boycott Israel, employ illegal immigrants, or boycott energy, fossil fuel, firearms, or ammunition industries. The document provides a structured framework for vendors to present their qualifications, proposed services, potential risks, and mitigation strategies, with an emphasis on transparency and compliance with state procurement regulations.

View the file

Other files for this state and local contract opportunity

Other files attached to Consulting and Actuarial Services, newest first.
File Type Posted
S000000450 Contract and Grant Disclosure.pdf PDF
Attachment B Business Associate Agreement.pdf PDF
Attachment C Non-Disclosure Agreement.pdf PDF
Attachment D Data Sharing Agreement.pdf PDF
S000000450 Consulting and Actuarial Services.pdf PDF
Attachment A Act 956.pdf PDF
S000000450 Official Solicitation Price Sheet~1.xlsx XLSX spreadsheet
S000000450 Services Contract SRV-1 Sample.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL PROPOSAL PACKET

S000000450 Consulting and Actuarial Services

PROPOSAL SIGNATURE PAGE

PROSPECTIVE CONTRACTOR’S INFORMATION

Company:

Address:

City:

State:

Zip Code:

PROSPECTIVE CONTRACTOR CONTACT INFORMATION

Provide contact information to be used for Solicitation related matters.

Contact Person:

Title:

Phone:

Alternate Phone:

Email:

CONFIRMATION OF REDACTED COPY

☐ YES, a redacted copy of submission documents is enclosed.

☐ NO, a redacted copy of submission documents is not enclosed. I understand a full copy of non-redacted submission documents will be released if requested.

If a redacted copy of the submission documents is not provided with Prospective Contractor’s response packet, and neither box is checked, a copy of the non-redacted documents, except for financial data (other than pricing), will be released in response to any request made under the Arkansas Freedom of Information Act (FOIA). See the Proprietary Information section of the Solicitation.

REQUIRED CERTIFICATIONS

By signing and submitting a response to this Solicitation, Prospective Contractor represents, warrants, and certifies that they are not a Scrutinized Company and they do not currently and shall not for the aggregate term of a resultant contract:

· Boycott Israel.

· Knowingly employ or contract with illegal immigrants.

· Boycott Energy, Fossil Fuel, Firearms, or Ammunition Industries.

· Employ a Scrutinized Company as a contractor.

Prospective Contractor represents, warrants, and certifies that it shall not become a Scrutinized Company during the aggregate term of a contract resulting from this Solicitation. The Prospective Contractor further represents, warrants, and certifies in shall in all other respects comply with the laws, rules, and executive orders of the state that apply to the Contractor’s performance during the aggregate term of a contract resulting from this Solicitation.

An official authorized to bind the Prospective Contractor to a resultant contract shall sign below. The signature below signifies agreement that any exception that conflicts with a Requirement of this Solicitation may cause the Prospective Contractor’s proposal to be rejected.

Authorized Signature: Title:

Printed/Typed Name: Date:

SUBMISSION REQUIREMENTS CHECKLIST

The following items must be submitted with the Prospective Contractor’s proposal:

· Proposal Signature Page

· Proposed Subcontractors Form

· Recommended Options Form

· Information for Evaluation

· Experience (2 pages or less)

· Solution (2 pages or less)

· Risk (2 pages or less)

· Copy of Prospective Contractor’s Equal Opportunity Policy

· Completed Official Solicitation Price Sheet

The following items, which must be submitted prior to a contract award to the Prospective Contractor, may also be included with the Prospective Contractor’s proposal:

· EO 98-04: Contract and Grant Disclosure Form

The following items should be submitted with the Prospective Contractor’s proposal, if applicable:

· Voluntary Product Accessibility Template (VPAT)

· Redacted copy of the submission documents

RECOMMENDED OPTIONS FORM

Prospective Contractors should identify optional recommended services available to the State, along with the schedule impact and cost details of each item. If the Prospective Contractor does not offer optional recommended services, Prospective Contractor should indicate so by checking the appropriate box. Responses to this form will not be scored for evaluation purposes.

Costs associated with the optional recommended services must be included on this form and must not be included in the completed pricing response.

Prospective Contractor proposes the following optional recommended services under a resulting contract:

Item Description:

How Will This Add Value?

Schedule Impact:

Cost Details:

Item Description:

How Will This Add Value?

Schedule Impact:

Cost Details:

Item Description:

How Will This Add Value?

Schedule Impact:

Cost Details:

Item Description:

How Will This Add Value?

Schedule Impact:

Cost Details:

Item Description:

How Will This Add Value?

Schedule Impact:

Cost Details:

Item Description:

How Will This Add Value?

Schedule Impact:

Cost Details:

☐ Prospective Contractor does not offer optional recommended services.

PROPOSED SUBCONTRACTORS FORM

Prospective Contractors shall complete the form for all subcontractors the Prospective Contractor proposes to use under a resulting contract (Services Contract (SRV-1) Fillable Form, section 14). If the Prospective Contractor does not intend to use subcontractor(s), Prospective Contractor should indicate so by checking the appropriate box.

Prospective Contractors should not include additional information relating to subcontractors on this form or as an attachment to this form.

Prospective Contractor proposes to use the following subcontractor(s) under a resulting contract:

SUBCONTRACTOR’S COMPANY NAME
STREET ADDRESS
CITY, STATE, ZIP

☐ Prospective Contractor does not propose to use subcontractors under a resulting contract.

Rev 07/2025 Page 2 of 2

INFORMATION FOR EVALUATION – EXPERIENCE

Using this template, Prospective Contractors should provide the Prospective Contractor’s experience and capabilities to meet the Solicitation requirements. The information provided should be prioritized beginning with the most important and/or relevant experience listed first.

Prospective Contractors may expand the space in each table, add a table, or delete a table as needed, but Prospective Contractors shall not exceed the two-page limit for this subsection. Prospective Contractors should not include links to outside sources within this document. Links found within the document will be redacted or removed and may cause the Prospective Contractor’s proposal to be rejected. See RFP Section 3.5 for more information about this subsection.

Prospective Contractors may delete the instructions above and example shown below.

Example:

Claim of Expertise:
We have a significant amount of experience in providing P-Card and T-Card services to State governments, and consistently delivery high performance.
Documented Performance:
We currently have 10 similar services, with an average rebate to the client of 5% and the average customer satisfaction rating on these services is currently a 9.8 out of 10.

Claim of Expertise:

Documented Performance:

Claim of Expertise:

Documented Performance:

Claim of Expertise:

Documented Performance:

Claim of Expertise:

Documented Performance:

Claim of Expertise:

Documented Performance:

Claim of Expertise:

Documented Performance:

Claim of Expertise:

Documented Performance:

Claim of Expertise:

Documented Performance:

INFORMATION FOR EVALUATION – SOLUTION

Using this template, Prospective Contractors should include a narrative to address and provide a high-level overview of the solution and/or approach proposed using the requirements outlined in the Solicitation.

Prospective Contractors shall not exceed the two-page limit for this subsection. Prospective Contractors should not include links to outside sources within this document. Links found within the document will be redacted or removed and may cause the Prospective Contractor’s proposal to be rejected. See RFP Section 3.5 for more information about this subsection.

Prospective Contractors may delete the instructions above.

INFORMATION FOR EVALUATION – RISK

Using this template, Prospective Contractors should identify and prioritize major risks that they reasonably foresee could potentially prevent or impair the Prospective Contractor’s delivery of the solution as offered in the proposal or to otherwise fail to meet the State’s desired outcome, specifications, and performance standards, and how they will mitigate, manage, and/or minimize each risk listed.

Prospective Contractors may expand the space in each table, add a table, or delete a table as needed, but Prospective Contractors shall not exceed the two-page limit for this subsection. Prospective Contractors should not include links to outside sources within this document. Links found within the document will be redacted or removed and may cause the Prospective Contractor’s proposal to be rejected. See RFP Section 3.5 for more information about this subsection.

Prospective Contractors may delete the instructions above and the example shown below.

Example:

Risk Description:
Participating Entity does not understand how to use the Commercial Card Program.
Solution:
A full-time training group will hold education meetings at all Participating Entity locations twice a year throughout the length of the contract.
Documented Performance:
This risk mitigation has been used on the last 4 clients and has received a 10/10 satisfaction rating. These four clients have reported 0 complaints from their constituents regarding the usage of their commercial card program.

Risk Description:

Solution:

Documented Performance:

Risk Description:

Solution:

Documented Performance:

Risk Description:

Solution:

Documented Performance:

Risk Description:

Solution:

Documented Performance:

File details come from the government source that posted it. Updated .