Site Visit Minutes.pdf

PDF 51 KB Posted

Attached to
Replace Food Service Fire Suppression System Federal contract opportunity
Solicitation number
RFQP0612100023
Issued by
Department of Justice Bureau of Prisons Federal Correctional Institution Sheridan

About this file

Minutes from Site Visit conducted July 28 2010.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Food Service Fire Suppression System, newest first.
File Type Posted
Amend 2.pdf PDF
Questions-Answers.pdf PDF
FCIHOODS.pdf PDF
Amend 1.pdf PDF
FPCHOODS.pdf PDF
FDCHOODS.pdf PDF
FPC5.JPG JPG image
FPC3.JPG JPG image
FPC1.JPG JPG image
FDC3.JPG JPG image
FDC4.JPG JPG image
FDC1.JPG JPG image
FCI5.JPG JPG image
Copy of FCI2.JPG JPG image
Copy of FCI1.JPG JPG image
FCI12.JPG JPG image
Copy of FCI8.JPG JPG image
Sf25a.pdf PDF
SF1442 Wage rates.pdf PDF
SiteVisitForm.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U. S. Department of Justice

Federal Bureau of Prisons

Office of Financial Management Sheridan, Oregon 97378

August 2, 2010

On July 28, 2010 a pre-quote conference for RFQP0612031000023 was initiated at the time of 9:20 A.M. at the Federal Prison Camp in Sheridan, Oregon. The following individuals were present for the meeting:

Stanley Labriere, Facilities Manager FCI Sheridan David Childress, General Foreman, FCI Sheridan Gary Baune, Engineering Technician, FCI Sheridan Patrick Malott, Contract Specialist, FCI Sheridan

Louis Woosley North Pacific Construction Matt Ragle Access Services Christopher Wavvens H&W Mechanical Ryan Hirte Colamette Construction Dan Liebersback Harvey and Price Co.

Bill Nelson Simplex Amber Hutchinson-Hutchinson Construction Pat Ryan Tornado Electric Danny McCubbins-McCubbins Cutting Edge Construction Gabreil McCubbins-McCubbins Cutting Edge Construction

Patrick Malott began the meeting by passing out the sign-in sheet and introducing himself. Mr. Malott advised the attendees the purpose of the meeting was: familiarize bidders with the requirements and unique circumstance surrounding a correctional setting, explain the solicitation as issued, inform meeting is not a substitute for defective or ambiguous specifications, nothing said here will be interpreted as a change to the solicitation without the issuance of a formal amendment through www.fedbizzopps.gov.

Mr. Malott stated: Work hours will be from 7:30 p.m. to 3:30 a.m. weekdays (excluding Federal holidays). The completion period is 45 days after issuance of notice to proceed.

This contract is subject to the Davis Bacon Act (Prevailing Wages). Hiring goals for this project are 2.9% for minorities and 6.9% for females, contractor will attempt a “good faith” effort to achieve these goals. The contractor is responsible for any building permits required. A payment bond or irrevocable letter of credit is required. The magnitude of this project is between $25,000 and $100,000. The government will not issue tax exemption certificates. Contractors should consider any applicable taxes in their offers. A pre-construction conference is required after the contract is awarded.

http://www.fedbizzopps.gov.

http://www.fedbizzopps.gov http://www.ccr.gov

Mr. Malott also furnished the following additional information: Price quote deadline, August 16, 2010. All offers mailed or emailed. These minutes to be recorded and uploaded to www.fedbizzopps.gov. All questions must be submitted in writing. Answers will also be posted to www.fedbizzopps.gov. The process for security background checks in accordance with HSPD-12 were explained.

Mr. Childress explained the security procedures for the project.

At approximately 9:40 a.m. the contractors were escorted to the first work site (Federal Prison Camp Food Service Area).

At approximately 10:20 a.m. the contractors were escorted to the second work site (Federal Detention Center Food Service Area) At approximately 11:00 a.m. the contractors were escorted to the third work site (Federal Correctional Institution Food Service Area).

Contractors were escorted back to front lobby area. Mr. Malott stated deadline for submitting questions was August 4, 2010. Meeting was adjourned at 12:00 p.m.