View the file

Other files for this federal contract opportunity

Other files attached to (Amendment 0002) CONE PENETROMETER TESTING (CPT) & SOIL LABORATORY TESTING for SMALL FLOOD RISK MANAGEMENT PROJECT HATCH, NEW MEXICO, newest first.
File Type Posted
W912PP21Q0012 AMD 0002.pdf PDF
Telecommunications Representations Fillable (Updated 8-Dec-2020).pdf PDF
W912PP21Q0012 AMD 0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEOTECHNICAL & ENV ENG BRANCH

4101 JEFFERSON PLAZA NE

ALBUQUERQUE NM 87109-3435

TEL: FAX:

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER)

PAGE OF PAGES

1 88

1. REQUEST NO. 2. DATE ISSUED RATING

W912PP21Q0012 13-Jan-2021 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. % NO TE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and

ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA

FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

US ARMY ENGINEER DISTRICT, ALBUQUERQUE

4101 JEFFERSON PLAZA NE

ALBUQUERQUE NM 87109-3435

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

(Date) 29-Jan-2021 at 2:00 PM MDT PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

ROBERT J MCPHERREN

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912PP21Q0012

Section B - Supplies or Services and Prices

SUBMISSION INSTRUCTIONS

Please submit offers to Robert McPherren via e-mail at robert.j.mcpherren@usace.army.mil.

The Government intends to award a Firm, Fixed-Price service contract, resulting from this solicitation, utilizing Simplified Acquisition Procedures per FAR Part 13.

SAM

****************Note to Offeror****************

The System for Award Management (SAM) registration (formerly CCR) should be completed prior to award of any resultant contract from the RFQ. Failure to have this registration completed could cause delay of award or rejection of offer. To complete or update a SAM registration, go to www.sam.gov.

Please provide the following information with quote:

Dun & Bradstreet Number: ______________________ Federal Tax ID Number: ______________________

CAGE Code: ______________________ mailto:robert.j.mcpherren@usace.army.mil http://www.sam.gov/

PRICING SCHEDULE

Item No.

Schedule Of Supplies/Service Quantity U/M Unit Price Amount

1 Abbrev. Health & Safety Plan and Work Plan 1 LS 2 Mobilization & Demobilization 1 LS 3 Standby Time 8 HR 4 Soil Sample Handling from USACE to Lab 1 LS 5 Laboratory Testing Services 1 LS 6 Refraction Microtremor Testing (ReMi) 1 LS 7 ASTM D 5778, Cone Penetrometer Test (CPT) 700 LF 8 NM Gross Receipts Tax N/A LS 7.3125%

Total - - - EA – each HR – hour LF – linear foot LS – Lump Sum U/M – unit of measure

ASTM Standard Test Method Description Unit Cost Quantity Subtotal Laboratory Compaction Characteristics of Soil Using Standard Effort (5 points) Methods A & B, 4 inch diameter mold Method C, 6 inch diameter mold 28

D854 Specific Gravity of Soil Solids by Water Pycnometer 28 D1140 Determining the Amount of Material in Soils Finer than 75-µm (No. 200) Sieve in Soils by Washing

Laboratory Compaction Characteristics of Soil Using Modified Effort (5 points) Methods A & B, 4 inch diameter mold Method C, 6 inch diameter mold

D2166 Unconfined Compressive Strength of Cohesive Soil 5 D2216 Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass 190 D2419 Sand Equivalent Value of Soils and Fine Aggregate D2435 One-Dimensional Consolidation of Soils Using Incremental Loading (with time rate curves) 33 D2850 Unconsolidated-Undrained Triaxial Compression Test on Cohesive Soils (1 point) D3080 Direct Shear Test of Soils Under Consolidated Drained Conditions (3 points) 33 D4221 Dispersive Characteristics of Clay Soil by Double Hydrometer D4318 Liquid Limit, Plastic Limit, and Plasticity Index of Soils 190 D4546 One-Dimensional Swell or Collapse of Soils

Method A - (4 single point specimens) Method B - (1 single point specimen) Method C - (1 multiple point specimen) 33

D4647 Identification and Classification of Dispersive Clay Soils by the Pinhole Test D4767 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (3 point) 33 D4829 Expansion Index of Soils D5084 Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter 28 D6467 Torsional Ring Shear Test to Determine Drained Residual Shear Strength of Cohesive Soils (3 points) D6913 Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis (3" - #200 Sieve). Limit 5kg. 190 D7608 Torsional Ring Shear Test to Determine Drained Fully Softened Shear Strength of Cohesive Soils (1 point) D7928 Particle-Size Distribution (Gradation) of Soils Using the Sedimentation (Hydrometer) Analysis. Limit 5kg. 190 --- Reconstituting Soil Specimens for Measurement of Engineering Properties (each)

Total

D698

D1557

CONE PENETROMETER TESTING (CPT) & SOIL LABORATORY TESTING

PROJECT TOTAL__________________________

PERFORMANCE WORK STATEMENT (PWS)

SMALL FLOOD RISK MANAGEMENT PROJECT

HATCH, NEW MEXICO

CONE PENETROMETER TESTING (CPT) & SOIL LABORATORY TESTING

PART 1

GENERAL INFORMATION

1.0 General: This is a non-personal services contract for cone penetrometer testing (CPT) & soil laboratory testing services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform cone penetrometer testing (CPT) & soil laboratory testing services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Under the authority of Section 205 of the Flood Control Act of 1948, the U.S.

Army Corps of Engineers (USACE) in cooperation with, and at the request of the Doña Ana County Flood Commission, proposes to implement the Small Flood Risk Management (FRM) Project that would reduce the potential for flood damage in the Village of Hatch, in Doña Ana County, New Mexico.

1.3 Objectives: This Performance Work Statement (PWS) for design includes Cone Penetrometer Testing (CPT), Refraction Microtremor Testing (ReMi) and laboratory soils testing requirements to characterize foundation conditions for the embankment, intake tower, outlet works, and diversion channel;

characterize the abutments; and characterize the suitability of the proposed embankment borrow source(s).

The subsurface investigation and related geotechnical portions of the project shall comply with, but not be limited to the following referenced material and criteria. In the event a conflict of criteria occurs, the more stringent requirement shall apply. Engineering Manual (EM) 1110-2-1906, Engineering and Design, Laboratory Soils Testing, 30 November 1970, updated 20 August 86. EM 1110-1-1804, Engineering and Design, Geotechnical Investigations, 1 January 2001.

1.4 Scope: Where required, the Cone Penetration Test (CPT) or Dutch cone boring (in-situ testing method) shall be used to evaluate detailed soil stratigraphy and estimate geotechnical engineering properties. The CPT involves hydraulically pushing a 1.4-in. diameter special probe into the earth while performing two measurements, cone resistance and sleeve friction resistance. The probe shall be pushed from a special heavy-duty truck or drilling rig. CPT data interpretations utilizing the applicable software programming are to be reported to USACE along with any field notes as a final deliverable.

The refraction microtremor (ReMi) technique provides a simplified characterization of relatively large volumes of the subsurface in 1-dimensional vertical (depth) profiles. ReMi will obtain vertical s–wave profiles for earthquake seismic site characterization. For site seismicity characterization, appropriate low frequency geophones and relatively long geophone arrays are needed. ReMi seismic lines are generally laid out using the standard spacings on the geophone cables. 10-foot spacings between geophones with a 120-foot array have a minimum depth of investigation of about 30 to 40 feet. ReMi and seismic refraction data can be collected using the same geophone array setups. Data collection consists of the system sampling the ambient or generated surface waves (a sampling event) at the geophone array for several to many seconds. Typical sampling times and intervals for a sampling event may be 6 seconds at 0.5 milliseconds, 12 seconds at 1 millisecond and 24 seconds at 2 milliseconds for array lengths of 60 feet, 120 feet and 240 feet, respectively. Field notes, including line number and orientation, topographic variations and other notes as appropriate are to be made on site maps and in notebooks as appropriate. Full ReMi seismic data interpretations utilizing the applicable software programming are to be reported to USACE along with any field notes as a final deliverable.

Lastly, soil samples obtained during a concurrent geotechnical field investigation executed by the US Army Corps of Engineers (COE) shall be carefully coordinated for collection, storage and transported to a USACE validated laboratory for soils testing. All samples shall be stored to avoid freezing until they can be transported to the laboratory for testing. Contractor shall coordinate with COE Albuquerque District (SPA) key personnel, named below, in order to identify select samples for testing. Untested samples shall be stored for up to 5 months or until a request for disposal has been made in writing by the appropriate COE SPA representative, whichever occurs first. Remnants of samples submitted for laboratory testing will be maintained at the testing laboratory for up to 90 days after the completion of lab testing or until a request for disposal has been made in writing by the appropriate COE SPA representative, whichever occurs first.

1.5 Period of Performance: The period of performance shall be for 150 days.

1.6 General Information:

1.6.1 Place of Performance: The work to be performed under this contract will be performed at the proposed Hatch Dam project site in the Village of Hatch, in Doña Ana County, New Mexico.

1.6.2 Type of Contract: The Government will award a firm-fixed price (FFP) contract.

1.6.3 Hours of Operation: The contractor is responsible for conducting business between the hours of 8:00am – 4:30pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.4 Recognized Holidays: The following holidays are recognized as Federal holidays and Government offices will not be open.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.5 Quality Control: The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

The contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract. Contractor shall submit within 7 days after contract award three copies of a comprehensive written QCP to the KO and COR, within 5 working days when changes are made thereafter.

After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.

1.6.6 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum satisfactory performance thresholds.

1.6.7 Security Requirements:

1.6.7.2.2 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

1.6.7.2.15 Pre-screen Candidates Using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.

1.6.8 Special Qualifications: A field inspector shall be present during the subsurface investigation and shall be an experienced engineering geologist or geotechnical engineer. Laboratory soils testing shall be conducted at a USACE validated laboratory for the tests required.

1.6.9 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.10 Contracting Officer’s Representative (COR): A COR may be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance;

maintain written and oral communications with the contractor concerning technical aspects of the contract;

issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor contractor's performance and notifies both the Contracting Officer and contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.6.11 Key Personnel: The follow personnel are considered key personnel by the Government: The follow personnel are considered key personnel by the Government:

Richard A. Negri, P.E.

USACE Geotechnical Engineer P: (516) 574-9404 E: Richard.A.negri@usace.army.mil

Jason Woodruff, P.E.

USACE Tech. Lead P: (505) 342-3382 E. Jason.R.Woodruff@usace.army.mil

Felton Prosper USACE Project Manager P: (505) 342-3270 E: Felton.M.Prosper@usace.army.mil

The contractor shall provide a Contract Manager who shall be responsible for the performance of the work.

The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Contract Manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate shall be available between 8:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons.

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.13 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.14 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.15 Safety:

1.6.15.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-

1-1 and OSHA Requirements: The contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health

Requirements Manual, EM 385-1-1 in effect on the date of the contract award. EM 385-1-1 and its changes are available at http://www.publications.usace.army.mil/USACE-publications/Engineer-Manuals/. The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.

1.6.15.2 Zero Accident Program: The Albuquerque District, in its continual pursuit of excellence in safety has established a goal of zero contractor injuries. To attain this goal it will be necessary for the contractor management personnel to communicate to the workers an expectation of zero injuries; that it is no longer acceptable to take chances; that shortcuts taken because of laziness or even while trying to do an efficient job are no longer welcomed; that praise for shortcuts or chance-taking will not exist. It is imperative that contractor management clearly sets forth the expectation for zero injuries so that the workers can begin to believe that the company is truly serious about safety. From the standpoint of worker psychology, zero is the only supportable goal. In attaining zero-injury performance, there is no substitute for the concept of setting and communicating safety performance expectations to the workers.

PART 2

DEFINITIONS & ACRONYMS

2.0 Definitions and Acronyms:

2.1 Definitions: For additional definitions, please refer to the attached Hatch Drilling Program Plan

(DPP).

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the

Government. The term used in this contract refers to the prime.

2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.8 Quality Assurance (QA): The Government procedures to verify that services being performed by the contractor are performed according to acceptable standards.

2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 Quality Control (QC): All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12 Work Day: The number of hours per day the contractor provides services in accordance with the contract.

2.1.12 Work Week: Monday through Friday, unless specified otherwise.

2.2 Acronyms: For additional acronyms, please refer to the attached Hatch Drilling Program Plan

(DPP).

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit USACE U.S. Army Corps of Engineers

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3.0 Government Furnished Items and Services:

3.1 Services: The government will not supply any services.

3.2 Facilities: The Government will provide rights-of-entry for the contractor to execute the requirements of this PWS.

3.3 Utilities: The government will not supply any utilities; however, access may be coordinated, at the contractor’s expense, through the Village of Hatch.

3.4 Equipment: The government will not supply any equipment.

3.5 Materials: The government will not supply any materials.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.0 Contractor Furnished Items and Responsibilities:

4.1 General: The contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Materials: The contractor shall procure and supply all materials required to execute this PWS.

4.3 Equipment: The contractor shall supply all equipment required to execute this PWS.

4.4 Government Safety Requirements: The contractor shall submit their written Abbreviated

Accident Prevention Program to the Contracting Officer for evaluation and acceptance. The plan must be submitted and approved before any on-site work begins.

4.5 Service Contract Reporting (SCR): The contractor shall report ALL contractor labor hours

(including subcontractor labor hours) required for performance of services provided under this contract for USACE via a secure data collection site. See clause 52.204-14. The contractor is required to completely fill in all required data fields using the following web address www.sam.gov

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at: www.fsd.gov

Contractor User Guide is available at www.sam.gov Click on the “Help” tab.

http://www.fsd.gov/

PART 5

SPECIFIC TASKS

5.0 Specific Tasks:

5.1 Basic Services: The contractor shall provide services for:

Cone Penetrometer Testing (CPT):

CPT data interpretations utilizing the applicable software programming are to be reported to USACE along with any field notes as a final deliverable.

Foundation

• Twenty-four (23), 40-foot deep Cone Penetration Tests (CPT) spaced every 200 feet along the centerline of the dam.

• One (1), 100-foot deep Cone Penetration Test (CPT) at the center of the dam.

Outlet Works – Intake Tower

• One (1), 25-foot deep Cone Penetration Test (CPT) located upstream of the embankment centerline at the approximate location of the intake tower.

# Location Lat/Long Coord. Depth (ft)

HD-CPT-1 Foundation 32°39'32.04"N, 107° 9'42.72"W 25 HD-CPT-2 Foundation 32°39'33.90"N, 107° 9'42.72"W 25 HD-CPT-3 Foundation 32°39'35.82"N, 107° 9'42.72"W 25 HD-CPT-4 Foundation 32°39'37.78"N, 107° 9'42.68"W 25 HD-CPT-5 Foundation 32°39'39.59"N, 107° 9'42.63"W 25 HD-CPT-6 Foundation 32°39'41.57"N, 107° 9'42.64"W 25 HD-CPT-7 Foundation 32°39'43.60"N, 107° 9'42.65"W 25 HD-CPT-8 Foundation 32°39'45.54"N, 107° 9'42.55"W 25 HD-CPT-9 Foundation 32°39'46.97"N, 107° 9'41.34"W 25

HD-CPT-10 Foundation 32°39'47.35"N, 107° 9'38.84"W 25 HD-CPT-11 Foundation 32°39'46.75"N, 107° 9'36.86"W 25 HD-CPT-12 Foundation 32°39'45.79"N, 107° 9'34.80"W 25 HD-CPT-13 Foundation 32°39'44.79"N, 107° 9'32.68"W 25 HD-CPT-14 Foundation 32°39'43.85"N, 107° 9'30.62"W 100 HD-CPT-15 Foundation 32°39'42.87"N, 107° 9'28.46"W 25 HD-CPT-16 Foundation 32°39'41.86"N, 107° 9'26.55"W 25 HD-CPT-17 Foundation 32°39'40.96"N, 107° 9'24.36"W 25 HD-CPT-18 Foundation 32°39'39.99"N, 107° 9'22.29"W 25 HD-CPT-19 Foundation 32°39'38.58"N, 107° 9'20.42"W 25 HD-CPT-20 Foundation 32°39'37.10"N, 107° 9'20.75"W 25 HD-CPT-21 Foundation 32°39'35.89"N, 107° 9'20.72"W 25 HD-CPT-22 Intake Tower 32°39'43.45"N, 107° 9'33.03"W 25 HD-CPT-23 Foundation 32°39'29.99"N, 107° 9'42.44"W 25 HD-CPT-24 Foundation 32°39'27.93"N, 107° 9'42.41"W 25 HD-CPT-25 Foundation 32°39'25.61"N, 107° 9'42.42"W 25

700Totals

Refraction Microtremor (ReMi):

• Lay out geophones using the standard spacings on the geophone cables. 10-foot spacings between geophones with a 120-foot array for a minimum depth of investigation of about 30 to 40 feet.

• Collect data by sampling generated surface waves at the geophone array for 12 seconds at 1 millisecond intervals.

• Field notes, including line number and orientation, topographic variations and other notes as appropriate are to be made on site maps and in notebooks as appropriate.

• Full ReMi seismic data interpretations utilizing the applicable software programming are to be reported to USACE along with any field notes as a final deliverable.

Collection of Soil Samples:

Soil samples obtained during a concurrent geotechnical field investigation executed by the US Army Corps of Engineers (COE) shall be carefully coordinated for collection, storage and transported to a USACE validated laboratory for soils testing.

Laboratory Testing:

Foundation

• Classify SPT samples according to USCS (ASTM D 2487).

o Sieve analysis (ASTM D 422).

o Liquid limit, plastic limit, plasticity index (ASTM D 4318).

• Determine moisture content of SPT samples (ASTM D 2216).

• Two, Standard Proctor Tests (ASTM D698) per borehole to determine relationship between unit weight and water content (compaction curve) of composite (bulk) samples.

• Five (5) Consolidated-Undrained (CU) triaxial compression tests (ASTM D 4767) to determine shear strength of undisturbed foundation clay materials.

• Five (5) Unconfined Compressive (UC) Strength tests (ASTM D2166) of undisturbed foundation clay samples.

• Five (5) Direct Shear (Consolidated Drained) tests (ASTM D3080) of in-situ foundation materials

(SM, SC, SP).

• Three (3), One-Dimensional Consolidation Tests (Oedometer Test) (ASTM D 2435) of undisturbed samples to determine potential settlement of foundation clay materials.

• Three (3) One-Dimensional Swell Pressure tests (ASTM D 4546) of undisturbed foundation clay samples.

• One, Falling Head Permeability Test, Method C (ASTM D 5084) per bulk sample.

Embankment Borrow – Basin Area

• Classification of SPT samples according to USCS (ASTM D 2487).

o Sieve analysis (ASTM D 422).

o Liquid limit, plastic limit, plasticity index (ASTM D 4318).

• Determine moisture content of SPT samples (ASTM D 2216).

• Two, Standard Proctor Tests (ASTM D698) per test pit to determine relationship between unit weight and water content (compaction curve) of remolded bulk samples

• Five (5), Consolidated-Undrained (CU) triaxial compression tests (ASTM D 4767) to determine shear strength of remolded samples (compacted to 95% laboratory maximum density, as determined by ASTM D 698) per bulk sample.

• Five (5) Unconsolidated Undrained (UU) triaxial compression tests (ASTM D2850) to determine shear strength of remolded samples (compacted to 95% laboratory maximum density, as determined by ASTM D 698).

• One, One-Dimensional Consolidation Test (Oedometer Test) (ASTM D 2435) per bulk sample.

• One, Falling Head Permeability Test, Method C (ASTM D 5084) per bulk sample.

Diversion Channel from Spring Canyon

• Classification of SPT samples according to USCS (ASTM D 2487).

o Sieve analysis (ASTM D 422).

o Liquid limit, plastic limit, plasticity index (ASTM D 4318).

• Two, Standard Proctor Tests (ASTM D698) per borehole to determine relationship between unit weight and water content (compaction curve) of composite (bulk) samples.

Outlet Works – Intake Tower

• Classification of SPT samples according to USCS (ASTM D 2487).

o Sieve analysis (ASTM D 422).

o Liquid limit, plastic limit, plasticity index (ASTM D 4318).

• Two, Standard Proctor Tests (ASTM D698) per borehole to determine relationship between unit weight and water content (compaction curve) of composite (bulk samples.

• One, Consolidated Undrained (CU) triaxial compression tests (ASTM D 4767) to determine shear strength of undisturbed foundation clay materials

• One (1) Unconfined Compressive (UC) Strength tests (ASTM D2166) of undisturbed foundation clay samples.

• One (1) Direct Shear (Consolidated Drained) tests (ASTM D3080) of in-situ foundation materials

(SM, SC, SP).

• One (1), One-Dimensional Consolidation Tests (Oedometer Test) (ASTM D 2435) of undisturbed samples to determine potential settlement of foundation clay materials

• One, Falling Head Permeability Test, Method C (ASTM D 5084).

Outlet Works – Channel to Colorado Drain

• Classification of SPT samples according to USCS (ASTM D 2487).

o Sieve analysis (ASTM D 422).

o Liquid limit, plastic limit, plasticity index (ASTM D 4318).

PART 6

APPLICABLE PUBLICATIONS

6.0 Applicable Publications (Current Editions)

The publications listed below form a part of this specification to the extent referenced. These are referred to by basic designation only. Work performed shall be in accordance with the latest editions of following documents:

American Society for Testing Materials (ASTM)

ASTM D 422 Standard Test Method for Particle-Size Analysis of Soils (No Hydrometer) ASTM D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using

Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3) ASTM D 1452 Standard Practice for Soil Exploration and Sampling by Auger Borings

ASTM D 1586 Standard Test Method for Standard Penetration Test (SPT) and Split-Barrel Sampling of

Soils ASTM D 1587 Standard Practice for Thin-Walled Tube Sampling of Soils for Geotechnical Purposes ASTM D 2113 Standard Practice for Rock Core Drilling and Sampling of Rock for Site Investigation.

ASTM D2166 Standard Test Method for Unconfined Compressive Strength of Cohesive Soil ASTM D 2216 Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass.

ASTM D2435 Standard Test Methods for One-Dimensional Consolidation Properties of Soils Using

Incremental Loading ASTM D 2487 Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil

Classification System) ASTM D2850 Standard Test Method for Unconsolidated-Undrained Triaxial Compression Test on

Cohesive Soils ASTM D3080 Standard Test Method for Direct Shear Test of Soils Under Consolidated Drained

Conditions ASTM D 3550 Standard Practice for Thick Wall, Ring-Lined, Split Barrel, Drive Sampling of Soil ASTM D 3740 Practice for Minimum Requirements for Agencies Engaged in the Testing and/or

Inspection of Soil and Rock as Used in Engineering and Design.

ASTM D 4220 Practices for Preserving and Transporting Soil Samples ASTM D 4318 Standard Test Methods for Liquid Limits, Plastic Limit, and Plasticity Index of Soils ASTM D4546 Standard Test Methods for One-Dimensional Swell or Collapse of Soils ASTM D 4767 Standard Test Method for Consolidated Undrained Triaxial Compression Test for

Cohesive Soils ASTM D5084 Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous

Materials Using a Flexible Wall Permeameter ASTM D 5240 Standard Test Method for Evaluation of the Durability of Rock for Erosion Control Using

Sodium Sulfate or Magnesium Sulfate ASTM D 5255 Certification of Personnel Engaged in the Testing of Soil and Rock.

ASTM D 5333 Standard Test Method for Measurement of Collapse Potential of Soils ASTM D 5781 Standard Guide for Use of Dual-Wall Reverse-Circulation Drilling for Geo-environmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices

ASTM D 5782 Standard Guide for Use of Direct Air-Rotary Drilling for Geo-environmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices

ASTM D 5783 Standard Guide for Use of Direct Rotary Drilling with Water-Based Drilling Fluid for Geo-environmental Exploration and the Installation of Subsurface Water-Quality Monitoring Devices

ASTM D 5872 Standard Guide for Use of Casing Advancement Drilling Methods for Geo-environmental

Exploration and Installation of Subsurface Water-Quality Monitoring Devices ASTM D 5875 Standard Guide for Use of Cable-Tool Drilling and Sampling Methods for Geo-environmental Exploration and Installation of Subsurface Water-Quality Monitoring Devices

ASTM D 5876 Standard Guide for Use of Direct Rotary Wireline Casing Advancement Drilling Methods for Geo-environmental Exploration and Installation of Subsurface Water- Quality Monitoring Devices

ASTM D 6151 Standard Practice for Using Hollow-Stem Augers for Geotechnical Exploration and Soil Sampling, 2008.

ASTM D 6286 Standard Guide for Selection of Drilling Methods for Environmental Site Characterization, 2012.

ASTM D 6473 Standard Test Method for Specific Gravity and Absorption of Rock for Erosion Control ASTM D 7181 Standard Test Method for Consolidated Drained Triaxial Compression Test for Soils ASTM D 7263 Standard Test Methods for Laboratory Determination of Density (Unit Weight) of Soil

Specimens

Code of Federal Regulations (CFR)

29 CFR 1926 Safety and Health in Construction

U.S. Army Corps of Engineers (USACE)

EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements Manual EM 1110-1-1804 Geotechnical Investigations EM 1110-2-1906 Laboratory Soils Testing EM 1110-2-2300 General Design and Construction Considerations for Earth and Rock-Fill Dams.

U.S. Bureau of Reclamation

Engineering Geology Field Manual 2nd Edition, Volume II, 2001

6.1 The contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7.0 Attachment/Technical Exhibit List:

7.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

7.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule

7.3 Attachment 3/Technical Exhibit 3 – CPT Test Locations Plan

7.4 Attachment 4/Technical Exhibit 4 – Consolidated Laboratory Testing Plan

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum satisfactory levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard PERFORMANCE

THRESHOLD (THIS IS

THE MAXIMUM ERROR

RATE. IT COULD

POSSIBLY BE “ZERO

DEVIATION FROM

STANDARD”)

Method of Surveillance

Task # 1.

The contractor shall provide Cone Penetrometer Testing (CPT) as detailed in this PWS.

See Part 6, Applicable Publications

Execution of anything less than all required activities.

100% Oversight and Inspection by USACE Personnel.

Task # 2.

The contractor shall provide Refraction Microtremor Testing (ReMi) as detailed in this PWS.

activities.

100% Oversight and Inspection by USACE Personnel.

Task # 3.

The contractor shall provide soil sample collection, storage and transport to the USACE validated laboratory.

activities.

100% Oversight and Inspection by USACE Personnel.

Task # 4.

The contractor shall provide laboratory testing services as detailed in this PWS.

activities.

Weekly and/or bi-weekly status inquiry by

USACE

Personnel.

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Form at Submit To

Abbv. Accident Prevention Plan (A.APP) & Work Plan

7 Days after

Award

1 PDF

Jason Woodruff, P.E.

Richard A. Negri, P.E.

4101 Jefferson Plaza

NE

Albuquerque, NM 87109

Jason.R.Woodruff@us ace.army.mil

Richard.A.Negri@usac e.army.mil

USACE Review 5 Days N/A N/A A.APP & Work Plan comment incorporation from USACE & BLM Review

2 Days 1 PDF

Field Operations (CPT, ReMi & sample handling) 5 Days N/A N/A

Laboratory Soils Testing 120 Days

Complete Field & Lab Data Reports 11 Days N/A PDF

Total Contract Duration 150 Days mailto:Jason.R.Woodruff@usace.army.mil mailto:Jason.R.Woodruff@usace.army.mil mailto:Richard.A.Negri@usace.army.mil mailto:Richard.A.Negri@usace.army.mil

TECHNICAL EXHIBIT 3

Cone Penetrometer Test (CPT) Locations (Red Diamond Symbol); ReMi Array Layout in General Area

TECHNICAL EXHIBIT 4

Consolidated Laboratory Testing Plan

Jar Samples

# Location Sample Type # of Samples Moisture Content Sieves & Hydrometer Atterberg Limits HD-AD-1 Foundation Jar 13 X X X HD-AD-2 Foundation Jar 13 X X X HD-AD-3 Foundation Jar 13 X X X HD-AD-4 Foundation Jar 13 X X X HD-AD-5 Foundation Jar 13 X X X HD-AD-6 Foundation Jar 13 X X X HD-AD-7 Foundation Jar 13 X X X HD-AD-8 Foundation Jar 13 X X X

HD-AD-10 Foundation Jar 13 X X X

HD-AD-12 Foundation Jar 13 X X X

HD-AD-14 Foundation Jar 13 X X X

HD-AD-16 Foundation Jar 13 X X X HD-AD-17 Foundation Jar 13 X X X

HD-AD-19 Foundation Jar 13 X X X HD-AD-20 Foundation Jar 13 X X X HD-AD-21 Foundation Jar 13 X X X HD-AD-22 Foundation Jar 13 X X X HD-AD-23 Foundation Jar 13 X X X HD-AD-24 Intake Tower Jar 10 X X X HD-AD-25 Intake Tower Jar 10 X X X HD-AD-26 Outlet Channel Jar 5 X X X HD-AD-27 Outlet Channel Jar 5 X X X HD-AD-28 Diversion Channel Jar 5 X X X HD-AD-29 Diversion Channel Jar 5 X X X HD-AD-30 Diversion Channel Jar 5 X X X HD-AD-31 Diversion Channel Jar 5 X X X HD-AD-32 Diversion Channel Jar 5 X X X HD-AD-33 Diversion Channel Jar 5 X X X HD-AD-34 Basin Jar 10 X X X HD-AD-35 Basin Jar 10 X X X HD-AD-36 Basin Jar 10 X X X HD-AD-37 Basin Jar 10 X X X HD-AD-40 Basin Jar 10 X X X HD-AD-42 Basin Jar 10 X X X HD-AD-43 Basin Jar 11 X X X HD-AD-44 Basin Jar 12 X X X HD-AD-45 Foundation Jar 13 X X X HD-AD-46 Foundation Jar 14 X X X

Totals 162 162 162

40% of Jar Samples to be Tested

REMOVED

REMOVED

REMOVED

REMOVED

REMOVED

Undisturbed/Shelby Tube Samples

# Location Sample Type # of Samples CU Triaxial UC Test Direct Shear 1D Consolidtaion 1D Swell Falling Head HD-AD-1 Foundation Shelby 1 1 1 1 1 1 1 HD-AD-5 Foundation Shelby 1 1 1 1 1 1 1 HD-AD-11 Foundation Shelby 1 1 1 1 1 1 1 HD-AD-15 Foundation Shelby 1 1 1 1 1 1 1 HD-AD-19 Foundation Shelby 1 1 1 1 1 1 1

5 5 55Totals 5 5 5

Bulk Samples

# Location Sample Type Moisture Content Sieves & Hydrometer Atterberg Limits Standard Proctor Triaxial Direct Shear Oedometer Permeability Specific Gravity HD-AD-1 Foundation HD-AD-2 Foundation HD-AD-3 Foundation HD-AD-4 Foundation HD-AD-5 Foundation HD-AD-6 Foundation HD-AD-7 Foundation HD-AD-8 Foundation HD-AD-9 Foundation HD-AD-10 Foundation HD-AD-11 Foundation HD-AD-12 Foundation HD-AD-13 Foundation HD-AD-14 Foundation HD-AD-15 Foundation HD-AD-16 Foundation HD-AD-17 Foundation HD-AD-18 Foundation HD-AD-19 Foundation HD-AD-20 Foundation HD-AD-22 Foundation HD-AD-23 Foundation HD-AD-24 Intake Tower HD-AD-25 Intake Tower HD-AD-26 Outlet Channel HD-AD-27 Outlet Channel HD-AD-28 Diversion Channel HD-AD-29 Diversion Channel HD-AD-30 Diversion Channel HD-AD-31 Diversion Channel HD-AD-32 Diversion Channel HD-AD-33 Diversion Channel HD-AD-34 Basin HD-AD-35 Basin HD-AD-36 Basin HD-AD-37 Basin HD-AD-38 Basin HD-AD-39 Basin HD-AD-40 Basin HD-AD-41 Basin HD-AD-42 Basin HD-AD-43 Basin HD-AD-44 Basin Bulk X X X X X X X X X HD-AD-45 Foundation HD-AD-46 Foundation HD-TP-1 Basin HD-TP-2 Basin HD-TP-3 Basin HD-TP-4 Basin HD-TP-5 Basin HD-TP-6 Basin HD-TP-7 Basin HD-TP-8 Basin HD-TP-9 Basin

HD-TP-10 Basin 28 28 28 28 28 28 28 28 28

X

X

X

X

X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X

X X X

X X X X X X X X

X

X

X X X X X

X X X X XX

X X X

X X X X X X X X

X

X

X X X X X

X X X

X X X X X X X X

X

X

X X X X X

X X X

X X X X X X X XX

X X X X X

X X X

X X X X X X X X

X X X X X

X X X

X X X X X X X X

X X X X X

X X X

X X X X X X X X

X X X X X

X X X

X X X X X X X X

X X X X X

X X X

X X X X X X X X

X X X X X

X X X

X X X X X X X X

X X X X X

Totals

X

Bulk X X X X X X X XX

X X

Bulk X X X X X X X

X X X

Bulk X X X X X X

Bulk X X X X X

X

Bulk

Bulk

Bulk

Bulk X X X X X X X

Bulk

X X X

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Bulk

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 12-FEB-2021 TO

12-JUL-2021

N/A GEOTECHNICAL & ENV ENG BRANCH

4101 JEFFERSON PLAZA NE

ALBUQUERQUE NM 87109-3435

FOB: Destination

968380

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

AUG 2020

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-5 Material Requirements AUG 2000 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION

2020-O0008).

MAR 2020

52.222-50 Combating Trafficking in Persons OCT 2020 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SEP 2013

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-9 Estimate of Percentage of Recovered Material Content for

EPA-Designated Items

MAY 2008

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.223-20 Aerosols JUN 2016 52.223-21 Foams JUN 2016 52.223-22 Public Disclosure of Greenhouse Gas Emissions and

Reduction Goals -- Representation.

DEC 2016

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

CLAUSES INCORPORATED BY FULL TEXT

252.239-7001 INFORMATION ASSURANCE CONTRACTOR TRAINING AND CERTIFICATION (JAN

2008)

(a) The Contractor shall ensure that personnel accessing information systems have the proper and current information assurance certification to perform information assurance functions in accordance with DoD 8570.01-M, Information Assurance Workforce Improvement Program. The Contractor shall meet the applicable information assurance certification requirements, including--

(1) DoD-approved information assurance workforce certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; and

(2) Appropriate operating system certification for information assurance technical positions as required by DoD 8570.01-M.

(b) Upon request by the Government, the Contractor shall provide documentation supporting the information assurance certification status of personnel performing information assurance functions.

(c) Contractor personnel who do not have proper and current certifications shall be denied access to DoD information systems for the purpose of performing information assurance functions.

(End of clause)

CLAUSES INCORPORATED BY REFERENCE

252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY…