RFQ_N6227120Q1162.docx

DOCX document 43 KB Posted

Attached to
Body Armor Panels Federal contract opportunity
Solicitation number
N6227120Q1162
Issued by
Department of the Navy Naval Supply Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Body Armor Panels, newest first.
File Type Posted
QR_N6227120Q1162.doc DOC document
SOW_Textile Armor_Final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ Number: N6227120Q1162 Description: Body Armor Panels

Solicitation is issued as a request for quotation (RFQ).

This is a COMBINED SYNOPSIS/SOLICITATION for 48 Body Armor Panels and is prepared in accordance with the information in FAR Part 13, Simplified Acquisition Procedures, and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

This solicitation documents and incorporates provisions and clauses in effect through FAC 2005-87-1 and DFARS Publication Notice 20160325. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses: https://www.acquisition.gov/far/ and http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html.

The NAICS code is 339999, with a small business size standard of 500 employees. This is set-aside 100% for small business.

Description of Service:

The Naval Postgraduate School is developing a lightweight concealable armor system for support of different end users. The NPS has successfully developed a system incorporating encapsulated ceramic spheres backed by an Ultra High Molecular Weight Polyethylene (UHMWPE). Contractor support is required to complete the final body armor system.

The contractor shall receive a quantity of 48 panels from the NPS. The panels will consist of a total of 5 different shapes and a total of 8 plates within an individual body armor system (total of 6 body armor systems). Two of the panels are single plates and the remaining three armor panel parts consist of qty 2 for inserts on the left and right side of the body. The dimensions of the panels include: qty 6 11.5” x 7”, qty 6 11” x 10”, qty 12 5” x 5”, qty 12 7” x 9”, qty 12 7” x 8”. The panels will require a backing material of 50 layers of HB212 initially pressed into contoured shapes (molds will be provided) at 5000 psi. Once pressed the vendor will apply an adhesive to bond the UHMWPE to the back of the ceramic sphere system. The final process will incorporate a nylon wrap to the entire system.

Period of Performance / Delivery Date:

Products must be delivered to NPS within 6 weeks from receipt of government furnished property.

Submission Deadline:

This announcement will close at 01:00 PM PST on 09/10/2020. All responsible sources may submit a quote which shall be considered by the agency. Quotes shall be submitted prior to the submission deadline to the NPS Contracting POC.

Vendor Questions:

Vendor questions shall be submitted by e-mail to the NPS Contracting POC listed.

NPS Contracting POC:

Name:
Phone Number:
E-mail:
Robert B. Gallagher
831-656-7853
rbgallag@nps.edu

Evaluation: Lowest Price Technically Acceptable Award will be made to the lowest-price technically acceptable offeror, proposing a solution that meets all the minimum technical requirements specified. The Government intends to make award based on the initial quote received.

Factor 1 – Minimum Requirements

· At least 4 years of experience working with Dyneema products and pressing material for armor applications

· Equipment to heat and press Dyneema HB212 fabric to 5000 psi

· Capability to bond HB212 to Ceramic Spheres

Factor 2 - Cost/Price Price proposals shall be firm fixed price and in accordance with CLIN structure provided below. Provide one price proposal, without alternate price arrangements, with sufficient information to allow for a detailed evaluation. At a minimum, provide the labor category, fully burdened hourly rate, number of hours, and material cost (if applicable). Price quotations shall be firm fixed price and in accordance with CLIN structure provided below.

The Government anticipates awarding a Firm Fixed Price single contract, resulting from this solicitation.

System for Award Management:

System for Award Management (SAM). Quoters must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/. All quotes shall include price(s), FOB point, a point of contact, name and phone number, business size, and payment terms. Each response must clearly indicate the capability of the quoter to meet all specifications and requirements.

Contractor must submit a signed statement of compliance and certification of the below statement:

I certify that I had no hand in the creation or refinement of this requirement and that I was not privy to any non-public information about the requirement before or after the point of solicitation.

Signature: ______________________________________________________________________________________

CLIN
DESCRIPTION
QTY
UOM
UNIT PRICE
EXTENDED PRICE
0001
Body Armor Panel (In accordance with the SOW)

Delivery Date: Products must be delivered to NPS within 6 weeks from receipt of government furnished property.

48
Each
$
$
0002
Shipping to Monterey, CA 93943
1
Lot
$
$
TOTAL:
$

Shipping Address: F.o.b. Destination Naval Postgraduate School Warehouse Attn: Gamache KFS 89346 Phone: 831-656-2259 1988 Lake Del Monte Drive Bldg 349 Monterey, CA 93943

Provisions and Clauses:

The following provisions and clauses apply to this acquisition and will be incorporated into any resultant purchase order.

52.204-24
Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
(AUG 2020)
52.212-1
Instructions to Offerors-Commercial Items
(OCT 2018)
52.212-2
Evaluation—Commercial Items
(OCT 2014)
52.212-3
Offeror Representations and Certifications Commercial Items
(OCT 2018)
52.223-3
Hazardous Material Identification and Material Safety Data
(JAN 1997)
52.225-13
Restrictions on Certain Foreign Purchases
(JUN 2008)
52.232-39
Unenforceability of Unauthorized Obligations
(JUN 2013)
52.243-7
Notification of Changes
(JAN 2017)
52.252-1
Solicitation Provisions Incorporated by Reference), http://farsite.hill.af.mil/ and www.acq.osd.mil
(FEB 1998)
52.252-2
Clauses Incorporated by Reference http://farsite.hill.af.mil/ and www.acq.osd.mil
(FEB 1998)
52.252-3
Alterations in Solicitation
(APR 1984)

The following DFARS provisions and clauses apply to this acquisition and are incorporated by reference. If the offeror has completed any of the following provisions listed in this paragraph electronically as part of its annual representations and certifications at https://www.acquisition.gov, the offeror they are to indicated in the submitted quote, there is no need to complete these provisions again for a this solicitation.

252.203-7000
Requirements Relating to Compensation of Former DoD Officials
(SEP 2011)
525.203-7002
Requirement to Inform Employees of Whistleblower Rights
(SEP 2013)
252.203-7005
Representation Relating to Compensation of Former DoD Officials
(NOV 2011)
252.204-7003
Control Of Government Personnel Work Product
(APR 1992)
252.204-7007
Alternate A, System For Award Management
(DEC 2018)
252.215-7007
Notice of Intent to Resolicit
(JUN 2012)
252.215-7008
Only One Offer
(OCT 2013)
252.223-7001
Hazardous Warning Labels
(DEC 1991)
252.223-7008
Prohibition of Hexavalent Chromium
(JUN 2013)
252.225-7048
Export – Controlled Items
(JUN 2013)
252.232-7003
Electronic Submission Of Payment Requests And Receiving Reports
(DEC 2018)
252.232-7006
Wide Area Workflow Payment Instructions
(DEC 2018)
252.232-7010
Levies on Contract Payments
(DEC 2006)
252.244-7000
Subcontracts for Commercial Items
(JUN 2013)
252.247-7023
Transportation of Supplies by Sea
(APR 2014)

52.247-34 F.O.B. DESTINATION (NOV 1991)

(a) The term “f.o.b. destination,” as used in this clause, means-

(1) Free of expense to the Government, on board the carrier’s conveyance, at a specified delivery point where the consignee’s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee’s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or “constructive placement” as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including “piggyback”) is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item568 of the National Motor Freight Classification for “heavy or bulky freight.” When supplies meeting the requirements of the referenced Item568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall- (1)

(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

(End of clause)

SUPTXT243-9400 (1-92) AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER (JAN 1992)

a. Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.

b. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.

c. The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer's. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is:

TBD

(End of SUP TXT)

Past Performance Form: CONTRACTOR/SUB:

Contract Number:

Type:

PoP:

Ceiling Value:

(with options: ________) Contract Value:

Customer Contact:

Name:

Address:

Phone:

E-Mail:

Customer COR:

Name:

Address:

Phone:

E-Mail:

Company’s Contracts POC:

Company’s Technical POC:

Overview / Description

Relevance:

Awards:

Corrective Actions:

image1.wmf

File details come from the government source that posted it. Updated .