RFQ 36C25723Q0547.docx

DOCX document 309 KB Posted

Attached to
6515--Patient Ceiling Lift & Installation Federal contract opportunity
Solicitation number
36C25723Q0547
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

View the file

Other files for this federal contract opportunity

Other files attached to 6515--Patient Ceiling Lift & Installation, newest first.
File Type Posted
Attachment C_Architectural Reflected Ceiling Plans.pdf PDF
36C25723Q0547 0003_1.docx DOCX document
SF30 36C25723Q0547 0003.pdf PDF
Statement of Work_revision 2.pdf PDF
SF30 36C25723Q0547 0002.pdf PDF
36C25723Q0547 0002_1.docx DOCX document
36C25723Q0547 0001.pdf PDF
36C25723Q0547 0001_1.docx DOCX document
Attachment B_Reflected Ceiling Plans.pdf PDF
36C25723Q0547_1.docx DOCX document
Attachment A_Installation or Relocation Checklist for Ceiling Mounted Patient Lifts rv2.1.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

671-23-1-5060-0019

36C25723Q0547 03-31-2023 Sherine Brooks Sherine.Brooks@va.gov 04-14-2023

4PM

CDT

36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504

X

339113 750 Employees

N/A

36C671 Audie L. Murphy VA Hospital 7400 Merton Minter Blvd

San Antonio TX 78229 36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

(877) 353-9791

(512) 460-5540

See CONTINUATION Page Ceiling Lifts and Installation IAW SOW See "Instructions to Offerors" on page 38.

This is a brand name or equal requirement to Arjo Huntleigh Patient Ceiling Lifts.

See CONTINUATION Page

Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES1
SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION DATA3
B.2 STATEMENT OF WORK4
B.3 PRICE/COST SCHEDULE14
ITEM INFORMATION14
SECTION C - CONTRACT CLAUSES15
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)15
C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)16
C.3 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)24
C.4 VAAR 852.212-71 GRAY MARKET ITEMS (APR 2020)24
C.5 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES24
(JAN 2023) (DEVIATION)24
C.6 VAAR 219-76 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SUPPLIES AND PRODUCTS (JAN 2023) (DEVIATION)27
C.7 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)30
C.8 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)31
C.9 VAAR 852.247-71 DELIVERY LOCATION (OCT 2018)31
C.10 VAAR 852.247-73 PACKING FOR DOMESTIC SHIPMENT (OCT 2018)32
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS33
SECTION E - SOLICITATION PROVISIONS34
E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)34
E.2 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)34
ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS38
BASIS FOR AWARD39
E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)40

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR: TBD

b. GOVERNMENT: Contract Specialist: Sherine Brooks, Sherine.Brooks@va.gov Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple, TX 76504

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management.

3. INVOICES: Invoices shall be submitted in arrears: After delivery and installation.

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

B.2 STATEMENT OF WORK

Patient Ceiling Lifts & Installation

A. GENERAL INFORMATION

1. Title of Project: This is a “Brand-Name or Equal Requirement”. New Ceiling Lifts and Installation in 1st floor Community Living Centers (CLC) for the Audie L. Murphy VA Hospital located at 7400 Merton Minter Blvd., San Antonio, TX 78229.

2. Scope of Work: The contractor shall provide all labor, supervision and all other resources required to deliver the requirements stated herein, except as may otherwise be specified in this statement of work. 600-pound ceiling lifts as specified (with fast motion, continuous-charge room-covering rail systems, and scales where specified). Lifts must be delivered, installed, and tested, in places listed in the location list, section E below. All lifts are in patient care areas and will need to have installation coordinated around patient care requirements. All lifts installed will have a minimum of 600-pound weight capacity. The handset should be a 4-function handset for all motors installed. Local clinical and technical support is required.

3. Background: Ceiling lifts have been installed in many places throughout the VA South Texas Health Care System. These systems integrate into an existing system in which most are either ARJO Huntleigh or AMICO ceiling lifts are used to lift, transfer, and reposition inpatients and outpatients. Patients may arrive at any of these locations on a sling or be sent on to another location on a sling applied at these locations. The systems being installed here are being installed in areas that already contain similar equipment, and our goal is to match the lifts in the same section of the hospital to avoid misuse of unfamiliar equipment. They may also receive patients wearing assorted brands of slings from home. They may also need to use compatible slings to lift patients to send them to other departments. Staff from other parts of the facility participate in transfers in Radiology and Nuclear Medicine, so compatibility and similar operation are important. All new lifts will be installed with continuous charge rail in accordance with requirements from VA Healthcare Technology Management (HTM).

4. Brand name or Equal to: ARJO Huntleigh Patient Lifts Salient Characteristics:

a. Ceiling Lifts shall meet all Underwriters Laboratory requirements, life safety codes, national electric codes, fire safety codes, and all other applicable federal, state, and local codes. Appropriate documentation should be provided.

b. Ceiling Lifts shall comply with ISO 10535 (Hoists for the transfer of disabled persons – Requirements and test methods).

c. Ceiling lift must be compatible with ARJO Huntleigh, Practical Products, or AMICO loop slings.

d. The lifts shall be mounted (using ceiling, wall, or floor support as determined by building structure and room covering layout needs) to provide lifting capability for the maximum area possible within each room which means wall to wall – not just over the bed.

e. Lifts must be capable of picking patients up off the floor.

f. Scales must have a readout in the hand control and must not decrease the lifting height of the system.

g. Ceiling lifts must not make warning beeps when they need charging or display flashing lights during normal operation

h. Ceiling lift motors shall be capable of lifting at least 600-pound, as specified on the Location list.

i. New lifts shall accept generic type replacement batteries without voiding any warranties.

j. Motors shall be GFCI protected.

k. Ceiling lifts’ vertical motion must be motorized.

l. Ceiling lifts must include a 2-point hanger bar suitable and allowable for use with the full range of ARJO Huntleigh, Practical Products, or AMICO repositioning slings. Hand controllers should all be 4-point controllers.

m. Ceiling lifts that connect from one room to another must be designed so that they cannot come off the rail system while in use, and the connecting rail and the systems in both rooms must all hold at least as much weight as the lift motor.

n. Ceiling lifts must recharge automatically, by recharging at any location on the rail without employee action.

o. Ceiling lifts must include safeguards to prevent patients from being trapped or hurt, such as emergency stop buttons and emergency lowering devices in case of power failure. Use of emergency lowering devices must not require tools or ladders.

p. Ceiling lifts must not be combined with rails or hardware from different manufacturers.

q. Lifts must be intended to lift patients at least 20 times per full charge at the capacity of the lift.

r. Lifts must charge anywhere on the rail system and must not require return to a charging station.

s. Provide ceiling lifts that can lift at speeds up to 6 cm/second and have speed adjusted if necessary.

t. Ceiling lifts must be able to lower patients easily in an emergency without the use of a ladder or tools, with a sustained pull on a red cord. The emergency stop must be able to be reset with a labeled button.

5. Performance Period/Schedule: The contractor shall start the work required under this SOW within 30 days of contract award and coordinate installation with room availability unless otherwise directed by the Point of Contact (POC). Some lifts are noted as requiring coordination with construction projects and will rely on the timing of those projects. The schedule may need to be altered by emergencies including virus-related restrictions to access.

B. CONTRACT AWARD MEETING

1. The contractor shall not commence performance on the tasks in this SOW until the POC has conducted a kick-off meeting or has advised the contractor that a kick off meeting is waived.

C. INSTALLATION REQUIREMENTS

1.

All installation must comply with requirements of Patient Safety Alert AL14-07, including the Checklist for Installation and Relocation. The installation checklist must be filled out for each installed lift, in addition to any checklist required by the manufacturer, and supplied to the COR.

2. Installers must have current certification to work on brand specific overhead lift and rail systems.

3. Contractor will provide evaluation of existing structure where ceiling lifts are needed and submission of plans to VA South Texas Healthcare System Engineering service, to assure that workable systems are installed and comply with VA design requirements and relevant standards.

4. Contractor will coordinate with Engineering service to verify access to engineering mechanical, HVAC, and fire systems components within the mounting area of the lift units.

5. Contractor will coordinate with POC to schedule installations.

6. Contractor will provide information on minimum clearances for operation of each lift, to be presented with the quote.

7. Contractor will provide a list of all construction or modifications required to install these lifts, to be presented with the quote. The goal is to install around any obstructions without requiring VA to make construction modifications.

8. Contractor will provide all qualified personnel, materials, equipment, and services necessary to install ceiling lifts for the rooms described below under Location, including lifts, tracks, spreader bars, attachment hardware, and all other equipment necessary for safe operation. Detailed requirements are described in the Standards and Special Requirements sections. Lift systems may be configured in any way that covers the rooms best and meets the requirements.

9. Contractor will provide installation and testing of all equipment for ceiling lifts, according to VA checklist requirements, resulting in a system that is fully functional and ready for clinical use when released to the Government.

10. Contractor will provide training on equipment use for all new types of equipment included in this contract, one session per shift for up to 2 shifts of personnel in each affected area and for onsite trainers (up to 10 sessions scheduled after installation and before use), in coordination with COR.

11. Contractor will provide as-built drawings and structural engineering drawings for lift units.

12. Contractor will provide evidence of testing of all lift systems provided and schedule testing when it can be overseen by COR.

13. Contractor will mitigate any new hazards created by installation, such as ramps over interstitial support beams that create trip hazards.

14. Contractor will meet construction safety requirements, including construction orientation, safety training requirements, dust control requirements from the Infection Control Risk Assessment, TB testing, electrical safety requirements, and Above Ceiling Permit requirements including re-sealing any penetrations of fire barriers.

15. Storage. Contractor will provide off-site storage to coordinate with construction projects and timing of those projects. The schedule may need to be altered by emergencies including virus-related restrictions to access.

D. NARA RECORDS MANAGEMENT LANGUAGE CLAUSE:

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. San Antonio VAMC and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of San Antonio VAMC or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to San Antonio VAMC. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to San Antonio VAMC control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and San Antonio VAMC guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with San Antonio VAMC policy.

8. The Contractor shall not create or maintain any records containing any non-public San Antonio VAMC information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The San Antonio VAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which San Antonio VAMC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA-provided records management training, Talent Management System (TMS) Item #3873736, Records Management for Records Officers and Liaisons. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

E. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES:

1. Location of Ceiling Lift Installations: VA South Texas Healthcare System, San Antonio VA Medical Center (7400 Merton Minter Blvd, San Antonio, Texas, 78229) on the 1st floor of the CLC building. The above ceiling structure is concrete. All items will be 600-pound lift with scale:

Item #
Building
Room #
Design
1
ALM - CLC
1A-111
New installation traverse tracks and motor with continuous charge rail
2
ALM - CLC
1A-112
New installation traverse tracks and motor with continuous charge rail
3
ALM - CLC
1A-113
New installation traverse tracks and motor with continuous charge rail
4
ALM - CLC
1A-114
New installation traverse tracks and motor with continuous charge rail
5
ALM - CLC
1A-115
New installation traverse tracks and motor with continuous charge rail
6
ALM - CLC
1A-116
New installation traverse tracks and motor with continuous charge rail
7
ALM - CLC
1A-117
New installation traverse tracks and motor with continuous charge rail
8
ALM - CLC
1A-118
Upgrade/refurbishing of existing track with installation of new motor
9
ALM - CLC
1A-119
Upgrade/refurbishing of existing track with installation of new motor
10
ALM - CLC
1A-121
Upgrade/refurbishing of existing track with installation of new motor
11
ALM - CLC
1A-122
Upgrade/refurbishing of existing track with installation of new motor
12
ALM - CLC
1A-124
New installation traverse tracks and motor with continuous charge rail
13
ALM - CLC
1A-125
New installation traverse tracks and motor with continuous charge rail
14
ALM - CLC
1A-126
New installation traverse tracks and motor with continuous charge rail
15
ALM - CLC
1A-127
New installation traverse tracks and motor with continuous charge rail
16
ALM - CLC
1A-128
New installation traverse tracks and motor with continuous charge rail

2. STANDARDS:

a. Ceiling Lift Performance Requirements:

i. Contractor must install lifts without relocating or interfering with operations of existing sprinkler heads, lights, HVAC grills, curtain tracks, IV tracks, televisions, permanent furniture, or other permanent structure. Contractor must describe any such fixtures that must be moved during contract quote and pre-construction meetings. Installation may be delayed, canceled, or moved to a mutually acceptable location if building changes cannot be made in ways that allow lift installation.

ii. Contractor shall not breach any firewalls during installation of these lifts. Any fire barrier that must be penetrated must be discussed with VA safety personnel and must immediately have fire barrier repaired. An Above Ceiling Permit must be completed before ceiling work, and the COR will check the ceiling after ceiling work, to make sure any fire barrier penetration was repaired.

iii. Each room where lifts are installed shall be returned to original condition, excluding the newly installed ceiling lift. Debris must be removed, and holes in the wall or ceiling tile must be reported to COR so that they can be fixed.

iv. Ceilings must not be slotted exposing space above ceiling to the room below.

v. A specific opportunity for Service Agreements, Preventive Maintenance Agreements, and Extended Warranty Agreements should be presented.

vi. Warranty of equipment, hardware, and installation shall be provided for three years from date of final acceptance.

vii. Warranty shall include all travel or shipping associated with any warranty repair.

viii. New lifts shall accept generic type replacement batteries without voiding any warranties.

3. Training:

a. Contractor shall provide certified in-service training for all shifts of direct patient care staff in units where lifts are installed at no additional cost to the Government, for any equipment new to this facility (up to 10 sessions in coordination with the COR). This training must include hands-on lift use and be extensive enough to prepare participants to train others.

b. Training must include each new type of equipment and sling used in an area.

c. Contractor shall provide certified in-service training on each site, multiple times in a day, for biomedical engineering staff in coordination with the COR.

4. Manuals: Contractor shall provide electronic copies of the user manuals and repair manuals for each different model of lift installed under this order or contract at no additional cost to the government.

5. Inspection:

a. Each room’s lift system shall be weight and function tested after installation in compliance with the VHA checklist required by Patient Safety Alert AL14-07. Each checklist shall be provided to Contracting Officer Technical Representative within 7 days of installation along with any checklist required by the manufacturer. Any changes in inspection requirements during the period of installation will be communicated to the Contractor immediately.

b. In accordance with Patient Safety Alert AL14-07, design and structural drawings must be provided, and VA San Antonio stakeholders must have an opportunity to approve or ask for changes before installation.

6. Contractor Conduct Requirements:

a. Equipment and supplies must not be shipped before designs are approved and contractor has approval to install. VA South Texas Healthcare System cannot store uninstalled equipment for a significant length of time.

b. All employees and subcontractors must wear a visible name and company identification when onsite. When more than one person is onsite performing work under this contract, one must be designated as a supervisor and must be fully responsible for the work to be performed.

c. The Contractor shall provide all supplies, materials, equipment, qualified personnel, supervision, management, and transportation to perform all tasks as identified herein. All work is to be performed in accordance with the guidelines established by Federal, State, and local ordinances and The Joint Commission. The Contractor’s procedures and quality control procedures shall conform to these guidelines.

d. Contractor personnel must conduct their work so as not to interfere with the normal functioning of the facility and will stop work if asked by VA South Texas Healthcare System personnel. Hours of work will need to be limited to daytime on units where patients sleep or to night time or weekends in areas where patients would be exposed by daytime work.

e. The Contractor shall take all precautions necessary to protect the lives and health of occupants of the building.

f. The Contractor must follow procedures required by VA South Texas Healthcare System Infection Control personnel and the construction safety committee, to include any required dust control specified in the Infection Control Risk Assessment.

g. The Contractor must state what efforts will be made to minimize noise during installation of equipment.

h. The Contractor shall immediately correct any fire and safety deficiencies caused by his personnel. If the contractor fails or refuses to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and may hold the contractor in default of the contract.

i. The Contractor shall comply with applicable Federal, State, and local safety and fire regulations and codes which are in effect at the beginning of the contract period. The contractor shall keep abreast of any changes in these regulations and codes applicable to the contract.

j. All material and equipment will be removed from the facility or stored properly at the end of each work day and secured during the work day in the areas specified by the Contracting Officer’s Technical Representative.

k. The Contractor is responsible for supplying, completing, and submitting all reports required or requested by Federal, State, or local ordinances which pertain to any duties contained in the contract.

l. The Contractor will be required to furnish the VA South Texas Healthcare System with material safety data sheets for all chemicals used during installation. This information is required by the VA for emergency treatment in the event of ingestion of and/or contact with the material by humans and is required by OSHA regulations.

m. The Contractor’s onsite lead installer must attend a VASTHCS construction safety orientation and supply job hazard analyses as required by Construction Safety Officer to show how hazards to Contractor and VASTHCS personnel are being minimized.

n. All Contractor personnel must have OSHA 10-hour construction safety training cards.

o. The Contractor’s personnel shall follow applicable policies of the VA South Texas Healthcare System, to include policies concerning fire and disaster preparedness programs.

p. The contractor shall furnish at his own expense all labor, materials, machinery, and appliances which may be necessary or appropriate in the performance of this contract.

q. All accumulated rubbish is to be collected and placed in the dumpster provided by the Government. Large quantities need to be disposed of in ways that do not overload the dumpsters.

7. Special Requirements:

a. Though not mandatory, it is strongly advised that contractors attend the site visit and assess the structure of each ceiling lift location to ensure safe installation of the equipment and shall supply the installation plans to the VA South Texas Healthcare System Engineering Service and Construction Safety Group, who must accept them before installation.

b. Ceiling lift installations shall comply with NFPA 13 for fire sprinklers and with NFPA 99 and NFPA 70 for proper grounding and bonding and access to electrical and safety systems.

c. The contractor should not require movement of any lights, sprinklers, televisions, or other fixtures in order to install ceiling lifts. If movement of preexisting fixtures is unavoidable, the contractor must include such notice when the quote is submitted. If the contractor fails to identify pre-existing fixtures which needs to be moved, a contract modification might not be approved for increased cost, after award.

d. Wall mounted lifts are acceptable in the place of ceiling mounts where they are more effective or cause less risk to install.

e. Ceiling lifts must not add obstacles or impair any normal operations in patient care rooms.

f. It is permissible to raise the lifting height or extend the range of a lift system that is being replaced, so long as designs are approved by the facility in advance and all obstacles are avoided to avoid interference with the operation of curtains, ventilation, or other moving or ceiling mounted items.

g. All installation that affects existing areas and electrical work shall be coordinated with the VA South Texas Healthcare System Engineering service.

h. The contractor will install all necessary mounts, braces, and any other components needed for full lift function and safety.

8. Schedule For Deliverables: If for any reason any deliverable cannot be delivered within the scheduled time frame, the contractor is required to explain why in writing to the CO, including a firm commitment of when the work shall be completed.

This notice to the CO shall cite the reasons for the delay, and the impact on the overall project. The CO will then review the facts and issue a response, in accordance with applicable regulations.

9. Changes to Statement of Work: Any changes to this SOW shall be authorized and approved only through written correspondence from the CO. A copy of each change will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor.

10. Reporting Requirements: The VHA checklist and any manufacturer’s checklist are the sole report and must be provided to the COR by 1 week after installation. Lift installation is not considered complete and cannot be paid for until the checklist is complete and provided to the COR.

11. Government Responsibilities: VA South Texas Healthcare System will provide:

a. Guidance for contractor site visits and information on which rooms need lifts. (Safety service/COR in association with affected services.)

b. Coordination to allow for lift installation as rooms are available. (Safety service/COR in association with affected services.)

c. Technical information on the building and requirements for construction. (Engineering service.)

d. Coordination and scheduling for training efforts. (Safety service/COR in association with affected services.)

e. Oversight of installation testing. (Safety service.)

f. Coordination for electrical outlet installation where necessary. (COR in association with Engineering.)

g. Answers to Contractor questions during the purchasing and installation process. (CO and COR.)

h. Prioritization and final specification of lift locations in case proposed cost exceeds budget. (COR in association with affected services.)

12. Technical

a. For reinstallations and structure alterations of existing lifts: Ceiling lifts, curtain compatibility, and continuous-charge rail must be approved by the manufacturer of the existing lifts, supports and/or rail system. Only one manufacturer’s lifts, rails, or hardware are allowed on any part of a system that interconnects.

b. The contractor must offer a warranty for and take responsibility and liability for the function of the rail system onto which they install their lifts or which they modify. The contractor will resolve any issues with the current structure or compatibility within the firm fixed price offered for this contract.

c. Provide ceiling lift weight capacities and scales as specified, with 2-point hanger bars that are quickly removable without tools and that have no moving parts near the hooks

d. Ceiling lifts that are specified as requiring scales must include a scale holding the capacity of the lift, operable in pounds or kilograms, with the weight visible on the hand control, which is attached to the lift in a way that prevents loss, and no decrease in working height.

e. For any new rail design: Specify solutions that cover rooms as fully as practical given room shape while allowing privacy and not blocking vents, sprinklers, lights, or other fixtures. Room coverage (also known as H, X-Y, or traverse) systems are required unless other system types are approved by COR for reasons of design practicality. Designs should avoid requiring the VA South Texas Health Care System to move preexisting fixtures or equipment.

f. Provide 3 years of warranty on tracks, installation, motors, and other parts, including the price of parts, labor and travel, or 10 years of warranty as long as the manufacturer is performing the preventive maintenance annually.

g. Expected life of ceiling lift system must be 10 years or more.

h. Provide fast support and parts for equipment.

i. Provide ongoing education and support for users.

End Statement of Work

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
EA
__________________
__________________

Track Assembly 4.5 METER 140MM KWIKTRAK Model #: 200.12870 (Or Equal to Arjo Huntleigh)

16.00
EA
__________________
__________________

Voltmeter - MS2 MB 2F ECS IC REG Model#: MS205-01-01 (Or Equal to Arjo Huntleigh)

16.00
EA
__________________
__________________

Motors MS2 MB 2F ECS IC REG - MS205-01-01 (Or Equal to Arjo Huntleigh)

16.00
EA
__________________
__________________

Hangar Bar MS2 2pt IC Spreader Bar - 700-19465 (Or Equal to Arjo Huntleigh)

16.00
EA
__________________
__________________

Hangar Bar SCALE MS2 - 700-19485 (Or Equal to Arjo Huntleigh)

24.00
EA
__________________
__________________

Track Assembly 3 METER 90MM KWIKTRAK - 200.12810 (Or Equal to Arjo Huntleigh)

12.00
EA
__________________
__________________

Track Assembly 4.5 METER 140MM KWIKTRAK - 200.12870 (Or Equal to Arjo Huntleigh)

24.00
EA
__________________
__________________

Track Assembly 2 METER 90MM KWIKTRAK - 200.12800 (Or Equal to Arjo Huntleigh)

1.00
SE
__________________
__________________

Ceiling Lift Hardware Kit (Or Equal to Arjo Huntleigh)

1.00
SE
__________________
__________________

Stamped Engineered Drawings

1.00
JB
__________________
__________________

Storage

GRAND TOTAL
__________________

Page 1 of Page 1 of

SECTION C - CONTRACT CLAUSES

C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

(End of Clause)

Page 1 of

Page 1 of

FAR Number
Title
Date
52.204-13
SYSTEM FOR AWARD MANAGEMENT MAINTENANCE
OCT 2018
52.204-18
COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
AUG 2020
52.212-4
CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
DEC 2022
52.232-40
PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS

NOV 2021

VHA Supplemental Contract Requirements for Combatting COVID-19

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, contractors shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.

1. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115–91).

(3) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115–232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[] (1) 52.203–6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

[] (2) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

[] (3) 52.203–15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[X] (4) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109–282) (31 U.S.C. 6101 note).

[] (5) [Reserved] [] (6) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[] (7) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[X] (8) 52.209–6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).

[] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

[] (10) [Reserved] [] (11) 52.219–3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).

[] (12) 52.219–4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[] (13) [Reserved] [] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[] (ii) Alternate I (MAR 2020) of 52.219-6.

[] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[] (ii) Alternate I (MAR 2020) of 52.219-7.

[] (16) 52.219-8, Utilization of Small Business Concerns (OCT 2022) (15 U.S.C. 637(d)(2) and (3)).

[] (17)(i) 52.219–9, Small Business Subcontracting Plan (OCT 2022) (15 U.S.C. 637(d)(4)).

[] (ii) Alternate I (NOV 2016) of 52.219-9.

[] (iii) Alternate II (NOV 2016) of 52.219-9.

[] (iv) Alternate III (JUN 2020) of 52.219–9.

[] (v) Alternate IV (SEP 2021) of 52.219–9.

[] (18)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

[] (ii) Alternate I (MAR 2020) of 52.219-13.

[] (19) 52.219–14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).

[] (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).

[] (21) 52.219–27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2022) (15 U.S.C. 657f).

[X] (22) (i) 52.219–28, Post-Award Small Business Program Rerepresentation (OCT 2022) (15 U.S.C. 632(a)(2)).

[] (ii) Alternate I (MAR 2020) of 52.219–28.

[] (23) 52.219–29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

[] (24) 52.219–30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

[] (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

[X] (26) l(26) 52.219–33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

[X] (27) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

[X] (28) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (DEC 2022) (E.O. 13126).

[X] (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (30)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).

[] (ii) Alternate I (FEB 1999) of 52.222-26.

[X] (31)(i) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

[] (ii) Alternate I (JULY 2014) of 52.222-35.

[X] (32)(i) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

[] (ii) Alternate I (JULY 2014) of 52.222-36.

[X] (33) 52.222–37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

[] (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (35)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).

[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[X] (36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

[] (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[] (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[] (40)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (OCT 2015) of 52.223-13.

[] (41)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-14.

[] (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

[] (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-16.

[X] (44) 52.223–18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O. 13513).

[] (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

[] (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

[] (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

[] (ii) Alternate I (JAN 2017) of 52.224-3.

[] (48)(i) 52.225-1, Buy American—Supplies (OCT 2022) (41 U.S.C. chapter 83).

[] (ii) Alternate I (OCT 2022) of 52.225–1.

[X] (49)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (DEC 2022) (19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[] (ii) Alternate I [Reserved].

[] (iii) Alternate II (DEC 2022) of 52.225-3.

[] (iv) Alternate III (JAN 2021) of 52.225-3.

[] (v) Alternate IV (OCT 2022) of 52.225-3.

[] (50) 52.225–5, Trade Agreements (DEC 2022) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[] (52) 52.225–26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

[] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

[] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

[] (55) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).

[] (56) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

[] (57) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

[X] (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Oct 2018) (31 U.S.C. 3332).

[] (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

[] (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[] (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

[] (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

[] (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).

[] (ii) Alternate I (Apr 2003) of 52.247-64.

[] (iii) Alternate II (NOV 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .