SF30 36C25723Q0547 0003.pdf
PDF 378 KB Posted
- Attached to
- 6515--Patient Ceiling Lift & Installation Federal contract opportunity
- Solicitation number
- 36C25723Q0547
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment C_Architectural Reflected Ceiling Plans.pdf | ||
| 36C25723Q0547 0003_1.docx | DOCX document | |
| Statement of Work_revision 2.pdf | ||
| SF30 36C25723Q0547 0002.pdf | ||
| 36C25723Q0547 0002_1.docx | DOCX document | |
| 36C25723Q0547 0001.pdf | ||
| 36C25723Q0547 0001_1.docx | DOCX document | |
| Attachment B_Reflected Ceiling Plans.pdf | ||
| 36C25723Q0547_1.docx | DOCX document | |
| Attachment A_Installation or Relocation Checklist for Ceiling Mounted Patient Lifts rv2.1.pdf | ||
| RFQ 36C25723Q0547.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0003 05-02-2023 671-23-1-5060-0019
36C257
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504
36C257
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504
To all Offerors/Bidders 36C25723Q0547
04-14-2023 X
X
** HOUR & DATE for Receipt of Offers is EXTENDED to:
See CONTINUATION Page
The purpose of this amendment is to:
1. Revise the Statement of Work and the Line Items to provide a well-defined requirement to interested vendors.
2. Provide answers to the technical questions received.
2. The offeror due date is extended to May 8, 2023, 4PM CST.
x
May 8, 2023, 4PM CST
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
16.00 EA __________________ __________________
Patient Lifts (See Salient Characteristics in the Statement of Work)
1.00 JB __________________ __________________
Installation - IAW SOW
4.00 WK __________________ __________________
Storage (Up to 4 weeks)
This Line Item must be invoiced only for the amount of weeks storage is used.
1.00 EA __________________ __________________
Stamped Engineer Drawings
10.00 JB __________________ __________________
Training (As Required IAW SOW)
Up to 10 sessions. This Line Item must be invoiced only for the amount of training sessions conducted.
GRAND TOTAL __________________
Technical Questions 36C25723Q0547 | Patient Ceiling Lifts & Installation
1. 36C25723Q0547 Due to the Lowest Price, Technically Acceptable (LPTA) source selection, please verify if the procurement is for Medical Device Patient Lifts FDA Complete System (FDA Includes: Motor, Rails, Hangar Bars) Brand New purchase and Installation.
a. S02-36C25723Q0577 Page 4 of 50…the paragraph says “ARJO Huntleigh or AMICO ceiling lifts”, “our goal is to match the lifts” suggesting Arjo Huntleigh or Amico will suffice the SOW only and no other Vendor will suffice. The VA has clearly made their decision on two vendors. This is a suggestion that the VA will not purchase based on equipment performance but by previous relationship.
Answer: Brand name items have been removed from the SOW.
b. 36C25723Q0547 Page 8 of 57…. this talks about Upgrade/refurbishing of existing track with installation of new motor”, insinuating a manufacturer can reuse old parts?
This will create an unfair pricing advantage if a manufacturer is allowed to bid an upgrade of the Motors to the current rails or reusing any end-of-life parts. Medical Device End of life parts are not allowed to be reused as they are End of Life, if you have a waiver for this, please provide the waiver to reuse Medical Device End of Life parts such as the rails shown here only Arjo or Amico can match per Sow. Page 8 of 57…Please clarify if this is an upgrade of only the MOTORS or a Brand-New FDA Medical Device Patient Ceiling Lift System?
Answer: The requirement has been revised for all new patient lifts.
c. 36C25723Q0547 Page 8 of 57…the paragraph says, “Ceiling lifts must not be combined with rails or hardware from different manufacturers.” . Page 5….we agree due to the liability and creating a new type of lift not approved by the FDA. We would like to alert the VA to also to…PAGE 24 C.4 VAAR 852.212-71 GRAY MARKET ITEMS (APR 2020) CURRENTLY does not allow reusing of End-of-Life equipment or any previously bought parts such as Line items 8-11, this would be considered remanufactured supplies or equipment/parts provided per C.4 VAAR 852.212-71 GRAY MARKET ITEMS (APR 2020)
Answer: The requirement has been revised for all new patient lifts.
d. 36C25723Q0547 Page 14 of 57 a. B.3 PRICE/COST SCHEDULE 0001 - 0009 looks like the government is procuring a parts contract as there are no mention of Medical Device Patient Ceiling Lifts. These are parts request line items only….please clarify if the government if procuring a parts contract or new Medical Device Patient Ceiling Lifts?
Question: Based on the above…. Is this an UPGRADE of End-of-Life Medical Device Patient Ceiling Lifts or is this a 100 percent brand new purchase of all Medical Device Patient Ceiling Lift needed? Parts Contract? It would be an unfair advantage to a single
Answer: The requirement has been revised for all new patient lifts.
2. 36C25723Q0577 has 52.211-6 BRAND NAME OR EQUAL? Yet there are several mention of no other brand will suffice or will be accepted.
i. Ceiling Lifts and Installation IAW SOW See "Instructions to Offerors" on page 38…clear direction SOW Only Brand Name.
Answer: The requirement has been revised for Patient Lifts with salient characteristics.
ii. The systems being installed here are being installed in areas that already contain similar equipment, and our goal is to match the lifts in the same section of the hospital to avoid misuse of unfamiliar equipment. Page 4….this clearly states its Brand Name Only.
Answer: Brand name items have been removed from the SOW.
iii. Scales must have a readout in the hand control and must not decrease the lifting height of the system. Page 4….specific to certain vendors only, limiting competition…too specific.
Answer: To maximize patient safety and patient comfort and convenience when using the lifts, this is what is required.
iv. New lifts shall accept generic type replacement batteries without voiding any warranties. Page 5….Too specific request, limits competition for the performance of the lift.
Answer: The specifications of the batteries must be compatible with the lifts provided to ensure neither the lifts, the batteries, nor the facility’s electrical system components are damaged.
v. For reinstallations and structure alterations of existing lifts: Ceiling lifts, curtain compatibility, and continuous-charge rail must be approved by the manufacturer of the existing lifts, supports and/or rail system. Only one manufacturer’s lifts, rails, or hardware are allowed on any part of a system that interconnects. Page 13…this shows its an unfair pricing situation with new lifts and upgrades being purchased that only limited vendors can perform.
Answer: The requirement has been revised for all new patient lifts.
vi. The contractor must offer a warranty for and take responsibility and liability for the function of the rail system onto which they install their lifts or which they modify. The contractor will resolve any issues with the current structure or compatibility within the firm fixed price offered for this contract taken from Page 13. Page 5 (4)(p) a says this is not allowed on page 13, conflicting SOW. “Ceiling lifts must not be combined with rails or hardware from different manufacturers.”
Answer: The requirement has been revised for all new patient lifts.
3. 36C25723Q0547 Training and Warranty
i. Page 6 of 57. Contractor will provide training on equipment use for all new types of equipment included in this contract, one session per shift for up to 2 shifts of personnel in each affected area and for onsite trainers (up to 10 sessions scheduled after installation and before use), in coordination with COR. Page 6…why the request for this quantity of training? Should this not be a line-item specific request if varying from manufacture directed free training?
Answer: The Contractor need not provide different training from what the manufacturer provides. The Contractor must ensure adequate training is provided as specified, whether done by the OEM’s staff or the Contractor’s staff. Training has been added as a separate Line Item.
ii. Page 9 of 57: A specific opportunity for Service Agreements, Preventive Maintenance Agreements, and Extended Warranty Agreements should be presented. Page 9….this will change pricing, what specifically is the government requesting in this solicitation, please provide a line item if this will affect LPTA.
Answer: The Government is requesting a description of a maintenance contract the offeror can provide that can be purchased after the equipment warranty ends. This requirement will not be included in this procurement, but this information is important for future life-cycle planning for this equipment.
iii. Page 10 of 57: Contractor shall provide certified in-service training on each site, multiple times in a day, for biomedical engineering staff in coordination with the COR Page 10….Too general, this training needs to be a Line item if it will affect LPTA.
Answer: Training has been added as a separate Line Item.
iv. Page 13 of 57: Provide 3 years of warranty on tracks, installation, motors, and other parts, including the price of parts, labor and travel, or 10 years of warranty as long as the manufacturer is performing the preventive maintenance annually. Page 13…very specific to a single manufacturer limiting competition to a single vendor. Government should list as a line item if need extra warranty if this will affect LPTA. Please clarify training and warranty needed for performance of this solicitation…if this will affect LPTA, please provide line item specific for training and additional specific warranties.
Answer: Contractor shall provide at least 3-year warranty or better on the lifts.
4. The Reflected ceiling plan provided, only indicated the structural components of the hospital.
I.e. concrete decking. Can you please share with me the Architectural Reflected Ceiling plans showcasing the track design with measurements?
Answer: Architectural Reflected Ceiling plans attached as Attachment C.
| Attachment C_Architectural Reflected Ceiling Plans.pdf |
| 6-S1 |
| 6-S2 |
| 6-S3 |
| 6-S4 |
| 6-S5 |
| 6-S6 |
| 6-S7 |
| 6-S8 |
| 6-S9 |
| 6-S10 |
| 6-S11 |
| 6-S12 |
| 6-S13 |
| 6-S14 |
| 6-S15 |
| 6-S16 |