RFQ 19MX5323Q0008 for Double Pane Windows Replacement.pdf
PDF 2 MB Posted
- Attached to
- Windows Replacement at Government Properties Federal contract opportunity
- Solicitation number
- 19MX5323Q0008
- Issued by
- Department of State US Embassy Mexico
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amedment 0001 19MX5323Q0008.pdf | ||
| SF-1442 - RFQ 19MX5323Q0008 for Double Pane Window Replacement.pdf | ||
| Letter to Offerors - Double Pane Windows Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Quotation No. 19MX5323Q0008 Double Pane Windows Replacement at III Cañadas
COVER PAGE SF -1442
TABLE OF CONTENTS
PART I – The Schedule SF-1442 Cover Sheet
A. Supplies or Service and Prices/Costs B. Scope of Work C. Packaging and Marking D. Inspection and Acceptance E. Deliveries/Performance F. Administration Data G. Special Requirements
PART II – Contract Clauses
H. Clauses
PART III – List of Documents, Exhibits, and Other Attachments
I. List of Attachments
Attachment 1: Sample Bank Letter of Guaranty Attachment 2: Breakdown of Price by Divisions of Specifications Attachment 3: Description/Specifications/Statement of Work Attachment 4: Supporting Photos, Drawings, Details and
Measurements Attachment 5: Quantity Survey Attachment 6: Payment Registration Pesos Form Attachment 6A: Payment Registration U.S. Dollars Form Attachment 7: NDAA Express Certification Attachment 8: Safety Management Plan Attachment 9: Guide for NCAGE and SAM Registration
PART IV – Representations and Instructions
J. Instructions, Conditions, and Quotation Information K. Evaluation Factors for Award L. Representations, Certifications, and Other Statements of Offerors or Quoters
PART I
SECTION A
SUPPLIES OR SERVICES
AND PRICES/COSTS
A.1 Contract Price
The Contractor shall complete all work, including furnishing all labor, material, equipment, and services required under this contract for the following firm fixed price and within the time specified to perform works in Government- Owned (GO) Residence in Mexico City. This work will be to replace the current single pained glass windows with new installed double pane windows. This price shall include all labor, materials, all insurances, overhead and profit.
All prices shall be in , currency.
$ Total Price
$ 16% Value Added Tax (I.V.A.) if applicable
$ Grand Total Price
A.2 Value Added Tax (VAT)
The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in Section A.
A.2.1 Payment Currency
Offers and Payment in U. S. Dollars. U. S. firms are eligible to be paid in U. S.
dollars. U. S. firms desiring to be paid in U.S. dollars should submit their officer in U. S. dollars. A U. S. firm is defined as a company which operates as a corporation incorporated under the laws of a state within the United States.
Offers and Payment in Pesos. Any firm which is not a U. S. firm is a foreign firm. Any firm that does not meet the definition of a U. S. firm shall submit its prices and receive payment in local currency.
A.3 Type of Contract
This is a firm, fixed- price contract. No additional sums will be payable for any escalation in the cost of materials, equipment, or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The Government will not adjust the contract price due to fluctuations in currency exchange rates. The Government will only make changes in the contract price or time to complete due to changes made by the Government in the work to be performed, or by delays caused by the Government.
SECTION B
SCOPE OF WORK
B.1 Scope of Work
The character and scope of the work are set forth in the contract. The Contractor shall furnish and install all materials required by this contract.
The Description/Specifications/Work Statement are set forth in Attachment 3.
Also, refer to the Attachment 1 through 9 for additional information and requirements.
B.2 Drawings
In case of differences between small and large-scale drawings, the latter will govern. Where a portion of the work is drawn in detail and the remainder of the work is indicated in outline, the parts drawn in detail shall apply also to all other portions of the work.
SECTION C
PACKAGING AND MARKING
C. Marking of Materials
The Contractor shall mark materials delivered to the site as follows:
Av. Bernardo Quintana # 120, 130, & 140 Colonia La Loma Alvaro Obregón C.P. 01210, Ciudad de México
SECTION D
INSPECTION AND ACCEPTANCE
D.1 Inspection
The Contracting Officer’s Representative (COR), or his/her authorized representatives, will inspect from time to time the services being performed and the supplies furnished to determine whether work is being performed in a satisfactory manner, and that all supplies are of acceptable quality and standards.
The Contractor shall be responsible for any countermeasures or corrective action, within the scope of this contract, which may be required by the Contracting Officer as a result of such inspection.
D.2 Substantial Completion
D.2.1 Definition
(a) "Substantial Completion" means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:
(1) do not interfere with the intended occupancy or utilization of the work, and
(2) can be completed or corrected within the time required for final completion.
(b) The "date of substantial completion" means the date determined by the Contracting Officer or authorized Government representative as of which substantial completion of the work has been achieved.
D.2.2 Use and Possession upon Substantial Completion
The Government shall have the right to take possession of and use the work upon substantial completion. Upon notice by the Contractor that the work is substantially complete (a Request for Substantial Completion) and an inspection by the Contracting Officer or an authorized Government representative (including any required tests), the Contracting Officer shall furnish the Contractor a Certificate of Substantial Completion. The certificate shall be accompanied by a Schedule of Defects listing items of work remaining to be performed, completed, or corrected before final completion and acceptance. Failure of the Contracting Officer to list any item of work shall not relieve the Contractor of responsibility for complying with the terms of the contract. The Government's possession or use upon substantial completion shall not be deemed an acceptance of any work under the contract.
D.3 Final Completion and Acceptance
D.3.1 Definitions
(a) "Final completion and acceptance" means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.
(b) The "date of final completion and acceptance" means the date determined by the Contracting Officer when final completion of the work has been achieved, as indicated by written notice to the Contractor.
D.3.2. Final Inspection and Tests
The Contractor shall give the Contracting Officer at least five (5) calendar days advance written notice of the date when the work will be fully completed and ready for final inspection and tests. Final inspection and tests will be started not later than the date specified in the notice unless the Contracting Officer determines that the work is not ready for final inspection and so informs the Contractor.
D.3.3. Final Acceptance
If the Contracting Officer is satisfied that the work under the contract is complete (except for continuing obligations), the Contracting Officer shall issue to the Contractor a notice of final acceptance and make final payment upon:
(a) Satisfactory completion of all required tests,
(b) A final inspection that all items by the Contracting Officer listed in the Schedule of Defects have been completed or corrected and that the work is finally complete (subject to the discovery of defects after final completion), and
(c) Submittal by the Contractor of all documents and other items required upon completion of the work, including a final request for payment (Request for Final Acceptance).
SECTION E
DELIVERIES OR PERFORMANCE
E.1 52.211-10, Commencement, Prosecution and Completion of Work (APR 1984)
The Contractor shall be required to:
(a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than eight (8) working days per house after the Notice to Proceed is issued. The time stated for completion shall include final cleanup of the premises and completion of “punch list” items.
The time stated for completion shall include final cleanup of the premises and completion of “punch list” items. Once the contractor believes work to be substantially completed, the contractor requests a formal inspection by the COR. The COR then develops a “punch list” of items that the contractor must complete or repair as part of the contract prior to the Contracting Officer’s written determination of substantial completion.
E.2 Liquidated Damages
F.2.1 FAR 52.211-12, Liquidated Damages - Construction (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, or any extension, the Contractor shall pay liquidated damages to the Government in the amount of (not applicable) for each day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed.
These liquidated damages are in addition to excess costs of repurchase under the Default clause.
E.3 Contractor’s Submission of Construction Schedules
(a) Time for Submission:
The time for submission of the schedules referenced in Section H, 52.236-15, "Schedules for Construction Contracts", paragraph (a), is hereby modified to reflect the due date for submission as "ten (10) calendar days after receipt of an executed contract".
(b) Schedules to Include:
These schedules shall include the time by which shop drawings, product data, samples and other submittals required by the contract will be submitted for approval.
(c) Revision of Schedules:
The Contractor shall revise such schedules:
(1) to account for the actual progress of the work,
(2) to reflect approved adjustments in the performance schedule, and
(3) as required by the Contracting Officer to achieve coordination with work by the Government and any separate contractors used by the Government. The Contractor shall submit a schedule which sequences work so as to minimize disruption at the job site.
(d) Language of Schedules:
All deliverables shall be in the English language and any system of dimensions (English or metric) shown shall be consistent with that used in the contract.
No extension of time shall be allowed due to a delay by the Government in approving such deliverables if the Contractor has failed to act promptly and responsively in submitting its deliverables. The Contractor shall identify each deliverable as required by the contract.
(e) Acceptance of Schedule:
When the Government has accepted any time schedule; it shall be binding upon the Contractor. The completion date is fixed and may be extended only by a written contract modification signed by the Contracting Officer.
Acceptance or approval of any schedule or revision thereof by the Government shall not:
(1) Extend the completion date or obligate the Government to do so,
(2) Constitute acceptance or approval of any delay, or
(3) Excuse the Contractor from or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.
E.4 Notice of Delay
If the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are causing delays which the Contractor believes may result in late completion of the project, the Contractor shall notify the Contracting Officer. The Contractor’s notice shall state the effect, if any, of such change or other conditions upon the approved schedule, and shall state in what respects, if any, the relevant schedule, or the completion date should be revised. The Contractor shall give this notice not more than ten (10) working days after the first event-giving rise to the delay or prospective delay. Only the Contracting Officer may revise the approved time schedule.
E.5 Notice to Proceed
(a) After receiving and accepting any bonds or evidence of insurance, the Contracting Officer will issue the Contractor a Notice to Proceed. The Contractor shall then prosecute the work commencing and completing performance not later than the time established in the contract.
(b) It is possible that the Contracting Officer may elect to issue the Notice to Proceed before receipt and acceptance of any bonds. Issuance of a Notice to Proceed by the Government before receipt of the required bonds or policies shall not be a waiver of the requirement to furnish these documents.
E.6 Working Hours
All work shall be performed during normal working hours from 08:30 to 17:30, Monday through Friday, except for the holidays identified below.
Other hours, if requested by the Contractor, may be approved by the Contracting Officer's Representative. The Contractor shall give 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours will not be a cause for a price increase.
E.7 U.S. and Mexican Holidays
The Department of State observes the following days as holidays. Observance of such days by Government personnel shall not be cause for additional period of performance or entitlement to compensation except as set forth in the contract. If the Contractor's personnel work on a holiday, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, unless authorized pursuant to an overtime clause elsewhere in this contract.
Any other day designated by Federal law, Executive Order, or Presidential Proclamation shall be notified to the Contractor in due time.
E.7.1 U. S. Holidays:
• New Year's Day (January 1st)
• Martin Luther King's Birthday (3rd Monday in January)
• Presidents Day (3rd Monday in February)
• Memorial Day (last Monday in May)
• Independence Day (4th of July)
• Labor Day (1st Monday in September)
• Columbus Day (2nd Monday in October)
• Veterans Day (November 11)
• Thanksgiving Day (4th Thursday in November)
• Christmas Day (December 25)
When any such day falls on a Saturday, the preceding Friday is observed;
when any such day falls on a Sunday, the following Monday is observed.
E.7.2 Mexican Holidays:
• *Anniversary of Mexican Constitution (1st Monday in February)
• *Benito Juarez's Birthday (3rd Monday in March)
• Holy Thursday (varies)
• Good Friday (varies)
• Mexican Labor Day (May 1)
• Anniversary of the Battle of Puebla (May 5)
• Mother’s Day (May 10)
• Mexican Independence Day (September 16)
• All Soul's Day (November 2)
• *Anniversary of Mexican Revolution (3rd Monday in November)
*These holidays will be observed on Monday. All other holidays falling on weekend are NOT observed on the preceding Friday or subsequent Monday.
E.8 Pre-Construction Conference
A pre-construction conference will be held ten (10) calendar days after contract award at Paseo de la Reforma No. 305, Colonia Cuauhtemoc, Alcaldia Cuauhtemoc, Ciudad de Mexico, C.P. 06500 to discuss the schedule, submittals, notice to proceed, mobilization and other important issues that affect construction progress. See Section H, FAR 52.236-26, Pre-Construction Conference.
E.9 Deliverables
The following items shall be delivered under this contract:
Description Quantity Delivery Date Deliver To:
G.1.2 Bonds/Insurance 1 10 days after award CO
E.3. Construction Schedule 1 10 days after award COR E.8. Pre-Construction Conference 1 10 days after award COR
G.5.3 Biographic Data on Personnel 1 10 days after award COR
D.3.2 Inspection and Tests 1 5 days after end of weekly period COR
F.2.2 Monthly Payments 1 Monthly COR E.3 (c) Updates to Construction Schedule 1 10 days after receipt executed contract COR
D.2.1 Request for Substantial Completion 1 5 days before inspection COR
D.3.3 Request for Final Acceptance 1 5 days before inspection COR
E.4 Notice of Delay 1 Within 10 days after event CO
E.6 Additional Hours 1 No later than 24 hours in advance of need
COR
G.9 Differing Site Condition 1 Within 10 days of occurrence CO
SECTION F
ADMINISTRATIVE DATA
F.1 Monitoring of the Contractor
F.1.1 652.242-70, Contracting Officer’s Representative (COR) (AUG 1999)
(a) The Contracting Officer may designate in writing one or more Government employees, by position title, to act for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer, and this authority is delegated in the designation.
(b) The COR for this contract is The Residential Project Manager/ Inspector
F.1.2 Duties
The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract. The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract. The COR is designated as the authority to act for the Contracting Officer in matters concerning technical clarification, random inspection of Contractor performance to ensure compliance with contract specifications and acceptance of the Contractor's performance under this contract. The COR will coordinate all work with the Contractor during the term of this contract. The COR is not authorized to alter the contract's terms, or conditions, including the design to budget parameter. Such changes must be authorized by the Contracting Officer in a written modification to the contract. Reference to the project architect within documents incorporated into this contract shall be read to mean COR.
F.2 Payment
The Contractor's attention is directed to Section H, FAR 52.232-5, "Payments Under Fixed-Price Construction Contracts". The following elaborates on the information contained in that clause.
Requests for payment may be made no more frequently than monthly.
Payment requests shall cover the value of labor and materials completed and in place, including a prorated portion of overhead and profit.
F.2.1 Evaluation by the Contracting Officer
After receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer shall decide as to the amount, which is then due. If the Contracting Officer does not approve payment of the full amount applied for, less the retainage allowed by in FAR 52.232-5, the Contracting Officer shall advise the Contractor as to the reasons.
F.2.2 Monthly Payment:
The Contractor shall submit monthly electronic invoices as follows:
1. Typed (not hand written);
2. Statement that prior payment has not been made;
3. Copies should be certified as being a true copy of the original and with signature;
4. Contractor’s name and complete address;
5. Contractor’s RFC;
6. Date issued;
7. Issued to the following address:
Embajada de Estados Unidos de Norteamérica;
Paseo de la Reforma No. 305, Colonia Cuauhtémoc, Mexico, D. F., C.P. 06500;
RFC: EEU 930201 289;
8. Period of performance being charged;
9. Contract number/Purchase Order Number;
10. List the items/services being provided by line item number as stated in the Contract or the Delivery/Task Order;
11. IVA broken down (if applicable);
12. Amount must be in numbers and spelled out;
13. Refer to payment FAR Clauses contained in Section H for Request for Quotation (RFQ) format or Section 2 for Commercial items format entitled “Contract Clauses”; and
14. A copy of the corresponding Vendor Registration Form (see Exhibit 5 fill in the applicable form).
-Send invoice to:
-If submitted electronically, invoices shall be submitted to the following electronic mail address:
mexfmcinvoices@state.gov COR@state.gov
F.2.3 Payment Due Period
Under the authority of 52.232-27(a) the 14-day period identified in FAR 52.232-27(a)(1)(i)(A) is hereby changed to 30 days.
F.4 Value Added Tax (VAT-IVA)
The Contractor shall identify Value Added Tax (VAT) as a separate line item in Exhibit 2, Breakdown of Proposal Price by Divisions of Specifications. The Contractor shall also show VAT as a separate charge on invoices submitted.
mailto:mexfmcinvoices@state.gov mailto:COR@state.gov
SECTION G
SPECIAL REQUIREMENTS
G.1 Bond/Irrevocable Letters of Credit Requirements
G.1.1 Performance/Payment Protection
The Contractor shall furnish some form of payment protection as described in FAR 52.228-13 in the amount of 50% of the contract price. The Contractor shall furnish comparable alternate performance security (irrevocable letter of credit) approved by the Government such as letter of credit/guaranty as shown in Section I – Exhibit 1, Bank Letter of Guarantee.
G.1.2 Time for Submission
The Contractor shall provide the information required by the paragraph above within ten (10) calendar days after award. Failure to timely submit the required security may result in rescinding or termination of the contract by the Government. If the contract is terminated, the Contractor will be liable for those costs as described in FAR 52.249-10, Default (Fixed-Price Construction), which is included in this purchase order.
G.1.3 Coverage
The bonds or alternate performance security shall guarantee the Contractor's execution and completion of the work within the contract time and the correction of any defects after completion as required by this contract, the payment of all wages and other amounts payable by the Contractor under its subcontracts or for labor and materials, and the satisfaction or removal of any liens or encumbrances placed on the work.
G.1.4 Term of Validity
The required securities shall remain in effect in the full amount required until final acceptance of the project by the Government. Upon final acceptance, the penal sum of the performance security shall be reduced to 10% of the contract price. The security shall remain in effect for one year after the date of final completion and acceptance, and the Contractor shall pay any premium required for the entire period of coverage.
G.2 Insurance
The Contractor is required by FAR 52.228-5, "Insurance - Work on a Government Installation" to provide whatever insurance is legally necessary.
The Contractor shall at its own expense provide and maintain during the entire performance period the following insurance amounts:
G.2.1 General Liability
General liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury):
(1) BODILY INJURY, ON OR OFF THE SITE, IN U.S. DOLLARS
Per Occurrence $ 5,000.00 U. S. Dollars
Cumulative $ 50,000.00 U. S. Dollars
(2) PROPERTY DAMAGE, ON OR OFF THE SITE, IN U.S. DOLLARS
Per Occurrence $ 10,000.00 U. S. Dollars
Cumulative $ 100,000.00 U. S. Dollars
G.2.2 Other Types of Insurance
The foregoing types and amounts of insurance are the minimums required.
The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.
G.2.2.1 Release of Liability
The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from, and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising there from, except in the instance of gross negligence on the part of the Government.
G.2.2.2 Insurance for Damage or Theft
The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.
G.2.2.3 Government as Additional Insured
The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.
G.3 Document Descriptions
G.3.1 Supplemental Documents
The Contracting Officer shall furnish from time to time such detailed drawings and other information as is considered necessary, in the opinion of the Contracting Officer, to interpret, clarify, supplement, or correct inconsistencies, errors or omissions in the Contract documents, or to describe minor changes in the work not involving an increase in the contract price or extension of the contract time. The Contractor shall comply with the requirements of the supplemental documents, and unless the Contractor makes objection within 20 calendar days, their issuance shall not provide for any claim for an increase in the Contract price or an extension of contract time.
G.3.2 Record Documents
The Contractor shall maintain at the project site:
(1) a current marked set of Contract drawings and specifications indicating all interpretations and clarification, contract modifications, change orders, or any other departure from the contract requirements approved by the Contracting Officer; and,
(2) a complete set of record shop drawings, product data, samples and other submittals as approved by the Contracting Officer.
G.4 Laws and Regulations
G.4.1 Compliance Required
The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the construction site without the permission of the Contracting Officer. Unless otherwise directed by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations, and orders and of the contract. In the event of a conflict between the contract and such laws, regulations and orders, the Contractor shall promptly advise the Contracting Officer of the conflict and of the Contractor's proposed course of action for resolution by the Contracting Officer.
G.4.2 Labor, Health and Safety Laws and Customs
The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.
G.4.3 Subcontractors
The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.
G.4.4 Evidence of Compliance
The Contractor shall submit proper documentation and evidence satisfactory to the Contracting Officer demonstrating compliance with this clause.
G.5 Construction Personnel
G.5.1 Removal of Personnel
The Contractor shall maintain discipline at the site and always take all reasonable precautions to prevent any unlawful, riotous, or disorderly conduct by or among those at the site. The Contractor shall ensure the preservation of peace and protection of persons and property about the project. The Contracting Officer may require, in writing that the Contractor remove from the work any employee that the Contracting Officer deems incompetent, careless, insubordinate, or otherwise objectionable, or whose continued employment on the project is deemed by the Contracting Officer to be contrary to the Government's interests.
G.5.2 Actual or Potential Labor Dispute
If the Contractor has knowledge that any actual or potential labor dispute is delaying or threatens to delay the timely performance of this contract, the Contractor shall immediately give notice, including all relevant information, to the Contracting Officer
G.5.3 Construction Personnel Security
After award of the contract, the Contractor shall have ten (10) calendar days to submit to the Contracting Officer a list of workers and supervisors assigned to this project (Biographic Data on Personnel) for the Government to conduct all necessary security checks. It is anticipated that security checks will take at least two weeks to perform. For everyone the list shall include:
• Full Name
• Place and Date of Birth
• Current Address
• Identification number
Failure to provide any of the above information may be considered grounds for rejection and/or re-submittal of the application. Once the Government has completed the security screening and approved the applicants, the Government will provide a badge to the individual for access to the site. The Government may revoke this badge at any time due to the falsification of data, or misconduct on site.
G.5.4 Language Proficiency
The Contractor shall always provide an English-speaking supervisor on site.
This position is considered as key personnel under this contract.
G.6 Materials and Equipment
All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified. All workmanship shall be of good quality and performed in a skillful manner that will withstand inspection by the Contracting Officer.
G.7 Special Warranties
G.7.1 Special Warranty Obligations
Any special warranties that may be required under the contract shall be subject to the stipulations set forth in FAR 52.246-21, "Warranty of Construction", if they are not in conflict.
G.7.2 Warranty Information
The Contractor shall obtain and furnish to the Government all information required to make any subcontractor's, manufacturers, or supplier's guarantee or warranty legally binding and effective. The Contractor shall submit both the information and the guarantee or warranty to the Government in sufficient time to permit the Government to meet any time limit specified in the guarantee or warranty, but not later than completion and acceptance of all work under this contract.
G.8 Equitable Adjustments
G.8.1 Adjustment under Changes”
Any circumstance for which the contract provides an equitable adjustment that causes a change within the meaning of paragraph (a) of the "Changes" clause shall be treated as a change under that clause. The Contractor shall give the Contracting Officer written notice (within 20 calendar days) stating:
(a) the date, circumstances, and applicable contract clause authorizing an equitable adjustment and
(b) that the Contractor regards the event as a changed condition for which an equitable adjustment is allowed under the contract.
G.9 Differing Site Condition Notice
The Contractor shall provide written notice of a differing site condition within 10 calendar days of occurrence following FAR 52.236-2, Differing Site Conditions.
G.10 Zoning Approvals and Permits
G.10.1 The Government shall be responsible for:
- obtaining proper zoning or other land use control approval for the project
- obtaining the approval of the Contracting Drawings and Specifications
- paying fees due for the foregoing; and,
- for obtaining and paying for the initial building permits.
PART II
SECTION H
CONTRACT CLAUSES
H.1 FAR 52.252-2, Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at:
http:/www./acquisition.gov/far/ or http://farsite.hill.af.mil/vffara.htm. Please not these addresses are subject to change.
If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Department of State Acquisition website at http://www.statebuy.state.gov/ to see the links to the FAR. You may also use Internet “search engines” (for example, Google, Yahoo or Excite) to obtain the latest location of the most current FAR.
The following Federal Acquisition Regulation (FAR) clauses are incorporated by reference (48 CFR CH. 1):
CLAUSE TITLE AND DATE
52.202-1 DEFINITIONS (JUN 2020)
52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL
(JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (JUN 2020)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
http://www./acquisition.gov/far/in http://farsite.hill.af.mil/vffara.htm http://www.statebuy.gov/home.htm
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
(AUG 2020)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED
OR PROPOSED FOR DEBARMENT (NOV 2021)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
52.213-4 TERMS AND CONDITIONS –SIMPLIFIED ACQUISITIONS (OTHER
THAN COMMERCIAL ITEMS) (DEC 2022)
52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222-19 CHILD LABOR – COOPERATION WITH AUTHORITIES AND
REMEDIES (JAN 2020)
52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING (JUN 2020)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)
52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION
OF CONTRACT (FEB 2000)
52.228-4 WORKERS’ COMPENSATION AND WAR-HAZARD INSURANCE
OVERSEAS (APR 1984)
52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION (JAN
1997)
52.228-11 PLEDGES OF ASSETS (FEB 2021)
52.228-17 INDIVIDUAL SURETY – PLEGE OF ASSETS (FEB 2021)
52.228-13 ALTERNATIVE PAYMENT PROTECTION (JULY 2000)
52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION (JUN
2020)
52.229-6 TAXES – FOREIGN FIXED-PRICE CONTRACTS (FEB 2013)
52.229-7 TAXES- FIXED PRICE CONTRACTS WITH FOREIGN GOVERNMENTS
(FEB 2013)
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS
(MAY 2014)
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
52.232-11 EXTRAS (APR 1984)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
52.232-22 LIMITATION OF FUNDS (APR 1984)
52.232-25 PROMPT PAYMENT (JAN 2017)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR
AWARD MANAGEMENT (OCT 2018)
52.232-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER – OTHER THAN
SYSTEM FOR AWARD MANAGEMENT (JULY 2013)
52.233-1 DISPUTES (MAY 2014) Alternate I (DEC 1991)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
(APR 1984)
52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236-8 OTHER CONTRACTS (APR 1984)
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236-12 CLEANING UP (APR 1984)
52.236-13 ACCIDENT PREVENTION (NOV 1991)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB
1997)
52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.242-14 SUSPENSION OF WORK (APR 1984)
52.243-4 CHANGES (JUN 2007)
52.243-5 CHANGES AND CHANGED CONDITIONS (APR 1984)
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (NOV 2021)
52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES
(APR 2012)
52.245-9 USE & CHARGES (APR 2012)
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
52.246-17 WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)
52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
52.246-26 REPORTING NONCONFORMING ITEMS (NOV 2021)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-
PRICE) (APR 2012) Alternate I (SEPT 1996)
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
52.249-14 EXCUSABLE DELAYS (APR 1984)
The following Department of State Acquisition Regulations (DOSAR) clause(s) is/are incorporated by full Text (48 CFR CH. 1):
FAR CLAUSES INCORPORATED IN FULL TEXT
H.2 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
(NOV 2021)
(a) Definitions. As used in this clause— Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network).
Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People’s Republic of China.
Covered telecommunications equipment or services means–
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means–
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in Federal Acquisition Regulation 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
(c) Exceptions. This clause does not prohibit contractors from providing—
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement.
(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any https://www.acquisition.gov/far/4.2104#FAR_4_2104 system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause
(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.
(End of clause)
The following Department of State Acquisition Regulation (DOSAR) clause(s) is/are set forth in full text:
H.3 652.204-70 Department of State Personal Identifications Card Issuance
(FEB 2015)
(a) The Contractor shall comply with the Department of State (DOS) Personal Identification Card Issuance Procedures for all employees performing under this contract who require frequent and continuing access to DOS facilities, or information systems. The Contractor shall insert this clause in all subcontracts when the subcontractor’s employees will require frequent and continuing access to DOS facilities, or information systems.
(b) The DOS Personal Identification Card Issuance Procedures may be accessed at http://www.state.gov/m/ds/rls/rpt/c21664.htm .
H.4 652.229-71 Personal Property Disposition at Posts Abroad (AUG 1999)
Regulations at 22 CFR Part 136 require that U.S. Government employees and their families do not profit personally from sales or other transactions with persons who are not themselves entitled to exemption from import restrictions, duties, or taxes. Should the Contractor experience importation or tax privileges in a foreign country because of its contractual relationship to the United States Government, the Contractor shall observe the requirements of 22 CFR Part 136 and all policies, rules, and procedures issued by the chief of mission in that foreign country.
H.4.1 CONTRACTOR IDENTIFICATION (JULY 2008)
http://www.state.gov/m/ds/rls/rpt/c21664.htm
Contract performance may require contractor personnel to attend meetings with government personnel and the public, work within government offices, and/or utilize government email.
Contractor personnel must take the following actions to identify themselves as non-federal employees:
1) Use an email signature block that shows name, the office being supported and company affiliation (e.g. “John Smith, Office of Human Resources, ACME Corporation Support Contractor”);
2) Clearly identify themselves and their contractor affiliation in meetings;
3) Identify their contractor affiliation in Departmental e-mail and phone listings whenever contractor personnel are included in those listings;
and
4) Contractor personnel may not utilize Department of State logos or indicia on business cards.
H.5. 652.236-70 Additional Safety Measures (OCT 2017)
In addition to the safety/accident prevention requirements of FAR 52.236-13, Accident Prevention Alternate I, the contractor shall comply with the following additional safety measures.
(a) High Risk Activities. If the project contains any of the following high risk activities, the contractor shall follow the section in the latest edition, as of the date of the solicitation, of the U.S. Army Corps of Engineers Safety and Health manual, EM 385-1-1, that corresponds to the high risk activity. Before work may proceed, the contractor must obtain approval from the COR of the written safety plan required by FAR 52.236-13, Accident Prevention Alternate I (see paragraph (f) below), containing specific hazard mitigation and control techniques.
(1) Scaffolding;
(2) Work at heights above 1.8 meters;
(3) Trenching or other excavation greater than one (1) meter in depth;
(4) Earth-moving equipment and other large vehicles;
(5) Cranes and rigging;
(6) Welding or cutting and other hot work;
(7) Partial or total demolition of a structure;
(8) Temporary wiring, use of portable electric tools, or other recognized electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits;
other electrical hazards may also require the use of a GFCI;
(9) Work in confined spaces (limited exits, potential for oxygen less than
19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.);
(10) Hazardous materials - a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive or unstable, or any operations, which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.; or
(11) Hazardous noise levels as required in EM 385-1 Section 5B or local standards if more restrictive.
(b) Safety and Health Requirements. The contractor and all subcontractors shall comply with the latest edition of the U.S. Army Corps of Engineers Safety and Health manual EM 385-1-1, or OSHA 29 CFR parts 1910 or 1926 if no EM
385-1-1 requirements are applicable, and the accepted contractor’s written safety program.
(c) Mishap Reporting. The contractor is required to report immediately all mishaps to the COR and the contracting officer.