RFP 50009_Exhibit B - Pricing.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
On-Call Environmental Consulting Services State and local contract opportunity
Solicitation number
50009
Issued by
Colorado

About this file

The document is a Pricing Exhibit (RFP 50009_Exhibit B - Pricing.xlsx) for the City and County of Denver's On-Call Environmental Consulting Services contract. The solicitation seeks qualified proposers to provide environmental consulting services, including asbestos detection, lead-based paint inspections, industrial hygiene, and related expert services. The contract spans five years, with pricing specified for standard and non-standard hours across different professional labor categories such as Field Operations Manager, Project Managers, Industrial Hygienists, Asbestos Inspectors, and Technical Support roles.

The pricing exhibit details two comprehensive tables: Table 1 outlines hourly rates for various professional labor categories across contract years 1-5, differentiating between standard (8 a.m. - 5 p.m., M-F) and non-standard hours (5 p.m. - 8 a.m., weekends, and city holidays). Table 2 provides flat rates for specialized analysis services and equipment rentals, including point count analyses (PLM, PCM, TEM), lead-based paint testing, mold spore testing, radon test kits, and metal analysis, with options for rush, priority, and standard turnaround times. The pricing structure allows for flexible service delivery and accommodates different project urgency levels.

View the file

Other files for this state and local contract opportunity

Other files attached to On-Call Environmental Consulting Services, newest first.
File Type Posted
RFP 50009_Exhibit C - Byrd Anti-Lobbying Certfication Form.pdf PDF
RFP 50009_Exhibit D - Sample Agreement.pdf PDF
RFP 50009_On-Call Environmental Consulting Services.pdf PDF
RFP 50009_Exhibit A - Scope of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 - Enviro Consult Svcs

RFP 50009_Exhibit B - PricingInstructions: Only complete cells with a $ symbol.
Table 1 - Environmental Consulting Services
CONTRACT YEARS 1-3CONTRACT YEARS 1-3CONTRACT YEAR 4CONTRACT YEAR 4CONTRACT YEAR 5CONTRACT YEAR 5
Labor Description (or equivalent)Total hourly rate STANDARD HOURS
(8 a.m. – 5 p.m., M-F)Total hourly rate

NON- STANDARD HOURS

(5 p.m. – 8 a.m., M-F, weekends & City holidays)Total hourly rate STANDARD HOURS
(8 a.m. – 5 p.m., M-F)Total hourly rate

NON- STANDARD HOURS

(5 p.m. – 8 a.m., M-F, weekends & City holidays)Total hourly rate STANDARD HOURS
(8 a.m. – 5 p.m., M-F)Total hourly rate

NON- STANDARD HOURS

(5 p.m. – 8 a.m., M-F, weekends & City holidays)

Field Operations Manager or Principal Level$$$$$$
Senior Project Manager$$$$$$
Project Manager$$$$$$
Certified Industrial Hygienist$$$$$$
Senior Industrial Hygienist$$$$$$
Staff Level Industrial Hygienist$$$$$$
Asbestos Project Designer$$$$$$
Asbestos Management Planner$$$$$$
Certified Asbestos Building Inspector$$$$$$
Asbestos Air Monitoring Specialist$$$$$$
Certified Asbestos Building Inspector for RACS$$$$$$
Lead-Based Paint Inspector$$$$$$
Lead Risk Assessor$$$$$$
Technical Drafter - CADD (I, II, or III)$$$$$$
Technical Assistant (I, II, or III)$$$$$$

Table 2 - Analysis, Equip.

RFP 50009_Exhibit B - PricingInstructions: Only complete cells with a $ symbol.
Table 2 - Analysis, Equipment Rental
YEARS 1-3CONTRACT YEARS 1-3CONTRACT YEAR 4CONTRACT YEAR 5
AnalysisUnitFlat RateFlat RateFlat Rate
PLM Point Count (Rush)Each$$$
PLM Point Count (Priority)Each$$$
PLM Point Count (Standard)Each$$$
PCM Analysis (Rush)Each$$$
PCM Analysis (Priority)Each$$$
PCM Analysis (Standard)Each$$$
TEM Analysis (Rush)Each$$$
TEM Analysis (Priority)Each$$$
TEM Analysis (Standard)Each$$$
Lead-Based Paint Dust Wipe or Bulk Analysis (Rush)Each$$$
Lead-Based Paint Dust Wipe or Bulk Analysis (Priority)Each$$$
Lead-Based Paint Dust Wipe or Bulk Analysis (Standard)Each$$$
Mold Spore Trap/Tape/Swab/Bulk (Standard)Each$$$
Radon Test KitEach$$$
ICP/AES Analysis (8 Metals), 24-hour Turnaround TimeEach$$$
Lead Waste (RCRA 8 TCLP) 3-day Turnaround TimeEach$$$
Equipment RentalUnitFlat RateFlat RateFlat Rate
Mold Spore Trap/Tape/Swab/Bulk (Rush)
Mold Spore Trap/Tape/Swab/Bulk (Priority)
X-Ray FluorescenceDay$$$
PID / FID / Multi Gas MeterDay$$$

File details come from the government source that posted it. Updated .