RFP 50009_Exhibit B - Pricing.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- On-Call Environmental Consulting Services State and local contract opportunity
- Solicitation number
- 50009
- Issued by
- Colorado
About this file
The document is a Pricing Exhibit (RFP 50009_Exhibit B - Pricing.xlsx) for the City and County of Denver's On-Call Environmental Consulting Services contract. The solicitation seeks qualified proposers to provide environmental consulting services, including asbestos detection, lead-based paint inspections, industrial hygiene, and related expert services. The contract spans five years, with pricing specified for standard and non-standard hours across different professional labor categories such as Field Operations Manager, Project Managers, Industrial Hygienists, Asbestos Inspectors, and Technical Support roles.
The pricing exhibit details two comprehensive tables: Table 1 outlines hourly rates for various professional labor categories across contract years 1-5, differentiating between standard (8 a.m. - 5 p.m., M-F) and non-standard hours (5 p.m. - 8 a.m., weekends, and city holidays). Table 2 provides flat rates for specialized analysis services and equipment rentals, including point count analyses (PLM, PCM, TEM), lead-based paint testing, mold spore testing, radon test kits, and metal analysis, with options for rush, priority, and standard turnaround times. The pricing structure allows for flexible service delivery and accommodates different project urgency levels.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP 50009_Exhibit C - Byrd Anti-Lobbying Certfication Form.pdf | ||
| RFP 50009_Exhibit D - Sample Agreement.pdf | ||
| RFP 50009_On-Call Environmental Consulting Services.pdf | ||
| RFP 50009_Exhibit A - Scope of Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 - Enviro Consult Svcs
| RFP 50009_Exhibit B - Pricing | Instructions: Only complete cells with a $ symbol. |
| Table 1 - Environmental Consulting Services |
| CONTRACT YEARS 1-3 | CONTRACT YEARS 1-3 | CONTRACT YEAR 4 | CONTRACT YEAR 4 | CONTRACT YEAR 5 | CONTRACT YEAR 5 | ||
| Labor Description (or equivalent) | Total hourly rate STANDARD HOURS | ||||||
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
| (5 p.m. – 8 a.m., M-F, weekends & City holidays) | Total hourly rate STANDARD HOURS |
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
| (5 p.m. – 8 a.m., M-F, weekends & City holidays) | Total hourly rate STANDARD HOURS |
| (8 a.m. – 5 p.m., M-F) | Total hourly rate |
NON- STANDARD HOURS
(5 p.m. – 8 a.m., M-F, weekends & City holidays)
| Field Operations Manager or Principal Level | $ | $ | $ | $ | $ | $ |
| Senior Project Manager | $ | $ | $ | $ | $ | $ |
| Project Manager | $ | $ | $ | $ | $ | $ |
| Certified Industrial Hygienist | $ | $ | $ | $ | $ | $ |
| Senior Industrial Hygienist | $ | $ | $ | $ | $ | $ |
| Staff Level Industrial Hygienist | $ | $ | $ | $ | $ | $ |
| Asbestos Project Designer | $ | $ | $ | $ | $ | $ |
| Asbestos Management Planner | $ | $ | $ | $ | $ | $ |
| Certified Asbestos Building Inspector | $ | $ | $ | $ | $ | $ |
| Asbestos Air Monitoring Specialist | $ | $ | $ | $ | $ | $ |
| Certified Asbestos Building Inspector for RACS | $ | $ | $ | $ | $ | $ |
| Lead-Based Paint Inspector | $ | $ | $ | $ | $ | $ |
| Lead Risk Assessor | $ | $ | $ | $ | $ | $ |
| Technical Drafter - CADD (I, II, or III) | $ | $ | $ | $ | $ | $ |
| Technical Assistant (I, II, or III) | $ | $ | $ | $ | $ | $ |
Table 2 - Analysis, Equip.
| RFP 50009_Exhibit B - Pricing | Instructions: Only complete cells with a $ symbol. |
| Table 2 - Analysis, Equipment Rental |
| YEARS 1-3 | CONTRACT YEARS 1-3 | CONTRACT YEAR 4 | CONTRACT YEAR 5 | |
| Analysis | Unit | Flat Rate | Flat Rate | Flat Rate |
| PLM Point Count (Rush) | Each | $ | $ | $ |
| PLM Point Count (Priority) | Each | $ | $ | $ |
| PLM Point Count (Standard) | Each | $ | $ | $ |
| PCM Analysis (Rush) | Each | $ | $ | $ |
| PCM Analysis (Priority) | Each | $ | $ | $ |
| PCM Analysis (Standard) | Each | $ | $ | $ |
| TEM Analysis (Rush) | Each | $ | $ | $ |
| TEM Analysis (Priority) | Each | $ | $ | $ |
| TEM Analysis (Standard) | Each | $ | $ | $ |
| Lead-Based Paint Dust Wipe or Bulk Analysis (Rush) | Each | $ | $ | $ |
| Lead-Based Paint Dust Wipe or Bulk Analysis (Priority) | Each | $ | $ | $ |
| Lead-Based Paint Dust Wipe or Bulk Analysis (Standard) | Each | $ | $ | $ |
| Mold Spore Trap/Tape/Swab/Bulk (Standard) | Each | $ | $ | $ |
| Radon Test Kit | Each | $ | $ | $ |
| ICP/AES Analysis (8 Metals), 24-hour Turnaround Time | Each | $ | $ | $ |
| Lead Waste (RCRA 8 TCLP) 3-day Turnaround Time | Each | $ | $ | $ |
| Equipment Rental | Unit | Flat Rate | Flat Rate | Flat Rate |
| Mold Spore Trap/Tape/Swab/Bulk (Rush) | ||||
| Mold Spore Trap/Tape/Swab/Bulk (Priority) | ||||
| X-Ray Fluorescence | Day | $ | $ | $ |
| PID / FID / Multi Gas Meter | Day | $ | $ | $ |
File details come from the government source that posted it. Updated .