This document is a comprehensive engineering design plan for the High-Level Trunkline Capacity Improvements project by the City of Ann Arbor, Michigan. The project involves approximately 1,500 feet of new sanitary sewer infrastructure, including water main and storm water improvements, and road resurfacing along Washington Street and First Street. The project spans multiple street segments from Washington Street to Miller Street, with detailed engineering plans covering removal, construction, sanitary sewer, storm sewer, water main, and instrumentation work. The project is identified by RFP No. 25-39 and File No. 2024-001, with design and engineering work prepared under the supervision of Christopher Jay Elenbaas, P.E. and Tracy Crane Anderson, P.E.

The engineering plans include extensive details for traffic management, including four distinct detour phases, bike detours, and pedestrian access routes. The project incorporates sophisticated monitoring systems, including inclinometer installations, settlement monitoring points, utility monitoring points, and observation wells. The design includes provisions for maintaining pedestrian and vehicular access during construction, with specific requirements for accessibility, surface treatments, and safety measures. The plan appears to be funded by the City of Ann Arbor's public services department and involves careful consideration of existing infrastructure, underground utilities, and minimal disruption to the surrounding urban environment.

View the file

Other files for this state and local contract opportunity

Other files attached to High-Level Trunkline Capacity Improvements Project, newest first.
File Type Posted
RFP_25-39_Document.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

IG

H

-L E

V E

L T

R U

N K

L

IN

E C

A P

A C

IT

Y

IM

P

R O

V E

M E

N T

S

R F

P N o . 2

5-

4-

T H

IS

P

R O

JE

C

T I

N C

L U

D E

S A

P P

R O

X

F T

O F

N E

W S

A N

IT

A

R Y

S E

W E

R E

F F

E C

T E

D W

A T

E R

M A

IN

A

N D

S T

O R

M W

A T

E R

A N

D R

O A

D R

E S

U R

F A

C

IN

G

HIGH-LEVEL TRUNKLINE

CAPACITY IMPROVEMENTS

RFP No. 25-39, FILE No. 2024-001

NORTH

VICINITY MAP

HURON

RIVER

STEIN

M A

P L

E

N E

W P

O R

T

HURON DRIVE

RIVER

MILLER

B A

R T

O N

W A

G N

E R

WARREN

DHUVARREN

P O

N T

IA

C

T R

A

IL

PLYMOUTH

ANN ARBOR

EA

R

H A

R T

GOSS

D

IX

B O

R O

N

IX

O N

H U

R O

N

PKW

Y

GEDDES

GLAZIER

FULLER

GEDDES

HURON

W

ASHTENAW

PA

C

K A

R

DS

T A

T E

WASHTENAW

DEXTERJACKSON

LIBERTY

STADIUM

M A

P L

E

S E

V E

N T

H

M A

IN

STADIUMW

A

G N

E R

SCIOCHURCH

WATERS

ANN A

RBORSALIN

E

M A

P L

E

L O

H R

S T

A T

E

S T

O N

E S

C H

O O

L

EISENHOWER

ELLSWORTH RD

ELLSWORTH

PACKARD

P L

A T

T

H O

G B

A C

K

23 14

DWS

HURON

C A

R P

E N

T E

R

SUNSET

G R

E E

N

R

Kn ow w ha t's be lo w.

Ca ll b ef or e y ou d ig

NNAF 4281DEDNUOF

1581DETAROPROCNI

NAGIH

R

OB

RAO

YTI

C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

R

Kn ow w ha t's be ef or e y ou d ig

NOTES R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

PROJECT LOCATION

CHRISTOPHER JAY ELENBAAS, P.E.

PROJECT MANAGER

PREPARED UNDER THE SUPERVISION OF

DATE

CITY APPROVAL

STAT E OF MI CHI GAN

L

ICENSED PROF ESS I ONA L E

NG

I N

EE

R

CHRISTOPHER

JAY ELENBAAS

ENGINEER

No.

6201056730

DATE

09 / 18 / 2025

TRACY CRANE ANDERSON, P.E.

PROJECT MANAGER

STAT E OF MI CH IGAN

L

ICENSED PROF ESS I ONA L E

NG

I N

EE

R

TRACY CRANE

ANDERSON

ENGINEER

No.

6201065162

CITY OF ANN ARBOR

ENGINEERING

Sheet List Table Sheet Number Sheet Title

1 COVER

2 STANDARD NOTES

3 LEGEND

4 SURVEY CONTROL POINTS

5 OVERALL PLAN

TYPICAL CROSS SECTIONS

6 WASHINGTON STREET

7 FIRST STREET - WASHINGTON TO HURON

8 FIRST STREET - HURON TO ANN

9 FIRST STREET - ANN TO MILLER

WASHINGTON STREET

10 WASHINGTON ST AND FIRST ST REMOVAL PLAN (POB TO STA 14+00)

11 WASHINGTON ST AND FIRST ST CONSTRUCTION PLAN (POB TO STA 14+00)

12 WASHINGTON ST SANITARY SEWER PLAN (STA 100+00 TO STA 105+00)

13 PROFILES

14 RAILROAD PLAN

15 STORM SEWER PLAN

16 WATER MAIN PLAN

FIRST STREET

17 FIRST ST REMOVAL PLAN (STA 14+00 TO POE)

18 FIRST ST CONSTRUCTION PLAN (STA 14+50 TO POE)

19 SANITARY SEWER PLAN (STA 150+00 TO STA 153+00)

20 SANITARY SEWER PLAN (STA 153+00 TO STA 157+00)

21 SANITARY SEWER PLAN (STA157+00 TO STA 161+75)

22 BYPASS PUMPING PLAN

23 STAGING PLAN

INSTRUMENTATION PLANS

24 WASHINGTON STREET (P.O.B. TO STA 105+00)

25 PROFILES

26 FIRST STREET (STA 150+00 TO STA 153+00)

27 FIRST STREET (STA 153+00 TO STA 157+00)

28 FIRST STREET (STA 157+00 TO STA 161+75)

MAINTENANCE OF TRAFFIC

29 DETOUR PHASE 1

30 DETOUR PHASE 2

31 DETOUR PHASE 3

32 DETOUR PHASE 4

33 BIKE DETOUR

34 DETOUR SIGNS

35 PAVEMENT MARKING SHEET

36 PAVEMENT MARKING SHEET

DETAILS

37 MISCELLANEOUS DETAILS

38 TRENCHLESS DETAILS

39 MANHOLE DETAIL

TAPR DETAILS

40 TAPR Details - Alternate Pedestrian Route (APR) Bypass

41 TAPR Details - TPAR Ramps

42 TAPR Details - TPAR Walkway Devices

09 / 18 / 2025

N

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

S T

A N

D A

R D

N O

T E

S

PERMITS REQUIRED TO BE OBTAINED BY THE CONTRACTOR

PRIOR TO THE BEGINNING OF CONSTRUCTION.

PERMIT ISSUING AUTHORITY

* NO COST TO CONTRACTOR

CONSTRUCTION NOTES:

PERMITS REQUIRED TO BE OBTAINED BY THE CITY OF ANN

ARBOR PRIOR TO THE BEGINNING OF CONSTRUCTION.

PERMIT ISSUING AUTHORITY

CONTACT INFORMATION

PUBLIC UTILITIES OWNER CONTACT

PRIVATE UTILITIES OWNER CONTACT

co

W

W

EXISTING LEGEND PROPOSED LEGEND

N

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-3

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

L E

G E

D

TRAVERSE POINTS

TP #

ELEV

802.04

803.04

799.74

809.24

799.72

799.14

803.19

815.49

822.84

809.93

816.34

816.60

823.67

805.63

813.16

811.25

817.55

801.09

797.31

808.97

786.58

791.23

NORTHING

285118.8870

285132.4090

285255.4920

284898.7880

285067.0220

285105.0100

285051.4190

285106.5280

285040.0040

284914.7850

285228.2500

285375.2930

285432.3900

285446.0230

285564.5780

285726.8600

285763.7360

285930.7152

286051.4950

286093.3760

286254.4110

286098.1680

EASTING

13289256.9300

13289029.7600

13289183.1300

13289225.4900

13289411.6900

13289575.1500

13289788.8500

13289976.1000

13290108.2900

13289967.3900

13289975.9600

13290011.7200

13290173.6800

13289829.8700

13289954.3200

13290004.1100

13290150.5500

13289965.1700

13290015.2600

13290191.9900

13289978.2100

13289789.3400

BENCHMARKS

BM #

ELEV

803.55

804.13

799.98

811.85

799.38

799.24

0.00

813.50

827.12

812.63

817.96

816.30

824.44

807.11

813.70

811.98

821.23

807.58

798.62

810.90

788.36

792.75

792.75

NORTHING

285073.2420

285086.1240

285294.0930

284852.5320

285068.5790

285064.3640

285100.5416

285046.4300

285040.0320

284907.5630

285209.7220

285366.3180

285431.3770

285444.7190

285661.0180

285769.3610

285720.0190

285889.4410

286095.5680

286048.4080

286271.1720

286141.8120

286144.8163

EASTING

13289258.7600

13288994.8800

13289204.9100

13289259.6200

13289455.7700

13289552.8800

13289781.5858

13289937.8400

13290136.5500

13289980.3200

13289939.6300

13289994.8000

13290179.8500

13289818.6500

13290003.6200

13290018.6100

13290205.3300

13290007.5300

13290045.8200

13290176.7500

13290019.7200

13289793.4200

13289784.8900

DESCRIPTION

SET COTTON SPINDLE IN NORTH FACE LIGHT

POLE IN SOUTHEAST QUAD OF WASHINGTON &

3RD.

SET COTTON SPINDLE IN NORTH FACE LIGHT

POLE SOUTH SIDE OF WASHINGTON, INFRONT OF

HOUSE #517.

SET COTTON SPINDLE WEST FACE POWER POLE

EAST SIDE 3RD,ACROSS FROM HOUSE #108.

SET COTTON SPINDLE IN WEST FACE POWER

POLE EAST SIDE OF 3RD, SOUTH OF HOUSE #217

SET COTTON SPINDLE IN NORTH FACE POWER

POLE SOUTH SIDE WASHINGTON +/- 50’ EAST OF

CP#104.

SET COTTON SPINDLE IN NORTH FACE POWER

SOUTH SIDE OF WASHINGTON, ACROSS FROM BLD

# 400 PARKING ENTRANCE.

SET ARROW ON HYD NORTH SIDE WSHINGTON, +/-

50’ EAST OF TRACKS.

SET COTTON SPINDLE IN NORTHEAST QUAD

POWER POLE IN SOUTHWEST QUAD WASHINGTON

& 1ST.

SET CHISELED X ON NORTHWEST BOLT LIGHT

POLE SOUTH SIDE WASHINGTON EAST OF ALLY.

SET ARROW ON HYDRANT EAST SIDE OF 1ST +/-

15’ EAST OF CP #109.

SET ARROW ON HYDRANT WEST SIDE OF 1ST

INFRONT OF BLD#106.

SET CHISELED BOX ON NORTH STRAIN POLE BASE

IN SOUTHEAST QUAD 1ST & HURON.

SET CHISELED BOX ON WEST BASE LIGHT POLE

NORTH SIDE HURON IN FRONT OF BLD#200.

SET ARROW ON HYDRANT NORTH SIDE HURON

EAST OF BLD #312.

SET COTTON SPINDLE IN WEST FACE POWER

POLE EAST SIDE 1ST, IN FRONT HOUSE #221.

SET COTTON SPINDLE IN SOUTH FACE POWER

POLE IN NORTHEAST QUAD 1ST & ANN.

SET NORTHEAST BOLT LIGHT POLE BASE

SOUTHSIDE OF ANN ACROSS FROM HOUSE #208.

SET ARROW ON HYDRANT EAST SIDE OF 1ST IN

FRONT OF HOUSE #210.

SET COTTON SPINDLE IN SOUTH FACE POWER

POLE IN NORTHEAST QUAD 1ST & MILLER.

SET ARROW ON HYDRANT SOUTH SIDE MILLER IN

FRONT OF HOUSE #209.

SET ARROW ON HYDRANT EAST SIDE 1ST ACROSS

FROM BLD #310.

SET ARROW ON HYDRANT NORTH SIDE OF MILLER

ACROSS FROM BLD #401.

RAILROAD SPIKE SET IN SW FACE OF UTILITY

POLE NORTH WEST OF MILLER ROAD +/- 8’ FROM

BM 221.

BM-200

BM-201

BM-202

BM-203

BM-204 BM-205

BM-206

BM-207 BM-208

BM-209

BM-210

BM-211

BM-212

BM-213

BM-214

BM-215

BM-216

BM-217

BM-218

BM-219

BM-220

BM-221

BM-RRSPIKEINUPOLE

0'

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-4

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

S U

R V

E Y

C O

N T

R O

L P

O

IN

T S

0'

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-5

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

O V

E R

A L

L P

L A

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-6

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T Y

P

IC

A L

C R

O S

S S

E C

T

IO

N S

W A

S H

IN

G

T O

N S

T R

E E

T

WASHINGTON STREET

EXISTING TYPICAL SECTION

NOTES:

WASHINGTON STREET

PROPOSED TYPICAL SECTION

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-7

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T Y

P

IC

A L

C R

O S

S S

E C

T

IO

N S

F

IR

S T

S T

R E

E T

W

A S

H

IN

G T

O N

T O

H U

R O

N

FIRST STREET

EXISTING TYPICAL SECTION

NOTES:

FIRST STREET

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-8

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T Y

P

IC

A L

C R

O S

S S

E C

T

IO

N S

F

IR

S T

S T

R E

E T

H

U R

O N

T O

A N

N

FIRST STREET

EXISTING TYPICAL SECTION

NOTES:

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-9

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T Y

P

IC

A L

C R

O S

S S

E C

T

IO

N S

F

IR

S T

S T

R E

E T

A

N N

T O

M

IL

L E

R

FIRST STREET

EXISTING TYPICAL SECTION

NOTES:

106BM-204 BM-205

BM-206

0+00 1+00 2+00 3+00 4+00 5+00

REMOVAL KEY

KEY DESCRIPTION

BM-207

BM-209

BM-210

5+

6+

10+00 11+00 12+00 13+00 14+00

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

W A

S H

IN

G

T O

N S

T R

E E

T

W A

S H

IN

G

T O

N S

T A

N D

F

IR

S T

S T

R E

M O

V A

L P

L A

N

P O

B T

O S

T A

4+

W A

S H

IN

G

T O

N S

T

FIRST STREET

WASHINGTON STREET

LIGHT POLES

REMOVED BY OTHER

DO NOT DISTURB HAND HOLE

NOTES:

1. PROPOSED TREE AND STREETLIGHT REMOVALS SHALL BE

REVIEWED DURING A CONSTRUCTION SITE WALK-THROUGH

PRIOR TO START OF WORK ALONG WASHINGTON STREET. ALL

TREE REMOVALS MUST OCCUR PRIOR TO MARCH 21, 2026.

2. IF STREET LIGHTS ARE REMOVED TO FACILITATE OVERHEAD

CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL BE

RESPONSIBLE FOR PROVIDING TEMPORARY LIGHTING OF THE

EXISTING SIDEWALK CORRIDOR.

106BM-204 BM-205

BM-206

CONSTRUCTION KEY

KEY DESCRIPTION

ABM

ASC

CD

CG

C-8

DSC

DWS

DO-M

DC-6

HMA

RG

SW-4

SWR-6

SW-8

UD

BM-207

BM-209

BM-210

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

W A

S H

IN

G

T O

N S

T R

E E

T

W A

S H

IN

G

T O

N S

T A

N D

F

IR

S T

S T

C O

N S

T R

U C

T

IO

N P

L A

N

P O

B T

O S

T A

4+

WASHINGTON STREET

HMA

HMA

HMA

HMA

W A

S H

IN

G

T O

N S

T

FIRST STREET

SW-6

CG

CG

SW-6

HMA

SW-4

106BM-204 BM-205

BM-206

SANITARY SEWER STRUCTURE TABLE

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

W A

S H

IN

G

T O

N S

T R

E E

T

W A

S H

IN

G

T O

N S

T S

A N

IT

A

R Y

S E

W E

R P

L A

N

S T

A

T

O S

T A

WASHINGTON STREET

NOTES:

CAUTION

HAZARDOUS

OR FLAMMABLE

MATERIAL

P_SAN WASHINGTON

100+00 101+00 102+00 103+00 104+00 105+00EX THRU S-4

175+00 176+00 177+00 178+00 179+00 180+00

P L

A N

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

W A

S H

IN

G

T O

N S

T R

E E

T

P R

O F

IL

E

106BM-205

BM-206

P_CL WASHINGTON

1+50 2+00 3+00 4+00 4+50

P L

A N

0'

P R

O F

IL

E

1"

WASHINGTON STREET

A

A

73°

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

W A

S H

IN

G

T O

N S

T R

E E

T

R A

IL

R

O A

D P

L

BM-207

STORM SEWER STRUCTURE TABLE

P_STM 2

P_STM

200+00 200+60 201+00 201+80

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

W A

S H

IN

G

T O

N S

T R

E E

T

S T

O R

M S

E W

E R

P L

A N

FIRST STREET

W A

S H

IN

G

T O

N

BM-207

BM-209

BM-218

P_WM

300+00 301+00 302+00 302+50

P_WM

312+00 313+00 313+50

P_WM

306+25 307+00 307+25

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

W A

S H

IN

G

T O

N S

T R

E E

T

W A

T E

R M

A

IN

P L

A N

FIRST STREET

W A

S H

IN

G

T O

N S

T

M

IL

L E

R

BM-211 BM-214

BM-215

14+00 15+00 16+00 17+00 18+00 19+00

BM-217

BM-218

BM-220

19+00 20+00 21+00 22+00 23+0023+00

REMOVAL KEY

KEY DESCRIPTION

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

F

IR

S T

S T

R E

E T

F

IR

S T

S T

R E

M O

V A

L P

L A

N

S T

A

4+

T O

P O

E

FIRST STREET

A N

N S

T

H U

R O

N S

T

M

IL

L E

R S

T

REMOVE (2) BOLLARDS

REMOVE AND REPLACE

DELINEATOR POST

BM-211 BM-214

BM-215

BM-217

BM-218

BM-220

CONSTRUCTION KEY

KEY DESCRIPTION

ABM

ASC

CD

CG

C-8

DSC

DWS

DO-M

DC-6

HMA

RG

SW-4

SWR-6

SW-8

UD

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

F

IR

S T

S T

R E

E T

F

IR

S T

S T

C O

N S

T R

U C

T

IO

N P

L A

N

S T

A

4+

T O

P O

E

FIRST STREET

A N

N S

T

H U

R O

N S

T

M

IL

L E

R S

T

HMA

HMA

CG

CG

CG

CG

HMA CG

SW-8

DC-6

SWR-6

DO-M

RG

REMOVE AND REPLACE

DELINEATOR POST

BM-207

BM-210

P_SAN WASHINGTON

105+00 106+00

SANITARY SEWER STRUCTURE TABLE

P_SAN FIRST

S-11 TO S-2

150+00 151+00 152+00 153+00

EX TO S10

106+00 106+70 110+00 110+35

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-1

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

F

IR

S T

S T

R E

E T

S A

N

IT

A R

Y S

E W

E R

P L

A N

S

T A

T O

S T

A

FIRST STREET

W A

S H

IN

G

T O

N

NOTES:

S-11 TO S-2

S-11 S-2

BM-211 BM-214

P_SAN FIRST

153+00 154+00 155+00 156+00 157+00

SANITARY SEWER STRUCTURE

TABLE

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

F

IR

S T

S T

R E

E T

S A

N

IT

A R

Y S

E W

E R

P L

A N

S

T A

T O

S T

A

FIRST STREET

H U

R O

N S

NOTES:

BM-215

BM-217

BM-218P_SAN FIRST

157+00 158+00 159+00 160+00 161+00 161+75

SANITARY SEWER STRUCTURE

TABLE

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

F

IR

S T

S T

R E

E T

S A

N

IT

A R

Y S

E W

E R

P L

A N

S

T A

7+

T

O S

T A

FIRST STREET

M

IL

L E

R S

T

NOTES:

A N

N

0'

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

B Y

P A

S S

P U

M P

IN

G

P L

A N

NOTES:

CONTRACTOR SHALL PERFORM A BYPASS PUMPING

WALK-THROUGH PRIOR TO SUBMITTING FINAL

BYPASS PLANS TO THE ENGINEER AND OWNER FOR

APPROVAL.

1"

0'

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

S T

A G

IN

G

P L

A N

W LIBERTY ST

TEMPORARY YMCA PARKING

LOT DURING CONSTRUCTION

PROPOSED

CONSTRUCTION

STAGING AREA

W WASHINGTON ST

106BM-204 BM-205

BM-206

IC-1

SMP-2

SMP-1OW-1

SMP-3

UMP-2 UMP-3 UMP-4

UMP-1 UMP-5 UMP-6

UMP-7

S M

P -4

S M

P -6

S M

P -5

OST-1 OST-3

S M

P -7

OST-2 OST-4

IC-3

SMP-8

SMP-9

OW-2

SMP-10

IC-2

SMP-11

OST-5 OST-6

UMP-11

UMP-12

UMP-13

UMP-14

SMP-11.2

SMP-11.4

OST-7 OST-8

SMP-11.1 SMP-11.3

SMP-2.1 SMP-2.2

1"

0'

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

IN

S

T R

U M

E N

T A

T

IO

N P

L A

N S

W A

S H

IN

G

T O

N S

T R

E E

T

P .O

.B . T

O S

T A

INCLINOMETER (IC)

SETTLEMENT MONITORING POINT (SMP)

UTILITY MONITORING POINT (UMP)

OPTICAL SURVEY TARGET (OST)

MONITORING POINT ARRAY (MPA)

OBSERVATION WELL (OW)

LEGEND:

NOTE:

WASHINGTON STREET

CAUTION

HAZARDOUS

OR FLAMMABLE

MATERIAL

P_SAN WASHINGTON

100+00 101+00 102+00 103+00 104+00 105+00EX THRU S-4

175+00 176+00 177+00 178+00 179+00 180+00

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

IN

S

T R

U M

E N

T A

T

IO

N P

L A

N S

P R

O F

IL

E

BM-207

BM-210

UMP-15

IC-5

IC-4

SMP-12

UMP-16 OW-3

SMP-15

SMP-16

UMP-21

SMP-14

UMP-17

UMP-19

SMP-17 SMP-18

S M

P -11.4

SMP-11.4

S M

P -11.3

SMP-11.5

SMP-11.6

SMP-11.7

P_SAN WASHINGTON

105+00 106+00

P_SAN FIRST

S-11 TO S-2

150+00 151+00 152+00 153+00

EX TO S10

106+00 106+70 110+00 110+35

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

IN

S

T R

U M

E N

T A

T

IO

N P

L A

N S

F

IR

S T

S T

R E

E T

S

T A

T O

S T

A

INCLINOMETER (IC)

SETTLEMENT MONITORING POINT (SMP)

UTILITY MONITORING POINT (UMP)

OPTICAL SURVEY TARGET (OST)

MONITORING POINT ARRAY (MPA)

OBSERVATION WELL (OW)

LEGEND:

NOTE:

FIRST STREET

W A

S H

IN

G

T O

N

S-11 TO S-2

S-11 S-2

BM-211 BM-214

SMP-19

OW-4

SMP-24

SMP-23

SMP-20

SMP-22

SMP-21

MPAMPAMPASMP-18

P_SAN FIRST

153+00 154+00 155+00 156+00 157+00

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

IN

S

T R

U M

E N

T A

T

IO

N P

L A

N S

F

IR

S T

S T

R E

E T

S

T A

T O

S T

A

INCLINOMETER (IC)

SETTLEMENT MONITORING POINT (SMP)

UTILITY MONITORING POINT (UMP)

OPTICAL SURVEY TARGET (OST)

MONITORING POINT ARRAY (MPA)

OBSERVATION WELL (OW)

LEGEND:

NOTE:

FIRST STREET

H U

R O

N

BM-215

BM-217

BM-218

SMP-33

OW-5

SMP-30

SMP-31

UMP-28UMP-27

UMP-26

SMP-29

SMP-28SMP-27

SMP-26

UMP-25

SMP-25

UMP-24UMP-23

UMP-22

IC-6

UMP-29 SMP-32

P_SAN FIRST

157+00 158+00 159+00 160+00 161+00 161+75

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-2

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

IN

S

T R

U M

E N

T A

T

IO

N P

L A

N S

F

IR

S T

S T

R E

E T

S

T A

T O

S T

A

NOTE:

INCLINOMETER (IC)

SETTLEMENT MONITORING POINT (SMP)

UTILITY MONITORING POINT (UMP)

OPTICAL SURVEY TARGET (OST)

MONITORING POINT ARRAY (MPA)

OBSERVATION WELL (OW)

LEGEND:

FIRST STREET

M

IL

L E

R S

T

A N

N

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D E

D N

U O

F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

D E

T O

U R

P H

A S

E

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D

E T

A R

O P

R O

C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

D E

T O

U R

P H

A S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

D E

T O

U R

P H

A S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

D E

T O

U R

P H

A S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D

E T

A R

O P

R O

C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

B

IK

E D

E T

O U

R

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

D E

T O

U R

S

IG

106BM-204 BM-205

BM-206

BM-207

BM-209

BM-210

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-3

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

P A

V E

M E

N T

M A

R K

IN

G

S H

E E

T

WASHINGTON STREET

W A

S H

IN

G

T O

N S

BM-211 BM-214

BM-215

BM-217

BM-218

BM-220

P L

A N

0'

P R

O F

IL

E

1"

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

R

Kn ow w ha t's be ef or e y ou d ig

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-3

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M A

IN

T

E N

A N

C E

O F

T R

A F

F

IC

P A

V E

M E

N T

M A

R K

IN

G

S H

E E

T

FIRST STREET

A N

N S

T

H U

R O

N S

T

M

IL

L E

R

CL

INCLINOMETER (IC)

SE

E

IN

ST

R U

M

EN

TA

TI

O N

P

LA

N S

H

EE

TS

F

O R

L O

C

AT

IO

N

S

AN

D D

EP

TH

S

'-0

(M

IN

SHAFT OR

TUNNEL INVERT

TIP

WATERTIGHT

END CAP

TEMPORARY OUTER

CASING MAY BE USED.

(REMOVE AS BOREHOLE

IS BACK-FILLED)

GROUT BACKFILL

COUPLING (TYP.)

2 34" I.D. CASING WITH

WATERTIGHT TAPED

CONTACTS. ALIGN GROOVES

PERPENDICULAR TO EXCAVATION

6" Ø (MIN)

BOREHOLE

CONCRETE

2' (M

IN

3" (MIN)

CONCRETE COVER

PLASTIC CAP

HIGHWAY TRAFFIC RATED CAST

IRON OR STEEL SURFACE

ROADWAY BOX WITH LOCKING COVER

PE

R

M

AN

U

FA

C

TU

R

ER

'S S

TA

N

D

AR

D

EXISTING GROUND

PATCHING

MATERIAL

3" 3"

12"

UTILITY MONITORING POINT (UMP)

EXISTING UTILITY

OR STRUCTURE

TO BE MONITORED

REFERENCE POINT

3" MIN I.D.

OUTER CASING

3/4" MINIMUM STEEL

ROD W/ ROUNDED END

RESTING ON PIPE

CONCRETE

CAP

EXISTING GROUND

" M

IN

D

EP

TH

V

AR

IE

S

MATCH EXISTING

PAVING MATERIAL

CL

12±

3" 3"

8"

3" (MIN)

CONCRETE COVER

TYPICAL SURFACE

MONITORING POINT (SMP)

GROUND SURFACE

OUTSIDE LIMIT OF

TUNNEL EXCAVATION

CL PIPE

GROUND SURFACE 6" ROADWAY BOX WITH

BOLTED TRAFFIC CAP

IDENTIFICATION MARKER

FIRMLY ATTACHED TO

REBAR OR CASING

SPACERS

PUNCH MARK

ON TOP

STEEL SLEEVE SET

IN GROUT BACKFILL

GROUT BACKFILL

3" MIN I.D. PVC CASING

#8 REBAR

DRIVE OR DRILL AND

GROUT TO ACHIEVE

FIRM ANCHOR

GROUT

(AS NEEDED)

M

IN

E M

BE

D

M

EN

T

SETTLEMENT MONITORING POINT (SMP)

MONITORING POINT ARRAY (MPA)

MONITORING POINT ARRAY NOTES:

1. ADJUST LOCATIONS AS NECESSARY FOR BUILDING AND OBSTRUCTIONS.

2. REFLECTORLESS MONITORING POINTS MAY BE USED INSTEAD OF PK NAILS.

3. REFLECTORLESS MONITORING POINTS ARE POSITIONED AT PREDETERMINED

LOCATIONS WHERE ACCESS IS LIMITED OR NOT ACCESSIBLE WITHIN THE RIGHT

OF WAY. AN AUTOMATED TOTAL STATION (ATS) MONITORS ON A CONTINUOUS

FREQUENCY DURING CONSTRUCTION USED TO COLLECT AND RECORD

MEASUREMENTS.

10'

25'

10'

25'

PK NAIL

1-INCH DIA MIN METAL

IDENTIFICATION TAG

PLAN VIEW

SECTION VIEW

TOP OF RAILROAD TIE,

PAVEMENT, CONCRETE,

OR MASONRY SURFACE

1/4"

2"

DETAIL

N.T.S.

DETAIL

N.T.S.

END OF SETTLEMENT ROD TO BE CAPPED

TO PROTECT EXISTING UTILITY

UMP NOTES:

1. AT A MINIMUM, PLACE AT LEAST ONE UMP ON ALL UTILITIES THAT THE TUNNEL

ALIGNMENT CROSSES. UMP SHALL BE PLACED AS CLOSE TO THE TUNNEL CENTERLINE

AS POSSIBLE.

2. EXPOSE UTILITY TO ALLOW DIRECT ACCESS FOR SURVEY ROD USING VACUUM

EXTRACTION OF SOILS OR OTHER NON-DESTRUCTIVE METHOD.

3. PROTECT ACCESS HOLE FROM SOIL WITH CASING.

4. CONTRACTOR TO OBTAIN WRITTEN AUTHORIZATION PRIOR TO UTILITY MONITORING

POINT INSTALLATION.

EXISTING CONC.,

ASPHALT OR

SOIL

6" ROADWAY BOX WITH

BOLTED TRAFFIC CAP

DETAIL

N.T.S.

DETAIL

N.T.S.

OPEN STANDPIPE PIEZOMETER

2' -0

M

IN

) L

EA

N

C O

N C

R

ET

E)

C

EM

EN

T

BE

N

TO

N

IT

E

G R

O U

T

BE

N

TO

N

IT

E

SE

AL

'-0

M

IN

2' -0

M

IN

) T

O P

O F

SC

R

EE

N

EL

EV

AT

IO

N

BE

N

TO

N

IT

E

SE

AL

'-0

M

IN

' S

C R

EE

N

L

EN

G

TH

(2

SL

O

T

SC

R

EE

N

.0

IN

C H

O

PE

N

IN

G

M

IN

6"

4" DIA. (MIN)

BOREHOLE

WELL SCREEN

PIPE END CAP

SLOTTED WELL PIPE

SCREEN (2" SCH 40 PVC)

THREADED FLUSH JOINT COUPLING

GRANULAR BENTONITE

2" SCHEDULE 40 PVC

CONCRETE

2" (MIN)

CONCRETE

COVER

CAP

8" ID (MIN) TRAFFIC RATED

STEEL MONUMENT FLUSH

WITH SURFACE

DETAIL

N.T.S.

N

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-3

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

M

IS

C E

L L

A N

E O

U S

D E

T A

IL

NOTES:

1. THE ABOVE DETAIL IS SCHEMATIC. CONTRACTOR SHALL SELECT, DESIGN, INSTALL AND MAINTAIN AN EXCAVATION SUPPORT SYSTEM UNTIL THE PIPELINE IS PLACED AND THE SHAFT IS BACKFILLED AS SPECIFIED AND SHOWN ON THE PLANS. THE EXCAVATION SUPPORT SYSTEM SHALL BE COMPATIBLE WITH SURFACE AND SUBSURFACE

CONDITIONS.

2. SUMP PUMP SHALL BE INCLUDED TO HANDLE ALL WATER INFILTRATION DURING SHAFT OPERATIONS.

3. USE MECHANICAL TUNNEL EYE SEAL. CONTRACTOR TO DESIGN TUNNEL EYE SEAL BASED ON SELECTED EQUIPMENT SIZE, GROUNDWATER LEVEL, LUBRICATION AND GROUT PRESSURES. CONTRACTOR SHALL PROVIDE A

REPLACEMENT SEAL SYSTEM ONSITE AT ALL TIMES DURING TUNNELING OPERATIONS.

4. CONTRACTOR SHALL GROUT OR BACKFILL BEHIND EXCAVATION SUPPORT SYSTEM AS NECESSARY TO MINIMIZE GROUND MOVEMENT AND MAINTAIN CONTACT BETWEEN GROUND AND EXCAVATION SUPPORT SYSTEM.

OPTICAL SURVEY POINTS

LOCATED ON SIDE AND BACK OF

SHAFT WITHIN 2 FEET OF TOP OF

SHORING

GROUND SURFACE (VARIES)

CENTER TO CENTER OF

SHORING SYSTEM

℄ EL. (SEE PROFILE)

ENTRY/EXIT SEAL

TUNNEL EYE

CONTRACTOR TO EXCAVATE INVERT

AS NECESSARY TO ALLOW FOR

PLACEMENT OF WORKING SLAB

DURING CONSTRUCTION AND ANY

ADDITIONAL THICKNESS NEEDED TO

RESIST UPLIFT (NOT SHOWN)

EXTEND BELOW DEPTH OF EXCAVATED DIA.

EXCAVATION AS DETERMINED

BY CONTRACTOR'S SHORING

DESIGNER AND PER

SPECIFICATIONS

SHAFT - SECTION SCHEMATIC

SCALE: NTS

â

4"

4"

6"

1'-8"

HMA PAVEME

CONCRETE CURB AND GUTTER,

BIKEWAY BEVELED CURB, 8

INCH

FORMED FACE, RUB FINISH

(FRONT, BACK & TOP)

RESERVOIR STONE

6" DRAIN PIPE; CONNECT TO CITY STORM SYSTEM COMPOSITE PLANTING MIX; COMPACT TO 70-80% PROCTOR

FINISHED SIDEWALK GRADE

LANDSCAPE INLET; SET TOP OF INLET 4" BELOW

LOWEST ELEVATION OF ADJACENT SIDEWALK

2" SHREDDED BARK MULCH

1'

- 0

1'-

6" M

IN

2 - 4% 2 - 4%

GEOTEXTILE FABRIC SURROUNDING PLANTING SOIL AND STONE

COMPACTED MDOT 21AA STONE

SUBGRADE

2'-3" OR 3'-4"

T/C (REFER TO GRADING PLAN)

1'- 6"

M

IN

SCALE: NTS

TYPICAL BIOSWALE BUFFER DETAIL

N

T S

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-3

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T R

E N

C H

L E

S S

D E

T A

IL

SCALE: 1/4" = 1'-0"

TOP SLAB PLAN

SCALE: 1/4" = 1'-0"

BASE SLAB PLAN

SCALE: 1/4" = 1'-0"2 SECTION

SCALE: 1/4" = 1'-0"1 SECTION

END VIEW

SCALE: 1/4" = 1'-0"3 SECTION

EL. 791.36'EL. 791.38' EL. 791.27'

EL. 791.22'

EL. 791.37' EL. 791.28' EL. 791.26'

P L

A N

R

Kn ow w ha t's be ef or e y ou d ig

N N

A F

D

E D

N U

O F

D E

T A

R O

P R

O C

NI

N A

GI

H

ROBRA

O YTI C

CI

M

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-3

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

D E

T A

IL

S

S

M A

N H

O L

E D

E T

A

IL

NOTES:

1. PERFORM EXPLORATORY EXCAVATION OF EXISTING SEWER

PRIOR TO ORDERING PRECAST CONCRETE DIVERSION

STRUCTURE.

2. DIVERSION MANHOLE SHALL SERVE AS PRIMARY BYPASS

SUCTION STRUCTURE FOLLOWING INSTALLATION. MAINTAIN

SEPARATION BETWEEN THE 24-INCH AND 18-INCH SEWERS

DURING BYPASS.

PEDESTRIAN

CHANNELIZERS

4' MINIMUM

5' DESIRABLE

PROVIDE TEMPORARY

WALKWAY SURFACE

BYPASS ON ADJACENT AVAILABLE

RIGHT OF WAY

BYPASS TYPE A

SIDEWALK BYPASS USING PARKING OR

SHOULDER ON LOW SPEED ROADWAY

BYPASS TYPE B

SIDEWALK BYPASS USING

SHOULDER OR PARKING LANE ON

HIGH SPEED ROADWAY

BYPASS TYPE C

4' MINIMUM

5' DESIRABLE

TEMPORARY TRUNCATED DOMES,

REQUIRED IF CROSSING A MINOR

ROAD OR COMMERCIAL DRIVEWAY.

MINOR ROAD

OR DRIVEWAY

PEDESTRIAN

CHANNELIZERS

NOTE: MAY ONLY BE USED ON ROADWAY WITH POSTED

SPEED OF 45 MPH OR LESS.

4' MINIMUM

5' DESIRABLE

BARRIER WITH TAPER

AND ATTENUATION

PEDESTRIAN

CHANNELIZERS

SPECIFIC NOTES

TEMPORARY CURB RAMPS WITH DETECTABLE WARNINGS.

5 DEVICE TAPER 25 FEET LONG, RECOMMENDED WHEN THE CLOSED AREA WAS USED AS AN

INTERMITTENT TRAFFIC LANE OR BYPASS LANE. STREET PARKING SHALL BE PROHIBITED FOR

AT LEAST 50 FEET IN ADVANCE OF THE MID-BLOCK CROSSWALK.

AN APPROVED AUDIBLE MESSAGE DEVICE OR TACTILE MESSAGE SHOULD BE PROVIDED FOR

SIGHT-IMPAIRED PEDESTRIANS.

THE INTERNATIONAL SYMBOL OF ACCESSIBILITY SHALL BE DISPLAYED WHEN ANY WALKWAY

THROUGH A WORK ZONE HAS BEEN DETERMINED TO BE TPAR COMPLIANT. THE SYMBOL OF

ACCESSIBILITY SHALL NOT BE DISPLAYED IF PERSONS WITH DISABILITIES SHOULD NOT USE THE

PRIMARY TEMPORARY PEDESTRIAN DETOUR. THE REASON FOR THE NON-COMPLIANCE SHALL

BE POSTED AND AN ALTERNATE ROUTE SHALL BE POSTED WHEN THE PRIMARY TEMPORARY

PEDESTRIAN DETOUR IS NON-COMPLIANT TO TPAR STANDARDS.

TYPICAL SIGN MESSAGE FOR A TEMPORARY PEDESTRIAN DETOUR SHALL INCLUDE

INFORMATION SUCH AS THE DURATION OF THE WALKWAY RESTRICTIONS (BEGINNING

AND/OR END DATES) AND A PROJECT CONTACT NUMBER FOR 24 / 7 QUESTIONS OR

REPORTING HAZARDS.

SEE MMUTCD FOR GUIDANCE ON PLACEMENT AND USAGE OF BARRIER.

LEGEND

SIGN

EXISTING PEDESTRIAN SURFACE

WORK AREA

PEDESTRIAN CHANNELIZATION DEVICE

BARRIER

SIDEWALK BARRICADE

DIRECTION OF TRAFFIC

TRAFFIC CONTROL DEVICE

GENERAL NOTES

WHEN CLOSING OR RELOCATING CROSSWALKS OR SIDEWALKS, THE CONTRACTOR SHALL

PROVIDE DETECTABLE TEMPORARY FACILITIES AND INCLUDE ACCESSIBILITY FEATURES

CONSISTENT WITH EXISTING PEDESTRIAN FACILITIES.

TEMPORARY TRAFFIC CONTROL DEVICES FOR PEDESTRIANS ARE SHOWN. OTHER DEVICES

MAY BE NECESSARY TO CONTROL VEHICULAR TRAFFIC. STAGE WORK, AS NECESSARY, TO

PROVIDE AN ALTERNATE PEDESTRIAN ROUTE (APR) AT ALL TIMES. FOR ROADWAYS WITH NO

AVAILABLE DETOURS, MAINTAIN ONE OPEN SIDEWALK AT ALL TIMES.

PROVIDE A SMOOTH, CONTINUOUS, HARD SURFACE THROUGH THE LENGTH OF THE APR.

COMPACTED GRAVEL, AGGREGATE, OR SLAG MATERIALS ARE NOT ALLOWED. PROVIDE A

FIRM, STABLE, AND SLIP RESISTANT TEMPORARY WALKWAY SURFACE TO COVER SHORT

SEGMENTS OF ROUGH, SOFT, OR UNEVEN GROUND.

THE PEDESTRIAN TRAFFIC SIGNALS CONTROLLING CLOSED CROSSWALKS SHALL BE COVERED

OR DEACTIVATED BY THE CITY OF ANN ARBOR. THE CONTRACTOR SHALL SCHEDULE AND

COORDINATE THIS WORK WITH THE ENGINEER A MINIMUM OF 72 HOURS (NOT INCLUDING

WEEKENDS & HOLIDAYS) PRIOR TO THE BEGINNING OF WORK THAT REQUIRES A SIDEWALK

CLOSURE.

POST MOUNTED SIGNS LOCATED ADJACENT TO A SIDEWALK SHALL HAVE A 7 FOOT MINIMUM

CLEARANCE FROM THE BOTTOM OF THE SIGN TO THE SIDEWALK SURFACE.

WHEN THE ENGINEER DETERMINES THAT THE CONTRACTOR'S OPERATIONS OR PLACEMENT

OF TRAFFIC CONTROL DEVICES HAS CAUSED A SITUATION THAT THE VISIBILITY OF A TRAFFIC

CONTROL DEVICE IS REDUCED ENOUGH TO CREATE A HAZARD, THE TRAFFIC CONTROL

DEVICES SHALL BE DELINEATED WITH FLAGS OR OTHER ENGINEER-APPROVED DEVICES AT NO

ADDITIONAL COST TO THE PROJECT.

MINIMIZE DISRUPTION TO PEDESTRIANS TO THE MAXIMUM EXTENT FEASIBLE BY PROVIDING

AN APR IN THE FOLLOWING ORDER OF PREFERENCE:

1. PROVIDE THE APR ON THE SAME SIDE OF THE STREET AS THE DISRUPTED ROUTE

UTILIZING BYPASSES.

2. WHERE IT IS NOT FEASIBLE TO PROVIDE A SAME SIDE APR, PROVIDE A DETOUR ON THE

OTHER SIDE OF THE STREET.

3. WHERE IT IS NOT FEASIBLE TO PROVIDE AN APR ON THE OTHER SIDE OF THE

ROADWAY, PROVIDE AN APR DETOUR WITH TRAILBLAZING SIGNS AS SHOWN ON THE

PROJECT PLANS.

N

.T .S

R

Kn ow w ha t's be ef or e y ou d ig

CITY

O

F

RBOR

M I C

H I

G A

N

F O

U N

D E

D

IN

C

O R

P O

R A

T E

D

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-4

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T A

P R

D E

T A

IL

S

A

L T

E R

N A

T E

P E

D E

S T

R

IA

N R

O U

T E

A

P R

B

Y P

A

SPECIFIC NOTES

CURB RAMPS SHALL BE 48" MIN. WIDTH WITH A FIRM, STABLE AND SLIP RESISTANT SURFACE.

PROTECTIVE EDGING WITH A 2.5" MIN. HEIGHT ABOVE THE RAMP SHALL BE PLACED WHEN A

CURB RAMP OR LANDING PLATFORM HAS A VERTICAL DROP OF 6" OR GREATER OR HAS A SIDE

APRON SLOPE STEEPER THAN 1:3. PROTECTIVE EDGING SHOULD BE CONSIDERED WHEN CURB

RAMPS OR LANDING PLATFORMS HAVE A VERTICAL DROP OF 3" OR MORE.

DETECTABLE EDGING ANYTIME A HANDRAIL IS REQUIRED, AND ANYTIME THE PATH CHANGES

DIRECTION. THIS INCLUDES A TURN ONTO THE RAMP FROM THE PATH. DETECTABLE EDGING

MUST BEGIN A MAXIMUM OF 2.5" ABOVE THE RAMP SURFACE, AND EXTEND AT LEAST 6"

ABOVE THE RAMP SURFACE. CONTRASTING COLOR SHALL BE PLACED ON ALL CURB RAMP

LANDINGS WHERE THE WALKWAY CHANGES DIRECTION (TURNS).

CURB RAMPS AND LANDINGS SHALL HAVE A 2% MAX. CROSS SLOPE.

CLEAR SPACE OF 48" x 48" MIN. SHALL BE PROVIDED ABOVE AND BELOW THE CURB RAMP.

THE CURB RAMP WALKWAY EDGE SHALL BE MARKED WITH A CONTRASTING COLOR, 2" TO 4"

WIDE MARKING. THE MARKING IS OPTIONAL WHERE COLOR CONTRASTING EDGING IS USED.

WATER FLOW IN THE GUTTER SYSTEM SHALL NOT BE IMPEDED.

LATERAL JOINTS OR GAPS BETWEEN SURFACES SHALL BE LESS THAN 1/2" WIDTH.

CHANGES BETWEEN SURFACE HEIGHTS SHALL NOT EXCEED 1/2". LATERAL EDGES SHOULD BE

VERTICAL UP TO 1/4" HIGH, AND BEVELED AT 1:2 BETWEEN 1/4" AND 1/2" HEIGHT.

2" TO 4" WIDE EDGE MARKING6

NON-SLIP SURFACE1

CURB FACE

DRAINAGE7

CLEAR SPACE5

EDGE TREATMENT9

EDGE TREATMENT9

JOINT GAP TREATMENT8

48" x 48" MIN. LANDING AREA5

DETECTABLE EDGING 6" MIN. HEIGHT3

DRAINAGE7

PROTECTIVE EDGING 2.5" MIN.

HEIGHT ABOVE RAMP SURFACE

CROSS SLOPE 2% MAX.4

TEMPORARY CURB RAMP

PARALLEL TO CURB

0.25 INCH

MAXIMUM

0.5 INCH MAXIMUM

LEADING EDGE

EDGE TREATMENT9

SHOWN WITH SIDE APRON

SHOWN WITH PROTECTIVE EDGE

TEMPORARY CURB RAMP

PERPENDICULAR TO CURB

2" TO 4" WIDE EDGE MARKING6

PROTECTIVE EDGING 2.5" MIN.

HEIGHT ABOVE RAMP SURFACE

DRAINAGE7

CURB FACE

CLEAR SPACE5

JOINT GAP TREATMENT8

EDGE TREATMENT9

DRAINAGE7 6 EDGE TREATMENT9

PROTECTIVE EDGING 2.5" MIN.

HEIGHT ABOVE RAMP SURFACE

NON-SLIP SURFACE1

CLEAR SPACE5

EDGE TREATMENT9

CROSS SLOPE 2% MAX.4

CROSS SLOPE 2% MAX.4

N

.T .S

R

Kn ow w ha t's be ef or e y ou d ig

CITY

M I C

H I

G A

N

F O

U N

D E

D

IN

C

O R

P O

R A

T E

D

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-4

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T A

P R

D E

T A

IL

S

T

P A

R R

A M

P

TEMPORARY PEDESTRIAN ACCESS

4' MINIMUM

5' DESIRABLE

TEMPORARY WALKWAY

SURFACE

2% MAX. CROSS SLOPE

2" MAX.

PEDESTRIAN CHANNELIZER

0.5 INCH MAXIMUM

LEADING EDGE

1 INCH MAXIMUM

0.25 INCH

MAXIMUMTEMPORARY WALKWAY SURFACE

DETECTABLE

EDGE

32" MIN.8

2" MAXIMUM

3 2

PEDESTRIAN CHANNELIZER USING A BARRIER

(MINIMUM REQUIREMENTS)

2" MAX. 32" MIN. 8

HANDTRAILING EDGE

DETECTABLE EDGE SHALL BE

CONTINUOUS AND A MINIMUM

OF 6 INCHES HIGH ABOVE THE

WALKWAY SURFACE

PEDESTRIAN CHANNELIZER

(MINIMUM REQUIREMENTS)

WALKWAY SURFACE 7

SIDEWALK BARRICADE

TYPICAL AUDIBLE MESSAGE

DEVICE LOCATION WHEN USED

2" MAX.

34" MIN.

4' MIN.

5' MIN.

NARROW TEMPORARY PEDESTRIAN ACCESS ROUTE PASSING DETAIL

5' MIN. 200' MAX. SPACING

FROM LAST PASSING

SPACE

200' MAX. SPACING

FROM LAST PASSING

SPACE

GENERAL NOTES

RAILINGS OR OTHER OBJECTS MAY PROTRUDE A MAXIMUM OF 4 INCHES INTO THE WALKWAY CLEAR

SPACE WHEN LOCATED A MINIMUM OF 27 INCHES ABOVE THE WALKWAY SURFACE.

ANY PEDESTRIAN DEVICES USED TO PROVIDE POSITIVE PROTECTION FOR PEDESTRIANS OR WORKERS

SHALL MEET NCHRP 350 CRASHWORTHY REQUIREMENTS APPROPRIATE FOR THE BARRIER'S

APPLICATION.

BARRICADES SHALL BE PLACED CONTINUOUSLY ACROSS THE ENTIRE WIDTH OF THE WALKWAY SURFACE

BEING CLOSED.

SPECIFIC NOTES

ANY TRIPPING HAZARD IN THE WALKWAY NEEDS A DETECTABLE EDGE. BALLAST SHALL BE LOCATED BEHIND OR INTERNAL TO THE DEVICE. ANY SUPPORT ON THE FRONT OF THE DEVICE SHALL NOT EXTEND INTO THE 48 INCH MINIMUM WALKWAY CLEAR SPACE AND SHALL NOT EXCEED 0.5 INCHES IN HEIGHT

ABOVE THE WALKWAY SURFACE.

DETECTABLE EDGES SHALL BE CONTINUOUS AND A MINIMUM OF 6 INCHES IN HEIGHT ABOVE

WALKWAY SURFACE AND HAVE COLOR MARKINGS CONTRASTING WITH THE WALKWAY SURFACE.

DEVICES SHALL NOT BLOCK WATER DRAINAGE FROM THE WALKWAY. A GAP HEIGHT OR OPENING FROM THE WALKWAY SURFACE UP TO A MAXIMUM OF 2 INCHES IS ALLOWED FOR DRAINAGE PURPOSES.

PROVIDE A HANDRAIL ON BOTH SIDES OF THE RAMP IF THE RAMP IS NOT EXPOSED TO VEHICLE TRAFFIC

AND HAS A TOTAL RISE GREATER THAN 6 INCHES, AND A LENGTH GREATER THAN 72 INCHES.

- ENSURE THE HANDRAIL IS 1.25 AND 1.5 INCHES WIDE AND CONFIGURED TO BE A "GRASPABLE"

CROSS-SECTION.

SEE CONSTRUCTION SUBSECTION 2.A FOR ADDITIONAL DETAILS.

WHEN THE RAMP IS EXPOSED TO TRAFFIC, IN LIEU OF HANDRAILS, USE A PROTECTIVE EDGE 2.5 INCHES

MINIMUM HEIGHT ABOVE THE RAMP SURFACE OR 1:10 FLARE ON BOTH SIDES OF THE RAMP.

ALL DEVICES SHALL BE FREE OF SHARP OR ROUGH EDGES, AND FASTENERS (BOLTS) SHALL BE ROUNDED

TO PREVENT HARM TO HANDS, ARMS OR CLOTHING OF PEDESTRIANS.

ALL DEVICES USED TO CHANNELIZE PEDESTRIAN FLOW SHOULD INTERLOCK SUCH THAT GAPS DO NOT

ALLOW PEDESTRIANS TO STRAY FROM THE INTENDED CHANNELIZED PATH.

A WALKWAY SURFACE SHALL BE FIRM, STABLE, AND SLIP RESISTANT. COMPACTED GRAVEL,

AGGREGATE, OR SLAG MATERIALS ARE NOT ALLOWED.

LONGITUDINAL CHANNELIZING DEVICES FOR PEDESTRIANS SHALL BE 32 INCHES IN HEIGHT OR GREATER.

N

.T .S

R

Kn ow w ha t's be ef or e y ou d ig

CITY

M I C

H I

G A

N

F O

U N

D E

D

IN

C

O R

P O

R A

T E

D

C

IT

Y O

F A

N N

A R

B O

R

P U

B L

IC

S

E R

V

IC

E S

E

N G

IN

E

E R

IN

G

C

IT

Y O

F A

N N

A R

B O

R P

U B

L

IC

S E

R V

IC

E

S

E

A S

T H

U R

O N

S T

R E

E T

P .O

. B O

X

A N

N A

R B

O R

, M I 4

-8

4-

4-w w w

.a 2g o v.

o rg

-0

-4

H

IG

H -L

E V

E L

T R

U N

K L

IN

E

C A

P A

C

IT

Y

IM

P R

O V

E M

E N

T S

T A

P R

D E

T A

IL

S

T

P A

R W

A L

K W

A Y

D E

V

IC

Sheets and Views
1 COVER
2 STANDARD NOTES
3 LEGEND
4 SURVEY CONTROL POINTS
5 OVERALL PLAN
6 WASHINGTON STREET
7 FIRST STREET - WASHINGTON TO HURON
8 FIRST STREET - HURON TO ANN
9 FIRST STREET - ANN TO MILLER
10 WASHINGTON ST AND FIRST ST REMOVAL PLAN (POB TO STA 14+00)
11 WASHINGTON ST AND FIRST ST CONSTRUCTION PLAN (POB TO STA 14+00)
12 WASHINGTON ST SANITARY SEWER PLAN (STA 100+00 TO STA 105+00)
13 PROFILES
14 RAILROAD PLAN
15 STORM SEWER PLAN
16 WATER MAIN PLAN
17 FIRST ST REMOVAL PLAN (STA 14+00 TO POE)
18 FIRST ST CONSTRUCTION PLAN (STA 14+50 TO POE)
19 SANITARY SEWER PLAN (STA 150+00 TO STA 153+00)
20 SANITARY SEWER PLAN (STA 153+00 TO STA 157+00)
21 SANITARY SEWER PLAN (STA157+00 TO STA 161+75)
22 BYPASS PUMPING PLAN
23 STAGING PLAN
24 WASHINGTON STREET (P.O.B. TO STA 105+00)
25 PROFILES
26 FIRST STREET (STA 150+00 TO STA 153+00)
27 FIRST STREET (STA 153+00 TO STA 157+00)
28 FIRST STREET (STA 157+00 TO STA 161+75)
29 DETOUR PHASE 1
30 DETOUR PHASE 2
31 DETOUR PHASE 3
32 DETOUR PHASE 4
33 BIKE DETOUR
34 DETOUR SIGNS
35 PAVEMENT MARKING SHEET
36 PAVEMENT MARKING SHEET
37 MISCELLANEOUS DETAILS
38 TRENCHLESS DETAILS
39 S5 MANHOLE DETAIL
40 TAPR Details - Alternate Pedestrian Route (APR) Bypass
41 TAPR Details - TPAR Ramps
42 TAPR Details - TPAR Walkway Devices