RFIs 573-19-615.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
J061--Upgrade Motor Control Centers at BLDG One Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This document contains responses to contractor questions regarding drawings for a project to upgrade motor control centers at a Department of Veterans Affairs building. The project will replace an existing motor control center with new three-phase panels and install a new unit substation. The contractor responses clarify that one of the replacement panels will have one motor starter instead of sixteen as shown on a different drawing. Ampere ratings are provided for items on two of the drawings. The related federal contract opportunity is a special notice from the VA seeking proposals, with a proposal due date of September 15, 2022, to add an addendum to the original drawings in response to the request for information from contractors.

View the file

Other files for this federal contract opportunity

Other files attached to J061--Upgrade Motor Control Centers at BLDG One, newest first.
File Type Posted
180-19-EP723.pdf PDF
180-19-EP105.pdf PDF
SF30 Amendment 36C24822R0166 0003.pdf PDF
180-19-EP722.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Upgrade Motor Control Centers at Building One
PROJ: 573-19-615
RFI's/QuestionsGovernment Response
1EF: S01+-+Attachment+01+-+Drawings+(Revised)+(18+pages) , Drawing EP722, NEW PANEL SCHEDULE H-PH3. The breaker amperage for PNL RA.EQ2.PA and breaker amperage for HOIST CONTROLLER is not given. I could not find the amperage on Drawing EP702 either. Please provide amperage for these two items.PNL RA EQ2 PA is 125 Amps, Hoist Controller is 30 Amps, changes made on DWG EP722. This answer was provided by VA Electricians.
2REF: S01+-+Attachment+01+-+Drawings+(Revised)+(18+pages) , Drawing EP723, NEW PANEL SCHEDULE EM-HB. It says this panel is fed from ATS. Where is the ATS? It is not indicted on Drawing EP106 ELECTRICAL ONE LINE DIAGRAMS. Also where are the loads going into new PNL EM-HB currently fed from? I don’t see them listed in EXISTING MCC-E1.Panel name was corrected to FPQ-4 in drawing EP723.
3REF: S01+-+Attachment+01+-+Drawings+(Revised)+(18+pages) , Drawing EP602, DETAIL 3, PARTIAL ONE-LINE DIAGRAM-BUILDING 1 – ACA. Panels H-GA and H-GB are to be fed from UNIT SUBSTATION 5 – US-5. US-5 is not shown on floor plan EP-105. Where is US-5 located in relationship to FB29-1.Unit substation US-5 was added to EP105.
41. REF: S01+-+Attachment+01+-+Drawings+(Revised)+(18+pages) , Drawing EP602,DETAIL 2, PARTIAL ONE-LINE DIAGRAM – BUILDING 1 -480 BED The replacement equipment for existing MCC-CPH3 is shown as MCC-CPH3 on the one-line diagram. Drawing EP722 PANELBOARD SCHEDULES show NEW-3-PHASE PANEL SCHEDULES H-CPH3A and H-CPH3B with only (1) MOTOR STARTER/DISCONNECT to be provided for E-17. Drawing EP-102 DETAIL 2, FLOOR PLAN 480-BED PENTHOUSE – NEW WORK shows NEW MCC-CPH3. Drawing EP702 EXISTING EQUIPMENT RECONNECTION SCHEDULES shows RECONNECTION TO NEW MCC and lists 16 LOCAL DISCONNECTS/STARTERS. Is the replacement equipment for MCC-CPH3 to be a NEW MCC complete with 16 starters/disconnects as indicated on EP702 or is it to be the 3-Phase Panels with only (1) separate starter/disconnect as shown on EP722?Yes we are installing a new 3 ph panel instead of an MCC.