Red_River_NWR_-_QAP_Janitorial_Services.pdf

PDF 136 KB Posted

Attached to
LA FWS NORTH LA REFS CMPLX PROVIDE JANIT Federal contract opportunity
Solicitation number
140F0621Q0141
Issued by
Department of the Interior Fish and Wildlife Service

View the file

Other files for this federal contract opportunity

Other files attached to LA FWS NORTH LA REFS CMPLX PROVIDE JANIT, newest first.
File Type Posted
140F0621Q0141_-_Price_Schedule-Janitorial_Opt_Yr.pdf PDF
FAR_52_212-3_Reps_and_Certs_AUG_2020.pdf PDF
Sol_140F0621Q0141.pdf PDF
B03_-Wage_Determination_No_2015-5191.pdf PDF
Red_River_NWR_Statement_of_Work_Janitorial_Services_6_17_21.pdf PDF
Red_River_NWR_-_PRS_Janitorial_Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Plan

Project Name Customer Janitorial Services Contract U.S Fish and Wildlife Service

Red River National Wildlife Refuge 150 Eagle Bend Point Bossier City, LA 71112

Contact Contact’s Phone # Date Prepared Terri Jacobson 318-742-1219 06/15/2021

1.0 Objective

Provide a brief description of the Quality Assurance Plan’s intent.

-Ensure that the contractor meets all contract guidelines and complies with scope of work within the contract.

-Ensure that the contractor meets all time schedules.

-Ensure that the contractor implements/completes project in a safe and effective manner.

2.0 Performance Indicators and Acceptable Quality Levels

Provide a description of the performance indicators to be measured and their acceptable quality levels.

-The contractor must complete all work as scheduled and comply with work schedules.

Government will accept 95% compliance (5% allowance due to possible uncontrollable events such as equipment breakdown and weather/water levels).

-All work must be completed appropriately with no deviation and with 100% compliance.

-Contractor will implement appropriate health and safety precautions to ensure the safety of all contract employees and the public. A safety plan shall be submitted before project begins.

-Contractor shall complete the standard FWS Daily Progress Report (DPR) documenting locations worked, and completed work. Reports will be accepted on a weekly basis, but must be submitted biweekly at a minimum.

3.0 Surveillance Methods

Provide a description of the evaluations that will be performed based on the indicators in section 2.0.

-Periodic inspections by one of the Refuge project officers will be conducted.

4.0 Incentives

Provide a description of any incentives/penalties.

-Non-compliance with the scope of work will result in a negative performance evaluation/rating.

-A positive performance evaluation will be given for overall satisfactory work and compliance with the guidelines listed within the work statement.

-Entire payment will be held until a final inspection, performed by the project officer, determines satisfactory completion of the scope of work.