Red_River_NWR_-_QAP_Janitorial_Services.pdf
PDF 136 KB Posted
- Attached to
- LA FWS NORTH LA REFS CMPLX PROVIDE JANIT Federal contract opportunity
- Solicitation number
- 140F0621Q0141
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140F0621Q0141_-_Price_Schedule-Janitorial_Opt_Yr.pdf | ||
| FAR_52_212-3_Reps_and_Certs_AUG_2020.pdf | ||
| Sol_140F0621Q0141.pdf | ||
| B03_-Wage_Determination_No_2015-5191.pdf | ||
| Red_River_NWR_Statement_of_Work_Janitorial_Services_6_17_21.pdf | ||
| Red_River_NWR_-_PRS_Janitorial_Services.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Plan
Project Name Customer Janitorial Services Contract U.S Fish and Wildlife Service
Red River National Wildlife Refuge 150 Eagle Bend Point Bossier City, LA 71112
Contact Contact’s Phone # Date Prepared Terri Jacobson 318-742-1219 06/15/2021
1.0 Objective
Provide a brief description of the Quality Assurance Plan’s intent.
-Ensure that the contractor meets all contract guidelines and complies with scope of work within the contract.
-Ensure that the contractor meets all time schedules.
-Ensure that the contractor implements/completes project in a safe and effective manner.
2.0 Performance Indicators and Acceptable Quality Levels
Provide a description of the performance indicators to be measured and their acceptable quality levels.
-The contractor must complete all work as scheduled and comply with work schedules.
Government will accept 95% compliance (5% allowance due to possible uncontrollable events such as equipment breakdown and weather/water levels).
-All work must be completed appropriately with no deviation and with 100% compliance.
-Contractor will implement appropriate health and safety precautions to ensure the safety of all contract employees and the public. A safety plan shall be submitted before project begins.
-Contractor shall complete the standard FWS Daily Progress Report (DPR) documenting locations worked, and completed work. Reports will be accepted on a weekly basis, but must be submitted biweekly at a minimum.
3.0 Surveillance Methods
Provide a description of the evaluations that will be performed based on the indicators in section 2.0.
-Periodic inspections by one of the Refuge project officers will be conducted.
4.0 Incentives
Provide a description of any incentives/penalties.
-Non-compliance with the scope of work will result in a negative performance evaluation/rating.
-A positive performance evaluation will be given for overall satisfactory work and compliance with the guidelines listed within the work statement.
-Entire payment will be held until a final inspection, performed by the project officer, determines satisfactory completion of the scope of work.
File details come from the government source that posted it. Updated .