The purpose of this amendment is to provide questions and answers and revised drawings as a result of the questions and answers. Offers must acknowledge receipt of this amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0007_package.pdf | ||
| Amend_0006_package.pdf | ||
| BOR_Admin_Building_BID_Set-Drawings_2016_05.26_(with_Amendment).pdf | ||
| SF_30.pdf | ||
| Bid_Set_Differences_2016-08-12pdf.pdf | ||
| SF_30.pdf | ||
| Amendment_0003_package.pdf | ||
| Amendment_0002_package.pdf | ||
| Sign_in_Sheet.pdf | ||
| R16PS00089___complete_package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
000008
3. EFFECTIVE DATE
09/06/2016
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE R30 7. ADMINISTERED BY (If other than Item 6) CODE
Bureau of Reclamation Lower Colorado Region Regional Office 500 Fir Street Boulder City NV 89005
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
(x) 9A. AMENDMENT OF SOLICITATION NO.
R16PS00089
x 9B. DATED (SEE ITEM 11)
07/11/2016
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, xis not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation!contract subject matter where feasible.)
Administration Building Renovation Construction
Purpose of Amendment: The purpose of this amendment is to provide questions and answers and revised drawings as a result of the questions and answers.
Description of Changes: This amendment incorporates the following changes (pages shall be replaced with the attached revised pages):
1) A1.00, A1.01 and A1.02 added keynote 82.
15A. NAME AND TIT LE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Meagan R. Fyffe
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING
CONTINUED R16PS00089/000008
PAGE OF
2 2
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
D)
UNIT PRICE
(E)
AMOUNT
(F)
2) E0.00 the Sheet Index table is updated to reflect changes made to E4.06, E4.07 and E7.00.
3) E4.06 and E4.07 added power and control for ADA motorized doors.
4) E7.00 added door circuits to the panel schedule L2A.
Receipt of Offers: The date and time for receipt of proposals remains September 14, 2016 at 4:00pm local time.
Acknowledgment: See block 11 above regarding how to acknowledge this amendment. The acknowledgment must be received at the place designated for receipt of offers.
Proposal Modification: See block 11 above if you have submitted your proposal and now desire to modify it or withdraw it.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
R16PS00089
Administration Building Renovation Construction Amendment 0008
Questions & Answers
1. Question: Who is the authority having jurisdiction for the fire alarm system?
Answer: Bureau of Reclamation is the Authority Having Jurisdiction (AHJ). AHJ contact information will be provided at the post-award conference. After which all questions shall be submitted via the normal submittal procedure.
2. Question: What is the fire alarm plan review process?
Answer: Fire alarm reviews will be coordinated with Reclamation.
3. Question: What are the fire alarm permit fees or contact information to verify the fees?
Answer: This project does not require fire alarm permit fees.
4. Question: It was mentioned on job-walk that the owner is handling the fire alarm directly. And no bid was required for the fire life safety. Is the owner also handling the the raceway, junction boxes & wire as well?
Answer: Yes, Reclamation will coordinate with the contractor on this installation during construction.
5. Question: Is EMT raceway required for tele/data? Drawing T0.00 shows plenum cabling on the wire schedule. Drawing T1.00 states to run a 1" raceway back to cable tray in hallway. Can J hooks be used in grid ceilings & raceway in open areas??
Answer: Please follow drawing T1.00 which states “All cable will be installed in a 1” EMT conduit homerun to the existing cable tray in the hallway.
6. Question: Drawing T2.01 shows various locations for ADA door openers. Drawings E4.06 & E4.07 do not show power ckt for door opener motors. Also who is furnishing & installing the ADA door openers? Would this be the door hardware contractor? .?
Answer: Revised drawings E0.00, E4.06, E4.07 and E7.00 to show power circuit for all door opener motors are attached. Furnishing and installing the ADA openers is the contractor’s responsibility. Existing ADA openers shall be reused.
7. Question: Does the OWNER/Reclamation supply the flat panel wall mounts??
Answer: Reclamation will supply and install all flat panel wall mounts post-construction.
8. Question: Does the OWNER/Reclamation supply the wireless microphones?
Answer: It is the contractor’s responsibility to supply wireless microphones compatible with the system being installed.
9. Question: Does the OWNER supply the camera mounts?
Amendment 0008
Answer: Per drawing T2.02 Notes 1 & 2, it is the contractor’s responsibility to supply the cameras and mounts.
10. Question: What are the cable TV/antenna requirements?
Answer: All coax shall be run to specified locations and hung in the telecommunications room for future termination by Reclamation.
11. Question: The requirement to do a hydrant flow test after the backflow is repositioned will be used for what purpose?
Answer: The hydrant flow test will be used to verify performance.
12. Question: Are hydraulic calculations required for the fire sprinkler piping system in any part of the building? If so, who will provide the existing fire sprinkler piping plans?
Answer: Please follow the Specification Section 21 13 13 - Wet-Pipe Sprinkler Systems.
Hydraulic calculations are necessary if determined by contractor’s designer.
Reclamation will provide existing fire sprinkler piping plans, but they will need to be field verified.
13. Question: Are there any fire sprinkler system piping requirements other than relocating the fire sprinkler drops and adding new sprinklers?
Answer: This will be determined by the contractor’s Fire Sprinkler designer per Specification Section 21 13 13 - Wet-Pipe Sprinkler Systems.
14. Question: Would Reclamation like to replace all of the old / standard response sprinklers in the building with new quick response?
Answer: No, only as required by code. Please reference Specification Section 21 13 13 - Wet-Pipe Sprinkler Systems.
15. Question: Is any work required between the Telecommunications Room and the Data Center?
Answer: No,low voltage work between the telecommunications room and the data center. Levels 100 and 300 will reuse the existing CAT6 cable. All data cables on level 200 will be replaced with new CAT6A plenum rated cable.
16. Question: Where is the staging area(s) located? Are they identified on a map relative to the buildings?
Answer: The staging area will be in the immediate vicinity of the building, but has not yet been determined.
Amendment 0008
17. Question: Can a window from each floor be removed to accommodate a trash shoot and/or material access?
Answer: Exterior windows are original to the building’s construction in 1931. The contractor must submit a plan for removal, safe storage, and replacement to be approved by the Government if this is desired.
18. Question: Identify epoxy or urethane for interior window?
Answer: Per drawing A1.00, Keynote 36, “PAINT CAVITY BETWEEN EXISTING
EXTERIOR WINDOW AND NEW INTERIOR WINDOW W/ EPOXY PAINT TO MATCH
THE ADJACENT INTERIOR WALL COLOR”
19. Question: Use existing pathway(s) above the North and South entry doors pathways?
Answer: If existing pathway(s) will work with new system, they may be reused.
20. Question: Who is supplying the ada door open switches and buttons?
Answer: Contractor is to supply ADA door open switches and buttons.
21. Question: Panic buttons? Surface or Wall mounted? On desk?
Answer: T2.01 LEVEL 200 - NEW AND DEMOLITION SECURITY PLANS, Note 2, “CONTRACTOR SHALL USE EXISTING PATHWAY FOR ACCESS CONTROL
DEVICES. CONTRACTOR SHALL PROVIDE PATHWAY, CABLE AND DURESS
(PANIC) DEVICE AT DESK LOCATION. CONTRACTOR SHALL COORDINATE WITH
FURNITURE LAYOUT DRAWINGS.”
T3.00 LEVEL 300 - NEW LOW VOLTAGE CEILING PLANS, Panic Button is shown wall-mounted.
22. Question: Is the owner furnishing the equipment for wireless access points is just installation required?
Answer: Owner will provide wireless access points for installation by contractor.
23. Question: Fiber Cabling or fiber equipment adds? Detail drawing shows new fiber cable.
Answer: No new fiber work or equipment is required for this project.
24. Question: Flat panel display wall box in every RD office?
Answer: Yes
Amendment 0008
25. Question: For the State Historic Preservation Office requirements, it was stated that Reclamation would take care of these post award. Correct?
Answer: SHPO consults are being done by Reclamation currently. The contractor is not responsible for the consults.
26. Question: Some of the life safety and fire protection design requirements needed for this project include any NICET level design stamps?
Answer: Yes, reference SECTION 21 13 13 - WET-PIPE SPRINKLER SYSTEMS
27. Question: Are the existing wood joist to be sanded and touched up to look like new?
Answer: Assume no sanding will be required, however, there may be some touch-up needed to make ready for finishing.
28. Question: There is tile specified in the central stairway for the bldg. The existing quarry tile floor on the stairs has tile stringers in conjunction with the treads & risers. Nothing is mentioned in the specifications about reproducing tile stringers for the new stairs. Please clarify if we are doing only treads & risers for the middle stairway or are we also responsible for adding the stringer mat'ls, too.
Answer: Revised drawings A1.00, A1.01 and A1.02 are attached. The stringer shall not be re-tiled, but instead remove the tile and paint the existing stringer, which is a steel channel according to the existing drawings.
29. Question: The 3rd floor in this building is composed of "lightweight" concrete. When demolition occurs, this lightweight mat'l will decompose - especially where the existing quarry floor tile exists in the lobby areas. Who is responsible for repairing or replacing the concrete where it is damaged? The entire floor of light weight mat'l will have to be properly sealed as well, too, before any new flooring can be installed for bond purposes. Please clarify who is responsible for sealing the 3rd floor sub floor prior to finished flooring installation.
Answer: The contractor is responsible for appropriate remediation of the lightweight concrete subfloor to make ready for installation of new flooring.
30. Question: The concrete floor in the basement has some severe problems in certain areas. The sub floor is off level in numerous places, appears to have severe moisture problems as it is hollow to the touch, & needs non-standard floor prep - as recognized per industry standards. Please stipulate what will be accepted as "floor prep" for the base bid & what options / alternatives can be offered for consideration. I.E.: Moisture mitigation, grinding, floating, etc are costly items & CANNOT be properly estimated until the existing demolition has taken place.
Answer: Assume standard demolition and replacement of flooring. Any differing site conditions shall be assessed by the Government and addressed post-award.
Amendment 0008
31. Question: The concrete sub floor on the 2nd level is not as flawed as the basement, but this sub floor is also not level in numerous places. Please advise as to floor prep requirements on this level as well.
Answer: Assume standard demolition and replacement of flooring. Any differing site conditions shall be assessed by the Government and addressed post-award.
32. Question: Please confirm if the fire alarm system is to be removed and replaced in its entirety or maintained and modified by the existing vendor.
Answer: Fire Alarm work will be managed by Reclamation.
This page intentionally left blank
1 2 3 3.7
5 6 7
A
B
C
D
F
E
G
H
3.9
A7.01
A7.00
A7.00
A7.00
A7.01
OFFICE
OFFICE
OFFICE
BREAKROOM
OFFICE (E)
OFFICE (E)
107A
OFFICE
107B
CONFERENCE
ROOM
STORAGE
109A
MER #2
HALL (E)
MEN (E)
ELEVATOR
LOBBY (E)
JANITOR (E)
WOMEN (E)
HALL (E)
MER #3
WEST
ENTRY
CLOSET (E)
CORRIDOR
(E)
STAIR NO. 1
(E)
REAR EXIT
119A
MECH
108A
AHU
AHU
A1.41
E
Q T
R E
A D
S
(V .I .F
E
Q T
R E
A D
S
(V .I .F
A1.41
TYP
A1.30
B A1.30
A
A8.01
A
A5.01
A5.01
A7.01
A8.01
C
LOUNGE
104A
B1
A7.01
A7.01
WELLNESS
109A
CORRIDOR
100A
B1
TECHNICAL
109B
MACHINE
ROOM
109C
ELECTRICAL
109D
RR
109EJANITOR
109F
ELECTRICAL
109G
OFFICE
109H
COMM.
109I
PERSONNEL
109J
TYP
TYP
TYP
TYP
TYP
A7.01
L
ABOVE
ABOVE
A7.01
M
3' - 4"
3' - 8"
L
1 2 3 3.7 4 5 6 7
A
B
C
D
F
E
G
H
3.9
AHU
AHU
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
. OF 3
TYP
3 20
ABOVE
ABOVE
TYP
20 20
18 58
TYP
TYP
TYP
TYP
TYP
TYP
B
INDICATES EXISTING
CONCRETE WALL TO
REMAIN
INDICATES EXISTING
MASONRY TO REMAIN
EXISTING WALL TO REMAIN
NEW WALL
WALL TO BE REMOVED
SEE KEYNOTE 12
EXISTING FLOOR TILE
Sheet Title
Sheet No:
P L E A S E R E C Y C L E
Project
Owner
THESE DRAWINGS AND SPECIFICATIONS ARE
THE PROPERTY OF TATE SNYDER KIMSEY
ARCHTECTS AND MAY NOT BE REPRODUCED
OR USED FOR ANY PURPOSE WITHOUT THE
ARCHITECTS WRITTEN CONSENT. AS
INSTRUMENTS OF SERVICE, THESE
DOCUMENTS ARE NOT FINAL AND READY FOR
USE, AND THEREFORE NOT VALID, UNLESS
THEY ARE SEALED, SIGNED AND DATED.
Consultant
709 Valle Verde Court Henderson, NV 89014 phone: 702.456.3000 fax: 702.898.6209 www.tska.com
A1.00
Date: MAY 26, 2016
LEVEL 100 NEW AND
DEMOLITION FLOOR
PLANS
BID SET
Job No: 15-059
ADMINISTRATION
BUILDING
RENOVATION
1200 PARK STREET
BOULDER CITY,
NEVADA 89005
BUREAU OF
RECLAMATION
Copyright, Ltd 2016
SCALE: 1/8" = 1'-0"
LEVEL 100 - NEW FLOOR PLAN
North
SCALE: 1/8" = 1'-0"
LEVEL 100 - DEMOLITION FLOOR PLAN
8 PATCH AND REPAIR ALL AREAS
DAMAGED BY DEMOLITION.
9 FURNITURE SHOWN FOR REFERENCE
ONLY. N.I.C.
10 ALL MARKER BOARDS TO BE REMOVED
AND TURNED OVER TO THE OWNER,
UNLESS NOTED OTHERWISE
11 PROVIDE METAL BACKING IN ALL WALLS
TO RECEIVE WALL MOUNTED
EQUIPMENT AND / OR TOILET
ACCESSORIES
12 SEE FURNITURE PLANS FOR
EQUIPMENT SCHEDULE
1 G.C. TO PROTECT ALL FINISHES TO
REMAIN DURING CONSTRUCTION.
2 EXISTING SHOWN HALFTONE, NEW
SHOWN BOLD
3 SEE A2.00 FOR MATERIAL AND FINISH
SCHEDULE
4 ALL EXISTING WALL COVERING TO BE
REMOVED.
5 SEE A1.10 FOR LEVEL 200 DIMENSION
PLAN
6 ALL FLOORS TO RECEIVE NEW FLOOR
FINISH
7 DASHED ITEMS INDICATE ITEMS TO BE
REMOVED
REVISIONS
REV DATE DESCRIPTION
B 9/6/2016 ADDENDUM B
49 EXISTING WATER/ICE MACHINE TO BE
REMOVED AND REINSTALLED, SEE NEW
WORK PLANS
50 REMOVE EXISITING MARKER BOARDS
AND MOULDING.
51 ALIGN NEW WALL FINISH WITH EXISTING
WALL FINISH
52 NEW OPENING IN EXISTING CONCRETE
WALL FOR DUCTWORK, SEE
MECHANICAL AND STRUCTURAL
DRAWINGS
53 ENLARGE EXISTING OPENING FOR NEW
DUCTWORK, SEE MECHANICAL AND
STRUCTURAL DRAWINGS
54 EXISTING STAIR ABOVE, SEE LEVEL 200
AND LEVEL 300 PLANS. PROTECT IN
PLACE
55 NEW WELL FOR HVAC, SEE
STRUCTURAL AND MECHANICAL
DRAWINGS. PROVIDE GRATE FOR FALL
PROTECTION - MATCH EXISTING AND
PAINT TO MATCH BUILDING. INSTALL
NEW DRAIN, SEE PLUMBING DRAWINGS
56 EXISTING OPENING TO BE ENLARGED
FOR NEW LOUVER, SEE STRUCTURAL
AND MECHANICAL DRAWINGS
57 REMOVE LOUVER AND ENLARGE
OPENING PER NEW WORK PLANS
58 SALVAGE DOOR, FRAME, AND
HARDWARE FOR REUSE, SEE NEW
WORK PLANS AND DOOR SCHEDULE
59 INFILL EXISTING OPENING, SEE
STRUCTURAL DRAWINGS
60 REMOVE EXISTING PROJECTION
SCREEN AND PROJECTOR AND TURN
OVER TO OWNER
61 REMOVE PORTIONS OF EXISTING
CONCRETE WALL FOR NEW OPENINGS,
SEE NEW WORK PLAN AND
STRUCTURAL DRAWINGS
62 NEW 4 TIER LOCKERS, SEE MATERIAL
SCHEDULE, L-1
63 MODIFY EXISTING HOLLOW METAL
DOOR/WINDOW FRAME TO REMOVE
ONE DOOR AS INDICATED, SEE NEW
WORK PLAN - REPAIR FRAME, GRIND
WELDS, AND PREP TO RECEIVE NEW
PAINT FINISH.
64 NEW DURESS ALARM LOCATION, SEE
TELECOM/SECURITY DRAWINGS
65 MOUNT NEW CARD READER ABOVE
NEW DOOR OPERATOR, SEE SECURITY
DRAWINGS
66 NEW ADA DOOR OPERATOR BUTTON
FOR LOBBY DOOR (BOTH SIDES)
67 REMOVE EXISTING PONY WALL, FAUX
PLANTER, AND ANY EXPOSED WALL
COVERING. PREPARE FOR NEW PAINT
FINISH
68 PREPARE EXISTING TOP RAIL FOR NEW
STAINED FINISH. STAIN TO MATCH,
WD-1.
69 RELOCATE EXISTING ADA DOOR
OPERATOR FOR RESTROOM TO
ADJACENT WALL, SEE NEW WORK
PLANS
70 LOCATION OF RELOCATED ADA DOOR
OPERATOR
71 LOUVER AT COUNTERTOP FOR
EQUIPMENT FAN, SEE TA SHEETS FOR
FAN INFORMATION. PAINT LOUVER TO
MATCH CABINETS, SEAL TO
COUNTERTOP
72 EXISTING UTILITY TRENCH, PROTECT IN
PLACE
73 BOTTOM OF EXISTING LIGHT WELL
INCLUDING EXISTING DRAIN, TO BE
LOWERED FOR NEW WORK.
74 NEW RETAINING WALL, SEE
STRUCTURAL DRAWINGS
75 EXISTING FIRE LINE TO REMAIN,
PROTECT IN PLACE.
76 REMOVE EXISTING BENCHES.
PATCH/REPAIR CONCRETE AS
NECESSARY FOR LIKE NEW FINISH
77 REMOVE TRIM AND PATCH/REPAIR AS
NECESSARY FOR NEW PAINT FINISH.
78 REMOVE EXISTING CURB AS INDICATED
79 REMOVE EXISTING CONCRETE
SIDEWALK AS REQUIRED FOR NEW
WORK
80 NEW CONCRETE CURB TO MATCH
EXISTING
81 FEATHER EDGE OF RAMP, 1" / 12" MAX
SLOPE
82 REMOVE TILE AT STAIR AND STAIR
STRINGER. PREPARE EXISTING STEEL
CHANNEL STRINGER FOR PAINT, PC-1
AND EXISTING STAIR STRUCTURE FOR
NEW TILE FINISH
1 FLOOR DRAIN TO REMAIN - SEE
PLUMBING DRAWINGS
2 REMOVE EXISTING METAL STUD WALL
3 EXISTING PLUMBING FIXTURES TO BE
REMOVED, SEE PLUMBING DRAWINGS
4 EXISTING ELECTRIC WATER COOLER TO
BE REPLACED, SEE PLUMBING
DRAWINGS
5 EXISTING METAL STUD WALL TO REMAIN
6 EXISTING INTERIOR DOOR TO REMAIN.
7 EXISTING STRUCTURAL COLUMN TO
REMAIN.
8 EXISTING COUNTER/CASEWORK AND
ASSOCIATED WOOD TRIM TO BE
REMOVED
9 EXISTING BRICK CHIMNEY TO REMAIN,
PROTECT IN PLACE
10 EXISTING CONCRETE WALLS TO
REMAIN, PROTECT IN PLACE
11 PATCH WALL WHERE WALLS HAVE BEEN
DEMOLISHED
12 6'-0" PORTION OF NEW WALL TO REMAIN
FREE OF POWER/DATA FOR FUTURE
RECEPTION WINDOW
13 PEDESTAL WITH ADA AND ACCESS
CONTROL EQUIPMENT, SEE PLANS AND
DOOR SCHEDULE. PLACE AT EXISTING
LOCATIONS AND REUSE EXISTING
CONDUIT. SEE TELECOM DRAWINGS
14 ELEVATOR TO REMAIN, PROTECT IN
PLACE
15 EXISTING STOREFRONT SYSTEM TO BE
REMOVED
16 EXISTING SECURITY CONTROL PANELS
TO BE REMOVED
17 REMOVE AND REPLACE EXISTING
EXTERIOR DOORS, SEE ELEVATIONS
AND DOOR SCHEDULE
18 EXISTING DOOR AND FRAME TO BE
REMOVED
19 REMOVE ALL INTERIOR WINDOWS AND
REPLACE WITH NEW. EXTERIOR
WINDOWS TO REMAIN, PROTECT IN
PLACE
20 REMOVE EXISTING FLOOR TILE,
PREPARE FLOOR FOR NEW FLOOR
FINISH
21 REMOVE EXISTING WALL COVERING.
PATCH AND REPAIR WALL TO RECEIVE
NEW PAINT FINISH
22 EXISTING BOARD-FORMED CONCRETE
WALLS TO BE EXPOSED. IF EXISTING
WALLS ARE COVERED IN PLASTER THEN
FURR-OUT PER WALL TYPE C.
23 AUDIO VISUAL EQUIPMENT CABINET,
SEE A/V PLANS
24 OPERABLE PARTITION, SEE
STRUCTURAL DRAWINGS AND
MATERIAL SCHEDULE
25 REMOVE EXISTING ELECTRICAL PANEL,
SEE ELECTRICAL PLANS
26 NEW ELECTRICAL PANEL, SEE
ELECTRICAL PLANS. PAINT TO MATCH
ADJACENT WALL
27 EXISTING SUPPLY/RETURN DUCTWORK
TO REMAIN, SEE MECHANICAL PLANS
28 WALL MOUNTED DISPLAY, NIC. PROVIDE
BACKING 18" ABOVE FINISH FLOOR TO
18" BELOW CEILINIG
29 SALVAGE ALL ROLLER SHADE WINDOW
COVERINGS FOR REUSE. REINSTALL
AFTER NEW WORK IS COMPLETE
30 REINSTALL SALVAGED ROLLER SHADE
WINDOW COVERINGS, TYP.
31 CUSTOM ALUMINUM DOOR WITH
ANODIZED FINISH IN MEDIUM BRONZE,
SEE DOOR TYPES
32 NEW CONCRETE VENTILATION WELL,
SEE A1.00 AND STRUCTURAL DRAWINGS
33 EXISTING COUNTERTOP, SINK AND
CABINETS TO BE REMOVED. TURN OVER
APPLIANCES TO OWNER
34 ALL EXISTING EQUIPMENT TO REMAIN,
UNLESS NOTED OTHERWISE ON
TELECOM DRAWINGS, PROTECT IN
PLACE
35 SEAL INTERIOR PERIMETER OF ALL
EXISTING EXTERIOR WINDOWS
36 PAINT CAVITY BETWEEN EXISTING
EXTERIOR WINDOW AND NEW INTERIOR
WINDOW W/ EPOXY PAINT TO MATCH
THE ADJACENT INTERIOR WALL COLOR
37 NEW LOUVERED PENTHOUSE, SEE
MECHANICAL DRAWINGS, PAINT TO
MATCH BUILDING.
38 REMOVE EXISTING SKYLIGHT AND
REPLACE WITH LOUVERED PENTHOUSE,
SEE NEW WORK
39 NEW SLAB OVER NEW VENTILATION
WELL FOR DUCTWORK, SEE
STRUCTURAL DRAWINGS
40 EXISTING TOILET PARTITIONS AND
ACCESSORIES TO BE REMOVED
41 SUPPORT STAIR LANDING DURING
DEMOLITION, EXCAVATION, AND
INSTALLATION OF NEW DUCT AND
RETAINING WALL
42 NEW PAINTED WALL FINISH
43 HANDRAILS TO REMAIN, PROTECT IN
PLACE. PREPARE FOR NEW PAINT
FINISH
44 ADD BLAST FILM TO ALL EXISTING
WINDOWS, UNLESS NOTED OTHERWISE.
SEE SPECIFICATIONS
45 REMOVE ALL EXISTING FLOOR FINISHES
AND PREPARE TO ACCEPT NEW FINISH
46 AUTOMATED FILING CABINET TO BE
REMOVED
47 4'-0" WIDE X 7'-0" TALL OPENING IN
EXISTING CONCRETE WALL, SEE
STRUCTURAL DRAWINGS
48 REMOVE CASEWORK, COUNTERTOP
AND SINK. REUSE EXISTING PLUMBING
CONNECTIONS
North
KEYNOTES
GENERAL NOTES
LEGEND
B
DN
1 2 3 3.7 4 5 6 7
A
B
C
D
F
E
G
H
3.9
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
B
1 2 3 3.7 4 5 6 7
A
B
C
D
F
E
G
H
3.9
A7.01
ELEV.
A1.31
A
A6.00
A6.00
213 SF
SMALL
CONFERENCE
163 SF
HOTELING
OFFICE
138 SF
SPECIAL
ASST.
217 SF
DEPUTY
RD
238 SF
DEPUTY
RD
211 SF
DEPUTY
RD
267 SF
REGIONAL
DIRECTOR
185 SF
RD CONF.
158 SF
MECHANICAL
/ COMM.
77 SF
BREAK
ROOM
115 SF
STORAGE
132 SF
WOMEN'S
129 SF
MEN'S
566 SF
LOBBY
271 SF
WAITING
256 SF
OPEN
OFFICE
149 SF
CORRIDOR
134 SF
CORRIDOR
A7.00
A7.00
A7.00
214 213 212
206 205
204A
A5.00
A5.00
A5.00
A8.00
A
A8.00
B
A2.30
A2.30
139 SF
CORRIDOR
208A
123 SF
OPEN
OFFICE
207A
220A
AA
CB
C
D C13A
C13A
B1 E
E E
C13A C13A
B1
B1
C13A
B1
D
E
C13A
B1
C13A
A7.01
A1.01
A1.01
C13A
B1
B1
120 SF
CORRIDOR
219B
B1
728 SF
LARGE
CONFERENCE
453 SF
MEDIUM
CONFERENCE
36 SF
STORAGE
216A
216A
154 SF
CORRIDOR
219A
145 SF
CORRIDOR
A2.31
A2.31
A2.31
A2.31
A2.30
TYP
TYP
A8.00
D A8.00
C
A5.00
A2.30
C
EE
EEEE E
C1
CC
C 22
A2.31
A2.31
A2.31
A1.41
TYP
TYP
TYP
TYP
SIM
A7.01
A7.01
E E
E
F
E
F
E
EEE
DDD
EEE
E
F
E
F
E
E E
E
D D D
TYP
TYP
TYP
B1
A2.31
A7.01
3' - 8"6"
B1
219A
B2
B1
TYP
ALIGN
TYP
INDICATES EXISTING
CONCRETE WALL TO
REMAIN
INDICATES EXISTING
MASONRY TO REMAIN
EXISTING WALL TO REMAIN
NEW WALL
WALL TO BE REMOVED
SEE KEYNOTE 12
EXISTING FLOOR TILE
6" X 6" HSS POST WITH
WELDED STEEL CAP, PAINT
TO MATCH BUILDING
CONCRETE
FOOTING
RUN CONDUIT WITHIN
HSS POST, USE EXISTING
UNDERGROUND CONDUIT
CALL BOX, WHERE
OCCURS - SEE PLANS
CARD READER
ADA PUSH BUTTON
SECTION A
PLAN
A
ELEVATION 1
ELEVATION 2
CARD READER AND CALL
BOX BEYOND - WHERE
OCCURS
ADA PUSH BUTTON
3'-5" AFF
2'-10" AFF
6" X 6" HSS POST WITH
WELDED STEEL CAP, PAINT
TO MATCH BUILDING
1' - 6"
EXISTING CONCRETE TO BE
REMOVED FOR INSTALLATION
OF NEW FOOTING - REPLACE
AND FINISH TO MATCH
EXISTING PATIO
SCALE: 1/8" = 1'-0"
LEVEL 200 - DEMOLITION FLOOR PLAN
SCALE: 1/8" = 1'-0"
LEVEL 200 - NEW FLOOR PLAN
North
Sheet Title
Sheet No:
P L E A S E R E C Y C L E
Project
Owner
THESE DRAWINGS AND SPECIFICATIONS ARE
THE PROPERTY OF TATE SNYDER KIMSEY
ARCHTECTS AND MAY NOT BE REPRODUCED
OR USED FOR ANY PURPOSE WITHOUT THE
ARCHITECTS WRITTEN CONSENT. AS
INSTRUMENTS OF SERVICE, THESE
DOCUMENTS ARE NOT FINAL AND READY FOR
USE, AND THEREFORE NOT VALID, UNLESS
THEY ARE SEALED, SIGNED AND DATED.
Consultant
709 Valle Verde Court Henderson, NV 89014 phone: 702.456.3000 fax: 702.898.6209 www.tska.com
A1.01
Date: MAY 26, 2016
LEVEL 200 NEW AND
DEMOLITION FLOOR
PLANS
BID SET
Job No: 15-059
ADMINISTRATION
BUILDING
RENOVATION
1200 PARK STREET
BOULDER CITY,
NEVADA 89005
BUREAU OF
RECLAMATION
Copyright, Ltd 2016
49 EXISTING WATER/ICE MACHINE TO BE
REMOVED AND REINSTALLED, SEE NEW
WORK PLANS
50 REMOVE EXISITING MARKER BOARDS
AND MOULDING.
51 ALIGN NEW WALL FINISH WITH EXISTING
WALL FINISH
52 NEW OPENING IN EXISTING CONCRETE
WALL FOR DUCTWORK, SEE
MECHANICAL AND STRUCTURAL
DRAWINGS
53 ENLARGE EXISTING OPENING FOR NEW
DUCTWORK, SEE MECHANICAL AND
STRUCTURAL DRAWINGS
54 EXISTING STAIR ABOVE, SEE LEVEL 200
AND LEVEL 300 PLANS. PROTECT IN
PLACE
55 NEW WELL FOR HVAC, SEE
STRUCTURAL AND MECHANICAL
DRAWINGS. PROVIDE GRATE FOR FALL
PROTECTION - MATCH EXISTING AND
PAINT TO MATCH BUILDING. INSTALL
NEW DRAIN, SEE PLUMBING DRAWINGS
56 EXISTING OPENING TO BE ENLARGED
FOR NEW LOUVER, SEE STRUCTURAL
AND MECHANICAL DRAWINGS
57 REMOVE LOUVER AND ENLARGE
OPENING PER NEW WORK PLANS
58 SALVAGE DOOR, FRAME, AND
HARDWARE FOR REUSE, SEE NEW
WORK PLANS AND DOOR SCHEDULE
59 INFILL EXISTING OPENING, SEE
STRUCTURAL DRAWINGS
60 REMOVE EXISTING PROJECTION
SCREEN AND PROJECTOR AND TURN
OVER TO OWNER
61 REMOVE PORTIONS OF EXISTING
CONCRETE WALL FOR NEW OPENINGS,
SEE NEW WORK PLAN AND
STRUCTURAL DRAWINGS
62 NEW 4 TIER LOCKERS, SEE MATERIAL
SCHEDULE, L-1
63 MODIFY EXISTING HOLLOW METAL
DOOR/WINDOW FRAME TO REMOVE
ONE DOOR AS INDICATED, SEE NEW
WORK PLAN - REPAIR FRAME, GRIND
WELDS, AND PREP TO RECEIVE NEW
PAINT FINISH.
64 NEW DURESS ALARM LOCATION, SEE
TELECOM/SECURITY DRAWINGS
65 MOUNT NEW CARD READER ABOVE
NEW DOOR OPERATOR, SEE SECURITY
DRAWINGS
66 NEW ADA DOOR OPERATOR BUTTON
FOR LOBBY DOOR (BOTH SIDES)
67 REMOVE EXISTING PONY WALL, FAUX
PLANTER, AND ANY EXPOSED WALL
COVERING. PREPARE FOR NEW PAINT
FINISH
68 PREPARE EXISTING TOP RAIL FOR NEW
STAINED FINISH. STAIN TO MATCH,
WD-1.
69 RELOCATE EXISTING ADA DOOR
OPERATOR FOR RESTROOM TO
ADJACENT WALL, SEE NEW WORK
PLANS
70 LOCATION OF RELOCATED ADA DOOR
OPERATOR
71 LOUVER AT COUNTERTOP FOR
EQUIPMENT FAN, SEE TA SHEETS FOR
FAN INFORMATION. PAINT LOUVER TO
MATCH CABINETS, SEAL TO
COUNTERTOP
72 EXISTING UTILITY TRENCH, PROTECT IN
PLACE
73 BOTTOM OF EXISTING LIGHT WELL
INCLUDING EXISTING DRAIN, TO BE
LOWERED FOR NEW WORK.
74 NEW RETAINING WALL, SEE
STRUCTURAL DRAWINGS
75 EXISTING FIRE LINE TO REMAIN,
PROTECT IN PLACE.
76 REMOVE EXISTING BENCHES.
PATCH/REPAIR CONCRETE AS
NECESSARY FOR LIKE NEW FINISH
77 REMOVE TRIM AND PATCH/REPAIR AS
NECESSARY FOR NEW PAINT FINISH.
78 REMOVE EXISTING CURB AS INDICATED
79 REMOVE EXISTING CONCRETE
SIDEWALK AS REQUIRED FOR NEW
WORK
80 NEW CONCRETE CURB TO MATCH
EXISTING
81 FEATHER EDGE OF RAMP, 1" / 12" MAX
SLOPE
82 REMOVE TILE AT STAIR AND STAIR
STRINGER. PREPARE EXISTING STEEL
CHANNEL STRINGER FOR PAINT, PC-1
AND EXISTING STAIR STRUCTURE FOR
NEW TILE FINISH
1 FLOOR DRAIN TO REMAIN - SEE
PLUMBING DRAWINGS
2 REMOVE EXISTING METAL STUD WALL
3 EXISTING PLUMBING FIXTURES TO BE
REMOVED, SEE PLUMBING DRAWINGS
4 EXISTING ELECTRIC WATER COOLER TO
BE REPLACED, SEE PLUMBING
DRAWINGS
5 EXISTING METAL STUD WALL TO REMAIN
6 EXISTING INTERIOR DOOR TO REMAIN.
7 EXISTING STRUCTURAL COLUMN TO
REMAIN.
8 EXISTING COUNTER/CASEWORK AND
ASSOCIATED WOOD TRIM TO BE
REMOVED
9 EXISTING BRICK CHIMNEY TO REMAIN,
PROTECT IN PLACE
10 EXISTING CONCRETE WALLS TO
REMAIN, PROTECT IN PLACE
11 PATCH WALL WHERE WALLS HAVE BEEN
DEMOLISHED
12 6'-0" PORTION OF NEW WALL TO REMAIN
FREE OF POWER/DATA FOR FUTURE
RECEPTION WINDOW
13 PEDESTAL WITH ADA AND ACCESS
CONTROL EQUIPMENT, SEE PLANS AND
DOOR SCHEDULE. PLACE AT EXISTING
LOCATIONS AND REUSE EXISTING
CONDUIT. SEE TELECOM DRAWINGS
14 ELEVATOR TO REMAIN, PROTECT IN
PLACE
15 EXISTING STOREFRONT SYSTEM TO BE
REMOVED
16 EXISTING SECURITY CONTROL PANELS
TO BE REMOVED
17 REMOVE AND REPLACE EXISTING
EXTERIOR DOORS, SEE ELEVATIONS
AND DOOR SCHEDULE
18 EXISTING DOOR AND FRAME TO BE
REMOVED
19 REMOVE ALL INTERIOR WINDOWS AND
REPLACE WITH NEW. EXTERIOR
WINDOWS TO REMAIN, PROTECT IN
PLACE
20 REMOVE EXISTING FLOOR TILE,
PREPARE FLOOR FOR NEW FLOOR
FINISH
21 REMOVE EXISTING WALL COVERING.
PATCH AND REPAIR WALL TO RECEIVE
NEW PAINT FINISH
22 EXISTING BOARD-FORMED CONCRETE
WALLS TO BE EXPOSED. IF EXISTING
WALLS ARE COVERED IN PLASTER THEN
FURR-OUT PER WALL TYPE C.
23 AUDIO VISUAL EQUIPMENT CABINET,
SEE A/V PLANS
24 OPERABLE PARTITION, SEE
STRUCTURAL DRAWINGS AND
MATERIAL SCHEDULE
25 REMOVE EXISTING ELECTRICAL PANEL,
SEE ELECTRICAL PLANS
26 NEW ELECTRICAL PANEL, SEE
ELECTRICAL PLANS. PAINT TO MATCH
ADJACENT WALL
27 EXISTING SUPPLY/RETURN DUCTWORK
TO REMAIN, SEE MECHANICAL PLANS
28 WALL MOUNTED DISPLAY, NIC. PROVIDE
BACKING 18" ABOVE FINISH FLOOR TO
18" BELOW CEILINIG
29 SALVAGE ALL ROLLER SHADE WINDOW
COVERINGS FOR REUSE. REINSTALL
AFTER NEW WORK IS COMPLETE
30 REINSTALL SALVAGED ROLLER SHADE
WINDOW COVERINGS, TYP.
31 CUSTOM ALUMINUM DOOR WITH
ANODIZED FINISH IN MEDIUM BRONZE,
SEE DOOR TYPES
32 NEW CONCRETE VENTILATION WELL,
SEE A1.00 AND STRUCTURAL DRAWINGS
33 EXISTING COUNTERTOP, SINK AND
CABINETS TO BE REMOVED. TURN OVER
APPLIANCES TO OWNER
34 ALL EXISTING EQUIPMENT TO REMAIN,
UNLESS NOTED OTHERWISE ON
TELECOM DRAWINGS, PROTECT IN
PLACE
35 SEAL INTERIOR PERIMETER OF ALL
EXISTING EXTERIOR WINDOWS
36 PAINT CAVITY BETWEEN EXISTING
EXTERIOR WINDOW AND NEW INTERIOR
WINDOW W/ EPOXY PAINT TO MATCH
THE ADJACENT INTERIOR WALL COLOR
37 NEW LOUVERED PENTHOUSE, SEE
MECHANICAL DRAWINGS, PAINT TO
MATCH BUILDING.
38 REMOVE EXISTING SKYLIGHT AND
REPLACE WITH LOUVERED PENTHOUSE,
SEE NEW WORK
39 NEW SLAB OVER NEW VENTILATION
WELL FOR DUCTWORK, SEE
STRUCTURAL DRAWINGS
40 EXISTING TOILET PARTITIONS AND
ACCESSORIES TO BE REMOVED
41 SUPPORT STAIR LANDING DURING
DEMOLITION, EXCAVATION, AND
INSTALLATION OF NEW DUCT AND
RETAINING WALL
42 NEW PAINTED WALL FINISH
43 HANDRAILS TO REMAIN, PROTECT IN
PLACE. PREPARE FOR NEW PAINT
FINISH
44 ADD BLAST FILM TO ALL EXISTING
WINDOWS, UNLESS NOTED OTHERWISE.
SEE SPECIFICATIONS
45 REMOVE ALL EXISTING FLOOR FINISHES
AND PREPARE TO ACCEPT NEW FINISH
46 AUTOMATED FILING CABINET TO BE
REMOVED
47 4'-0" WIDE X 7'-0" TALL OPENING IN
EXISTING CONCRETE WALL, SEE
STRUCTURAL DRAWINGS
48 REMOVE CASEWORK, COUNTERTOP
AND SINK. REUSE EXISTING PLUMBING
CONNECTIONS
8 PATCH AND REPAIR ALL AREAS
DAMAGED BY DEMOLITION.
9 FURNITURE SHOWN FOR REFERENCE
ONLY. N.I.C.
10 ALL MARKER BOARDS TO BE REMOVED
AND TURNED OVER TO THE OWNER,
UNLESS NOTED OTHERWISE
11 PROVIDE METAL BACKING IN ALL WALLS
TO RECEIVE WALL MOUNTED
EQUIPMENT AND / OR TOILET
ACCESSORIES
12 SEE FURNITURE PLANS FOR
EQUIPMENT SCHEDULE
1 G.C. TO PROTECT ALL FINISHES TO
REMAIN DURING CONSTRUCTION.
2 EXISTING SHOWN HALFTONE, NEW
SHOWN BOLD
3 SEE A2.00 FOR MATERIAL AND FINISH
SCHEDULE
4 ALL EXISTING WALL COVERING TO BE
REMOVED.
5 SEE A1.10 FOR LEVEL 200 DIMENSION
PLAN
6 ALL FLOORS TO RECEIVE NEW FLOOR
FINISH
7 DASHED ITEMS INDICATE ITEMS TO BE
REMOVED
SCALE: 1" = 1'-0"
ACCESS CONTROL PEDESTAL
KEYNOTES
GENERAL NOTES
REVISIONS
REV DATE DESCRIPTION
B 9/6/2016 ADDENDUM B
1 2 3 3.7 4 5 6 7
A
B
C
D
F
E
G
H
3.9
A7.01
A6.00
A6.00
A7.00
A7.00
A7.00
A7.01
CONF. (E)
301A
OFFICE (E)
301B
CORRIDOR
(E)
300E
OFFICE (E)
OFFICE (E)
301C
OFFICE (E)
301D
OFFICE (E)
301E
OFFICE (E)
CONF. (E)
OFFICE (E)
OFFICE (E)
OFFICE (E)
MER #5 (E)
MEN (E)
WOMEN (E)
ELEVATOR
LOBBY (E)
OFFICE (E)
OFFICE (E)
OFFICE (E)
OFFICE
OFFICE
CORRIDOR
(E)
300W
STAIR NO. 2
(E)
AHU20
A1.41
E
Q T
R E
A D
S
(V .I .F
5 EQ TREADS @ 11"
+/- 4' - 7" (V.I.F.)
A1.41
TYP
A1.31
B
TYP
A8.01
B
A5.01
A7.01
CORRIDOR
(E)
H H H H H
H J H
G G G G G G G G G G G G
H J H
H
H
J
H
H
HHHHH
GGGGGGGGG GG
H
H
J
H
H
TYP
TYP
TYP
B1
B1
B1
K
B1
B1
B1
B1
B1
B1
A2.31
ALIGN
ABOVE
ABOVE
A1
A1
1 2 3 3.7 4 5 6 7
A
B
C
D
F
E
G
H
3.9
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
ABOVE
TYP
TYP
ABOVE
TYP
TYP
TYP
B
INDICATES EXISTING
CONCRETE WALL TO
REMAIN
INDICATES EXISTING
MASONRY TO REMAIN
EXISTING WALL TO REMAIN
NEW WALL
WALL TO BE REMOVED
SEE KEYNOTE 12
EXISTING FLOOR TILE
Sheet Title
Sheet No:
P L E A S E R E C Y C L E
Project
Owner
THESE DRAWINGS AND SPECIFICATIONS ARE
THE PROPERTY OF TATE SNYDER KIMSEY
ARCHTECTS AND MAY NOT BE REPRODUCED
OR USED FOR ANY PURPOSE WITHOUT THE
ARCHITECTS WRITTEN CONSENT. AS
INSTRUMENTS OF SERVICE, THESE
DOCUMENTS ARE NOT FINAL AND READY FOR
USE, AND THEREFORE NOT VALID, UNLESS
THEY ARE SEALED, SIGNED AND DATED.
Consultant
709 Valle Verde Court Henderson, NV 89014 phone: 702.456.3000 fax: 702.898.6209 www.tska.com
A1.02
Date: MAY 26, 2016
LEVEL 300 NEW AND
DEMOLITION FLOOR
PLANS
BID SET
Job No: 15-059
ADMINISTRATION
BUILDING
RENOVATION
1200 PARK STREET
BOULDER CITY,
NEVADA 89005
BUREAU OF
RECLAMATION
Copyright, Ltd 2016
SCALE: 1/8" = 1'-0"
LEVEL 300 - NEW FLOOR PLAN
North
SCALE: 1/8" = 1'-0"
LEVEL 300 - DEMOLITION FLOOR PLAN
8 PATCH AND REPAIR ALL AREAS
DAMAGED BY DEMOLITION.
9 FURNITURE SHOWN FOR REFERENCE
ONLY. N.I.C.
10 ALL MARKER BOARDS TO BE REMOVED
AND TURNED OVER TO THE OWNER,
UNLESS NOTED OTHERWISE
11 PROVIDE METAL BACKING IN ALL WALLS
TO RECEIVE WALL MOUNTED
EQUIPMENT AND / OR TOILET
ACCESSORIES
12 SEE FURNITURE PLANS FOR
EQUIPMENT SCHEDULE
1 G.C. TO PROTECT ALL FINISHES TO
REMAIN DURING CONSTRUCTION.
2 EXISTING SHOWN HALFTONE, NEW
SHOWN BOLD
3 SEE A2.00 FOR MATERIAL AND FINISH
SCHEDULE
4 ALL EXISTING WALL COVERING TO BE
REMOVED.
5 SEE A1.10 FOR LEVEL 200 DIMENSION
PLAN
6 ALL FLOORS TO RECEIVE NEW FLOOR
FINISH
7 DASHED ITEMS INDICATE ITEMS TO BE
REMOVED
REVISIONS
REV DATE DESCRIPTION
B 9/6/2016 ADDENDUM B
49 EXISTING WATER/ICE MACHINE TO BE
REMOVED AND REINSTALLED, SEE NEW
WORK PLANS
50 REMOVE EXISITING MARKER BOARDS
AND MOULDING.
51 ALIGN NEW WALL FINISH WITH EXISTING
WALL FINISH
52 NEW OPENING IN EXISTING CONCRETE
WALL FOR DUCTWORK, SEE
MECHANICAL AND STRUCTURAL
DRAWINGS
53 ENLARGE EXISTING OPENING FOR NEW
DUCTWORK, SEE MECHANICAL AND
STRUCTURAL DRAWINGS
54 EXISTING STAIR ABOVE, SEE LEVEL 200
AND LEVEL 300 PLANS. PROTECT IN
PLACE
55 NEW WELL FOR HVAC, SEE
STRUCTURAL AND MECHANICAL
DRAWINGS. PROVIDE GRATE FOR FALL
PROTECTION - MATCH EXISTING AND
PAINT TO MATCH BUILDING. INSTALL
NEW DRAIN, SEE PLUMBING DRAWINGS
56 EXISTING OPENING TO BE ENLARGED
FOR NEW LOUVER, SEE STRUCTURAL
AND MECHANICAL DRAWINGS
57 REMOVE LOUVER AND ENLARGE
OPENING PER NEW WORK PLANS
58 SALVAGE DOOR, FRAME, AND
HARDWARE FOR REUSE, SEE NEW
WORK PLANS AND DOOR SCHEDULE
59 INFILL EXISTING OPENING, SEE
STRUCTURAL DRAWINGS
60 REMOVE EXISTING PROJECTION
SCREEN AND PROJECTOR AND TURN
OVER TO OWNER
61 REMOVE PORTIONS OF EXISTING
CONCRETE WALL FOR NEW OPENINGS,
SEE NEW WORK PLAN AND
STRUCTURAL DRAWINGS
62 NEW 4 TIER LOCKERS, SEE MATERIAL
SCHEDULE, L-1
63 MODIFY EXISTING HOLLOW METAL
DOOR/WINDOW FRAME TO REMOVE
ONE DOOR AS INDICATED, SEE NEW
WORK PLAN - REPAIR FRAME, GRIND
WELDS, AND PREP TO RECEIVE NEW
PAINT FINISH.
64 NEW DURESS ALARM LOCATION, SEE
TELECOM/SECURITY DRAWINGS
65 MOUNT NEW CARD READER ABOVE
NEW DOOR OPERATOR, SEE SECURITY
DRAWINGS
66 NEW ADA DOOR OPERATOR BUTTON
FOR LOBBY DOOR (BOTH SIDES)
67 REMOVE EXISTING PONY WALL, FAUX
PLANTER, AND ANY EXPOSED WALL
COVERING. PREPARE FOR NEW PAINT
FINISH
68 PREPARE EXISTING TOP RAIL FOR NEW
STAINED FINISH. STAIN TO MATCH,
WD-1.
69 RELOCATE EXISTING ADA DOOR
OPERATOR FOR RESTROOM TO
ADJACENT WALL, SEE NEW WORK
PLANS
70 LOCATION OF RELOCATED ADA DOOR
OPERATOR
71 LOUVER AT COUNTERTOP FOR
EQUIPMENT FAN, SEE TA SHEETS FOR
FAN INFORMATION. PAINT LOUVER TO
MATCH CABINETS, SEAL TO
COUNTERTOP
72 EXISTING UTILITY TRENCH, PROTECT IN
PLACE
73 BOTTOM OF EXISTING LIGHT WELL
INCLUDING EXISTING DRAIN, TO BE
LOWERED FOR NEW WORK.
74 NEW RETAINING WALL, SEE
STRUCTURAL DRAWINGS
75 EXISTING FIRE LINE TO REMAIN,
PROTECT IN PLACE.
76 REMOVE EXISTING BENCHES.
PATCH/REPAIR CONCRETE AS
NECESSARY FOR LIKE NEW FINISH
77 REMOVE TRIM AND PATCH/REPAIR AS
NECESSARY FOR NEW PAINT FINISH.
78 REMOVE EXISTING CURB AS INDICATED
79 REMOVE EXISTING CONCRETE
SIDEWALK AS REQUIRED FOR NEW
WORK
80 NEW CONCRETE CURB TO MATCH
EXISTING
81 FEATHER EDGE OF RAMP, 1" / 12" MAX
SLOPE
82 REMOVE TILE AT STAIR AND STAIR
STRINGER. PREPARE EXISTING STEEL
CHANNEL STRINGER FOR PAINT, PC-1
AND EXISTING STAIR STRUCTURE FOR
NEW TILE FINISH
1 FLOOR DRAIN TO REMAIN - SEE
PLUMBING DRAWINGS
2 REMOVE EXISTING METAL STUD WALL
3 EXISTING PLUMBING FIXTURES TO BE
REMOVED, SEE PLUMBING DRAWINGS
4 EXISTING ELECTRIC WATER COOLER TO
BE REPLACED, SEE PLUMBING
DRAWINGS
5 EXISTING METAL STUD WALL TO REMAIN
6 EXISTING INTERIOR DOOR TO REMAIN.
7 EXISTING STRUCTURAL COLUMN TO
REMAIN.
8 EXISTING COUNTER/CASEWORK AND
ASSOCIATED WOOD TRIM TO BE
REMOVED
9 EXISTING BRICK CHIMNEY TO REMAIN,
PROTECT IN PLACE
10 EXISTING CONCRETE WALLS TO
REMAIN, PROTECT IN PLACE
11 PATCH WALL WHERE WALLS HAVE BEEN
DEMOLISHED
12 6'-0" PORTION OF NEW WALL TO REMAIN
FREE OF POWER/DATA FOR FUTURE
RECEPTION WINDOW
13 PEDESTAL WITH ADA AND ACCESS
CONTROL EQUIPMENT, SEE PLANS AND
DOOR SCHEDULE. PLACE AT EXISTING
LOCATIONS AND REUSE EXISTING
CONDUIT. SEE TELECOM DRAWINGS
14 ELEVATOR TO REMAIN, PROTECT IN
PLACE
15 EXISTING STOREFRONT SYSTEM TO BE
REMOVED
16 EXISTING SECURITY CONTROL PANELS
TO BE REMOVED
17 REMOVE AND REPLACE EXISTING
EXTERIOR DOORS, SEE ELEVATIONS
AND DOOR SCHEDULE
18 EXISTING DOOR AND FRAME TO BE
REMOVED
19 REMOVE ALL INTERIOR WINDOWS AND
REPLACE WITH NEW. EXTERIOR
WINDOWS TO REMAIN, PROTECT IN
PLACE
20 REMOVE EXISTING FLOOR TILE,
PREPARE FLOOR FOR NEW FLOOR
FINISH
21 REMOVE EXISTING WALL COVERING.
PATCH AND REPAIR WALL TO RECEIVE
NEW PAINT FINISH
22 EXISTING BOARD-FORMED CONCRETE
WALLS TO BE EXPOSED. IF EXISTING
WALLS ARE COVERED IN PLASTER THEN
FURR-OUT PER WALL TYPE C.
23 AUDIO VISUAL EQUIPMENT CABINET,
SEE A/V PLANS
24 OPERABLE PARTITION, SEE
STRUCTURAL DRAWINGS AND
MATERIAL SCHEDULE
25 REMOVE EXISTING ELECTRICAL PANEL,
SEE ELECTRICAL PLANS
26 NEW ELECTRICAL PANEL, SEE
ELECTRICAL PLANS. PAINT TO MATCH
ADJACENT WALL
27 EXISTING SUPPLY/RETURN DUCTWORK
TO REMAIN, SEE MECHANICAL PLANS
28 WALL MOUNTED DISPLAY, NIC. PROVIDE
BACKING 18" ABOVE FINISH FLOOR TO
18" BELOW CEILINIG
29 SALVAGE ALL ROLLER SHADE WINDOW
COVERINGS FOR REUSE. REINSTALL
AFTER NEW WORK IS COMPLETE
30 REINSTALL SALVAGED ROLLER SHADE
WINDOW COVERINGS, TYP.
31 CUSTOM ALUMINUM DOOR WITH
ANODIZED FINISH IN MEDIUM BRONZE,
SEE DOOR TYPES
32 NEW CONCRETE VENTILATION WELL,
SEE A1.00 AND STRUCTURAL DRAWINGS
33 EXISTING COUNTERTOP, SINK AND
CABINETS TO BE REMOVED. TURN OVER
APPLIANCES TO OWNER
34 ALL EXISTING EQUIPMENT TO REMAIN,
UNLESS NOTED OTHERWISE ON
TELECOM DRAWINGS, PROTECT IN
PLACE
35 SEAL INTERIOR PERIMETER OF ALL
EXISTING EXTERIOR WINDOWS
36 PAINT CAVITY BETWEEN EXISTING
EXTERIOR WINDOW AND NEW INTERIOR
WINDOW W/ EPOXY PAINT TO MATCH
THE ADJACENT INTERIOR WALL COLOR
37 NEW LOUVERED PENTHOUSE, SEE
MECHANICAL DRAWINGS, PAINT TO
MATCH BUILDING.
38 REMOVE EXISTING SKYLIGHT AND
REPLACE WITH LOUVERED PENTHOUSE,
SEE NEW WORK
39 NEW SLAB OVER NEW VENTILATION
WELL FOR DUCTWORK, SEE
STRUCTURAL DRAWINGS
40 EXISTING TOILET PARTITIONS AND
ACCESSORIES TO BE REMOVED
41 SUPPORT STAIR LANDING DURING
DEMOLITION, EXCAVATION, AND
INSTALLATION OF NEW DUCT AND
RETAINING WALL
42 NEW PAINTED WALL FINISH
43 HANDRAILS TO REMAIN, PROTECT IN
PLACE. PREPARE FOR NEW PAINT
FINISH
44 ADD BLAST FILM TO ALL EXISTING
WINDOWS, UNLESS NOTED OTHERWISE.
SEE SPECIFICATIONS
45 REMOVE ALL EXISTING FLOOR FINISHES
AND PREPARE TO ACCEPT NEW FINISH
46 AUTOMATED FILING CABINET TO BE
REMOVED
47 4'-0" WIDE X 7'-0" TALL OPENING IN
EXISTING CONCRETE WALL, SEE
STRUCTURAL DRAWINGS
48 REMOVE CASEWORK, COUNTERTOP
AND SINK. REUSE EXISTING PLUMBING
CONNECTIONS
North
KEYNOTES
GENERAL NOTES
This page intentionally left blank