Tab_14_-Solicitation_R15PS00713_Vol_I.pdf

PDF 299 KB Posted

Attached to
Bulk Equipment Purchase Federal contract opportunity
Solicitation number
R15PS00713
Issued by
Department of the Interior Bureau of Reclamation

About this file

Solicitation Vol I

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Equipment Purchase, newest first.
File Type Posted
Sol_R15PS00713_Amd_000001.pdf PDF
Sol_R15PS00713.pdf PDF
Tab_14_-Att_2_Drawings_Rev_09042014_Final 1 _-_Copy.pdf PDF
Tab_14_-Att_3_PPQ_R15PS00713_-_Copy.pdf PDF
Tab_14_-Att_1_Vol._II__Bulk_Equipment_Specifications_Final_3_26_15_-_Copy.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BULK EQUIPMENT PURCHASE

Volume I of II

SOLICITATION NO. R15PS00713

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

UPPER COLORADO REGION

SALT LAKE CITY, UTAH

R15PS00713 Bulk Equipment Purchase Page 2 of 45

FOREWARD

Background

Project pumping plants, Ruin Canyon, Pleasant View, Cahone, and Dove Creek provide seasonal irrigation water under pressure to approximately 20,000 acres in southwest Colorado for the Dolores Project, owned by the Bureau of Reclamation and operated by the Dolores Water Conservancy District (DWCD). Pumps are vertical turbine pumps powered by electric motors, currently operating at 2,400 VAC. The electric motors are operated as fixed speed or variable speed control, by slip ring recovery systems, which at 30 years old is considered obsolete.

Scope

Four pumping plants are being upgraded: Pleasant View Pumping Plant (PP), Ruin Canyon PP, Dove Creek PP, and Cahone PP. The objective of this upgrade project is to replace nine existing Variable Frequency Drives (VFD) with modern VFDs, to be operated at 480 VAC.

Two of the plants currently use medium voltage VFDs and motors, and the other two plants were previously converted to 480V with new drives and motors. The current 480V drives are old technology and significantly aged. The new equipment will be fully compliant with the harmonic distortion requirements of IEEE 519 using 18 pulse VFD technologies, backed up with alternate fixed speed motor controls using soft start controls installed within the same enclosures as the

VFD.

To support the change in pump operating voltage to 480 VAC at Pleasant View PP and Ruin Canyon PP, the equipment at each plant will include a new section of 5kV metal-enclosed switchgear, a new 750kVA, 2400 VAC to 480 VAC station service transformer, as well as new a 480VAC distribution switchboard. New 480 VAC inverter duty motors will replace the 4 variable speed 2400 VAC motors on the existing pumps at those two plants. These new motors will be a hollow shaft design. Cahone PP and Dove Creek PP will simply have the existing 480V VFDs replaced.

R15PS00713 Bulk Equipment Purchase Page 3 of 45

SECTION B – SUPPLIES AND PRICES

FY15 P1 Bulk Equipment

CRSP Dolores Project

Colorado

SCHEDULE

a. Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the Schedule.

b. Offerors shall complete the Schedule by inserting a price(s) in all the line items in the Schedule, including the options. The Government may exercise one or more of the options in accordance with FAR Clause 52.217-6, “Option For Increased Quantity” and FAR Clause 52.217-7 “Option For Increased Quantity- Separately Priced Line Item” contained in the Contract.

c. All offers are subject to the terms and conditions of this solicitation.

d. Definition: CLIN – Contract Line Item Number

SCHEDULE

CLIN Delivery End Date

Supplies or Services and Section Ref.

Quantity and Unit

Unit Price Amount

0001 11/15/15 Pad Mounted Oil Filled Distribution transformer

26 12 19

2 Each $ $

0002 11/15/15 5kV Metal-enclosed Switchgear

26 13 10

2 Each $ $

0003 11/15/15 Distribution Switchboards 26 24

2 Each $ $

0004-A 09/30/16 Low-voltage Variable Frequency Drive Systems, 200Hp

26 29 23

2 Each $ $

0004-B 11/15/15 Low-voltage Variable Frequency Drive Systems, 250Hp

26 29 23

4 Each $ $

0004-C 09/30/16 Low-voltage Variable Frequency Drive Systems, 400Hp

26 29 23

3 Each $ $

0004-D 07/15/17 Low-voltage Variable Frequency Drive Systems, 200Hp – Field Service

26 29 23

40 Hours

Lump Price $

R15PS00713 Bulk Equipment Purchase Page 4 of 45

SCHEDULE

CLIN Delivery End Date

Supplies or Services and Section Ref.

Quantity and Unit

Unit Price Amount

0004-E 07/15/16 Low-voltage Variable Frequency Drive Systems, 250Hp – Field Service

26 29 23

80 Hours Lump Price $

0004-F 07/15/18 Low-voltage Variable Frequency Drive Systems, 400Hp – Field Service

26 29 23

40 Hours Lump Price $

0005 11/15/15

Induction Motors, 250Hp

33 12 82

5 Each $ $

TOTAL AMOUNT FOR SCHEDULE $ ______________________

52.212-4 CONTRACT TERMS AND CONDITIONS – (DEC 2014)

COMMERCIAL ITEMS (SEPT 2013)

ADDENDUM TO 52.212-4

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

FAR Clauses – https://www.acquisition.gov/far/

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE (OCT 2010)

CERTAIN FEDERAL TRANSACTIONS

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER (April 2014)

RIGHTS AND REQUIREMENT TO INFORM

EMPLOYEES OF WHISTLEBLOWER RIGHTS

52.204-04 PRINTED OR COPIED DOUBLE-SIDED ON POST (MAY 2011)

CONSUMER FIBER CONTENT PAPER

52.204-13 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

MAINTENANCE

52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (JAN 2014)

R15PS00713 Bulk Equipment Purchase Page 5 of 45

52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014)

52.222-42 STATEMENT OF EQUIVELANT RATES FOR (MAY 2014)

HEDERAL HIRES

EMPLOYEE CLASS MONITARY WAGE- FRINGE BENEFITS

Machinery Maintenance Mechanic $ 27.86

52.222-55 MINIMUM WAGES UNDER EXECUTIVE (DEC 2014)

ORDER 13658

52.223-06 DRUG-FREE WORKPLACE (MAY 2001)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN (JUNE 2008)

PURCHASES

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED (JUL 2013)

OBLIGATIONS

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL (DEC 2013)

BUSINESS SUBCONTRACTORS

52.242-13 BANKRUPTCY (AUG 1984)

52.242-15 STOP-WORK ORDER (AUG 1989)

52.247-34 F.O.B DESTINATION (NOV 1991)

DIAR

1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

R15PS00713 Bulk Equipment Purchase Page 6 of 45

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of clause

DIAPR

2010-14

CONTRACTOR PERFORMANCE ASSESSMENT

REPORTING SYSTEM

JULY 2010

(a) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

(b) The past performance evaluation process is a totally paperless processing using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

(c) We request that you furnish to Contracting Officer with the name, position title, phone number, and email address for each person designated to have access to your firms's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official. The report information must be protected as source selection sensitive information not releasable to the public.

(d) When your Contractor Representative(s) (Past Performance Points of Contact) are registered in CPARS, they will receive an automatically-generated email with detailed login instructions. Further details, system requirements, and training information for CPARS is available at http://www.cpars.csd.disa.mil/. The CPARS User Manual, registration for On Line Training for Contractor Representatives, and a practice application may be found a t this site.

(e) Within 60 days after the end of a performance period, the Contracting Officer will complete an interim or final past performance evaluation and the report will be accessible at http://www.cpars.csd.disa.mil/..

Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment. Comments are limited to the space provided in Block 22. Your comments should focus on objective facts in the Assessing Official's narrative and should provide your views on the causes and ramifications of the assessed performance. In addition to the ratings and supporting narratives, R15PS00713 Bulk Equipment Purchase Page 7 of 45 block 1 - 17 should be reviewed for accuracy, as these include key fields that will be used by the Government to identify your firm in future source selection actions. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in Block 22, and then signing and dating Block 23 of the form. Without a statement in Block 22, you will be unable to sign and submit the evaluation back to the Government. If you do not sign and submit the CPAR within 30 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment." Your response is due within 30 calendar days after receipt of the CPAR.

(f) The following guidelines apply concerning your use of the past performance evaluation:

(1) Protect the evaluation as "source selection information." After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS< contact the Contracting Officer for instructions.

(2) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

(3) Prohibit the use of or reference to evaluation data for advertised, promotional material, preaward surveys, responsibility determinations, production readiness reviews, or other similar purposes.

(g) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the Contracting Officer no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 30 - day review period.

(h) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

DIAPR

2011-04

AMEND 4

INVOICE PROCESSING PLATFORM (IPP) –

TREASURY ELECTRONIC INVOICING SYSTEM

(AUG 2013)

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform System (IPP). The Contractor shall also submit an electronic copy of the IPP invoice to the Contract Specialist/Contracting Officer at Mcouvrette@usbr.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.

"Payment requests" means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions-Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

The vendor shall upon invoicing through the internet payment platform, attach a copy of their regular vendor invoice by utilizing the attachments feature on the lower right hand corner of the invoicing screen to substantiate requests for payment. The vendor invoice shall be readable in Microsoft Excel, Adobe Acrobat (.pdf) or Microsoft Word.

FAR 32.905(b) outlines a Proper Invoice to include:

R15PS00713 Bulk Equipment Purchase Page 8 of 45

1. Name & address of the Contractor.

2. Invoice date & number.

3. Contract number, contract line item number and, if applicable, the order number.

4. Description, quantity, unit of measure, unit price and extended price of the items delivered.

5. Shipping number and date of shipment including the bill of lading number and weight of shipment if shipped on Government bill of lading.

6. Terms of any discount for prompt payment offered.

7. Name and address of official to whom payment is to be sent.

8. Name, title, and phone number of person to notify in event of defective invoice.

9. Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

10. Any other information or documentation required by the contract.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

WBR 1452.201-80 - AUTHORITIES AND LIMITATIONS – (JUL 1993)

BUREAU OF RECLAMATION

(a) All work shall be performed under the authority exercised by the Contracting Officer who has been appointed in accordance with the requirements of the Department of the Interior Acquisition Regulation

(DIAR) 1401.603 (48 CFR 1401.603).

(b) The Contracting Officer may designate other Government employees to act as authorized representatives in administering this contract in accordance with the requirements of DIAR 1401.670 (48 CFR 1401.670). Any designation shall be made to the authorized representative by an appointment memorandum signed by the Contracting Officer which contains the scope and limitations of authority delegated for purposes of administering this contract. A copy of the memorandum, and any revisions to it, shall be provided to the Contractor which shall acknowledge receipt.

(c) The Contractor shall, without unnecessary delay, comply with any written or oral direction of the contracting officer or authorized representative(s) acting within the scope and authority of their appointment memorandum. Such orders or direction include, but are not limited to, instructions, interpretations, approvals, or rejections associated with work under this contract including requirements for submission of technical data, shop drawings, samples, literature, plans, or other data required to be approved by the Government under this contract.

(d)(1) If the Contractor receives direction for work under this contract (including any written or oral orders it regards as a change order under the Changes clause of this contract) and it considers such direction to have been issued without proper authority (including instances where it believes delegated authority has been exceeded), it shall not proceed with the direction and shall notify the Contracting Officer within five

(5) working days of receipt of the direction. On the basis of the most accurate information available to the Contractor, the notice shall state--

(i) The date, nature, and circumstances of the direction received;

(ii) The name, function, and activity of each Government individual and Contractor official or employee involved in or knowledgeable about such direction;

(iii) The identification of any documents and the substance of any oral communication involved in such direction;

(iv) The contract line items or other contract requirements that may be affected by the alleged direction including any suspected delays or disruption of performance; and

R15PS00713 Bulk Equipment Purchase Page 9 of 45

(v) Any other information considered pertinent.

(2) Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform under this paragraph prior to receipt of the Contracting Officer's determination issued under paragraph (e) of this clause.

(e) The Contracting Officer shall promptly, after receipt of any notice made under paragraph (d) of this clause, respond to the notice in writing. The response shall --

(1) Confirm that the direction contained in the Contractor's notice was unauthorized and either authorize it by appropriate contract modification or countermand it;

(2) Deny that the direction contained in the Contractor's notice was outside the scope and limitations of the authority of the authorized representative who gave the direction and direct the Contractor to proceed immediately with the direction received or, when necessary, direct the mode of further performance; or

(3) In the event the information contained in the Contractor's notice is inadequate to make a decision under subparagraphs (e)(1) or (2) of this clause, advise the Contractor what additional information is required, and establish the date by which it should be furnished and the date thereafter by which the Government will respond.

(f) A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(End of clause)

WBR 1452.223-80 ASBESTOS-FREE WARRANTY (OCT 1992)

(a) The Contractor warrants that all items delivered, or work required by the contract shall be free of asbestos in any form whatsoever except for the use of asbestos cement pipe.

(b) The Contractor may request the Contracting Officer to approve an exception to this prohibition when an asbestos-free product is not available. Such requests shall be fully documented and submitted as soon as possible after the Contractor determines that an asbestos-free product is not available. Contracting Officer disapproval of a request for an exception shall be final and not subject to the Disputes clause of this contract.

WBR 1452.223-82 -- PROTECTING FEDERAL EMPLOYEES AND THE (OCT 1998)

PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE

FEDERAL WORKPLACE -- BUREAU OF RECLAMATION

(a) In performing work under this contract, the contractor shall comply with the requirements of Executive Order 13058, dated August 9, 1997, which prohibits the smoking of tobacco products in all interior space owned, rented, or leased by the executive branch of the Federal Government, and in any outdoor areas under executive branch control in front of air intake ducts.

(b) This restriction does not apply in designated smoking areas that are enclosed and exhausted directly to the outside and away from air intake ducts, and are maintained under negative pressure (with respect to surrounding spaces) sufficient to contain tobacco smoke within the designated area.

(c) Smoking may also be restricted at doorways and in courtyards under executive branch control in order to protect workers and visitors from environmental tobacco smoke.

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO (MAR 2015)

IMPLEMENT STATUTES OR EXECUTIVE ORDERS –

R15PS00713 Bulk Equipment Purchase Page 10 of 45

COMMERCIAL ITEMS

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014)

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)(Public Laws 108-77 and

108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

_XX_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009

(June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_XX_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of

Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014)

(Pub. L. 111-117, section 743 of Div. C).

_XX_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug 2013) (31 U.S.C. 6101 note).

_XX_ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters

(Jul 2013) (41 U.S.C. 2313).

__ (10) [Reserved].

__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).

__ (ii) Alternate I (Nov 2011) of 52.219-3.

__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns

(OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (JAN 2011) of 52.219-4.

__ (13) [Reserved] _XX_ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

__ (ii) Alternate I (Nov 2011).

__ (iii) Alternate II (Nov 2011).

__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

_XX_ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2014) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Oct 2001) of 52.219-9.

__ (iii) Alternate II (Oct 2001) of 52.219-9.

R15PS00713 Bulk Equipment Purchase Page 11 of 45

__ (iv) Alternate III (Oct 2014) of 52.219-9.

__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011)(15 U.S.C. 644(r)).

__ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).

__ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011)

(15 U.S.C. 657 f).

_XX_ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C.

632(a)(2)).

__ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business

(EDWOSB) Concerns (Jul 2013) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible

Under the WOSB Program (Jul 2013) (15 U.S.C. 637(m)).

_XX_ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

_XX_ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2014) (E.O. 13126).

_XX_ (27) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

_XX_ (28) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

_XX_ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212).

_XX_ (3 0) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

_XX_ (31) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).

_XX_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act

(Dec 2010) (E.O. 13496).

_XX_ (33)(i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (34) 52.222-54, Employment Eligibility Verification (AUG 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (36)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-13.

__ (37)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and

13514).

__ (ii) Alternate I (Jun 2014) of 52.223-14.

__ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

__ (39)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (JUN 2014) (E.O.s

13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-16.

_XX_ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).

_XX_ (41) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).

__ (42)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C.

chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, R15PS00713 Bulk Equipment Purchase Page 12 of 45

Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (May 2014) of 52.225-3.

__ (iii) Alternate II (May 2014) of 52.225-3.

__ (iv) Alternate III (May 2014) of 52.225-3.

__ (43) 52.225-5, Trade Agreements (NOV 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_XX_ (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013)

(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)

(42 U.S.C. 5150).

__ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_XX_ (50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013)

(31 U.S.C. 3332).

__ (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management

(Jul 2013) (31 U.S.C. 3332).

__ (52) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006)

(46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

__ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

__ (1) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).

__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and

41 U.S.C. chapter 67).

__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment

(Multiple Year and Option Contracts) (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment

(May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).

__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014) (41 U.S.C. chapter 67).

__ (7) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O.13495).

__ (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42

U.S.C. 1792).

R15PS00713 Bulk Equipment Purchase Page 13 of 45

__ (9) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

__ (10) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (Executive Order

13658).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.

Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(iv) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (Jul 2014) (38 U.S.C. 4212).

(vi) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(vii) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212)

(viii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(ix) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).

(x)

_XX_(A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O 13627).

__(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O 13627).

R15PS00713 Bulk Equipment Purchase Page 14 of 45

(xi) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(xii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

(xiii) 52.222-54, Employment Eligibility Verification (AUG 2013).

(xiv) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul

2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xvi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (Executive Order 13658).

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

ADDENDUM TO 52.212-5

52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT (MAR 2015)

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS (DEVIATION 2015-02)

(a) The contractor shall not require employees or subcontractors seeking to report fraud, waste, or abuse to sign or comply with internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors from lawfully reporting such fraud, waste, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

(b) The contractor shall notify employees that the prohibition and restrictions of any internal confidentiality agreements covered by this clause are no longer in effect.

(c) The prohibition in paragraph (a) of this clause does not contravene requirements applicable to Standard Form 312, Form 4414, or any other form issued by a Federal department or agency governing the nondisclosure of classified information.

(d)(1) In accordance with section 743 of Division E, Title VII, of the Consolidated and Further Continuing Resolution Appropriations Act, 2015 (Pub. L. 113-235), use of funds appropriated (or otherwise made available) under that or any other Act may be prohibited, if the Government determines that the contractor is not in compliance with the provisions of this clause.

(2) The Government may seek any available remedies in the event the contractor fails to comply with the provisions of this clause.

R15PS00713 Bulk Equipment Purchase Page 15 of 45

(End of Clause)

R15PS00713 Bulk Equipment Purchase Page 16 of 45

ATTACHMENT 1 – STATEMENT OF WORK/SPECIFICATIONS

R15PS00713 Bulk Equipment Purchase Page 17 of 45

ATTACHMENT 2 – DRAWINGS

R15PS00713 Bulk Equipment Purchase Page 18 of 45

ATTACHMENT 3 – PAST PERFORMANCE QUESTIONNAIRE

R15PS00713 Bulk Equipment Purchase Page 19 of 45

ATTACHMENT 4 – WAGE DETERMINATION

R15PS00713 Bulk Equipment Purchase Page 20 of 45

52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL (APR 2014)

ITEMS

ADDENDUM TO 52.212-1

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

FAR Provisions – https://www.acquisition.gov/far/

(End of provision)

ADDENDUM TO 52.212-1

This addendum replaces the term “offer” with “quote” within the provision at 52.212-1.

52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

52.204-19 INCORPORATION BY REFERENCE OF (DEC 2014)

REPRESENTATIONS AND CERTIFICATIONS

52.233-02 SERVICE OF PROTEST -- DEPARTMENT OF THE (JULY 1996)

INTERIOR (DEVIATION)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the General Accounting Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Upper Colorado Regional Office 125 South State Street, Room 8100 Salt Lake City, UT 84103

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor for Procurement and Patents, 1849 C Street, NW, Room 6511, Washington, D.C. 20240

WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS (APRIL 2001)

-- BUREAU OF RECLAMATION

(a) General. The technical proposal shall be identified as Volume II of the offeror's proposal and shall be an orderly, specific, and complete document in every detail. It should be presented in a manner which allows it to "stand alone" without the need to reference other documents. It should convincingly describe the capability of the offeror's organization to participate in this project and effectively demonstrate a thorough

R15PS00713 Bulk Equipment Purchase Page 21 of 45 understanding of the statement of objectives contained in Attachment 1 to this solicitation. The proposal shall be organized and written so that it can be easily read and meaningfully evaluated by Reclamation personnel from a variety of different functional and technical disciplines. It should be a coherent document free of internal inconsistencies as well as inconsistencies with other volumes of the proposal.

(b) Use and Disclosure of Proposal Information. In accordance with the Use and Disclosure of Proposal Information -- Department of the Interior provision of this solicitation, offerors shall mark trade secret or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3) contained in the proposal with the restrictive legend "Proprietary Information."

(c) Format and Content. To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the technical proposal:

(1) Table of contents. The Table of Contents shall list all sections of the technical proposal. Any future amendments, additions and/or revisions to the proposal shall be included in an updated Table of Contents;

(2) Index. The index shall cross reference the work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in Part IV, Section M;

(3) Enclosures. The enclosures shall include a list of any tables, drawings, charts, and any other enclosures which summarize data or information;

(4) Executive summary. The Executive Summary shall include a brief discussion of how the required work will be performed and important highlights of the proposal.

(5) Technical approach proposed to accomplish the work statement. The discussion of the technical approach shall:

(i) Contain detailed explanations of proposed approaches to performing and accomplishing the work, including preliminary design and other information indicating configuration and functions of components as applicable, and a specific outline of the actual tasks proposed to be performed in order to complete the work. Repeating the work statement without elaborating on the specific tasks to be performed is unacceptable;

(ii) Contain a specific statement of any problems or major difficulties anticipated in performing or accomplishing the work, an evaluation of the various methods considered for resolution of the problems/difficulties, substantiation of the method(s) selected, principles or techniques which are proposed to solve the problem, and the degree of success expected;

(iii) Include specific statements of any interpretations, deviations, and exceptions to the work statement, specifications, or other solicitation requirements (unless alternate proposals are permitted by the General Proposal Instructions -- Bureau of Reclamation provision of this solicitation, offerors are cautioned that deviations and exceptions to the solicitation requirements may be detrimental to the evaluation of a proposal);

(iv) In accordance with the work statement, include a proposed project plan which divides the work into severable tasks or phases which indicates for each task or phase the work to be accomplished, start/completion schedule, milestone chart, and labor hours by labor category including the basis for the hour estimates;

(v) Include a discussion of the method(s) and resources to be used in timely preparation and transmittal of reports and submittals required by the solicitation;

(vi) Include an estimate of the extent of anticipated subcontracting together with a list of items or work to be subcontracted.

R15PS00713 Bulk Equipment Purchase Page 22 of 45

(vii) Address each of the factors listed in the Technical Evaluation Criteria listed below.

1. Suitability/Quality of Equipment – For the major components identify the intended manufacturers, manufacturing plant, and country of origin.

2. Technical Support: Training, documentation, phone support and, programming available through the supplier/manufacturer. Include a detailed list of support available from the manufacturer for major equipment proposed, i.e. variable frequency drives, electric induction motors, transformers. The list should include at a minimum training available either on-site or on-line, product documentation, phone support and, programming available through the supplier/manufacturer.

3. Technical Service: Identify the parts availability for all equipment being purchased, and lead times to obtain major components.

4. Past performance: Reputable firm with manufacturing history, good performance and technical support.

5. Price: Overall price.

(6) Offeror Experience and Past Performance. Provide a list of projects similar in scope and magnitude to the work required under this solicitation which the offeror has completed during the last 3 years. For each project, include:

(i) Name of the project;

(ii) Description of the work;

(iii) Contract number, date and type;

(iv) Name and address of the acquiring Government agency or commercial customer;

(v) Initial contract amount and final contract amount;

(vi) Any problems encountered in performance of the work and corrective action(s) taken; and

(vii) Name(s) and telephone number(s) of references from the acquiring agency or customer who may be contacted for further information.

(d) Cost/Price Information. To permit objective evaluation of the technical proposal, no cost or price information shall be included in the technical proposal. [Insert the following subparagraphs, as applicable, if unpriced pricing proposal information is required for technical analysis "However, the proposal shall include:

(1) A breakdown of unpriced labor hour estimates for each labor category proposed to accomplish each task or phase of the work and the basis for each estimate;

(2) Identification of the types and quantities of proposed materials and equipment necessary to perform the work; and

(3) The number, duration, destination and purpose of each trip proposed for performing the work"].

(e) Facilities and equipment information. The offeror shall provide information on any special plant, equipment, or test facilities (including Government property) required to perform and accomplish the work statement. The need for the special equipment or facilities shall be fully substantiated and include the extent to which the work can be accomplished without them. Information on alternate sources considered for the equipment or facilities shall also be included.

(End of provision)

R15PS00713 Bulk Equipment Purchase Page 23 of 45

WBR 1452.215-83 PRICING PROPOSAL INSTRUCTIONS (JAN 1998)

-- BUREAU OF RECLAMATION

(a) General. The pricing proposal shall be identified as Volume III of the offeror's proposal and shall be an orderly, specific, and complete document in every detail. It should be a coherent document free of internal inconsistencies and should be consistent with the technical approach proposed in the technical proposal (Volume II). Offerors are hereby notified that even though cost or pricing data are not initially requested in this solicitation, the Contracting Officer reserves the right to request such data if they are later found necessary pursuant to FAR 15.403-5(a)(1).

(b) Use and Disclosure of Proposal Information. In accordance with the Use and Disclosure of Proposal Information -- Department of the Interior provision of this solicitation, offerors shall mark trade secret or confidential commercial or financial information contained in the proposal with the restrictive legends specified. The offeror shall also clearly and separately mark all proprietary information (as defined in FAR 3.104-3 contained in the proposal with the restrictive legend "Proprietary Information."

(c) Format and Content. To assist in the uniform evaluation of proposals, the following format shall be utilized in preparing the pricing proposal:

(1) Table of contents. The Table of Contents shall list all sections of the pricing proposal. Any modifications or revisions to the proposal, up to the date of agreement on price, shall include an updated Table of Contents;

(2) Index. The index shall cross reference the work statement to the terms of the proposal and indicate how the proposal conforms to the evaluation factors contained in Part IV, Section M of this solicitation;

(3) Enclosures. A list shall be included of all enclosures, attachments, tables, drawings, charts, and any other materials which summarize data or information contained or referenced in the pricing proposal.

(4) Pricing proposal breakdown. The offeror shall submit the contract Schedule (Part I of this solicitation) with its proposed total prices/costs for each contract line item (including any options) and proposed unit price(s), if required. In addition, a total proposed price consisting of the sum of all contract line items (excluding options) shall be submitted. In addition, the offeror shall provide a non-certified copy of the final pricing proposal (i.e. other than cost or pricing data in accordance with Table 15-2.)

(d)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .