J-5_with_cover.pdf

PDF 67 KB Posted

Attached to
Elevator Modernization at Glen Canyon Dam Federal contract opportunity
Solicitation number
R15PS00433
Issued by
Department of the Interior Bureau of Reclamation

About this file

Attachment J-5 Subcontraction Percentage Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Modernization at Glen Canyon Dam, newest first.
File Type Posted
Sol_R15PS00433_Amd_000002.pdf PDF
Amended_SOW.docx DOCX document
Site_visit_attendees.pdf PDF
Questions_ _Answers.docx DOCX document
Sol_R15PS00433_Amd_000001.pdf PDF
J-3_with_cover.pdf PDF
R15PS00433_Attachment_J-1_SOW.docx DOCX document
J-4_with_cover.pdf PDF
R15PS00433_Attachment_J-2_Drawings.pdf PDF
Sol_R15PS00433.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elevator Modernization

Glen Canyon Power Plant Middle River Division – Glen Canyon Unit – Arizona – Utah Colorado River Storage Project

Attachment J-5, Subcontracting Percentage Worksheet

Solicitation No: R15PS00433

T:\AQ\Dick's Files\R15PS00433 GC Elevator\Solicitation\R15PS00433 Attachment J-5 Sub Worksheet.docx DIAPR 2011-06 3/17/2011

U.S. Department of the Interior

FAR Clauses 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet for

Non-Commercial Negotiated Acquisitions Requiring Cost Proposals

Note to Offeror: Complete one form for each subcontractor which is included in your Technical and Cost Proposal. This form is for small businesses only who are required to meet the goals setforth under FAR Clause 52.219-14, Limitations of Subcontracting.

PRIME CONTRACTOR: ____________________ SOURCE: ________________

SUBCONTRACTOR: _______________________ SOURCE: ________________

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $ $

FRINGE BENEFITS* $ $

SUB TOTAL (A) $ (B) $

LABOR G&A**@______% $ $

TOTAL LABOR COSTS (C) $ (D) $

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Calculate the subcontractor’s LABOR G&A by multiplying the subcontractor’s G&A rate by the subcontractor’s SUBTOTAL in figure (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = __________________%

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

T:\AQ\Dick's Files\R15PS00433 GC Elevator\Solicitation\R15PS00433 Attachment J-5 Sub Worksheet.docx DIAPR 2011-06 3/17/2011

** G&A denotes General and Administrative Costs

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor’s costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor’s costs.

J-5 Cover
R15PS00433 Attachment J-5 Sub Worksheet

File details come from the government source that posted it. Updated .