Marble_Bluff_Spillway_Repair-Q A2.pdf

PDF 10 KB Posted

Attached to
Marble Bluff Dam Spillway Repair Federal contract opportunity
Solicitation number
R15PS00337
Issued by
Department of the Interior Bureau of Reclamation

About this file

Question Answer 2

View the file

Other files for this federal contract opportunity

Other files attached to Marble Bluff Dam Spillway Repair, newest first.
File Type Posted
Section_J _Amend002.pdf PDF
Amendment_2_Blk._14_Cont._Page.pdf PDF
SF30.pdf PDF
Amendment_1_Blk._14_Cont._Page.pdf PDF
Section_J _Amendment_001.pdf PDF
Marble_Bluff_Spillway_Repair-Q A_w.attach.pdf PDF
Section_I _Amendment_001.pdf PDF
1._Solicitation_No._R15PS00337.pdf PDF
2._Section_C-Specification-Solicitation_No._R15PS00337.pdf PDF
3._Drawings-_Solicitation_No.R15PS00337.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number R15PS00337 Marble Bluff Spillway Repair

Questions and Answers – Amendment 002

Q1: Refer to Sheet 320-D-322 note 2. Instead of the seams being continuously welded can the bottom and sides of the SS plate be bent essentially forming a U shape with the bottom leg and then fully welding the bottom return legs on?

A1: This would be acceptable. We don't specify on the drawings or in the specifications how the contractor produces the shapes, only that the plates are to be prefabricated. This means no bending on-site. The steel must maintain 1/2" thickness at the bends. Also, the contractor will need to provide a joint between plates where placed directly over a joint in the concrete, as specified in the drawings.