R15PS00155.pdf
PDF 1 MB Posted
- Attached to
- Wapatox Canal Reshape Federal contract opportunity
- Solicitation number
- R15PS00155
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_R15PS00155_Amd_000002.pdf | ||
| R15PS00155 _Amendment_2.pdf | ||
| Sol_R15PS00155_Amd_000001.pdf | ||
| L-22.pdf | ||
| R15PS00155 _Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior Bureau of Reclamation Pacific Northwest Region December 2014
Solicitation No. R15PS00155
WAPATOX CANAL
IMPROVEMENT PROJECT
YAKIMA PROJECT, WASHINGTON
This solicitation issued by Regional Director
Pacific Northwest Region Bureau of Reclamation
1150 North Curtis Road, Suite 100 Boise ID 83706-1234
Phone inquiries regarding this solicitation should be made to Regional Acquisition Management Officer
Telephone Number: (208) 378-5364
WAPATOX CANAL IMPROVEMENT PROJECT
FOREWORD
The principal components of the work to be performed under these specifications include;
Furnishing and installing riprap canal side slope, reinforced concrete in structures for the check structure downstream apron and training walls, removal of existing concrete ecology blocks, and excavation and backfill of canal invert. Work is located approximately 4.2 miles northwest of Naches, Washington in Yakima County
A pre-offer site visit will be conducted in accordance with the Clause in Section L entitled “Site Visit - Construction.” Offerors are strongly urged to participate in the site visit.
Failure by offerors to inspect the site will not relieve them of the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the specifications and within the allowed time. Attendees are to provide and wear safety boots, hard hats, and safety vests.
FOR DATE AND PLACE OF PROPOSAL SUBMISSION, SEE "SOLICITATION,
OFFER, AND AWARD," STANDARD FORM 1442, IMMEDIATELY FOLLOWING
THE "TABLE OF CONTENTS."
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S HANDBOOK
ENTITLED "RECLAMATION SAFETY AND HEALTH STANDARDS," (2009
EDITION) WHICH IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE
NOTICE IN PART II, SECTION I ENTITLED "SAFETY AND HEALTH."
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040200156
Bureau of Reclamation
Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
See item 7.
Misty Gates 208-378-5079
1x 05/05/2015
R15PS00155
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Wapatox Canal Improvement Project, Yakima Project, Washington.
This project is set aside for HUBZone small business concerns.
The construction cost magnitude is between $250,000.00 and $500,000.00.
The system used for issuing this solicitation won't allow a calendar date in Block
11, so the number of days stated for completion in Block 11 is not accurate
(placeholder of 1 has been used). The actual completion date for the resulting contract will be February 29, 2016, as described in solicitation, Section F, clause
52.211-10.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 1 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
06/09/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
Clay W. Wright
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
R15PS00155
Delivery: 02/26/2016
Delivery Location Code: 0009906765
Bureau of Reclamation-PN-CCAO
Columbia Cascades Area Office
1917 Marsh Road
Yakima WA 98901-2058 US
FOB: Destination
00010 Wapatox Canal Improvement Project, Yakima 1 AU
Project, Washington.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No. Solicitation No. R15PS00155 Wapatox Canal Improvement Project Yakima Project, Washington i
PART I THE SCHEDULE
SECTION A SOLICITATION/CONTRACT FORM...................................................................... A-1
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ...................................................B-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ........................... C-1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 29 00 Payment Procedures 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal from Work 01 35 30 Contractor’s Onsite Safety and Health Personnel 01 42 10 Reference Standards 01 43 10 Quality Control Testing for Earthwork and Cast-In-Place Concrete 01 43 20 Contractor Quality Control for Materials Used in the Work 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 60 00 Product Requirements 01 74 10 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 - EXISTING CONDITIONS
02 41 13 Selective Site Demolition
DIVISION 03 - CONCRETE
03 20 70 Grouted Dowel Bars 03 30 00 Cast-In-Place Concrete
DIVISIONS 04 THROUGH 30 - NOT USED
Yakima Project, Washington ii
DIVISION 31 - EARTHWORK
31 03 10 Diversion and Care of Stream During Construction 31 03 33 Removal of Water From Excavation 31 23 02 Compacting Earth Materials 31 23 11 Earthwork for Structures 31 23 12 Earthwork for Channel Reshaping 31 23 19 French Drains 31 23 90 Disposal of Excavated Materials 31 37 00 Riprap
DIVISIONS 32 THROUGH 50 - NOT USED
DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 10 Photographs
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DRAWINGS
SECTION D PACKAGING AND MARKING ................................................................................. D-1
SECTION E INSPECTION AND ACCEPTANCE ..........................................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ........................................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)...................................... E-1
E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I
APR 1984) ....................................................................................................................... E-3
SECTION F DELIVERIES OR PERFORMANCE ......................................................................... F-1
F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ......................................................................................................... F-1 F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ................... F-1 F.3. 52.242-14 SUSPENSION OF WORK (APR 1984) ........................................................ F-1
SECTION G CONTRACT ADMINISTRATION DATA ................................................................ G-1
G.1. GOVERNMENT POINT OF CONTACT--BUREAU OF RECLAMATION--PN
REGION (OCT 2010) ..................................................................................................... G-1
G.2. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE
INTERIOR (MAY 2010) ................................................................................................ G-1
Yakima Project, Washington iii
G.3. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE
PROCESSING PLATFORM (IPP) (APRIL 2013) ........................................................ G-2
SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................................. H-1
H.1. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF
RECLAMATION CONTRACTORS (SEP 2002).......................................................... H-1
PART II CONTRACT CLAUSES
SECTION I CONTRACT CLAUSES ................................................................................................ I-1 I.1. 52.202-1 DEFINITIONS (NOV 2013) ............................................................................. I-1 I.2. 52.203-3 GRATUITIES (APR 1984) ............................................................................... I-1 I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014) ........................ I-2
I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE
GOVERNMENT (SEPT 2006)......................................................................................... I-2 I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) .......................................... I-3
I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS
FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) ........................................... I-4
I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER
ACTIVITY (MAY 2014) .................................................................................................. I-5
I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN
FEDERAL TRANSACTIONS (OCT 2010) .................................................................... I-6
I.9. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS (APR 2014) ...................................................................................................... I-10
I.10. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE
INTERIOR (JUL 1996) .................................................................................................. I-11
I.11. 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS
(MAR 2015) .................................................................................................................... I-11
I.12. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER
FIBER CONTENT PAPER (MAY 2011) ...................................................................... I-11
I.13. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ............................... I-12
I.14. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (JUL 2013) ..................................................................... I-14
I.15. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER
MAINTENANCE (DEC 2012)....................................................................................... I-17
I.16. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL
2013) ............................................................................................................................... I-18
I.17. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR
(JUL 1996) ...................................................................................................................... I-20
I.18. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS
AND CERTIFICATIONS (DEC 2014) .......................................................................... I-20
Yakima Project, Washington iv
I.19. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,
OR PROPOSED FOR DEBARMENT (AUG 2013) ..................................................... I-20
I.20. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED
DOMESTIC CORPORATIONS (DEC 2014) ................................................................ I-21
I.21. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010) ............................. I-22
I.22. 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT
(OCT 1997) ..................................................................................................................... I-24
I.23. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF
THE INTERIOR (AUG 1996) (DEVIATION) ............................................................... I-24
I.24. 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA
AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—
MODIFICATIONS (OCT 2010) .................................................................................... I-24
I.25. 52.219-3 NOTICE OF TOTAL HUBZONE SET-ASIDE OR SOLE SOURCE
AWARD (NOV 2011) .................................................................................................... I-26
I.26. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014) ............ I-28 I.27. 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011) ............................ I-30
I.28. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JUL 2013) ............................................................................. I-30 I.29. 52.222-3 CONVICT LABOR (JUNE 2003) .................................................................. I-32
I.30. 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS
-OVERTIME COMPENSATION (MAY 2014) ............................................................ I-33
I.31. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) ............ I-34
I.32. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) .................................................. I-37 I.33. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ..................................... I-37 I.34. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) .......................................... I-39
I.35. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB
1988) ............................................................................................................................... I-40 I.36. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ....................... I-40 I.37. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ................... I-42
I.38. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE
REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .......................... I-42
I.39. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) .............. I-42 I.40. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) .................................... I-42 I.41. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) .................. I-43 I.42. 52.222-26 EQUAL OPPORTUNITY (APR 2015) ........................................................ I-43
I.43. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION (APR 2015) ..................................................................................... I-46 I.44. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014) ........................... I-51
I.45. 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES
(JUL 2014) ...................................................................................................................... I-51 I.46. 52.222-37 EMPLOYMENT REPORTS VETERANS (JUL 2014) ............................... I-52
Yakima Project, Washington v
I.47. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE
NATIONAL LABOR RELATIONS ACT (DEC 2010) ................................................ I-53
I.48. 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ...................... I-54 I.49. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)................. I-61
I.50. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC
2014) ............................................................................................................................... I-64
I.51. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL
SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) ........................................... I-69
I.52. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW
INFORMATION (MAY 2011) ....................................................................................... I-70 I.53. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ................................................... I-71
I.54. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT
MESSAGING WHILE DRIVING (AUG 2011) ............................................................ I-73
I.55. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF
RECLAMATION (OCT 1992) ....................................................................................... I-74
I.56. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION
(MAY 2010).................................................................................................................... I-74
I.57. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE
PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL
WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) .................................... I-75
I.58. 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014) ............ I-75
I.59. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE
2008) ............................................................................................................................... I-79 I.60. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ....................................... I-79
I.61. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND
COPYRIGHT INFRINGEMENT (DEC 2007) .............................................................. I-80
I.62. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC
2007) ............................................................................................................................... I-80 I.63. 52.228-1 BID GUARANTEE (SEP 1996) ..................................................................... I-80 I.64. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ........................................... I-81
I.65. 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION
(JAN 1997)...................................................................................................................... I-81 I.66. 52.228-11 PLEDGE OF ASSETS (JAN 2012) .............................................................. I-82
I.67. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS
(MAY 2014).................................................................................................................... I-82 I.68. 52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014) ................................ I-83
I.69. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION
(OCT 2010) ..................................................................................................................... I-87
I.70. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR
(JUL 1996) ...................................................................................................................... I-88
I.71. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR
CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996) .................. I-88
Yakima Project, Washington vi
I.72. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) .............................. I-89
I.73. WBR 1452.229-90 NOTICE OF WASHINGTON STATE SALES TAX--
BUREAU OF RECLAMATION--PN REGION (FEB 1995) ........................................ I-90
I.74. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE
-- BUREAU OF RECLAMATION (JUL 1998) ............................................................. I-90
I.75. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION
CONTRACTS (MAY 2014) ........................................................................................... I-92 I.76. 52.232-17 INTEREST (MAY 2014) .............................................................................. I-95 I.77. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) ................................................. I-96
I.78. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014) ....... I-97
I.79. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR
AWARD MANAGEMENT (JUL 2013) ...................................................................... I-105
I.80. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS
(JUN 2013).................................................................................................................... I-107
I.81. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL
BUSINESS SUBCONTRACTORS (DEC 2013) ......................................................... I-108 I.82. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ............................... I-108 I.83. 52.233-3 PROTEST AFTER AWARD (AUG 1996) ................................................... I-109
I.84. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT
2004) ............................................................................................................................. I-110 I.85. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984) ........................................... I-111
I.86. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE
WORK (APR 1984) ...................................................................................................... I-111 I.87. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) .................. I-112 I.88. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ................................... I-112
I.89. 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) ........................... I-112 I.90. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ............................. I-112 I.91. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) ......... I-113 I.92. 52.236-12 CLEANING UP (APR 1984) ...................................................................... I-113
I.93. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV
1991) ............................................................................................................................. I-114
I.94. 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984) ........ I-115
I.95. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB
1997)- ALTERNATE I (APR 1984)............................................................................. I-115 I.96. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) ................................ I-117
I.97. 1452.236-70 PROHIBITION AGAINST USE OF LEAD-BASED PAINT --
DEPARTMENT OF THE INTERIOR (JUL 1996 ....................................................... I-117
I.98. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –
BUREAU OF RECLAMATION (FEB 2000) .............................................................. I-117 I.99. 52.242-13 BANKRUPTCY (JUL 1995)....................................................................... I-119 I.100. 52.243-4 CHANGES (JUNE 2007) .............................................................................. I-119
Yakima Project, Washington vii
I.101. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF
RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-120
I.102. 52.244-2 SUBCONTRACTS (OCT 2010) ................................................................... I-121 I.103. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015) ................. I-124
I.104. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2010) -
ALTERNATE I (APR 1984) ........................................................................................ I-126
I.105. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT
(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-129 I.106. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................... I-132 I.107. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-133 I.108. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) ...................................... I-134
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J LIST OF ATTACHMENTS.......................................................................................... J-1
PART IV REPRESENTATIONS AND INSTRUCTIONS
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS ....................................................................... K-1
K.1. 52.203-98, PROHIBITION ON CONTRACTING WITH ENTITIES THAT
REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—
REPRESENTATION (FEB 2015) - DEVIATION ........................................................ K-1
K.2. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC
2014) ............................................................................................................................... K-1
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS ............................................................................................................L-1
L.1. 52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER
(JUL 2013) ....................................................................................................................... L-1
L.2. 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE
REPORTING (NOV 2014) .............................................................................................. L-2
L.3. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE
MAINTENANCE (NOV 2014) ....................................................................................... L-3
L.4. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) ............. L-4
L.5. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA
INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND
COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) .................................................. L-4
L.6. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ......................... L-19
L.7. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC PRODUCTS
AND SERVICES - BUREAU OF RECLAMATION (MAR 1993) ............................. L-20
Yakima Project, Washington viii
L.8. 52.215-1 INSTRUCTIONS TO OFFERORSBCOMPETITIVE ACQUISITION
(JAN 2004)..................................................................................................................... L-20
L.9. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL
INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984) ....................... L-25
L.10. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION
PROCEDURES--BUREAU OF RECLAMATION (MAY 2005) ................................ L-26
L.11. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--BUREAU OF
RECLAMATION (JAN 1998) ...................................................................................... L-29
L.12. WBR 1452.215-82 TECHNICAL PROPOSAL INSTRUCTIONS--BUREAU OF
RECLAMATION (APR 2001) ...................................................................................... L-31
L.13. WBR 1452.215-83 PRICING PROPOSAL INSTRUCTIONS--BUREAU OF
RECLAMATION (JAN 1998) ...................................................................................... L-34
L.14. WBR 1452.215-91 FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS,
MODIFICATIONS TO OFFERS, AND WITHDRAWALS OF OFFERS-
BUREAU OF RECLAMATION--PN REGION (APR 2007) ...................................... L-35
L.15. 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................. L-36
L.16. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY
SITE OF THE WORK (MAY 2014) ............................................................................. L-36
L.17. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)..................................................................................................................... L-37
L.18. WBR 1452.222-90 NON-DISCRIMINATION NOTICE TO U.S.
DEPARTMENT OF THE INTERIOR CONTRACTORS, SUBCONTRACTORS,
AND LESSORS -- BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ...... L-38
L.19. 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—
CONSTRUCTION MATERIALS (MAY 2014) ........................................................... L-38
L.20. 52.233-2 SERVICE OF PROTEST – DEPARTMENT OF THE INTERIOR
(SEPT 2006) (DEVIATION) ......................................................................................... L-39
L.21. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB
1995) .............................................................................................................................. L-39
L.22. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997) ....... L-40
L.23. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ................... L-40
SECTION M EVALUATION FACTORS FOR AWARD .............................................................. M-1
M.1. WBR 1452.215-85 EVALUATION FACTORS FOR AWARD - QUALITY
PREDOMINANCE--BUREAU OF RECLAMATION (MAY 2005) ........................... M-1
M.2. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION
GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--
BUREAU OF RECLAMATION (MAY 2005) .............................................................. M-2
Yakima Project, Washington
Schedule
B-1
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
WAPATOX CANAL IMPROVEMENT PROJECT
(a) Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the schedule.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) Definitions:
(1) CLIN - Contract Line Item Number
SCHEDULE
Item Work or Material Quantity and unit
Unit Price
Amount
1 Wapatox Canal Improvement Project One lump sum of $
Total $
DIVISION 01
GENERAL REQUIREMENTS
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located approximately 4.2 miles northwest of Naches, Washington in Yakima County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Principal components of work consist of:
1. Furnish and install rip rap canal side slope.
2. Reinforced concrete in structures for the following:
a. Check structure downstream apron.
b. Training Walls.
3. Removal of existing concrete ecology blocks
4. Excavation and backfill of canal invert.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.
1.04 DEFINITIONS
A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.
B. Quality Assurance: Inspection and tests performed by Government to ensure compliance with the terms of the contract.
C. Quality Control: Activities performed by Contractor to ensure work conforms to contract requirements.
Summary of Work
01 11 00 - 2
D. Contractor Quality Testing: Specified tests to be performed by the Contractor.
1. The Government may use the test results for Quality Assurance.
2. The Contractor may use the test results as part of Contractor quality control.
a. The Government anticipates that these tests will be part of the Contractor’s quality control program, however the tests do not relieve the Contractor of providing adequate quality control measures in accordance with the clause at FAR 52.246-12, “Inspection of Construction.”
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 52:
1. CO: Contracting Officer
2. COR: Contracting Officer’s Representative
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Use of Site 01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 COST
A. Include in prices offered in the schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (USBR)
1. USBR Cleaning Manual Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2010 Edition - Available online at:
http://www.usbr.gov/mussels/prevention
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals:
1. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
a. For each Contractor use site on Government land.
1) Show use location and extent of impact. Uses include but are not limited to the following:
a) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.
b) Parking areas, temporary roads, and haul routes.
c) Utilities including air, power, and water lines; fire hydrants;
and compressor station.
d) First-aid and medical facilities.
e) Areas for processing, storing, and disposing of waste materials from construction operations.
f) Temporary fences.
2) Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed and which do not interfere with the work required under this http://www.usbr.gov/mussels/prevention
01 14 10 - 2 contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
3) Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.
4) Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
b. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
1.04 PROJECT CONDITIONS
A. Government land as shown on drawings may be used for required construction facilities.
B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.
C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.
D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.
E. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by the COR.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 CLEANING
A. Construction equipment: Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.
B. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in USBR Cleaning Manual.
C. The COR will inspect construction equipment following procedures described in USBR Cleaning Manual before allowing the equipment onsite.
01 14 10 - 3
3.02 RESTORATION
A. Restore temporary construction roads to original contours and make impassable to vehicular traffic when no longer required.
B. After completion of work, scarify and regrade Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will provide proper drainage, and prevent erosion.
Payment Procedures
01 29 00 - 1
SECTION 01 29 00
PAYMENT PROCEDURES
PART 1 GENERAL
1.01 SUBMITTALS
A. Submit in accordance with Section 01 33 00 - Submittals:
1. RSN 01 29 00-1, Schedule of Values.
1.02 SCHEDULE OF VALUES
A. Prepare a separate Schedule of Values for each schedule of the Work under the Contract.
B. Upon request of COR, provide documentation to support the accuracy of the Schedule of values.
C. Lump Sum Work:
1. Reflect specified allowances and alternates, as applicable.
2. List bonds and insurance premiums, mobilization, demobilization, preliminary and detailed progress schedule preparation, equipment testing, facility startup, and contract closeout separately.
D. An unbalanced or front-end loaded schedule will not be acceptable.
E. Summation of the complete Schedule of Values representing all the Work shall equal the Contract Price.
1.03 PAYMENT
A. Payment for all Lump Sum Work shown or specified in Contract Documents is included in the Contract Price. Payment will be based on a percentage complete basis for each line item of the accepted Schedule of Values.
B. Payment for Lump Sum Work covers all Work specified or shown within the limits or Specification sections as follows: All Work shown on Drawings and in Specification sections.
1.04 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS
A. Payment will not be made for following:
1. Loading, hauling, and disposing of rejected material.
2. Quantities of material wasted or disposed of in manner not called for under
Contract Documents.
Payment Procedures
01 29 00 - 2
3. Rejected loads of material, including material rejected after it has been placed by reason of failure of Contractor to conform to provisions of Contract Documents.
4. Material not unloaded from transporting vehicle.
5. Defective Work not accepted by COR.
6. Material remaining on hand after completion of Work.
PART 1 PRODUCTS
Not Used
PART 2 EXECUTION
Submittals
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 COST
A. Include in prices offered in the schedule for other items of work.
1.02 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittal Types, as listed in Table 01 33 00A - List of Submittals:
1. A - Approval:
a. Government will approve or disapprove these submittals.
b. Approval submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, “Specifications and Drawings for Construction.”
2. I - Informational:
a. The Government will acknowledge receipt of these submittals.
b. The Government may reject an Informational submittal when the submittal does not comply with the contract. The Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.
c. Informational submittals are considered to be “shop drawings” within the terms of the clause at FAR 52.236-21, “Specifications and Drawings for Construction,” except that approval by the Government is not required.
1.03 GOVERNMENT USE OF SUBMITTALS
A. The Government reserves all rights to use submittals provided under the contract, in accordance with FAR Clause 52.227-17, “Rights in Data - Special Works.”
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
01 33 00 - 2
1. Prepare in English.
2. Label with contract number and title, and RSN.
3. Measurement units: US Customary Units.
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
c. Date.
2. Provide space next to title block for review stamps.
3. Size: D size (22 inches by 34 inches).
4. Draw to scale with neat lettering using drafting equipment or computer drafting equipment.
5. Final drawings:
a. AUTOCAD® format (.dwg) on CD-ROM disc.
b. Original D size (22 inches by 34 inches) plots.
c. Show as-built changes, including revision dates, made during installation.
D. Product data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets.
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
01 33 00 - 3
B. Submit number of complete copy sets, if applicable per subparagraph B, above, of required materials for each RSN as specified in "Submittals Required" column in Table 01 33 00A - List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
D. More than one hard copy RSN may be submitted under a transmittal letter, provided the responsible code is the same.
1.06 REVIEW OF SUBMITTALS
A. Time required:
1. Submittal review will require 20 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through return mailing postmark date or date posted in Project Management Work Flow System.
B. Time in excess of specified:
1. The CO may extend the contract completion date to allow additional time for completing work affected by excess review time.
a. The time extension will be to the extent that excess review time caused delay to the contract completion date.
b. The time extension will not exceed the time used in excess of the specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending the contract completion date.
2. No time extension will be allowed if the Contractor fails to make complete approval submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to the extent that:
a. Approval was required under the contract, and
01 33 00 - 4
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR 52.242-14, “Suspension of Work,” however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Return of submittals:
1. One set of submittals required for approval will be returned either approved, approved subject to identified changes, or not approved.
2. Submittals not approved:
a. Revise and resubmit for approval.
b. Show changes and revisions with revision date.
c. Describe reasons for significant changes in transmittal letter.
d. Resubmit returned submittals within 20 days after receiving the comments, unless otherwise specified.
e. Requirements for initial submittals apply to resubmittals.
3. Do not change designs without approval of the CO after approval drawings, documentation, and technical data have been approved.
4. The Government will acknowledge Informational submittals.
a. Informational submittals will not be returned when they comply with the specifications.
b. Informational submittals that do not comply with the specifications may be returned for resubmittal or additional information may be requested.
1.07 TRANSMITTAL
A. Addresses for codes listed in Table 01 33 00A - List of Submittals:
1. CO: Contracting Officer, Bureau of Reclamation, 1150 North Curtis Road, Suite 100, Boise, ID, 83706.*
*The Contractor shall provide the Contracting Officer a copy of all correspondence and related documents, pertaining to this contract, that it addresses to a representative of the Government. This does not pertain to the Submittal Requirements as they are outlined herein.
2. COR: Program Manager, Construction Engineering Group, Bureau of Reclamation, 1150 North Curtis Road, Suite 100, Boise, ID, 83706.
B. Send original transmittal letter with appropriate number of sets to office listed in “Responsible Code” column in Table 01 33 00A - List of Submittals.
01 33 00 - 5
C. Send copy of transmittal letter with appropriate number of sets to offices that are not the responsible code, but show “No. of sets to be sent to” in Table 01 33 00A - List of Submittals.
D. When “No. of sets to be sent to” is 0, send a copy of transmittal letter to that office.
E. Submittals required by the specifications, but not listed in Table 01 33 00A - List of Submittals:
1. Submit in accordance with this section.
2. Submit to COR, unless otherwise specified.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
01 33 00 - 6
Table 01 33 00A - List of Submittals
* Submittal types: A - Approval, I - Information. CP indicates that the submittal is required to be shown on the Construction Schedule.
** CO indicates Contracting Officer and COR indicates Program Manager, Construction Engineering Group.
RSN
Clause or
Section Title
Submittals required Due date or delivery time Type
Respon-sible code
No. of sets to be sent
CO COR
I-1 Release of Claims (1452.204-70)
Release of claims (DI-
137) against United States
After completion of work and prior to final payment
I COR 1 1
I-2 Payrolls and Basic Records (52.222-8)
Certified payrolls Weekly for each week any contract work is performed
I COR 0 1
I-3 Labor Standards Data (52.222-11)
1) List of subcontractors
2) Statement and Acknowledgement Form (SF-1413) for each subcontract
Within 14 days after award of contract, and within 14 days after award of any subcontract
I COR 0 1
I-4 Equal Opportunity (52.222-26)
Information required by Executive Order
11246 (SF-100)
Within 30 days following the award
I COR 0 1
I-5 Estimate of Percentage of Recovered Material Content for
EPA-
designated Items (52.223- 9)
Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance
On completion of the contract (no later than with submittal of final invoice)
I COR 0 1
I-6 Safety and Health (WBR 1452.223-81)
Safety program Submitted and accepted before commencing onsite work. See section 3 of
RSHS.
A, CP COR 0 3
I-7 Safety and Health (WBR 1452.223-81)
Monthly accident summary report
First Monday of each month.
See paragraph 3.8 of RSHS.
I COR 0 1
I-8 Bonds (52.228-15)
Performance and payment bonds
Within 10 calendar days after award
I CO 1 0
I-9 Liability Insurance (1452.228-70)
Acceptable evidence showing that insurance has been obtained
Prior to commencement of work under the contract
I CO 1 0
01 33 00 - 7
* Submittal types: A - Approval, I - Information. CP indicates that the submittal is required to be shown on the
** CO indicates Contracting Officer and COR indicates Program Manager, Construction Engineering Group.
or
Section Title
Submittals required Due date or delivery time Type
Respon-sible code
No. of sets to be sent
CO COR
I-10 Security Requirements
(WBR
1452.237-80)
Security program Submitted and approved prior to mobilization
A COR 0 3
I-11 Security Requirements
(WBR
1452.237-80)
List of onsite employees
At least 7 days before employee arrival
I COR 0 1
I-12
Schedules for Construction Contracts (52.236-15)
Practicable schedule Submitted and approved prior to mobilization
A COR 0 3
I-13
Contracts (52.236-15)
Annotated schedule showing actual progress
Monthly or as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .