R15PS00049_Final_Solicitation.pdf

PDF 6 MB Posted

Attached to
Cle Elum Radial Gate Modifications Federal contract opportunity
Solicitation number
R15PS00049
Issued by
Department of the Interior Bureau of Reclamation

About this file

R15PS00049 Final Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Cle Elum Radial Gate Modifications, newest first.
File Type Posted
R15PS00049_Amendment_003.pdf PDF
R15PS00049_Amendment_No._002.pdf PDF
R15PS00049_Amendment_No._001.pdf PDF
R15PS00049_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior Bureau of Reclamation Pacific Northwest Region July 2015

Solicitation No. R15PS00049

Cle Elum Radial Gate Modification Yakima Project, Washington

This solicitation issued by Contracting Officer

Pacific Northwest Region Bureau of Reclamation

1150 North Curtis Road, Suite 100 Boise ID 83706-1234

Phone inquiries regarding this solicitation should be made to Contracting Officer

Telephone Number: (208) 378-5156

CLE ELUM RADIAL GATE MODIFICATION

YAKIMA PROJECT, WASHINGTON

FOREWORD

The work required for Cle Elum Radial Gate Modifications includes: Removal of corrosion prevention coating on portions of the radial gates, handling and disposing of the removed coating, removal of steel expanded metal and angle supports at top of radial gates 1 through 5, removal of the ports installed in radial gate 1, surface preparation of portions of the gates, prior to welding, furnishing and installing fabricated metal components on five radial gates, in order to increase the gate height as shown on the drawings, furnishing and installing fabricated metal components to fill temporary ports in radial gate 1, furnishing and installing aluminum skin plate on downstream side of five radial gates, replacing rubber side seals on five radial gates, replacing timber bottom seals on five radial gates, spot repair coatings on five radial gates, coating new metalwork on the radial gates, overcoating existing metal handrails and hoist mounts. Work is located at Cle Elum Dam, approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County.

A pre-offer site visit will be conducted in accordance with the Clause in Section L entitled “Site Visit - Construction.” Offerors are strongly urged to participate in the site visit.

Failure by offerors to inspect the site will not relieve them of the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the specifications and within the allowed time. Attendees are to provide and wear safety boots, hard hats, and safety vests.

FOR DATE AND PLACE OF PROPOSAL SUBMISSION, SEE "SOLICITATION,

OFFER, AND AWARD," STANDARD FORM 1442, IMMEDIATELY FOLLOWING

THE "TABLE OF CONTENTS."

FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S HANDBOOK

ENTITLED "RECLAMATION SAFETY AND HEALTH STANDARDS," (2009

EDITION) WHICH IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE

NOTICE IN PART II, SECTION I ENTITLED "SAFETY AND HEALTH."

i

PART I THE SCHEDULE

SECTION A SOLICITATION/CONTRACT FORM...................................................................... A-1

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ...................................................B-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ........................... C-1

SECTION D PACKAGING AND MARKING ................................................................................. D-1

SECTION E INSPECTION AND ACCEPTANCE ..........................................................................E-1 E.1. 52.236-5 MATERIAL AND WORKMANSHIP (APR 1984) ........................................ E-1 E.2. 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)...................................... E-1

E.3. 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) - ALTERNATE I

APR 1984) ....................................................................................................................... E-3

SECTION F DELIVERIES OR PERFORMANCE ......................................................................... F-1

F.1. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984) ......................................................................................................... F-1 F.2. 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) ................... F-1 F.3. 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) ........................... F-1 F.4. 52.242-14 SUSPENSION OF WORK (APR 1984) ........................................................ F-1

SECTION G CONTRACT ADMINISTRATION DATA ................................................................ G-1

G.1. GOVERNMENT POINT OF CONTACT--BUREAU OF RECLAMATION--PN

REGION (OCT 2010) ..................................................................................................... G-1

G.2. 1452.201-70 AUTHORITIES AND DELEGATIONS--DEPARTMENT OF THE

INTERIOR (MAY 2010) ................................................................................................ G-1

G.3. ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-INVOICE

PROCESSING PLATFORM (IPP) (APRIL 2013) ........................................................ G-2

SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................................. H-1

H.1. AUTHORIZED WORKERS NOTICE TO POTENTIAL BUREAU OF

RECLAMATION CONTRACTORS (SEP 2002).......................................................... H-1

H.2. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM

(JULY 2010) ................................................................................................................... H-2

PART II CONTRACT CLAUSES

SECTION I CONTRACT CLAUSES ................................................................................................ I-1 I.1. 52.202-1 DEFINITIONS (NOV 2013) ............................................................................. I-1

Yakima Project, Washington ii

I.2. 52.203-3 GRATUITIES (APR 1984) ............................................................................... I-1 I.3. 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014) ........................ I-2

I.4. 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (SEPT 2006)......................................................................................... I-2 I.5. 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014) .......................................... I-2

I.6. 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014) ........................................... I-4

I.7. 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014) .................................................................................................. I-5

I.8. 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (OCT 2010) .................................................................... I-6

I.9. 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER

RIGHTS (APR 2014) ...................................................................................................... I-10

I.10. 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS

(MAR 2015) .................................................................................................................... I-11

I.11. 1452.203-70 RESTRICTION ON ENDORSEMENTS--DEPARTMENT OF THE

INTERIOR (JUL 1996) .................................................................................................. I-11

I.12. 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER

FIBER CONTENT PAPER (MAY 2011) ...................................................................... I-11

I.13. 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011) ............................................................................................. I-12

I.14. 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (JUL 2013) ..................................................................... I-12

I.15. 52.204-12 DATA UNIVERSAL NUMBERING SYSTEM NUMBER

MAINTENANCE (DEC 2012)....................................................................................... I-16

I.16. 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE. (JUL

2013) ............................................................................................................................... I-16

I.17. 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (JUL 2015) ........................................................................................ I-18

I.18. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS (DEC 2014) .......................................................................... I-19

I.19. 1452.204-70 RELEASE OF CLAIMS -- DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-19

I.20. 52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,

OR PROPOSED FOR DEBARMENT (AUG 2013) ..................................................... I-19

I.21. 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (JUL 2013) ......................................... I-21

I.22. 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS (DEC 2014) ................................................................ I-22 iii

I.23. 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010) ............................. I-22

I.24. 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT

(OCT 1997) ..................................................................................................................... I-24

I.25. 1452.215-70 EXAMINATION OF RECORDS BY THE DEPARTMENT OF

THE INTERIOR (AUG 1996) (DEVIATION) ............................................................... I-24

I.26. 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA

AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—

MODIFICATIONS (OCT 2010) .................................................................................... I-25

I.27. 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) ......... I-26 I.28. 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014) ............ I-27 I.29. 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011) ............................ I-29

I.30. 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION (JUL 2013) ............................................................................. I-30 I.31. 52.222-3 CONVICT LABOR (JUNE 2003) .................................................................. I-31

I.32. 52.222-4 CONTRACT WORK HOURS AND SAFETY

STANDARDS -OVERTIME COMPENSATION (MAY 2014) ................................... I-32

I.33. 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014) ............ I-33

I.34. 52.222-7 WITHHOLDING OF FUNDS (MAY 2014) .................................................. I-36 I.35. 52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014) ..................................... I-36 I.36. 52.222-9 APPRENTICES AND TRAINEES (JULY 2005) .......................................... I-37

I.37. 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB

1988) ............................................................................................................................... I-39 I.38. 52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014) ....................... I-39 I.39. 52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014) ................... I-41

I.40. 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE

REQUIREMENTS AND RELATED REGULATIONS (MAY 2014) .......................... I-41

I.41. 52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988) .............. I-41 I.42. 52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014) .................................... I-41 I.43. 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015) .................. I-41 I.44. 52.222-26 EQUAL OPPORTUNITY (APR 2015) ........................................................ I-42

I.45. 52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR

CONSTRUCTION (APR 2015) ..................................................................................... I-44 I.46. 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014) ........................... I-50

I.47. 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES

(JUL 2014) ...................................................................................................................... I-50 I.48. 52.222-37 EMPLOYMENT REPORTS VETERANS (JUL 2014) ............................... I-50

I.49. 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT (DEC 2010) ................................................ I-51 I.50. 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ...................... I-53 I.51. 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)................. I-60

I.52. 52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC

2014) ............................................................................................................................... I-63

Yakima Project, Washington iv

I.53. 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995) ........................................... I-67

I.54. 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION (MAY 2011) ....................................................................................... I-69

I.55. 52.223-6 DRUG-FREE WORKPLACE (MAY 2001) ................................................... I-70

I.56. 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (AUG 2011) ............................................................ I-71

I.57. WBR 1452.223-80 ASBESTOS-FREE WARRANTY--BUREAU OF

RECLAMATION (OCT 1992) ....................................................................................... I-72

I.58. WBR 1452.223-81 SAFETY AND HEALTH -- BUREAU OF RECLAMATION

(MAY 2010).................................................................................................................... I-73

I.59. WBR 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE

PUBLIC FROM EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL

WORKPLACE–BUREAU OF RECLAMATION (DEC 2009) .................................... I-74

I.60. 52.225-9 BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014) ............ I-74

I.61. 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUNE

2008) ............................................................................................................................... I-77 I.62. 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007) ....................................... I-78

I.63. 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (DEC 2007) .............................................................. I-78

I.64. 52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC

2007) ............................................................................................................................... I-78 I.65. 52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007) ................................ I-79 I.66. 52.228-1 BID GUARANTEE (SEP 1996) ..................................................................... I-80 I.67. 52.228-2 ADDITIONAL BOND SECURITY (OCT 1997) ........................................... I-81

I.68. 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION

(JAN 1997)...................................................................................................................... I-81 I.69. 52.228-11 PLEDGE OF ASSETS (JAN 2012) .............................................................. I-82

I.70. 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS

(MAY 2014).................................................................................................................... I-82 I.71. 52.228-14 IRREVOCABLE LETTER OF CREDIT (DEC 1999) ................................. I-82

I.72. 52.228-15 PERFORMANCE AND PAYMENT BONDS-CONSTRUCTION

(OCT 2010) ..................................................................................................................... I-86

I.73. 1452.228-70 LIABILITY INSURANCE-DEPARTMENT OF THE INTERIOR

(JUL 1996) ...................................................................................................................... I-87

I.74. WBR 1452.228-84 CERTIFICATION OF REPRESENTATIVES FOR

CORPORATE SURETIES--BUREAU OF RECLAMATION (SEP 1996) .................. I-88

I.75. 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013) .............................. I-88

I.76. WBR 1452.231-81 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE

-- BUREAU OF RECLAMATION (JUL 1998) ............................................................. I-89

I.77. 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (MAY 2014) ........................................................................................... I-91 v

I.78. 52.232-17 INTEREST (MAY 2014) .............................................................................. I-94 I.79. 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) ................................................. I-95

I.80. 52.232-27 PROMPT PAY FOR CONSTRUCTION CONTRACTS (MAY 2014) ....... I-96

I.81. 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-SYSTEM FOR

AWARD MANAGEMENT (JUL 2013) ...................................................................... I-104

I.82. 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS

(JUN 2013).................................................................................................................... I-106

I.83. 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL

BUSINESS SUBCONTRACTORS (DEC 2013) ......................................................... I-107

I.84. WBR 1452.232-80 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) --

BUREAU OF RECLAMATION (SEPT 2003) ............................................................ I-107

I.85. WBR 1452.232-82 OTHER INVOICE REQUIREMENTS -- BUREAU OF

RECLAMATION (DEC 2002) ..................................................................................... I-109 I.86. 52.233-1 DISPUTES (MAY 2014) ALTERNATE I (DEC 1991) ............................... I-109 I.87. 52.233-3 PROTEST AFTER AWARD (AUG 1996) ................................................... I-111

I.88. 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT

2004) ............................................................................................................................. I-112 I.89. 52.236-2 DIFFERING SITE CONDITIONS (APR 1984) ........................................... I-112

I.90. 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE

WORK (APR 1984) ...................................................................................................... I-112 I.91. 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984) .................. I-113 I.92. 52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991) ................................... I-113 I.93. 52.236-8 OTHER CONTRACTS (APR 1984) ............................................................. I-113

I.94. 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984) ........................... I-113 I.95. 52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984) ............................. I-114 I.96. 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984) ......... I-114 I.97. 52.236-12 CLEANING UP (APR 1984) ...................................................................... I-115

I.98. 52.236-13 ACCIDENT PREVENTION (NOV 1991) - ALTERNATE I (NOV

1991) ............................................................................................................................. I-115

I.99. 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB

1997)- ALTERNATE I (APR 1984)............................................................................. I-116 I.100. 52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995) ................................ I-117

I.101. WBR 1452.236-84 PRESERVATION OF CULTURAL RESOURCES –

BUREAU OF RECLAMATION (FEB 2000) .............................................................. I-117

I.102. WBR 1452.237-80 SECURITY REQUIREMENTS – BUREAU OF

RECLAMATION (FEBRUARY 2011) ALTERNATE III (OCT 2006) ..................... I-119

I.103. 52.242-13 BANKRUPTCY (JUL 1995)....................................................................... I-126 I.104. 52.243-4 CHANGES (JUNE 2007) .............................................................................. I-127

I.105. WBR 1452.243-80 MODIFICATION PROPOSALS -- BUREAU OF

RECLAMATION (DEC 2001) ALTERNATE III (JUL 1998) .................................... I-128 I.106. 52.244-2 SUBCONTRACTS (OCT 2010) ................................................................... I-129

Yakima Project, Washington vi

I.107. 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015) ................. I-131

I.108. 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2010) -

ALTERNATE I (APR 1984) ........................................................................................ I-133

I.109. 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT

(FIXED-PRICE) (APR 2012)-ALTERNATE I (SEP 1996) ........................................ I-136 I.110. 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)................... I-139 I.111. 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984) ........................ I-140 I.112. 52.253-1 COMPUTER GENERATED FORMS (JAN 1991) ...................................... I-140

PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J LIST OF ATTACHMENTS.......................................................................................... J-1

PART IV REPRESENTATIONS AND INSTRUCTIONS

SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS ....................................................................... K-1

K.1. 52.203-98, PROHIBITION ON CONTRACTING WITH ENTITIES THAT

REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS—

REPRESENTATION (FEB 2015) - DEVIATION ........................................................ K-1

K.2. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC

2014) ............................................................................................................................... K-1

K.3. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL

2013) ............................................................................................................................... K-5

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS ............................................................................................................L-1

L.1. 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013) ................................ L-1

L.2. 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING (JUL 2015)................................................................................................ L-3

L.3. 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998) ............. L-4

L.4. 52.211-3 AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA

INDEX OF FEDERAL SPECIFICATIONS, STANDARDS AND

COMMERCIAL ITEM DESCRIPTIONS (JUN 1988) .................................................. L-4

L.5. 52.211-6 BRAND NAME OR EQUAL (AUG 1999) (DEVIATION) ........................... L-4

L.6. WBR 1452.211-80 NOTICE OF INTENT TO ACQUIRE METRIC PRODUCTS

AND SERVICES - BUREAU OF RECLAMATION (MAR 1993) ............................... L-5

L.7. 52.215-1 INSTRUCTIONS TO OFFERORSBCOMPETITIVE ACQUISITION

(JAN 2004)....................................................................................................................... L-6

L.8. 1452.215-71 USE AND DISCLOSURE OF PROPOSAL

INFORMATION--DEPARTMENT OF THE INTERIOR (APR 1984) ....................... L-10

vii

L.9. WBR 1452.215-80 SOURCE EVALUATION AND SELECTION

PROCEDURES--BUREAU OF RECLAMATION (MAY 2005) ................................ L-12

L.10. WBR 1452.215-81 GENERAL PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-14

L.12. WBR 1452.215-83 PRICE PROPOSAL INSTRUCTIONS--BUREAU OF

RECLAMATION (JAN 1998) ...................................................................................... L-16

L.13. FACSIMILE ACKNOWLEDGMENT OF AMENDMENTS, MODIFICATIONS

TO OFFERS, AND WITHDRAWALS OF OFFERS-BUREAU OF

RECLAMATION--PN REGION (APR 2007) .............................................................. L-17

L.14. 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................. L-18

L.15. 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY

SITE OF THE WORK (MAY 2014) ............................................................................. L-18

L.16. 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)..................................................................................................................... L-18

L.17. NON-DISCRIMINATION NOTICE TO U.S. DEPARTMENT OF THE

INTERIOR CONTRACTORS, SUBCONTRACTORS, AND LESSORS --

BUREAU OF RECLAMATION -- PN REGION (JAN 2000) ..................................... L-19

L.18. 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014) ........................................................... L-19

L.19. 52.233-2 SERVICE OF PROTEST – DEPARTMENT OF THE INTERIOR

(SEPT 2006) (DEVIATION) ......................................................................................... L-20

L.20. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB

1995) .............................................................................................................................. L-21

L.21. 52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997) ....... L-21

L.22. 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984) ................... L-22

SECTION M EVALUATION FACTORS FOR AWARD .............................................................. M-1

M.1. WBR 1452.215-85 EVALUATION FACTORS FOR AWARD - QUALITY

PREDOMINANCE--BUREAU OF RECLAMATION (MAY 2005) ........................... M-1

M.2. WBR 1452.225-82 NOTICE OF WORLD TRADE ORGANIZATION

GOVERNMENT PROCUREMENT AGREEMENT EVALUATIONS--

BUREAU OF RECLAMATION (MAY 2005) .............................................................. M-1

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Bureau of Reclamation

Attn: Contracting Officer, PN-3726 1150 N. Curtis Road, Suite 100 Boise, ID 83706-1234

Susan Kramer 208-378-5156

1x 07/20/2015

R15PS00049

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

CLE ELUM DAM RADIAL GATE MODIFICATIONS, YAKIMA PROJECT, WASHINGTON

THE SOLICITATION IS SET-ASIDE FOR SMALL BUSINESS CONCERNS

THE ESTIMATED PRICE RANGE OF THE WORK IS $1,000,000 TO $5,000,000

IN BLOCK 11, THE COMPLETION DATE IS NOT A NUMBER OF DAYS AFTER NOTICE TO PROCEED, BUT IS A CALENDAR DATE AS DESCRIBED IN CLAUSE F.1.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 0 calendar days and complete it within ________________ ________________ calendar days after receiving

08/20/2015

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Pacific Northwest Region

Regional Office Acquisition Management Division

R10

1150 N. Curtis Road, Ste. 100

Boise ID 83706-1234

Susan E. Kramer

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R15PS00049

Section B

(a) Offers will be considered for award on the following price schedule, but no offer will be considered for award on only part of the price schedule.

(b) Offers are subject to the terms and conditions of this solicitation.

(c) Definitions:

(1) CLIN - Contract Line Item Number

(2) AU - Activity Unit (equals Lump Sum)

(3) SF - Square Foot

(4) EA - Each

(d) Quantities in the schedule that are not designated as "AU" are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns.

(e) CLINS 30, 40, 50, and 60 are optional CLINS.

The offeror shall include a price for each of these CLINS, the total evaluated price will include these CLINS, and the awarded contract will include these CLINS, but the decision of whether or not the work will need to be done will be determined in the field after the gates are removed and the Government inspects the existing conditions.

Delivery: 07/01/2018

FOB: Destination

00010 Cle Elum Radial Gate Modification - total for all 1 AU items of work except separately listed CLINS 20-60

00020 Spot repair existing radial gate coating 2678 SF

00030 OPTIONAL ITEM - Furnish new hinge pin anchor - 8 EA pier

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

R15PS00049

00040 OPTIONAL ITEM - Remove, install, and align hinge 8 EA pin anchor - pier

00050 OPTIONAL ITEM - Furnish new hinge pin anchor side 2 EA wall

00060 OPTIONAL ITEM - Remove, install, and align hinge 2 EA pin anchor - side wall

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

C-1

SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Signature Sheet / Certification of Technical Specifications

Project Title:

Yakima Project, Idaho

Region:

Pacific Northwest Region

Technical Specifications: Cle Elum Radial Gate Modification Title and Number: R15PS00049

Prepared by:

/s/ Cahl Gouker

Date:

12/11/14

Technical Approval:

/s/ Larry Soderlind

Date:

12/11/14

1. The person signing the specifications package as “Prepared” shall have developed or assembled the written specifications.

2. The person signing the specifications package for “Technical Approval” shall have been in responsible charge of the overall design including developing or assembling the specifications. This person will typically be the design team leader. In cases where the designs described by the specifications meet the criteria for preparation by a registered engineer or architect, this person shall be registered with the applicable professional designation after their signature, such as P.E. for professional engineer or R.A. for registered architect. By this signature, this person is certifying the written specifications convey the design intent as portrayed on the drawings included therein.

For specifications package containing designs from multiple disciplines, it is the signing individual's responsibility to ensure (using procedures defined by his/her organization) that the technical information prepared by other professions and disciplines and depicted in the document is compatible with the overall design intent and that the documents used to depict that information (e.g., drawings) include signatures with appropriate professional registration designations.

DIVISION 01 - GENERAL REQUIREMENTS

Yakima Project, WA

Summary of Work

01 11 00 - 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.01 LOCATION

A. Work is located at Cle Elum Dam, approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County.

1.02 PRINCIPAL COMPONENTS OF WORK

A. The work required for Cle Elum Radial Gate Modifications includes:

1. Removal of corrosion prevention coating on portions of the radial gates

2. Handling and disposing of the removed coating

3. Removal of steel expanded metal and angle supports at top of radial gates 1 through 5

4. Removal of the ports installed in radial gate 1

5. Surface preparation of portions of the gates, prior to welding.

6. Furnishing and installing fabricated metal components on five radial gates, in order to increase the gate height as shown on the drawings

7. Furnishing and installing fabricated metal components to fill temporary ports in radial gate 1

8. Furnishing and installing aluminum skin plate on downstream side of five radial gates

9. Replacing rubber side seals on five radial gates

10. Replacing timber bottom seals on five radial gates

11. Spot repair coatings on five radial gates

12. Coating new metalwork on the radial gates

13. Overcoating existing metal handrails and hoist mounts.

Gates are numbered from left to right facing downstream. There are five radial gates total.

1.03 SPECIFICATIONS REQUIREMENTS

A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.

B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.

C. Where specifications are written in streamlined form, the words “shall be” are included by inference where a colon (:) is used within the sentence or phrase.

Summary of Work

01 11 00 - 2

1.04 DEFINITIONS

A. When the specifications use a word or term defined in the Federal Acquisition Regulations (FAR), the definition of the word or term shall be in accordance with FAR sections in effect at the time the solicitation was issued.

B. Quality Assurance: Inspection and tests performed by Government to ensure compliance with the terms of the contract.

C. Quality Control: Activities performed by Contractor to ensure work conforms to contract requirements.

D. Contractor Quality Testing: Specified tests to be performed by the Contractor.

1. The Government may use the test results for Quality Assurance.

2. The Contractor may use the test results as part of Contractor quality control.

a. The Government anticipates that these tests will be part of the Contractor’s quality control program, however the tests do not relieve the Contractor of providing adequate quality control measures in accordance with the clause at FAR 52.246-12, “Inspection of Construction.”

1.05 ACRONYMS

A. The following acronyms apply to specifications Divisions 1 through 52:

1. CO: Contracting Officer

2. COR: Contracting Officer’s Representative

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

END OF SECTION

Use of Site 01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 COST

A. Include in lump sum price offered in the schedule for Cle Elum Radial Gate Modification Project, Yakima Project, Washington.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (USBR)

1. USBR Cleaning Manual Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2010 Edition - Available online at: http://www.usbr.gov/mussels/prevention

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals:

1. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

a. For each Contractor use site on Government land.

1) Show use location and extent of impact. Uses include but are not limited to the following:

a) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

b) Parking areas, temporary roads, and haul routes.

c) Utilities including air, power, and water lines; fire hydrants;

and compressor station.

d) First-aid and medical facilities.

e) Areas for processing, storing, and disposing of waste materials from construction operations.

f) Temporary fences.

2) Describe methods to preserve, protect, and repair if damaged, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to the jobsite, which are not to be removed http://www.usbr.gov/mussels/prevention

01 14 10 - 2 and which do not interfere with the work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

3) Describe methods to protect, and repair if damaged, existing improvements and utilities at or near the jobsite.

4) Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

b. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

1.04 PROJECT CONDITIONS

A. Government land as shown on drawings may be used for required construction facilities.

1. Staging: Spillway apron, downstream spillway floor, and dam crest, as approved by COR.

B. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

C. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of the COR.

D. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.

E. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by the COR.

1.05 RESERVOIR WATER SURFACE ELEVATIONS

A. Prospective offerors and the Contractor are alerted and cautioned that construction of the required features may not interfere with the normal operations of Cle Elum Reservoir.

The reservoir serves primarily as storage for irrigation.

B. It is anticipated that the construction season coincides with the storage delivery season of the reservoir. Releases from Cle Elum Reservoir are directed by the Bureau of Reclamation and depend on downstream water demand.

C. Figure 1, located in Section 51 10 20- Historic Water Elevations, provides information on historic water surface elevations for Cle Elum Reservoir for the calendar years 1994 to 2014 and is included to illustrate the historic fluctuations of Cle Elum Reservoir. The Government assumes no responsibility for any deductions, conclusions, or interpretation that may be made from them.

01 14 10 - 3

1.06 FACILITIES OPERATION

A. Dam and Reservoir operation: The Government will operate Cle Elum Dam and Reservoir facilities during the construction period to comply with water rights and contract obligations to deliver stored water. Reservoir operations will not be materially altered to accommodate construction.

B. Large and maximum floods for this facility have large snowmelt components. In event of flooding, Reclamation would strive to notify the Contractor of the impending flood and expected operation as soon as possible.

C. Spillway: The spillway at Cle Elum Dam is 201-feet wide and is located at the right abutment adjacent to the outlet works. The spillway consist of a concrete-lined, open channel section controlled by five 37-foot by 17-foot tall radial gates. The spillway crest is at elevation 2223’. There is a 19-foot by 201-foot (5 span) combination bridge operating deck across the gate structure. Water released for irrigation and downstream flows is typically delivered via the outlet works and not through the spillway.

PART 2 PRODUCTS

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment: Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.

B. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in USBR Cleaning Manual.

C. The COR will inspect construction equipment following procedures described in USBR Cleaning Manual before allowing the equipment onsite.

3.02 RESTORATION

A. Restore temporary construction roads to original contours and make impassable to vehicular traffic when no longer required.

B. After completion of work, scarify and regrade Government land used for construction purposes and not required for completed installation so that surfaces blend with natural terrain and are in a condition that will facilitate natural revegetation, provide proper drainage, and prevent erosion.

01 14 10 - 4

Facility Operations and Construction Sequencing

01 14 50 - 1

SECTION 01 14 50

FACILITY OPERATIONS AND CONSTRUCTION SEQUENCING

PART 1 GENERAL

1.01 COST

A. Include all costs for coordination of facilities operations and construction sequencing in prices offered in the schedule for other items of work.

1.02 FACILITY OPERATION

A. The Government will operate Cle Elum Dam and Reservoir facilities during the construction period to comply with water rights and contract obligations to deliver stored water. Reservoir operations will not be materially altered to accommodate construction.

B. Proposed work will occur in the spillway of Cle Elum Dam. The spillway is 201-feet wide and is located at the right abutment of the dam. The spillway consists of a concrete-lined, open channel section controlled by five 37-foot wide by 17-foot tall radial gates.

The spillway crest is at elevation 2223’.

C. Water released for irrigation and downstream flow is typically delivered via the outlet works and not through the spillway.

1.03 RESERVOIR WATER SURFACE ELEVATION

A. Full pool for Cle Elum Reservoir is Elevation 2240’.

B. Figure 1, located in Section 51 10 20 – Historic Water Elevations, provides information on historic water surface elevations for Cle Elum Reservoir for the calendar years 1994 to 2014 and is included to illustrate the historic fluctuations of Cle Elum Reservoir. The Government assumes no responsibility for any deductions, conclusions, or interpretation that may be made from them.

C. Data, including forebay water surface elevation, from the Cle Elum Reservoir Weather Station (CLE) can be obtained from the following website, maintained by Reclamation’s Yakima Project Hydromet: http://www.usbr.gov/pn/hydromet/yakima/index.html.

1.04 LIMITATIONS ON CONTRACTOR’S OPERATIONS

A. Prospective offerors and the Contractor are alerted and cautioned that construction of the required features may not be performed when the reservoir elevation is above the spillway floor at elevation 2223’.

B. The typical construction period will be from August to April, as reservoir elevations and weather conditions allow.

http://www.usbr.gov/pn/hydromet/yakima/index.html

Facility Operations and Construction Sequencing

01 14 50 - 2

C. The wet operational tests must be performed with the full reservoir elevation on the gates.

D. The wet operational tests may produce rapid changes in river elevation; therefore, testing shall be performed when it will have the least impact downstream. Contractor shall coordinate dates for the wet operational tests with the Contracting Officer.

1.05 FLOOD CONSIDERATIONS

A. Floods in the Cle Elum Reservoir drainage basin have large snowmelt components; and may occur with little warning time.

B. Given notice of an impending flood, the Contractor shall be responsible for protecting construction equipment and features under construction to the maximum reasonable level possible and will not be compensated for flood damages which could have reasonable been avoided.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CONSTRUCTION SEQUENCING

A. No more than two radial gates shall be non-operational at any time.

B. All gates modified by the contractor shall be fully operational, and the Contractor shall be de-mobilized from the spillway work area, prior to the reservoir water level reaching the spillway floor in the spring.

Payment Procedures

01 29 00 - 1

SECTION 01 29 00

PAYMENT PROCEDURES

PART 1 GENERAL

1.01 SUBMITTALS

A. Submit in accordance with Section 01 33 00 - Submittals:

1. RSN 01 29 00-1, Schedule of Values.

2. RSN 01 29 00-2, Application for Payment.

3. RSN 01 29 00-3, Final Application for Payment.

1.02 SCHEDULE OF VALUES

A. Prepare a separate Schedule of Values for each schedule of the Work under the Contract.

B. Upon request of COR, provide documentation to support the accuracy of the Schedule of values.

C. Lump Sum Work:

1. Reflect specified allowances and alternates, as applicable.

2. List bonds and insurance premiums, mobilization, demobilization, preliminary and detailed progress schedule preparation, equipment testing, facility startup, and contract closeout separately.

D. An unbalanced or front-end loaded schedule will not be acceptable.

E. Summation of the complete Schedule of Values representing all the Work shall equal the Contract Price.

1.03 PAYMENT

A. Payment for all Lump Sum Work shown or specified in Contract Documents is included in the Contract Price. Payment will be based on a percentage complete basis for each line item of the accepted Schedule of Values.

B. Payment for Lump Sum Work covers all Work specified or shown within the limits or Specification sections as follows: All Work shown on Drawings and in Specification sections.

1.04 NONPAYMENT FOR REJECTED OR UNUSED PRODUCTS

A. Payment will not be made for following:

1. Loading, hauling, and disposing of rejected material.

2. Quantities of material wasted or disposed of in manner not called for under

Contract Documents.

Payment Procedures

01 29 00 - 2

3. Rejected loads of material, including material rejected after it has been placed by reason of failure of Contractor to conform to provisions of Contract Documents.

4. Material not unloaded from transporting vehicle.

5. Defective Work not accepted by COR.

6. Material remaining on hand after completion of Work.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Construction Program

01 32 10 - 1

SECTION 01 32 10

CONSTRUCTION PROGRAM

PART 1 GENERAL

1.01 PAYMENT

A. Costs:

1. Developing Cost-Loaded Baseline Schedule: Include in lump sum price offered in the schedule for Cle Elum Radial Gate Modification Project, Yakima Project, Washington.

2. Updating and Using Cost-Loaded Construction Program: Include in lump sum price offered in the schedule for Cle Elum Radial Gate Modification Project, Yakima Project, Washington.

1.02 REFERENCE STANDARDS

A. Associated General Contractors of America (AGC)

1. AGC Manual Construction Planning and Scheduling Manual, 2004

1.03 DEFINITIONS

A. Schedule: The Critical Path Method (CPM) of planning and scheduling a construction project where activities are arranged based on activity relationships and network calculations determine when activities can be performed and the critical path of the project.

B. Project Calendar(s): Cross reference of numerical work days with calendar days. Project calendars serve as the basis for day/date conversion and assign work days and non-workdays.

C. Resources: Equipment, labor or crews, materials, subcontractors, fabricators, manufacturers, and consultants.

D. CLIN: Contract Line Item Number

E. Out of Sequence Work: An activity that starts before its predecessor activities are completed.

1.04 SUBMITTALS

A. Submit the following in…