Quality Assurance Surveillance Plan (QASP)_ Attachment 0002.pdf
PDF 380 KB Posted
- Attached to
- Granite Plates Calibration and Repairs Federal contract opportunity
- Solicitation number
- W9098S21Q0070
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 21Q0070-0002 Amendment Released.pdf | ||
| 21Q0070-0001 Amendment Released.pdf | ||
| 21Q0070 Released.pdf | ||
| Price Matrix_ Attachment 0003.xlsx | XLSX spreadsheet | |
| Scope of Work (SOW)_ Attachment 0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
Granite Surface Plates – Remedial Repair (RR), Preventive Maintenance (PM) & Calibration (CAL)
1. CONTRACT REQUIREMENT:
The contractor is to perform PM & CAL, RR, of Granite Surface Plates outlined in the SOW IAW the ANSI Z540 standard.
2. PRIMARY METHOD OF SURVEILLANCE:
The contractor’s performance will be inspected by TARA-PQ personnel to ensure all requirements have been followed IAW this
QASP. Specific inspection methods are outlined below.
3. ANALYSIS OF RESULTS:
TARA-QA personnel will analyze the results of the RR, PM & CAL operations and coordinate any issues with the contractor.
Service Paragraph
Letter/Number
Standards AQL & Lot Size Method of Surveillance
Performance 5.0 IAW SOW 0%
N/A
100% Inspection
Calibrations 5.1 IAW ANSI Z-540-1 standards
& traceable to N.I.S.T
100%
IAW ANSI requirements
100% Inspection
Schedule Service 5.1.1 & 5.1.3 IAW SOW – ensure machines are calibrated/certified on or before due date
0%
NA
100% Inspection
Remedial Repair 5.3 IAW SOW – ensure all repairs are authorized by CO or COR
0%
NA
100% Inspection
Service Acceptance
Report (SAR)
5.3.1 & 5.6 IAW SOW – ensure all parts and labor costs are itemized
0%
NA
100% Inspection
Warranty 5.3.2.1 &
5.3.2.2
IAW SOW requirements 0%
NA
100% Inspection
Labor & Repair tools 5.4 IAW SOW requirements – contractor responsibility
0%
NA
100% Inspection
Shipping of Parts 5.5 IAW SOW requirements – contractor responsibility
0%
NA
100% Inspection
Allowable costs 5.7 IAW SOW requirements – receipts must be provided upon request
0%
NA
100% Inspection
Technician capability / training
7. IAW SOW requirements – must be factory trained with 3 years experience
0%
NA
100% Inspection