Quality Assurance Surveillance Plan.docx
DOCX document 32 KB Posted
- Attached to
- J061--Diesel Generators Maintenance Service Federal contract opportunity
- Solicitation number
- 36C24223Q0836
About this file
This Quality Assurance Surveillance Plan outlines performance standards and monitoring procedures for a diesel generators maintenance service contract with the Department of Veterans Affairs. Key services include preventative maintenance and repair of diesel generators at the James J. Peters VA Medical Center. Performance will be monitored by the Contracting Officer's Representative and evaluated based on metrics such as emergency response time, generator uptime, and accuracy of maintenance reports. The contractor must meet minimum performance thresholds to avoid penalties to the base contract rate. Surveillance methods incorporate direct observation, full inspections, and monthly performance review meetings. Ratings will indicate if standards are met or not met for each performance measure. The Contracting Officer retains final responsibility for assessing contractor adequacy and taking any necessary contractual actions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24223Q0836.docx | DOCX document | |
| Past Performance Evaluation Questionnaire.docx | DOCX document | |
| Wage Determination No. 2015-4187 Rev 25.txt | TXT text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored?
· How monitoring will take place.
· Who will conduct the monitoring?
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
A. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO:
Organization or Agency: Department of Veterans Affairs, RPO East, VISN 2
B. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: John Adeyeye Organization or Agency: VHA
C. Other Key Government Personnel:
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
A. Program Manager: To Be Determined upon vendor selection
B. Dispatcher: To Be Determined
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, paragraph (N/A) in the Statement of work (SOW), includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Contractor agrees to maintain an on-going Quality Management/Assurance Program which include the following activities Quality Assurance: The contractor will be evaluated throughout the contract period in regard to their compliance with all VA quality performance measures and monitors as it pertains to Ambulance Services; proper documentation, adherence to performance measures, timely access, excessive waits/delays, pickup and delivery of special mode. Additionally patient safety and patient complaints will be researched and addressed as necessary.
| Task |
| ID |
| Indicator |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
Incentive/Penalty
Submit a PM report of scheduled, completed, and outstanding tasks monthly
Timeliness and Accuracy of PM Reports
| 100% of reports accurately depict current status |
| 99% |
| File review, periodic inspections, and observations. |
Incentives: Favorable contactor performance evaluation
Disincentive: Unfavorable contractor performance evaluation
| Emergency Call response time |
| 2 |
| Amount of time taken to respond to an emergency call |
| Contractor shall arrive on site within the 4 hours as specified in the contract. |
| 99% |
| Observations |
20% Base Rate Penalty > ½ hour
Generator uptime
| 3 |
| Amount of time in days generators in use are operational without interruption |
| Contractor shall ensure generators are operating at effect. |
| 99% for Emergency Generators unless a catatrophic failure occurs. |
Record of number of days fully operational relative to the number of days of the contract.
Incentives: Favorable contactor performance evaluation
Disincentive: Unfavorable contractor performance evaluation
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
A. DIRECT OBSERVATION. (Can be performed periodically or through 99% surveillance.)
B. 99% INSPECTION. (Evaluates all outcomes.)
6. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used for measurement will be: meets standards/does not meet standards
7. DOCUMENTING PERFORMANCE
A. Acceptable Performance
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
B. Unacceptable Performance
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. FREQUENCY OF MEASUREMENT
A. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
B. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor monthly to assess performance, discuss concerns, and troubleshoot existing problems.
Name: John Adeyeye Title : Healthcare Engineer Signature:
image1.emf
File details come from the government source that posted it. Updated .