Quality Assurance Surveillance.docx
DOCX document 26 KB Posted
- Attached to
- S205--Solid Waste Removal and Recycling Service Federal contract opportunity
- Solicitation number
- 36C24222Q0497
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24222Q0497 0005.docx | DOCX document | |
| 36C24222Q0497 0004.docx | DOCX document | |
| 36C24222Q0497 0003.docx | DOCX document | |
| 36C24222Q0497 0002.docx | DOCX document | |
| 36C24222Q0497 0001.docx | DOCX document | |
| Past Performance Evaluation Questionnaire.docx | DOCX document | |
| Directive_0063 - Waste Prevention and Recycling Program.pdf | ||
| 2015-4187.txt | TXT text file | |
| 36C24222Q0497.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Trash and Recycle Services for James J. Peters VA Medical Center
Contract Number: TBD
Contract Description: The James J. Peters VA Medical Center has a need for solid waste disposal and recycling services of Bottles, Cans, Plastics, Scrap Metal, Cardboard and Wood Pallets located within the James J. Peter VA Medical Center. Solid Waste will be transported and disposed/recycled in compliance with Federal, State and Local regulation
Solid Waste and Recycling Services consist of physically collecting and disposing/recycling of refuse on a regularly scheduled basis. Individual weight tickets for solid waste and recyclable items are required as described in specifications. Contractor will not make any change in where solid waste is hauled to without prior written approval by the Contracting Officer.
Contractor’s name: TBD
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Safa Shleiwet Organization or Agency: Department of Veterans Affairs, RPO East, VISN 2
b. Contracting Officer’s Technical Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
| Primary COR: | Joanne Turnier | |
| Department of Veterans Affairs | ||
| 130 West Kingsbridge Road | ||
| Bronx, NY 10468 |
c. Other Key Government Personnel: Annette Lopez, Chief, EMS; Christopher Spence, Assistant Chief, EMS
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as Contractor’s Program Manager(s) for this contract.
a. Program Manager: TBD
b. Other Contractor Personnel: TBD
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
| Task |
| ID |
| Indicator |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Incentive |
Rating
Maintenance and Support
| 1 |
| Vendor responds to service calls |
| Replacement of damaged containers will take place within 24 hours after the service call is made. |
| Replacement completed within standard 100% of the time |
| Periodic Inspection |
| See Paragraph 5 |
| Excellent = < 24 hours |
Satisfactory = 24 hours
Unsatisfactory = > 24 hours
| Monthly Reports |
| 2 |
| Vendor to provide monthly poundage summary of trash/waste disposed of. |
| Vendor to provide report of how much waste was disposed of within monthly timeframe |
| Must be provided at least 30 days after last work day of month. |
| Periodic Inspection |
| See Paragraph 5 |
| Satisfactory = reports received on time |
Unsatisfactory = not received on time or not at all
| Monthly Reports |
| 3 |
| Vendor to provide monthly summary of recycling poundage disposed of. |
| Vendor to provide report of how much recycling was disposed of within monthly timeframe |
| Must be provided at least 30 days after last work day of month. |
| Periodic Inspection |
| See Paragraph 5 |
| Satisfactory = reports received on time |
Unsatisfactory = not received on time or not at all
| Monthly Reports |
| 4 |
| Vendor to provide accurate and timely monthly invoices |
| Vendor to provide accurate and timely invoices clearly stating all dates, quantities, weights and rates of services received monthly |
| Must be provided at least 30 days after last work day of month. |
| Periodic Inspection |
| See Paragraph 5 |
| Satisfactory = reports received on time |
Unsatisfactory = not received on time or not at all
| Daily Reports |
| 5 |
| All waste containers properly serviced as indicated in contract SOW |
| Waste containers will be serviced as outlined in SOW schedule |
| 100% compliance |
| Validated User/Customer Complaint |
| See Paragraph 5 |
| Satisfactory = 95% or greater effectiveness level |
Unsatisfactory = >%95 effectiveness level
| 6 |
| Contractor provides and maintains containers to meet the government’s needs |
| Contractor provides and maintains containers to meet the government’s needs |
| 100% |
compliance
| Periodic Inspection |
| See Paragraph 5 |
| Satisfactory = 95% or greater effectiveness level |
Unsatisfactory = >%95 effectiveness level
5. INCENTIVES
The Government shall use exercise of option period and past performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
PERIODIC INSPECTION: Inspections may be scheduled quarterly.
Performance Standard ID – 1,2,3,4
VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on internal customers to identify deficiencies. Complaints are then investigated and validated.)
Performance Standard ID – 5
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Excellent = Exceeds Standards Satisfactory = Meets Standards Unsatisfactory = Fails To Meet Standards
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager with a copy to the Contracting Officer.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor monthly to assess performance and shall provide a written assessment.
<After award, both the contractor’s Program Manager and the COR shall sign this document.>
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
File details come from the government source that posted it. Updated .