QASP Residential Programs HTs FY22.pdf
PDF 154 KB Posted
- Attached to
- Health Technicians for Domiciliary services Federal contract opportunity
- Solicitation number
- 36C26122Q0046
About this file
This Quality Assurance Surveillance Plan outlines performance standards and monitoring methods for health technicians providing direct care services under Solicitation Number 36C26122Q0046 for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. Key responsibilities of the health technicians include prompt and accurate communication with staff, co-facilitating community meetings and classes, timely completion of documentation such as pass down logs and building rounds, conducting safety drills and urine drug screens, and direct case management of veterans in treatment programs. Performance will be monitored through methods such as direct observation, periodic inspections of documentation and logs, and validated customer complaints. Ratings of exceptional, satisfactory or unsatisfactory will be used to evaluate whether performance meets or exceeds standards. The contracting officer's representative will document performance and any corrective actions needed to address unacceptable performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Questions.pdf | ||
| 36C26122Q0046.pdf | ||
| WD 2015-5637.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) Health Technician – [Contract #]
Project Title: Health Technician for VA Palo Alto Health Care System’s Residential Programs: First Step Program (FS) and Homeless Veterans Rehabilitation Program (HVRP) Contract Number:
Contractor's Name:
Contract Description: The Veterans Affairs Palo Alto Health Care System (VAPAHCS) requires a Contractor to provide two full-time Health Technicians to perform direct care services primarily in the Residential Program consisting of First Step Program (FSP) and the Homeless Veterans Rehabilitation Program (HVRP) in the Domiciliary Service located at Menlo Park Division (MPD) of the VAPAHCS at 795 Willow Road, Building 347, Menlo Park, California, 94025.
1. PURPOSE
The QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored How monitoring will take place Who will conduct the monitoring How monitoring efforts and results will be documented
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the Contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government's responsibility to be objective, fair, and consistent in evaluating performance.
This QASP may be revised as needed. Changes will be reviewed with the Contractor to ensure that they are aware of how performance is being monitored. Copies of the QASP will be provided to the Contractor and may be provided to Government officials responsible for surveillance activities (i.e.
auditors).
2. GOVERNMENT ROLE AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO)- The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor's performance.
Assigned CO:
Organization or Agency: Department of Veterans Affairs, Network Contracting Office 21
b. Contracting Officer Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor's performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government's behalf.
Assigned COR: Randolph Fry
c. Other Key Government Personnel:
Timothy Ramsey, Ph.D., FSP Program Manager John Sirley, LCSW, HVRP Program Manager Kate Severin, LCSW, COR’s Supervisor and Chief, Domiciliary Service
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor's program manager for this contract.
a. Program Manager –
b. Other Contractor Personnel-
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Performance Requirements Summary Matrix includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Performance Indicator Performance
Measurement AQL Assessment Method
Prompt and accurate communication with staff
Critical information provided in a timely fashion 100% Direct observation
Co-facilitate community meetings, evening meetings and classes as assigned Attendance
100% (barring agreed upon leave or other assignment) Direct Observation
Timely completion of documentation
% assigned documentation completed within appropriate timeframe
80% of assigned documentation complete within the appropriate time frame Once monthly Review
Timely and comprehensive
% assigned logs completed
100% (barring agreed upon leave or other assignment) Periodic review completion of the pass down log Completion of building rounds and log entry
% assigned rounds and log entry completed
100% of assigned round and entry logs complete Periodic review
Conducting safety drills % of drills completed 100% Period review Direct observation
Conducting urine drug screens
% completed on days assigned to conduct screens
100% (barring agreed upon leave or other assignment)
Periodic documentation review
Direct case management of Veterans in treatment
Absence of patient complaints
No more than 3 patient complaints
Validated customer complaints
5. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance) Prompt & Accurate Communication with staff Co-facilitate community meetings, evening meetings and classes as assigned Conducting safety drills
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis) Inspections may be scheduled weekly, monthly, quarterly, annually, or unscheduled, as required.
Timely completion of documentation Timely and comprehensive completion of pass down log Completion of building rounds and log entry Conducting safety drills Conducting urine drug screens
c. VALIDATED USER/CUSTOMER COMPLAINTS.
Direct case management of Veterans in treatment
6. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used: The rating method may depend on the monitoring techniques you select. One rating method may be used for all standards or multiple methods may be used.
EXCEPTIONAL: Performance significantly exceeds contract requirements to the Government's benefit.
SATISFACTORY: Performance meets contractual requirements.
UNSATISFACTORY: Performance does not meet contractual requirements.
7. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file. When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager. The Contractor shall acknowledge receipt of the CDR in writing. The COR will specify if the Contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the Contractor has to present this corrective action plan to the COR. The Government shall review the Contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
8. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement. During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the Contractor biannually to assess performance and shall provide a written assessment.
X_____________________________ X___________________________ Randolph Fry Contracting Officer’s Representative Contractor Program Manager
| Performance Indicator: | |
| Performance Measurement: | |
| AQL: | |
| Assessment Method: | |
| 100: | |
| Attendance: | |
| Timely and comprehensive: | |
| assigned logs completed: | |
| Periodic review: | |
| completion of the pass down log: | |
| Periodic review_2: | |
| EXCEPTIONAL: | |
| SATISFACTORY: | |
| Performance meets contractual requirements: | |
| 2021-05-05T08:56:01-0700 | |
| Randolph R Fry 120185 |
File details come from the government source that posted it. Updated .