QAS_2022.docx

DOCX document 48 KB Posted

Attached to
118th Wing Mess Attendant Services Federal contract opportunity
Solicitation number
W50S9722Q0002
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to 118th Wing Mess Attendant Services, newest first.
File Type Posted
QUESTIONS FOR SOLICITATIONUT22July22 (003).pdf PDF
118th Mess Attendant PWS and PRS_2022.docx DOCX document
WD-2015-4647 REV 20.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Kitchen Personnel (KP)

For

118th Force Support Squadron, 118th Sustainment Services Flight (118 FSS/FSV)

Issued 1 August 2022

(Ver May 2018) i

TABLE OF CONTENTS

1INTRODUCTION1
1.1Purpose1
1.2Performance Management Approach1
1.3Performance Management Strategy1
2ROLES AND RESPONSIBILITIES2
2.1The Contracting Officer2
2.2The Contracting Officer’s Technical Representative2
3IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS2
4METHODOLOGIES TO MONITOR PERFORMANCE2
4.1Surveillance Techniques2
4.2Customer Feedback3
4.3Acceptable Quality Levels3
5QUALITY ASSURANCE DOCUMENTATION3
5.1The Performance Management Feedback Loop3
5.2Monitoring Forms3
6ANALYSIS OF QUALITY ASSURANCE ASSESSMENT4
6.1Determining Performance4
6.2Reporting4
6.3Reviews and Resolution4
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY5
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM6

ii

INTRODUCTION

This QASP is pursuant to the requirements listed in the performance work statement (PWS) entitled KP. This plan sets forth the procedures and guidelines the 118 FSS/FSV will use in ensuring the required performance standards or services levels are achieved by the contractor.

Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.

This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by 118 FSS/FSV to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The Contracting Officer Representative/Contracting Officer Technical Representative (COR/COTR) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

ROLES AND RESPONSIBILITIES

The Contracting Officer The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, cost control and for resolving any differences between the observations documented by the COR/COTR and the contractor. The KO will designate one full-time COR/COTR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO.

The COR/COTR The COR/COTR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR/COTR limitations are contained in the written appointment letter. The COR/COTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR/COTR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR/COTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS and in Attachment 1, Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

METHODOLOGIES TO MONITOR PERFORMANCE

Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

· Random monitoring, which shall be performed by the COR/COTR designated inspector.

· 100% Inspection – Each month, the COR/COTR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

Customer Feedback

4.2.1 The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

4.2.2 Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR/COTR as opposed to the contractor.

4.2.3 Customer complaints, to be considered valid, must set forth clearly and in writing. The detailed nature of the complaint must be stated, document signed and forwarded to the COR/COTR. Upon receipt of a complaint, the COR/COTR will investigate and document the findings on the monitoring form, Attachment 2 and in the COR file.

4.2.4 Customer feedback may also be obtained from the results of formal customer satisfaction surveys or random customer complaints.

Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving compliance with the Tri-Service Food Code, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance.

2 QUALITY ASSURANCE DOCUMENTATION

The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1, Performance Requirements Summary.

Monitoring Forms The government’s QA surveillance, accomplished by the COR/COTR, will be reported using the monitoring form in Attachment 2. The form, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required quality levels are being achieved.

The COR/COTR will retain a copy of all completed QA surveillance forms.

ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

Determining Performance

The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment.

Reporting

At the end of each quarter, the COR will prepare a written report for the KO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which include the completed quality assurance monitoring form (Attachment 2), will become part of the QA documentation and COR/COTR file. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

Reviews and Resolution

The COR/COTR may require the contractor’s project manager, or a designated alternate, to meet with the KO, COR/COTR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR/COTR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR/COTR as often as required or per the contractor’s request. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

· Issues arising from the performance monitoring processes

6.3.2 The COR/COTR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.

6.3.3 The COR/COTR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the KO.

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY (PRS)

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom
6.1 Pots and Pans
Wash and sanitize dirty pots and pans used in preparation of meals. Cleaning will include use of the 3 compartment sink.
Pots and pans are clean of dirt and grease. Stacked upside down to air dry. Available to be used for cooking food.
Visual Inspection / COR
6.2 Dishwashing
Responsible for the cleaning and sanitizing all dishware and eating utensils during and after meals.
Dishware and utensils are clean of dirt and grease. Stacked with handles facing up in storage containers. Ready to be used for scheduled meals.
Visual Inspection / COR
6.3 Replenishment
Prior to scheduled meals, initial set-up and replenishment of napkins, utensils, glasses, bowls, plates, salt, and pepper shakers.
100% available for scheduled meals.
Visual Inspection / COR
6.4 Sanitation Requirement
Complete all federal, state, and Air Force mandated sanitation requirements on food contact services in dining facility. Use of the sanitation solutions Quat will be used in red buckets.
100% Compliance by using Quat sanitizer in red buckets within facility.
Visual Inspection / COR
6.5 Food Serving
Set-up the pre-cooked food and salad on the serving lines. Provide serving personnel to ensure patrons can be served at the rate of 4 guests per minute per serving line.
4 Patrons served within 1 minute according to the menu.
Visual Inspection / COR
6.6 Housekeeping Services
Cleanup of areas that immediately affect customers to include appearance of the dining facility. Follow cleaning techniques described in PWS.
100% compliance with technical exhibit 2.
Visual Inspection / COR
6.7 Floor Cleaning
Clean and sanitize floors in dining facility described in PWS.
100% compliance with technical exhibit 2.
Visual Inspection / COR
6.8 Spot Floor Cleaning
Immediately clean, remove, and sanitize food/drink spills when needed.
100% compliance with technical exhibit 2.
Visual Inspection / COR
6.9 Entrance Way and Doors
Clean entrance way doors, floors, matting, trach cans, and cigarette receptacles as needed.
Entrance way doors, floors, matting, trash cans, and cigarette receptacles free of dirt and trash.
Visual Inspection / COR
6.10 Clean and Sanitize
Sanitize all dishes, pots, pans, kitchen, and dining room following PWS.
100% compliance with technical exhibit 1.
Visual Inspection / COR
6.11 Breakdown of Serving Lines and Salad Bar Areas
Breakdown serving lines, salad bar, and all display cabinet doors and shelves cleaned, sanitized, and free of debris.
Serving lines, salad bar, and all display cabinet doors and shelves cleaned, sanitized, and free of debris.
Visual Inspection / COR
6,12 Dish Washing Area
Clean and sanitize areas in the dishwashing machine room, the pots and pans 3 compartment sink, and the food preparation sink. All equipment, food contact and non-food contact surfaces, floors, interior walls, and sinks cleaned.
Areas will be free of dirt and equipment taken apart at the end of the scheduled service for air drying until next scheduled service.
Visual Inspection / COR
6.13 Restrooms
Clean restrooms before, during, after scheduled meals. Check to make sure supplies are available. Clean toilets, sinks, floors, and all wall prior to any scheduled meals.
100% compliance with technical exhibit 2
Visual Inspection / COR
6.14 Waste Management
Empty trash cans throughout dining facility when they become ¾ full.
100% compliance with technical exhibit 2
Visual Inspection / COR

ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM

PERFORMANCE OBJECTIVE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check):

Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (Check):

MonthlyQuarterlyAs needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check):Meets Standards
Does Not Meet Standards

Narrative of Performance During Survey Period:

PREPARED BY: ___________________________________ DATE: _________________

(Ver. May 2018)