QALI_F-15CRC_DUAL_AND_SINGLE.pdf
PDF 909 KB Posted
- Attached to
- Canopy Remover Cartridges Federal contract opportunity
- Solicitation number
- FA821321R3017
About this file
This document outlines requirements for canopy remover cartridges and related data under two line items of a Department of the Air Force Materiel Command solicitation. Line Item 0001 covers canopy remover cartridges for the F-15 aircraft under National Stock Numbers 1377012029195ES and 1377016488443ES, with quantities ranging from 1 to 50 each across five subline items, for a total of 97 cartridges. Line Item 0002 requires data delivery in accordance with DD Form 1423-1. Delivery is to foreign military customers. The planning sheet specifies quality assurance inspection points for the canopy remover cartridge part numbers 2297800-1 and 2404800-1, including explosive weight verification, leak testing, x-ray or n-ray film evaluation, lot acceptance testing witnessing, and paperwork reviews.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0004 Amended Solicitation_FA821321R3017.pdf | ||
| 01 Amended Solicitation 0003_FA821321R3017.pdf | ||
| FA821321R3017_______0002.pdf | ||
| FA821321R3017_______0001.pdf | ||
| JQR_202-9195_F-15_Canopy_remover_cart.pdf | ||
| AIRSPEC_DOC_FD2020-21-50122_50123.pdf | ||
| REPSHIP11Mar14.pdf | ||
| IHC_LogNo19-281.pdf | ||
| CADPADItemMarkingInstruction.pdf | ||
| FA821321R3017.pdf | ||
| ADCSOWJan2018.pdf | ||
| ID_016488443.pdf | ||
| ID_012029195.pdf | ||
| EDL_8443.pdf | ||
| JQR01-648-8443_F-15_Canopy_rem_cart.pdf | ||
| 21-50122_50123_CDRLS.pdf | ||
| SOWSPI.pdf | ||
| EDL_012029195.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor, at a minimum, shall allow DCMA to inspect the following points:
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend per comment section.
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.
Notify - N: By phone or email prior to action.
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer Signature
Rev Date: 5 May 2019
Sheet1
| Text46: 17 JUN 2020 | |
| 2020-06-17T11:49:16-0600 | |
| TIDWELL.QUINN.RAY.1241451913 |
| undefined_9: N |
| Text32: 9. Additional Requirements |
| undefined_8: M |
| Text31: 8. Shippers (DD250, Reports) |
| undefined_7: M |
| Text30: 7. AMMO Data Card Review |
| undefined_6: V |
| Text29: 6. Preparation for Shipment |
| undefined_5: W |
| Text28: 5. LAT |
| undefined_4: V |
| Text27: 4. LAT Sample Selection |
| undefined_3: V |
| Text26: 3. X-Ray/N-Ray |
| undefined_2: V |
| Text25: 2. Leak Test |
| undefined: V |
| Text36: 1. Explosive Weight |
2. Verify gross leak and fine leak check are performed.
3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer
| Text24: 1.Inspection |
| Part Number: 2297800-1, 2404800-1 |
| DODIC: MT86, MJ19 |
| Text20: |
| Text19: |
| Part Number Line 2: |
| Contract No: 21-50122, 21-50123 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: F-15 |
File details come from the government source that posted it. Updated .