QALI.pdf

PDF 854 KB Posted

Attached to
Inert Firing Assemblies Federal contract opportunity
Solicitation number
FA8213
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This quality assurance letter of instruction outlines inspection requirements for inert firing assemblies procured through a sole source contract with Martin-Baker Aircraft Co. Ltd. The Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base will procure critical safety items including an interseat sequencing valve and firing assembly from Martin-Baker for the T-38 weapon system. The quality assurance letter specifies mandatory stamping and signature requirements on manufacturing documentation, witnessing of inspection and testing, and verification of preparation for shipment. Inspection points include radiographic examination and calibration verification of test equipment used prior to testing firing assemblies in accordance with approved procedures.

View the file

Other files for this federal contract opportunity

Other files attached to Inert Firing Assemblies, newest first.
File Type Posted
Packaging SOW MILB.pdf PDF
AFMC FORM 158 MIPR.pdf PDF
Item Des (9367).pdf PDF
REWORK.pdf PDF
REPSHIP.pdf PDF
SOW.pdf PDF
QAIR (9367) 807.pdf PDF
Item Des (0709).pdf PDF
AFMC FORM 158 2OF2.pdf PDF
CADPAD_Marking Instructions.pdf PDF
DD 1653.pdf PDF
Packaging SOW SPI.pdf PDF
TransInstruction.pdf PDF
Special Packing Instructions.pdf PDF
QAIR (0709) 807.pdf PDF
AIR SPEC.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA Signature

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Date

Rev Date: 30 Sept 2019

Sheet1

Text49:
Text46: 4/30/2019
2019-04-30T10:55:34-0600
KRAMER.LAWRENCE.C.1141472808
undefined_9:
Text32:
undefined_8:
Text31:
undefined_7:
Text30:
undefined_6:
Text29:
undefined_5:
Text28: 5. Additional Requirements
undefined_4: M
Text27: 4. Shippers (DD250, DD1149, Reports)
undefined_3: V
Text26: 3. Preparation for Shipment
undefined_2: W
Text25: 2. Inspection/Testing
undefined: V
Text36: QALI to be completed randomly twice a year for

duration of the contract to spot check Martin Baker processes. Inspect a different part each time.

1. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.

2. Prior to Inspection/Testing ensure proper calibration and validation of all test equipment.

Testing should occur in accordance with latest government approved ATP or Martin Baker test procedures (MBA-DS-T-122 Initial Issue).

3. Ensure Paperwork is correct.

4. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

5. Any additional requirements imposed by DCMA shall be approved by Project Engineer

Text24: 1. X-Ray/N-Ray
Part Number: MBEU200429, MBEU200389, MBEU200371, MBEU185720, MBEU200370, MBEU105980, MBEU201075
Text23:
DODIC:
Text22:
Text21:
Text20: U1604
Text19: Martin Baker
Part Number Line 2:
Contract No: 20-50064
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: T-38

File details come from the government source that posted it. Updated .