PWS-JEOL VP Scanning Electron Microscope 3-13-23.docx
DOCX document 91 KB Posted
- Attached to
- JEOL VPSEM MAINTENANCE AND REPAIR Federal contract opportunity
- Solicitation number
- FA822723QJEOL
About this file
This combined synopsis/solicitation requests quotations for preventative maintenance, repair, and data services for two JEOL variable pressure scanning electron microscopes located at Hill Air Force Base in Utah. The requirement is a sole source acquisition from JEOL USA, Inc. for a one-year base period and four one-year options. Offerors must submit their quote by May 1, 2023 and the contract will be awarded based on lowest price technically acceptable to the government. The services include on-site preventative maintenance visits twice in the first year and data deliverables. Spare and replacement parts, technical support, and urgent on-site repairs as needed are also required. The period of performance is estimated from July 2023 to July 2028 at the place of performance of Hill Air Force Base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CDRL A004 QAPP-JEOL_signed.pdf | ||
| Combined Synopsis Solicitation - JEOL.docx | DOCX document | |
| CDRL A002-JEOL_signed.pdf | ||
| CDRL A003 Safety Plan JEOL_Signed.pdf | ||
| CDRL A001-JEOL_signed.pdf | ||
| SSJ-JEOL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance-Based Work Statement (PWS)
JEOL VARIABLE PRESSURE SCANNING ELECTRON MICROSCOPES (VPSEM) MAINTENANCE AND REPAIR
U.S AIR FORCE
309TH MAINTENANCE SUPPORT GROUP (MXSG) 809TH MAINTENANCE SUPPORT SQUADRON
Cody Hone
Version 1
3/13/2023 JEOL VARIABLE PRESSURE SCANNING ELECTRON MICROSCOPES (VPSEM) MAINTENANCE AND REPAIR i
TABLE OF CONTENTS
| 309TH MAINTENANCE SUPPORT GROUP (MXSG) 809TH MAINTENANCE SUPPORT SQUADRON | i | |
| 1 | DESCRIPTION OF SERVICES | 1 |
| 2 | BASIC SERVICES | 1 |
| 3 | SERVICE SUMMARY | 3 |
| 4 | CDRL SUMMARY | 4 |
| 5 | ADDITIONAL REQUIREMENTS | 5 |
| 6 | SECURITY | 6 |
| 7 | GENERAL INFORMATION | 11 |
| 8 | ENVIRONMENTAL CONTROLS | 12 |
| 9 | GOVERNMENT OBSERVATIONS | 13 |
| 10 | FOREIGN OBJECT DAMAGE (FOD) AND TOOL CONTROL | 13 |
| 11 | ENVIRONMENTAL: | 13 |
| Appendix A – ACRONYMS AND ABBREVIATIONS | 14 | |
| appendix B – EQUIPMENT LISTING | 15 | |
| Appendix C – SAFETY | 16 |
DESCRIPTION OF SERVICES
The Contractor shall provide on-site maintenance services of two (2) JEOL variable pressure scanning electron microscopes (VPSEM) and all accessories, located in building 100 bay D, at Hill Air Force Base (AFB), Utah. The Contract shall include the hardware and software which make up the existing VPSEM systems to include items specified in Appendix B.
BASIC SERVICES
PREVENTATIVE MAINTENANCE (PM)
The Contractor’s personnel shall perform maintenance service (IAW OEM manuals) on-site at Hill AFB at least twice during the Period of Performance (POP). The first service shall occur within 90 days of contract award and the other approximately six months later. The Contractor shall schedule the first visit within sixty (60) calendar days after contract award and coordinate on-site visits with 809 MXSS/MXDTAC Engineer.
The equipment and accessories specified in Appendix B shall be serviced and repaired on-site by a JEOL certified engineer. The following actions shall be completed:
· The Contractor shall perform PM, troubleshooting, repair and software updates/upgrades to bring systems to current OEM specification and function.
· Consumable parts requiring replacement during routine PM visits shall be provided by contractor, as detailed in sect. 2.3.1.
Any discrepancies identified shall be communicated with the 809 MXSS/MXDTAC Engineer at time of discovery and noted on field service report, then repairs shall be completed as detailed in sect. 2.2.1.
After every PM/repair/service call, the instrument shall be operated by 809 MXSS/MXDTAC Engineer to ensure that it is functioning properly and accurately. The Contractor shall provide a service report to 809 MXSS/MXDTAC Engineer within six (6) business days of work completion. (Contract Data Requirements List) (CDRL A001).
GENERAL REPAIRS
Repair in conjunction with PM. The Contractor shall make all necessary repairs during PM visit, including troubleshooting, aligning, and replacement of parts (see section 2.3.2). The Contractor shall bring instrument back to full functionality. Any repair actions shall be noted on field service report (CDRL A001).
Technical Support for troubleshooting/repair via telephone/e-mail. The Contractor shall provide access to a customer support hotline, 7 a.m. to 4:30 p.m. Mountain Time, Monday-Friday (a recording device is acceptable) at designated customer service offices for the duration of the period of performance. The Contractor shall provide telephone/e-mail response within one (1) business day. Telephone/email assistance may include a parts exchange effort (defined as: contractor will ship user replaceable parts FOB Destination within six (6) business days of declaring part defective with a prepaid return shipping label for defective part return, if applicable). If telephone/email assistance does not resolve the problem, Contractor personnel shall arrive on site to resolve the problem as detailed under urgent repair section 2.2.3.
Urgent Repair. Should a system malfunction occur during the POP and outside of the two PM service visits, which cannot be resolved via Technical Support, the contactor shall provide on-site urgent repair visits. The Contractor shall arrive on-site within eight (8) business days of initial request for service. The Contractor shall complete repairs within ten (10) business days from arrival on-site. Parts shall be provided as detailed in section 2.3.2.
The Contractor shall repair all malfunctions which may consist of troubleshooting, aligning, repair/parts replacement, and if affected, PM and calibration. The Contractor shall bring instrument back to full functionality. Any repair actions shall be noted on field service report and provided to 809 MXSS/MXDTAC Engineer within six (6) business days of work completion.
REPLACEMENT PARTS
2.3.1. Consumable parts. The Contractor shall provide the following consumable parts, at no additional cost, prior to first visit: 4 moveable strip apertures (20, 30,100), 4 disk apertures (2mm/0.2mm) and 4 CL apertures (6x60/6x80), matched to instruments listed in Appendix B.
| 2.3.2. | Repair parts. The Contractor shall provide replacement parts, at no additional cost, and replace all instrument components/parts determined to be defective. However, filaments, Wehnelt assemblies, specimen exchange tools, and specimen holders are excluded from this task. The Contractor shall use only OEM approved parts in making sure that the equipment is fully functional. Off-brand parts not approved by OEM shall not be used as replacements on any of 809 MXSS equipment. The Contractor may use reconditioned parts if the OEM deems them fully functional replacements and they meet the OEM’s specifications. All parts needing replacement shall be replaced within ten (10) business days after the contractor has determined the part(s) responsible for the equipment’s malfunction. |
| SOFTWARE UPDATES/INSTALLATION |
Software updates/installation must be approved by the to 809 MXSS/MXDTAC Engineer or designated alternate. Any relevant software updates, bug fixes and/or safety related improvements, available from the OEM shall be installed during scheduled maintenance visits.
All software updates shall be on Compact Disk/Digital Video Disc’s (CD/DVD) or portable hard drives. Absolutely no flash memory devices are permitted on Government computers. If updated, professional copies of the instrument’s current software versions on CD/DVD with keys shall be provided to the Government at the time of update. (CDRL A002).
SERVICE SUMMARY
| PWS Paragraph |
| Performance Objective |
Performance Threshold
| 2.1.1 |
| The Contractor shall be on-site at Hill AFB within 90 days of award and again approximately 6 months later. |
| (Satisfactory) When the Contractor has met the objective 90% of the time by being on-site when requested twice, annually. |
| 2.1.1 |
| The Contractor shall schedule a service visit with the 809 MXSS Engineer. |
| (Satisfactory) When the Contractor has met the objective 90% of the time by scheduling visit within 60 days of contract award. |
| 2.1.2 |
| 809 MXSS/MXDTAC will test system functionality and accuracy before contractor departs worksite. |
| (Satisfactory) When the Contractor has met the objective 90% of the time when 809 MXSS/MXDTAC Engineer has tested and accepted systems functionality and accuracy. |
| 2.1.2 |
| The Contractor shall provide a report listing services performed: PMs, troubleshooting, repair, and software updates of each system. |
| (Satisfactory) When the Contractor has met the objective 90% of the time by providing the report within 6 days of maintenance completion. |
| 2.2.2 |
| The contactor shall provide technical support via telephone and e-mail, 7 a.m. to 4:30 p.m. MST Monday – Friday, responding within one (1) business day of request. |
| (Satisfactory) When the Contractor has met the objective by responding within one business day 90% of the time. |
Definitions:
** Validated customer complaint – A customer complaint that is reviewed, documented, and confirmed via a Corrective Action Report (CAR).
CDRL SUMMARY
Contract information data shall be delivered electronically in accordance to the corresponding requirement for each Data Item listed in Table 4-1 (below). The contractor shall have no more than one error per quarter for all CDRL submittals. The contractor shall submit CDRLs according to the due date indicated and have no more than one CDRL per quarter submitted after the identified due date. Grammatical errors do not count as an error. Substantive mistakes shall be corrected within two working days and corrective action taken to prevent recurrence of inaccurate late CDRLs.
Table 4-1
| Exhibit |
| Title |
| PWS Paragraph |
Delivery
| A001 |
| Service Report |
| 2.1.2/2.2.1 |
| Within six (6) business days of completion of maintenance |
| A002 |
| Disc (CD/DVD) |
| 2.4.2 |
| CD/DVD is required when software is updated; provided at time of service |
| A003 |
| Safety Plan |
Appendix C NLT fifteen (15) calendar days after contract award
| A004 |
| Quality Assurance Plan |
5.2
NLT thirty (30) Calendar days after contract award
ADDITIONAL REQUIREMENTS
Government Provided Support The Government will provide necessary working space, including heat, light, ventilation, and electrical powered outlets for the use of contractors’ maintenance personnel. The Government shall provide access to the necessary facilities where the equipment resides. The place of performance shall be Hill Air Force Base (AFB), UT.
Government telephones shall be used for official business only.
The contractor shall be responsible for safeguarding all Government property provided for contractor use.
Quality Control Plan The contractor shall establish a complete Quality Control Plan (QCP) to ensure the requirements of this contract are provided as specified. The contractor's quality management program shall comply with the minimum quality management systems elements specified in the American National Standards Institute (ANSI), American Standards Organization (ASO), and International Standard Organization (ISO) family of standards. The report shall be submitted to the 309 MXSG/MASO QAPC, NLT 30 days post contract award. (CDRL A004).
Quality Assurance The 309 MXSG/MASO QAPC will perform assessments of the contractor’s performance. Subsequent to contract award, specific name and contact information of the 309 MXSG/MASO QAPC with a letter defining duties and authority will be furnished to the contractor.
The 309 MXSG/MASO QAPC will inform the task manager in person when discrepancies occur and will request corrective action. The 309 MXSG/MASO QAPC will make a notation of the discrepancy on the assessment checklist with the date and time the discrepancy was noted and will request the task manager (or authorized representative) to initial the entry on the checklist.
The government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints.
Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO.
SECURITY
Security Review Date:
13 Mar 2023 Reviewed By:
Samuel Samuelson 309 MSXG Security Manager Security Review Control Number:
20230313SS
Conflicts of Interest The contractor shall not assign to contract or task order performance any person, including any employee of the U.S. Government, if employing that person would create a conflict of interest under any law, regulation or policy of the United States Government. Additionally, the contractor shall not assign to contract or task order performance, any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DoD Directive 5500.7-R, Standards of Conduct, and any other applicable regulation or policy of the Department of the Air Force or its subordinate commands, as applicable, including but not limited to Air Force Materiel Command.
Contractors will not use any other form of identification to access any government installation or facility while working on a government contract except the issued credentials associated with the awarded contract or task order. Example: using a military retiree card to access an installation to work on a contract.
Contractor will schedule all visits and coordinate Base entry by contacting 809 MXSS/MXDTAC Engineer. The contractor shall be escorted at all times.
Security Requirements Foreign nationals (FN) will not be escorted, or sponsored, onto the installation without being properly vetted. Any request must follow 309 MXSG OI 16-102, Security Requirements section 7. FNs must be approved for access via the Foreign Disclosure Office and Air Force Office of Special Investigations (AFOSI).
The contractor shall comply with all security, force protection, operation security and antiterrorism requirements at each installation.
The contractor shall comply with 309 MXSG in and out-processing procedures for all contractor personnel to ensure required security-related briefings and debriefings are accomplished. Specific in and out-processing checklists may be included at the task order level.
The contractor will use the 809 MXSS/MXDTAC Engineer. as the primary means of reviewing and approving forms and for communicating with necessary government representatives.
Communications Security All communications with DoD organizations are subject to Communications Security (COMSEC) review.
The DoD authorizes the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
The Government advises the contractor that at any time they place a call to, or receive a call from, a DoD organization, they are subject to COMSEC procedures.
The contractor assumes the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DoD information.
Operations Security (OPSEC) Requirements During the course of this contract, in addition to those restrictions, instructions and guidelines delineated in the PWS and/or other references provided, the contractor will adhere to the following minimum requirements.
Introduction of personnel electronic devices into government spaces, laptops, tablet Personal Computers (PC)s, cellular phones, cameras, recording devices, and data recording/storage devices is strictly controlled and forbidden in most cases. Company issued equipment required for the performance of work must be approved by the government 309th MXSG security office. Photography and recording is not allowed in restricted areas and controlled areas except for official use and by approved photography letter only. NOTE: Unless otherwise stipulated in the contract, contact the Installation Public Affairs or SM for approval.
Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Official Business controlled unclassified information (CUI) may only be transmitted as directed in the PWS as it adheres to CUI Guidelines.
The Contractor shall not post to company websites, publications, newsletters, or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or CUI. When in doubt, company press releases, related to this contract, will be coordinated through the Public Affairs Office prior to release.
Contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including all Social Networking sites) any images, data or information that reveals sensitive government operations, personnel, equipment, including, but not limited to: Tactics, techniques and procedures, production or work schedules, any visible or concealed modifications, upgrades, additions to Air Force installations, property or weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, project schedules, logistics or material delivery schedules; specialized equipment orders, deliveries, shipments, etc. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.); Unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the SM and/or installation SFS, COR, and, if applicable, the company FSO and/or the Defense Security Service.
Practice OPSEC and implement countermeasures to protect Critical Information (CI) and other sensitive unclassified information and activities vigilance or degrade the planning and execution of military operations performed or supported by the contractor in support of the mission. Protection of CI will include the adherence to and execution of countermeasures which the contractor initiates or as provided by OPSEC manager or installation OPSEC Program Manager, for CI on or related to the PWS.
The contractor must mark and protect any information IAW CUI, to include E-mail, and adhere to all CUI standards and policies.
Contractors who have access to the Ogden Air Logistics Complex (OO-ALC) and Government Servicing Units (GSU)s facilities or critical information shall have OPSEC training IAW AFI 10-701, Operations Security (OPSEC). Initial training will be approximately one (1) hour and follow-on recurring annual training will be approximately 1/2 (0.5) hour. OPSEC training will be conducted within 30 days of assignment.
Contractor Identification & Badges All contractor management, staff and contractor personnel shall be clearly identified as such at ALL times. Contractor identification shall include visible badges, conversations, mail, email, teleconferences, video teleconferences, faxes, and/or other electronic communication whether with government personnel, other contractor personnel, or with the public when supporting this contract where their status as contractor employees might not otherwise be apparent or where they might be mistaken for civil service employees. At a minimum, contractor management staff or contractor personnel shall clearly identify themselves using the label “contractor” in email addresses in accordance with Federal Acquisition Regulation (FAR) 37.114(c), Special Acquisition Requirements; opening ALL phone conversations with a statement materially the same as, “[office name], I am [employee name], a [prime contractor’s company name] employee,” including the employing contractor’s name in the letterhead and/or signature block of any written correspondence; and any other means necessary.
In/Out-Processing All contractors are required to in/out-process from each respective organization regardless of if they are issued a DBIDS or CAC.
Contractor employees will complete the same in/out processing checklist from the assigned organization. Employees removed from the contract will be required to return all government issued credentials and vindicator key to the issuing office within the same day of separation. If employee is unable to return the credentials and vindicator key, then 809 MXSS/MXDTAC Engineer Supervisor will ensure that all credentials are returned to the issuing SM the same day.
Security Incident Should a security incident occur, the contractor shall: immediately report to the site location 309 MXSG Security Manager all available facts related to each instance, take such precautions as the 309 MXSG Security Manager may reasonably require for security purposes, take reasonable and prudent action to establish control of the scene; prevent further violation, to preserve evidence until released by proper authority; and cooperate fully and assist Government personnel as the Government conducts an investigation of the violation. NOTE: Participation shall last until the investigation is complete.
Training Requirements 309 MXSG Security Manager (SM), contractor and/or 309 MXSG MASO will administer and maintain all individual training and records, for compliance purposes, associated with this PWS. Training records must be made available during self-inspections and other oversight activities.
Contractors may be required to complete the following trainings as applicable and administered electronically, whenever possible, or in-person:
Training required for all personnel Operations Security (OPSEC) Awareness – Frequency: Initially upon assignment (within 30-days) and annually thereafter IAW AFI 10-701, Operations Security (OPSEC). Presentation/Means: Unit Security Manager or TSS Course #MHPSEC9800301BR.
Controlled Unclassified Information (CUI) Frequency: Initially upon assignment (within 30-days) and annually thereafter. Presentation/Means: Unit Security Manager IAW DoDI 5200.48_AFI 16-1403, Controlled Unclassified Information (CUI).
Unit Indoctrination and Orientation Training – Frequency: within 30 calendar days of assignment. Presentation/Means: Unit Security Manager or CDSE Course at https://securityawareness.usalearning.gov/initialorientation/index.htm. 309 MXSG initial security orientation TSS course #MHPSEC9803600BR (NOTE: for cleared personnel, initial security briefing TSS Course #MHPSEC9803601BR is required before access to classified information is granted).
Counter-Insider Threat (C-InT) Training - This training covers procedures for C-InT awareness and reporting IAW AFI 16-1402, Counter-Insider Threat Program Management. Frequency: Initially upon assignment (within first 30-days) and annually thereafter. Presentation/Means: Unit Security Manager or CDSE Course at https://securityawareness.usalearning.gov/itawareness/index.htm.
GENERAL INFORMATION
Hours of Operation Normal Hours of Operation: The contractor shall perform the services required under this contract during the following hours: Monday through Friday 0600-1600 – EXCEPT FEDERAL HOLIDAYS and other base closures.
Federal Holidays: Unless otherwise required by the Government, the contractor shall not have access to the Government facilities on the following federal holidays: New Year’s Day, Martin Luther King’s Birthday, Washington’s Birthday, Memorial Day, Independence Day, Juneteenth, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. If a holiday falls on Saturday, it is observed on Friday and working hours are Monday through Wednesday for that week. If the holiday falls on a Sunday, it is observed on Monday. Any other circumstances that may prompt base closure, such as Days of National Mourning, may also restrict opportunity to perform the exchanges. In the event of a base closure, exchanges shall be performed on the next business day. There may also be up to six AFMC Goal Days and four Wingman Days per year awarded to Government civilian employees, as well as possible weather related days and Government directed holidays. On these days, the contractor shall not generally be required to work and the Government shall not be billed for work not performed.
NOTE: Good Friday is regarded as a holiday by the Utah Wage Determination; however, Good Friday is not a Federal Holiday so the Government facilities will be open for work that day. The contractor shall plan on employees working business as usual on that day, unless the Government supervisor or section chief determines that such services are either unnecessary or will be less than a full normal workday.
Down Days/Weather Days: The Government will notify the contractor when official notice has been given for Energy/Weather Down days. The contractor is not expected to work on any Energy/Weather Down days.
Rescheduling: Down Days/Weather days may be rescheduled if conditions/emergency operations require.
Conservation of Utilities The contractor shall instruct their employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities.
ENVIRONMENTAL CONTROLS
Hazardous Work Environment The Contractor shall ensure their employees are made aware that the performance of these services will occur in industrial areas. The industrial complex at Hill AFB has the potential to expose workers to hazardous materials which may include, but is not limited to: hexavalent, chrome, cadmium, beryllium, lead, and others. While the Contractor shall not perform duties in a regulated area (where exposure are expected to exceed the permissible exposure limits set by 29 CFR1910.10xx), there may be contact hazards with these materials. The contractor shall ensure proper protective measures and training is taken to ensure contracted employees are protected from hazards. The 75th Air Base Wing (ABW) Bio-Environmental Engineering Flight produces BIO Survey of these areas which will be made available upon award.
Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.
Notification of Environmental Spills If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to the 809 MXSS/MXDTAC Engineer or Shop Supervisor. The liability for the spill or release of such substances rests solely with the contractor and its agent.
Safety Program The contractor shall implement a safety program that ensures protection of Government personnel and property. (See Appendix C) In the event of an accident/mishap, the contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence. An email copy of the mishap / incident notification shall be sent within three calendar days to the 809 MXSS/MSDTAC Engineer Shop Supervisor, who will forward it to OO-ALC safety.
GOVERNMENT OBSERVATIONS
During the period that the contractor is working on equipment, government personnel, other than CO, may, from time-to-time, observe contractor operations. However, these personnel may not interfere with contractor performance.
FOREIGN OBJECT DAMAGE (FOD) AND TOOL CONTROL
The contractor shall follow the applicable guidance in chapters/paragraphs/sections of AFI 21-101 and HQ AFMC, Hill AFB, and 309 MXW supplements to the AFI 21-101 concerning base tool (chapter 10 section B), and FOD control policies (chapter 14, and sub paragraphs designated as 41), daily. Cloth rags are considered tools and will follow the same regulations and procedures as tools.
If tools, and/or equipment are lost, the contractor will report the loss to the GM/COR no later than two hours after discovery. If tools are lost or not accounted for, then the contractor shall implement the lost tool procedures of AFMC supplement to AFI 21-101, chapter 10, section B.
Contractors performing functions in industrial areas on the center shall have a method for controlling and accounting for all tools used. All contractors working on the center shall inventory their tools at the beginning and end of each shift and at the end of each task to check for any lost or missing tools.
ENVIRONMENTAL:
Weather Hazards. Workers may encounter hazardous weather conditions including snow, heavy rain, lightning, extreme dust, and other conditions that warrant appropriate precautions.
Appendix A – ACRONYMS AND ABBREVIATIONS
| Acronym/Abbreviations | Definition | ||
| AF | Air Force | ||
| AFB | Air Force Base | ||
| AFI | Air Force Instruction | ||
| AFMC | Air Force Material Command | ||
| ANSI | American National Standards Institute | ||
| ASO | American Standards Organization | ||
| CAC | Common Access Card | ||
| CAR | Corrective Action Report | ||
| CDRL | Contractor Data Requirements Listing | ||
| CFR | Code of Federal Regulation | ||
| CMRA | Contractor Manpower Reporting Application | ||
| CO | Contract Officer | ||
| COR | Contracting Officer Representative | ||
| DoD | Department of Defense | ||
| EPA | Environmental Protection Act | ||
| FAR | Federal Acquisition Regulation | ||
| FE | Facility Engineer | ||
| FOD | Foreign Object Damage | ||
| HAFB | Hill Air Force Base | ||
| IAW | In Accordance With | ||
| IC | Ion Chromatography | ||
| IEC | International Electrotechnical Commission | ||
| ISO | International Organization for Standardization | ||
| NELAP | National Environmental Laboratory Accreditation Program | ||
| OEM | Original Equipment Manufacturer | ||
| OSHA | Occupational Safety and Health Act | ||
| PE | Performance Evaluation | ||
| POP | Period of Performance | ||
| PWS | Performance-Based Work Statement | ||
| QCP | Quality Control Plan | ||
| SS | Service Summary | ||
| TO | Technical Order | ||
| TCIR/DART | Total Case Incident Rate/Days Away Restricted or Transferred | ||
| VPP | Voluntary Protection Program |
appendix B – EQUIPMENT LISTING
A. JSM-6490LV VPSEM (Serial #147000-84)
| 1. ULVAC | Dual Vacuum Pumps | G-100DB | |
| 2. BEI | Backscattered Electron Unit | ||
| 3. GW-IRCS | GW Infrared Chamberview System | ||
| 4. LV-SEI | LV Secondary Electron Unit | ||
| 5. R050 | Water Chiller | ||
| 6. Computer | Dell Precision 390 | DKPP4C1 | |
| 7. Monitor | LCD2090UXi | 69001295YA | |
| 8. SurgeProt | Tripp Lite IB4060 | 9531CS1 |
B. JSM-6460LV VPSEM (Serial #181100-40)
| 1. ULVAC | Dual Vacuum Pumps | G-100DB | |
| 2. BEI | Backscattered Electron Unit | ||
| 3. ETP SEMRA | Infrared Chamberview System | ||
| 4. LV-SEI | LV Secondary Electron Unit | ||
| 5. PCD | Probe Current Unit | ||
| 6. R025 | Water Chiller | ||
| 7. Computer | Dell Precision 360 | 489RJ41 | |
| 8. Monitor | LCD2080UXi | 42001869YA |
Appendix C – SAFETY
SAFETY, FIRE PROTECTION AND HEALTH
SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
OGDEN AIR LOGISTICS COMPLEX
UNITED STATES AIR FORCE
HILL AIR FORCE BASE, UTAH 84056
JEOL VARIABLE PRESSURE SCANNING ELECTRON MICROSCOPES (VPSEM) MAINTENANCE AND REPAIR 13 Mar 2023 Reviewed by:
Robert Pickett
OO-ALC/SE
801-586-4461
Control Number: RP230302
A. Safety Program Requirements The contractor shall implement a safety program plan that ensures protection of Government personnel and property. (CDRL A003) (DI-SAFT-82313) The program shall consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B1 below.
2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific Requirements, and shall be used during the performance of the work described in the contract. The Safety Plan shall be approved by OO-ALC/SE (Safety Office) prior to commencement of any work described in this contract.
3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.
4. Competent personnel to provide surveillance of the Safety Plan.
5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.
6. All contractor personnel shall be trained and qualified to perform their duties safely.
7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify OO-ALC/SE Workflow (OO-ALC.SE.Workflow@us.af.mil) or the Hill AFB Command Post (801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of ALL the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.
Mishap notifications shall contain, as a minimum, the following information:
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (Events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. The contractor shall cooperate with any and all government mishap investigations. Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
4. The contractor shall support and comply with the safety investigation and reporting requirements of DAFI 91-204, Chapters 1 – 5.
C. General Safety Requirements:
| If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative. |
| The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force Occupational Safety and Health Standards (AFOSH STD), to include DAFMAN 91-203, Air Force Occupational Safety, Fire, and Health Standards, DAFI 91-204, Safety Investigations and Reports, Contract Safety, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. |
| The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels. |
| Compliance with OSHA |
and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
SECTION II – SPECIFIC REQUIREMENTS
The contractor’s prepared Safety Plan shall:
· Provide contact information for on-site personnel
· Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures
· Identify employee safety and health training requirements and the documentation process
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:
PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4; DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07; Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition: AFI 13-213, Airfield Management, 29 Jan 08, Paragraphs 1.3.6 and 4.4.2.1 applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.
HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.
image1.jpg
File details come from the government source that posted it. Updated .