PWS - Emergency Generators.docx
DOCX document 54 KB Posted
- Attached to
- Emergency Generators for USACE SPK Federal contract opportunity
- Solicitation number
- W91238-21-SS-0974
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sources Sought - Emergency Generators.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Emergency Generators at Multiple SPK Projects
PANSPD-21-P-0000 000974
Performance Work Statement
Points of Contact
Contractor POC TBD
| Contract Officer’s | TBD | ||
| Representative (COR) | U.S. Army Corps of Engineers | ||
| CESPK-ODS-K | |||
| PO Box 44270 | |||
| 34443 Sierra Dr. | |||
| Lemon Cove, CA 93244 | |||
| Ph: (559) 597-2301 |
| Contracting POC | TBD | |
| U.S. Army Corps of Engineers | ||
| 1325 J Street | ||
| Sacramento CA 95814 | ||
| Ph: (916) 557-7229 |
Payment Questions: Direct payment questions to shall be directed to the Contracting Officer’s Representative (COR).
For prompt payment, submit invoices to all parties and follow the guidance provided in the Payment and Invoices paragraph. Payment is NET 30 unless the Contractor specifies prompt payment discount terms in the quote/proposal.
Incomplete or inaccurate invoices shall be returned to the Contractor for revision.
1. GENERAL:
1.1. Project Description: Provide and install nine (9) liquid propane (LP) fueled emergency generators at the seven (7) project locations specified below. Generators will be installed on concrete slabs, which will be provided by the government. At each location, the contractor shall provide and install required automatic transfer switches, sub-panels, breakers, wiring, conduit, fuel line, propane tanks, etc. as specified in section 2 for each project location. Contract shall include start-up and testing of each new generator and transfer switch as well as training for maintenance personnel.
1.2. Locations: Each of the following locations require generator installation. The number of generators required at each location is indicated in parentheses. Maps and photos of these locations are provided in Attachment 1.
1.2.1. Buchanan Dam, Eastman Lake (1)
32175 Road 29 P.O. Box 67 Raymond, CA 93653
1.2.2. New Hogan Dam and Lake (2)
2713 Hogan Dam Rd Valley Springs, CA 95252
1.2.3. Englebright Dam and Lake (2)
12896 Englebright Dam Rd P.O. Box 6 Smartsville, CA 95977
1.2.4. Stanislaus River Parks (1)
17968 Covered Bridge Road Oakdale, CA 95361
1.2.5. Hidden Dam, Hensley Lake (1)
| 25207 Road 407 |
| P.O. Box 85 |
| Raymond, CA 93653 |
1.2.6. R.L. Schafer Dam, Success Lake (1)
| 29330 Highway 190 |
| P.O. Box 1072 |
| Porterville, CA 93258 |
1.2.7. Terminus Dam, Lake Kaweah (1)
| 34443 Sierra Dr |
| P.O. Box 44270 |
| Lemon Cove, CA 93244 |
1.3. Period of Performance: This contract is a one-time contracting action for the installation of emergency generators with a period of performance that shall be completed within 365 days of contract award.
1.4. Schedule: All work is to be performed within normal work hours, which are 0700 to 1530, Monday thru Friday, unless coordinated with the Operations Project Manager for each project location.
1.5. Authorities/Technical Direction - The Contractor shall take no direction from any Government employee or any other person other than the Government Contracting Officer that changes the terms and conditions of this contract action, the scope or any change that impacts the cost, price or schedule. Changes authorized by the Contracting Officer will be in the form of a written, official, signed modification to the contract action received by the Contractor before the Contractor will act upon those changes. The Contractor will comply with the Changes clause of this contract when the Contractor believes direction has been given from persons other than the Government Contracting Officer. Contracting Officer Representatives (CORs) are limited to the authorities stated in the COR appointment letters. If a COR is appointed under this contract, they will be appointed by written letter from the Contracting Officer to the Contractor and COR specific to this contract only. COR appointment letters from pervious contracts at this installation are not valid for this contract.
1.6. Payment - Payment shall be made in arrears at the contract unit price for quantities delivered in accordance with the pricing schedule and as described herein. Invoices shall include all necessary information, including any necessary supporting documentation required as part of this Scope of Work. All invoices must reflect the contract number W91238-XX-X-XXXX. The final invoice must be marked “FINAL.” Copies of all invoices shall be provided to the following:
An original invoice WITHOUT additional information or supporting documentation shall be mailed to:
U.S. Army Corps of Engineers Finance Center
ATTN: CEFC-FP
5722 Integrity Drive Millington, TN 38054-5005
A copy of each invoice WITH all necessary supporting documentation as required by this Performance Work Statement shall be mailed to the following individuals:
Mail one invoice to the Operations Project Manager at each of the following depending on project site:
Buchanan Dam, Eastman Lake P.O. Box 67 Raymond, CA 93653
New Hogan Dam and Lake 2713 Hogan Dam Rd Valley Springs, CA 95252
Englebright Dam and Lake P.O. Box 6 Smartsville, CA 95977
Stanislaus River Parks 17968 Covered Bridge Road Oakdale, CA 95361
Hidden Dam, Hensley Lake P.O. Box 85 Raymond, CA 93653
R.L. Schafer Dam, Success Lake P.O. Box 1072 Porterville, CA 93258
Terminus Dam, Lake Kaweah P.O. Box 44270 Lemon Cove, CA 93244
U.S. Army Corps of Engineers, Sacramento District Attn: CESPK-CT 1325 J Street Sacramento, CA 95814-2922
1.
1.1.
1.2.
1.3.
1.4.
1.5.
1.7. Site Inspection
1.7.1. Prior to submitting bids, bidders are urged to inspect the job sites to observe conditions that may affect contract cost.
1.7.2. In no event will failure to inspect the site constitute grounds for the withdrawal of a bid after opening or for a claim after the award of the contract. (FAR 52.237-1)
1.8. Technically Acceptable Requirements
1.8.1. The contractor must provide documentation they hold one of the following license(s):
A-General Engineering Contractor or B-General Building Contractor or C10 Electrical Contractor
1.8.2. The contractor must provide documentation showing proof they are certified by the manufacturer of the system to install its product.
1.9. Pre-Work Meeting
1.9.1. At least ten (10) days prior to commencement of work, the Contractor shall contact the COR to schedule a pre-work meeting.
1.9.2. During the pre-work meeting, the Contractor shall provide the COR with the following for approval:
1.9.3. Project Work Plan: The contractor shall prepare a Project Work Plan (PWP) that identifies in detail the work to be completed as indicated below. All work shall be completed in accordance with all applicable laws, regulations and Regulatory Agency guidance or instructions. As a minimum, the PWP shall include project description, project objectives, schedule, and detailed sketches and schematics.
1.9.4. The Contractor shall provide copies of Safety Data Sheets (SDS) for all chemical products to be used by the Contractor or their employees during the execution of this contract.
1.9.5. Uniform and Personal Protection Equipment (PPE).
1.9.6. Insurance: The Contractor shall procure and maintain insurance for any and all employees during the entire period of his/her performance under this contract and in accordance with the Contract Clause, “Insurance - Work on a “Government Installation”:
· Workmen’s Compensation and Employers’ Liability Insurance.
· Workmen’s Compensation and Occupational Disease Coverage in accordance with statutory limits.
· Employers’ Liability coverage with a minimum limit of $100,000.
· Comprehensive Automobile Liability Insurance: Bodily Injury coverage with minimum limits of $200,000 per person and $500,000 per occurrence.
· Property Damage Coverage with a minimum limit of $20,000 per occurrence.
1.9.7. Contractor Vehicle Identification: All Contractor vehicles shall be identified with the company name or logo conspicuously displayed on door panels. Professionally made magnetic signs or pressure sensitive decals may be used to comply with this specification.
1.9.8. The Contractor shall submit a copy of all federal and/or state applicable licenses and certifications prior to the commencement of work. The Contractor and all employees shall be licensed and permitted to operate all equipment necessary to complete work under this contract. All required licenses and permits to operate shall be the responsibility of the Contractor.
1.10. Accident Prevention Plan (APP)
1.10.1. The Contractor shall obtain the USACE Project Safety Officer’s approval of the Accident Prevention Plan BEFORE starting any on-site work.
1.10.2. The Contractor shall use a qualified Safety and Health Manager (SHM) to prepare the written site-specific Accident Prevention Plan (APP) in accordance with the format and requirements of USACE EM 385-1-1. Cover all paragraph and subparagraph elements in Appendix A of USACE EM 385-1-1 "Minimum Basic Outline for Preparation of Accident Prevention Plan.” Activity Hazard Analyses (AHAs) shall be appended to the APP.
1.10.3. The Contractor shall develop an Injury and Illness Prevention Program (IIPP) for projects within the State of California as an appendix to the APP. Where a paragraph or subparagraph element is not applicable to the work to be performed, indicate "Not Applicable" next to the heading. The APP shall be job specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program (SHP). Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the Subcontractors. The Contractor is responsible for informing their Subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting Subcontractor operations to ensure that accident prevention responsibilities are being carried out. The Contractor, COR, and Site Safety and Health Officer (SSHO) shall sign the APP.
1.10.4. The Contractor shall submit the APP to the USACE Project Safety Officer within 10 days of award. The Government will review the documents within 10 days. The Contractor shall resubmit the documents, with any requested changes, within 5 days of request.
1.10.5. The Contractor’s APP and subsequent activities shall comply with the following referenced documents (most current version, if different than the date referenced), at a minimum:
· EM 385-1-1, USACE Safety & Health Requirements Manual, EM 385-1-1, EM 385-1-1, 30 November 2014 Edition. http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf?ver=2015-04-09-142531-467
· Title 29 Code of Federal Regulations (CFR) 1910, Occupational Safety and Health Standards.
· 29 CFR 1926.65/29 CFR1910.120, Hazardous Waste Operations and Emergency Response.
· USACE, Safety and Occupational Health Document Requirements for Hazardous, Toxic and Radioactive Waste (HTRW) Activities, ER 385-1-92 (1 July 2003).
· NIOSH/OSHA/USCG/EPA, Occupational Safety and Health Guidance Manual for Hazardous Waste Activities (October 1985).
· 8 CCR Chapter 4 Subchapter 7, General Industry Safety Orders.
· 8 CCR Sections 3203 & 1509, Injury and Illness Prevention Program.
· OSHA ancillary safety and health regulations governing certain aspects for this contract include:
· Respiratory Protection (29 CFR 1910.134/8 CCR Section 5144)
· Occupational Noise Exposure (29 CFR 1910.95/8 CCR Sections 5095-5100)
· Hazard Communication (29 CFR 1910.1200/29 CFR 1926.59/8 CCR Section 5194)
· The Control of Hazardous Energy (Lockout/Tag-out) (29 CFR 1910.147)
· Proposition 65 (22 CCR Section 12000) Chemicals Know to the State to Cause Cancer or Reproductive Toxicity
1.11. Antiterrorism and Operational Security
1.11.1. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
1.11.2. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.11.3. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.11.4. The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.11.5. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
1.11.6. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
2. SCOPE OF WORK:
2.1. The Contractor shall furnish all labor, materials, equipment, transportation and supplies necessary to fulfill the terms and conditions stated in this contract. The Contractor shall be responsible for all costs related to performing construction, including any required permits. All work, materials and equipment shall be subject to the control and approval of the Contracting Officer’s Representative (COR).
2.2. Description of Services:
2.2.1. Buchanan Dam, Eastman Lake, Main Office (CLIN 0001 - Base)
2.2.1.1. Provide and install one (1) Generac Guardian model #RGO2515GNAX 25KW LP fueled standby generator or equivalent with weatherproof enclosure on existing concrete foundation provided by USACE. Placement of the generator must meet NFPA 37 standards.
2.2.1.2. Provide and install one (1) 200amp, 120/208-volt, three phase automatic transfer switch. Transfer switch to be mounted on the exterior wall of the building.
2.2.1.3. Provide and install a new 125-amp sub-panel near existing distribution panel. Panel to be mounted on the exterior wall of the building.
2.2.1.4. Relocate the following circuits from the existing distribution panel to the new subpanel:
A. Up to 40 amps at 208 volts three phase for Air Conditioners.
B. Up to 15 amps at 120 volts for lighting circuits.
C. Up to 15 amps at 120 volts for receptacle circuits.
2.2.1.5. Provide and install a new 125-amp, two pole breaker in the existing distribution panel to feed the new sub-panel. New feeder to be routed through the new automatic transfer switch then to the new sub-panel.
2.2.1.6. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.1.7. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.1.8. Provide and install fuel line sized per manufacturer specifications from existing propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.1.9. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.1.10. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.1.11. Include training for maintenance personnel.
2.2.1.12. Provide Owner’s Manuals for all equipment.
2.2.2. New Hogan Dam and Lake, Main Office (CLIN 1001 – Option Item 1)
2.2.2.1. Provide and install one (1) 150 KW 120/240 volt, 3-phase, 4-wire, LP fueled stand-by generator with weatherproof enclosure on existing concrete foundation provided by USACE.
2.2.2.2. Provide and install one (1) 400 amp Automatic Transfer Switch.
2.2.2.3. Schedule outage on power system and modify internal busbars in the existing 400 amp Main Service Switchboard and reconfigure for proper connection of the new Automatic Transfer Switch.
2.2.2.4. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.2.5. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.2.6. Provide and install one (1) 500-gallon propane tank to fuel the generator.
2.2.2.7. Provide and install fuel line sized per manufacturers specifications from the new propane tank to the new generator. Include all required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.2.8. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.2.9. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.2.10. Include training for maintenance personnel.
2.2.2.11. Provide Owner’s Manuals for all equipment.
2.2.3. New Hogan Dam and Lake, Northern Operations Branch Office (CLIN 1002 – Option Item 2)
2.2.3.1. Provide and install one (1) 50 KW 120/240 volt, 1-phase, 3-wire, LP fueled stand-by generator with weatherproof enclosure on existing concrete foundation provided by USACE.
2.2.3.2. Provide and install one (1) 200 amp Automatic Transfer Switch.
2.2.3.3. Modify existing 200 amp Main Service Switchboard and connect new Automatic Transfer Switch.
2.2.3.4. Provide and install new 200 amp, 120/240 volt weatherproof distribution panel.
2.2.3.5. Provide and install underground conduits and cabling to connect existing gate to the new distribution panel.
2.2.3.6. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.3.7. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.3.8. Provide and install fuel line sized per manufacturer specifications from existing propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.3.9. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.3.10. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.3.11. Include training for maintenance personnel.
2.2.3.12. Provide Owner’s Manuals for all equipment.
2.2.4. Englebright Dam and Lake, Main Office (CLIN 1003 – Option Item 3)
2.2.4.1. Provide and install one (1) Generac Guardian model #RGO2515GNAX 25KW LP fueled standby generator or equivalent with weatherproof enclosure on existing concrete foundation provided by USACE. Placement of the generator must meet NFPA 37 standards.
2.2.4.2. Provide and install one (1) 200amps, 120/240-volt, three phase automatic transfer switch. Transfer switch to be mounted on the exterior wall of the building.
2.2.4.3. Provide and install a new 125-amp sub-panel near existing distribution panel. Panel to be mounted on the exterior wall of the building.
2.2.4.4. Relocate the following circuits from the existing distribution panel to the new subpanel:
A. Up to 40 amps at 208 volts three phase for Air Conditioners.
B. Up to 15 amps at 120 volts for lighting circuits.
C. Up to 15 amps at 120 volts for receptacle circuits.
2.2.4.5. Provide and install a new 125-amp, two pole breaker in the existing distribution panel to feed the new sub-panel. New feeder to be routed through the new automatic transfer switch then to the new sub-panel.
2.2.4.6. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.4.7. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.4.8. Provide and install fuel line sized per manufacturer specifications from existing propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.4.9. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.4.10. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.4.11. Include training for maintenance personnel.
2.2.4.12. Provide Owner’s Manuals for all equipment.
2.2.5. Englebright Dam and Lake, Maintenance Shop (CLIN 1004 – Option Item 4)
2.2.5.1. Provide and install one (1) Generac Guardian model #RGO2515GNAX 25KW LP fueled standby generator or equivalent with weatherproof enclosure on existing concrete foundation provided by USACE. Placement of the generator must meet NFPA 37 standards.
2.2.5.2. Provide and install one (1) 200amps, 120/240-volt, three phase automatic transfer switch. Transfer switch to be mounted on the exterior wall of the building.
2.2.5.3. Provide and install a new 125-amp sub-panel near existing distribution panel. Panel to be mounted on the exterior wall of the building.
2.2.5.4. Relocate the following circuits from the existing distribution panel to the new subpanel:
A. Up to 40 amps at 208 volts three phase for Air Conditioners.
B. Up to 15 amps at 120 volts for lighting circuits.
C. Up to 15 amps at 120 volts for receptacle circuits.
2.2.5.5. Provide and install a new 125-amp, two pole breaker in the existing distribution panel to feed the new sub-panel. New feeder to be routed through the new automatic transfer switch then to the new sub-panel.
2.2.5.6. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.5.7. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.5.8. Install one (1) 250-gal propane tank to fuel the generator.
2.2.5.9. Provide and install fuel line sized per manufacturer specifications from the new propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.5.10. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.5.11. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.5.12. Include training for maintenance personnel.
2.2.5.13. Provide Owner’s Manuals for all equipment.
2.2.6. Stanislaus River Parks, Main Office (CLIN 1005 – Option Item 5)
2.2.6.1. Provide and install one (1) Generac Guardian model #RGO2515GNAX 25KW LP fueled standby generator or equivalent with weatherproof enclosure on existing concrete foundation provided by USACE. Placement of the generator must meet NFPA 37 standards.
2.2.6.2. Provide and install one (1) 200amps, 120/240-volt, three phase automatic transfer switch. Transfer switch to be mounted on the exterior wall of the building.
2.2.6.3. Provide and install a new 125-amp sub-panel near existing distribution panel. Panel to be mounted on the exterior wall of the building.
2.2.6.4. Relocate the following circuits from the existing distribution panel to the new subpanel:
A. Up to 40 amps at 208 volts three phase for Air Conditioners.
B. Up to 15 amps at 120 volts for lighting circuits.
C. Up to 15 amps at 120 volts for receptacle circuits.
2.2.6.5. Provide and install a new 125-amp, two pole breaker in the existing distribution panel to feed the new sub-panel. New feeder to be routed through the new automatic transfer switch then to the new sub-panel.
2.2.6.6. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.6.7. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.6.8. Provide and install fuel line sized per manufacturer specifications from existing propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.6.9. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.6.10. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.6.11. Include training for maintenance personnel.
2.2.6.12. Provide Owner’s Manuals for all equipment.
2.2.7. Hidden Dam, Hensley Lake, Main Office (CLIN 1006 – Option Item 6)
2.2.7.1. Provide and install one (1) Generac Guardian model #RGO2515GNAX 25KW LP fueled standby generator or equivalent with weatherproof enclosure on existing concrete foundation provided by USACE. Placement of the generator must meet NFPA 37 standards.
2.2.7.2. Provide and install one (1) 200amps, 120/208-volt, three phase automatic transfer switch. Transfer switch to be mounted on the exterior wall of the building.
2.2.7.3. Provide and install a new 125-amp sub-panel near existing distribution panel. Panel to be mounted on the exterior wall of the building.
2.2.7.4. Relocate the following circuits from the existing distribution panel to the new subpanel:
A. Up to 40 amps at 208 volts three phase for Air Conditioners.
B. Up to 15 amps at 120 volts for lighting circuits.
C. Up to 15 amps at 120 volts for receptacle circuits.
2.2.7.5. Provide and install a new 125-amp, two pole breaker in the existing distribution panel to feed the new sub-panel. New feeder to be routed through the new automatic transfer switch then to the new sub-panel.
2.2.7.6. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.7.7. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.7.8. Provide and install fuel line sized per manufacturer specifications from existing propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.7.9. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.7.10. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.7.11. Include training for maintenance personnel.
2.2.7.12. Provide Owner’s Manuals for all equipment.
2.2.8. R.L. Schafer Dam, Success Lake, Southern Operations Branch Office (CLIN 1007 – Option Item 7)
2.2.8.1. Provide and install one (1) Generac Guardian model #RGO2515GNAX 25KW LP fueled standby generator or equivalent with weatherproof enclosure on existing concrete foundation provided by USACE. Placement of the generator must meet NFPA 37 standards.
2.2.8.2. Provide and install one (1) 200amps, 120/240-volt, three phase automatic transfer switch. Transfer switch to be mounted on the exterior wall of the building.
2.2.8.3. Provide and install a new 125-amp sub-panel near existing distribution panel. Panel to be mounted on the exterior wall of the building.
2.2.8.4. Relocate the following circuits from the existing distribution panel to the new subpanel:
A. Up to 40 amps at 208 volts three phase for Air Conditioners.
B. Up to 15 amps at 120 volts for lighting circuits.
C. Up to 15 amps at 120 volts for receptacle circuits.
2.2.8.5. Provide and install a new 125-amp, two pole breaker in the existing distribution panel to feed the new sub-panel. New feeder to be routed through the new automatic transfer switch then to the new sub-panel.
2.2.8.6. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.8.7. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.8.8. Provide and install fuel line sized per manufacturer specifications from existing propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.8.9. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.8.10. Include training for maintenance personnel.
2.2.8.11. Provide Owner’s Manuals for all equipment.
2.2.9. Terminus Dam, Lake Kaweah, Main Office (CLIN 1008 – Option Item 8)
2.2.9.1. Disconnect and remove the existing 25KW Generator.
2.2.9.2. Provide and install one (1) Generac Guardian model #RGO2515GNAX 25KW LP fueled standby generator or equivalent with weatherproof enclosure on existing concrete foundation provided by USACE. Placement of the generator must meet NFPA 37 standards.
2.2.9.3. Provide and install one (1) 200amps, 120/240-volt, three phase automatic transfer switch. Transfer switch to be mounted on the exterior wall of the building.
2.2.9.4. Provide and install conduit and wire to connect the generator to the automatic transfer switch/sub-panel/panel.
2.2.9.5. Provide and install required grounding for Generator, automatic transfer switch and new sub-panel.
2.2.9.6. Provide and install fuel line sized per manufacturer specifications from existing propane tank to the new generator. Include required shut-off valves, regulators and safety fittings as required by NFPA 58.
2.2.9.7. Provide and install four (4) 4.5” diameter X 48” long galvanized pipe bollards to be placed around the generator.
2.2.9.8. Include commissioning, start-up and testing of new generator and transfer switch to verify proper operation.
2.2.9.9. Include training for maintenance personnel.
2.2.9.10. Provide Owner’s Manuals for all equipment.
Contract Line Item Number (CLIN) Schedule
| Base Item No. |
| Description |
| Estimated Quantity |
| Unit of Measure |
| Unit Price |
| Total Price |
| 0001 |
| Provide and Install 25KW backup emergency generator at Buchanan Dam, Eastman Lake, Main Office |
| 1 |
| EA |
| $_____ |
| $_____ |
TOTAL:
OPTION
ITEM NO.
| DESCRIPTION |
| ESTIMATED QUANTITY |
| UNIT OF MEASURE |
| UNIT PRICE |
| TOTAL PRICE |
| 1001 |
| Provide and Install 150KW backup emergency generator at New Hogan Dam and Lake, Main Office |
| 1 |
| EA |
| $_____ |
| $_____ |
| 1002 |
| Provide and Install 50KW backup emergency generator at New Hogan Dam and Lake, Northern Operations Branch Office |
| 1 |
| EA |
| $_____ |
| $_____ |
| 1003 |
| Provide and Install 25KW backup emergency generator at Englebright Dam and Lake, Main Office |
| 1 |
| EA |
| $_____ |
| $_____ |
| 1004 |
| Provide and Install 25KW backup emergency generator at Englebright Dam and Lake, Maintenance Shop |
| 1 |
| EA |
| $_____ |
| $_____ |
| 1005 |
| Provide and Install 25KW backup emergency generator at Stanislaus River Parks, Main Office |
| 1 |
| EA |
| $_____ |
| $_____ |
| 1006 |
| Provide and Install 25KW backup emergency generator at Hidden Dam, Hensley Lake, Main Office |
| 1 |
| EA |
| $_____ |
| $_____ |
| 1007 |
| Provide and Install 25KW backup emergency generator at RL Schafer Dam, Success Lake, Southern Operations Branch Office |
| 1 |
| EA |
| $_____ |
| $_____ |
| 1008 |
| Provide and Install 25KW backup emergency generator at Terminus Dam, Lake Kaweah, Main Office |
| 1 |
| EA |
| $_____ |
| $_____ |
| TOTAL: |
| $_____ |
| TOTAL PROJECT COST |
| (Base Items + Option Items): $_____ |