Project_Specifications.pdf
PDF 408 KB Posted
- Attached to
- INDU Interior Painting & Flooring Replacement Federal contract opportunity
- Solicitation number
- 140P6422Q0059
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage_Determination.pdf | ||
| Vaccination_Certification_Notification_Template.pdf | ||
| APPENDIX_F_-_TABLE_3_DOORS.pdf | ||
| APPENDIX_D_-_TABLE_2_FINISH_SCHEDULE.pdf | ||
| APPENDIX_B_-_DRAWINGS.pdf | ||
| Certification_of_Vaccination_Form.pdf | ||
| APPENDIX_A_-_AS-BUILT_DRAWINGS.pdf | ||
| Experience_Questionnaire.pdf | ||
| APPENDIX_C_-_PHOTOGRAPHS.pdf | ||
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Submittal_List.pdf | ||
| Price_Schedule.pdf | ||
| Experience_Questionnaire.xls | XLS spreadsheet | |
| APPENDIX_E_-_TABLE_1_PAINTING.pdf | ||
| Sol_140P6422Q0059.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDIANA DUNES NATIONAL PARK
100 North Lake St.
City of Gary, Indiana
Interior Painting and Flooring Replacement
PMIS 324870, PMIS 253102
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
01/06/2022
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 09 - FINISHES
Section 03 53 00 – Concrete Topping Section 09 68 16 – Sheet Carpeting Section 09 91 23 – Interior Painting
APPENDIX
APPENDIX A (ASBUILT)
APPENDIX B (DRAWINGS)
APPENDIX C (PHOTOGRAPHS)
APPENDIX D (TABLE 2 – FINISH SCHEDULE)
SECTION 01 10 00
SHORT FORM GENERAL REQUIREMENTS
Page | 1
DIVISION 1
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: The original building was built in 1984 and is a combination of masonry and heavy timber & reinforced concrete construction. This facility is known as the Paul H. Douglas Environmental and Learning Center “PDELC”. The facility provides several programs for students of all ages and the surrounding community. The goal of this project is to paint interior walls and doors, drywall ceilings, and replace flooring.
1.2 Work Covered by the Contract Documents:
A. Project Location: The work is located at the Paul H. Douglas Environmental Learning Center Building # 314. Located at 100 North Lake St. Gary, Indiana 46403.
The work for this project consists of painting interior walls and doors, drywalling ceiling surface areas, and replacing various types of flooring. The contractor shall provide all the equipment, tools, and materials necessary to complete the job. Scaffolding or electric scissor lift will be required to do the work and the contractor shall follow OSHA and State Standards and regulations. The following are the tasks to be completed under this contract.
1. Paint interior walls and doors and drywall ceiling surface areas. The contractor shall provide a color sample to the COR for approval before ordering the paint. The contractor shall field verify all the dimensions. See Tables 1 and 3 (attached as Appendix E & F) and Table 2 (attached as Appendix D) for more information.
2. Replace flooring of various types – this includes replacing sheet vinyl and/or carpet with vinyl plank: oak 6.5 in W x 48 in L (engineering waterproof), replacing carpet with carpet in kind, and replacing sheet vinyl with an animal print concrete topping. See Table 2 (attached as Appendix D) for more information.
3. Option 1 – Moving of boxes and furniture to allow for painting and flooring installation.
The contractor shall coordinate the relocation of boxes and furniture to prevent any conflict with the painting and floor installation. This option may or may not be exercised by the Government at the time of award (dependent on cost and Government funding available).
B. All work will be performed under a single contract.
C. Period of Performance: Work shall be completed within 120 calendar days after the issuance of the Notice to Proceed.
ITEM 2 - EXISTING UTILITIES
2.1 Existing Utilities: N/A
ITEM 3 - CONTRACTOR’S USE OF PREMISES
INDU PMIS 324870, PMIS 253102
Page | 2
3.1 Conduct of Operations: At all times the contractor shall conduct operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. Superintendent's Compendium - Indiana Dunes National Park (U.S. National Park Service) (nps.gov)
A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer’s Representative.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 7 a.m. to 4 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.
The following Federal holidays are observed by the National Park Service:
New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday;
holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan Appendix B Sheet C02. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Limits: Limit of construction shall be limited to building interior. The contractor shall provide cones, signs, and warning tapes to discourage the public to enter the construction area.
https://www.nps.gov/indu/learn/management/compendium.htm https://www.nps.gov/indu/learn/management/compendium.htm https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/#url=2022
Page | 3
C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances. Do not block the access to Milller Woods Trail, which is also a fire route.
D. Limit site disturbance, including earthwork and clearing of vegetation, to:
a. Not Apply.
E. Utilities
a. General: Cost or use charges for temporary facilities shall be included in the Contract
Sum as required.
b. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.
c. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs.
Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.
d. Toilets: Contractor will be allowed to use the building restroom facilities. The contractor shall maintain the restrooms clean at all the time and need to be in the same or better condition at the end of the project.
F. Security and Protection facilities:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Tree and Plant Protection: N/A
4. Site Enclosure Fence: N/A
5. Security Enclosure and Lockup: N/A
6. Temporary Enclosures: Provide temporary enclosures as required for protection of construction in progress and completed, to discourage visitors to access the building. Provide snow fence at the main entrance and behind the building (East and West boundaries elevations) See Location Map Sheet C02.
3.4 Storage - Staging Areas:
Page | 4
A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. No cost specific storage and staging area’s may be discussed at the preconstruction briefing. (Reference a plan showing project and allowable construction area see Appendix B Sheet C02. The area of the parking designated on C02 is available for storage. Limits of use and control shall be subject to Contracting Officer’s approval.
Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
3.5 Preservation of Natural Features: N/A
3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times.
a. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters
b. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Even when the Government will not occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government limited usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
B. New Buildings/Existing Buildings Unoccupied: N/A
3.9 Photo Documentation:
Contractor must provide existing condition, progress and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
Page | 5
A. Existing Condition Images:
Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.
B. Construction Progress Images:
1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
C. Completion Images:
1. Document all completed work within scope of work.
2. Maintain organized index for photos with date, description, etc..
3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
As a minimum, conduct one weekly 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.
These meetings can be annotated on the contractors’ daily reports
A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction.
B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
i. Immediately report all spills of hazardous materials to the CO, COR and park.
ii. Maintain a spill emergency response kit.
iii. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management Noise Control: N/A
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.
ITEM 5 - EXAMINATION OF THE SITE
https://www.osha.gov/laws-regs/regulations/standardnumber/1926
Page | 6
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.
Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, standards and organizations which may be used in/referred within the Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.”
https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.
7.2 Submittals:
A. Accident Prevention (Safety) Plan (APP): Submit a site specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:
1. Name and qualifications of responsible supervisor to carry out the program.
2. First aid and rescue procedures.
3. Training, both initial and continuing.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.
5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
6. Contractor to identify nearest location of medical facility for emergencies
7. Recognition that work will be performed in remote areas with limited communication or cell phone coverage if applicable.
8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.
7.3 Qualification of Employees:
https://www.nps.gov/orgs/1671/do-business-with-us.htm
Page | 7
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.
B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
C. All PPE will be serviceable at all times. At a minimum, maintain four (4) sets of PPE including hard hats and all other Accident Prevention Plan required equipment.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE:
The Contracting Officer will conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The Contracting Officers notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.
ITEM 9 - SUBMITTALS
9.1 General Submittal Procedures:
A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.
Page | 8
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR
B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.
C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:
1. Letter designating Project Superintendent.
2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention (Safety) Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Quality Control Plan.
8. Waste Management Plan.
9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.
A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selection. Paint samples shall be actual paint finish drawdown for all project colors.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
Page | 9
D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer and/or COR will return one copy to the Contractor.
If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested; but minimally with each pay application.
Submit digital copy electronically (PDF preferred) of all required documents. Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work.
For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
Page | 10
B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.
ITEM 10 – TEMPORARY SERVICES
10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.
11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.
A. If the work is determined to be complete following the final inspection with minor comments, the
COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.
B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.
C. Contractor shall complete the Punch List within 30 calendar days or a time directed by the CO.
D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.
E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
F. Disposition of any permits and warranties required by the specifications in this section.
Page | 11
11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.
B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.
C. Information shall include operation and maintenance manuals for each warranted product.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
SECTION 03 53 00
CONCRETE TOPPING
Page | 12
PART 1 - PRODUCTS
1.1 CONCRETE, GENERAL
A. ACI Publications: Comply with ACI 301 unless otherwise indicated.
B. ACI 117 Standard Specification for Tolerances for Concrete Construction and Materials.
1.2 QUALITY ASSURANCE
A. Specialist Applicator/Installer: Topping slabs shall be installed and finished by a skilled and experienced installer specializing in the installation and finishing of architectural concrete slabs.
The Contractor shall submit evidence that the slab installer and finisher is approved by the manufacturer of the nonslip materials.
B. Floor Finish: "Nonslip finish" in combination with a "troweled finish" or fine "broom finish" conforming to applicable requirements of ACI 301.
C. Floor Tolerance: “Flat” tolerance conforming to ACI 117.
D. Cold Joints: Cold joints in concrete will not be permitted unless planned and treated properly as construction joints.
E. Site Mock-Ups: Field Samples and Mockups, for mock-up requirements. Provide site mock-up, at least 3 feet by 4 feet in size, of exposed slab finish for the COR's review and approval. Provide additional mock-ups, as required, until the desired finish is obtained. Site mock-up requires approval of the COR before work may proceed.
F. Manufacturer's Instructions: Application of the nonslip floor ingredients and concrete hardener material and finishing of the concrete topping slabs shall be in accordance with the written or printed instructions and recommendations of the manufacturer of nonslip floor ingredients and concrete hardener materials.
G. Manufacturer's Field Services: The Contractor shall engage the manufacturer of the nonslip floor ingredients and concrete hardener materials
PART 2 - PRODUCTS
2.1 TOOLS AND EQUIPMENT
A. The Contractor shall furnish all materials, tools, equipment, facilities, and services as required for performing the required topping slab placing and finishing work.
Page | 13
2.2 MATERIALS
2.2.1 FORMS
A. Form Materials: Plywood, metal, metal-framed plywood, or other approved panel-type materials to provide full-depth, continuous, straight, and smooth exposed surfaces.
1. Use flexible or uniformly curved forms for curves with a radius of 100 feet or less. Do not use notched and bent forms.
B. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and that will not impair subsequent treatments of concrete surfaces.
2.2 CONCRETE MATERIALS
A. Cementitious Materials: Use the following cementitious materials, of same type, brand, and source throughout Project:
1. Portland Cement: ASTM C 150, Portland Cement Type I/II.
2. Topping slab concrete shall have a minimum compressive strength at 28 days of 4,000 psi. Maximum size of aggregate shall be 1 inch, except that 3/8 inch maximum size aggregate shall be used for locations where congestion and other conditions indicate the need for smaller aggregate. Minimum cement content per cubic yard of concrete shall be six and a half 94-pound sacks.
3. Mix design for topping-slab concrete shall include up to ten percent replacement of the cement content with fly ash (ASTM C618) along with a plasticizing admixture, conforming with ASTM C1017, to provide a dense and plastic concrete mix which will trowel more easily with less surface bleeding of water.
B. Nonslip Aggregate Material: Crushed ceramically bonded or fused aluminum oxide as specified in ACI 301. Provide 25 pounds per 100 square feet as specified. All aggregate particles shall pass a No. 8 U.S. Standard Sieve and shall be graded from No. 16 to No. 8 mesh.
C. Normal-Weight Aggregates: ASTM C 33 , uniformly graded. Provide aggregates from a single source with documented service-record data of at least 10 years' satisfactory service in similar paving applications and service conditions using similar aggregates and cementitious materials.
1. Aggregate Source, Shape, and Color: Local source virgin limestone crushed aggregate, not round ½” to ¾” aggregate, grey whitish color
D. Air-Entraining Admixture: ASTM C 260.
E. Chemical Admixtures: Admixtures certified by manufacturer to be compatible with other admixtures and to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material.
1. Water-Reducing Admixture: ASTM C 494.
2. Retarding Admixture: ASTM C 494.
Page | 14
3. Plasticizing and Retarding Admixture: ASTM C 1017.
F. Color Pigment: (Match existing Imprint Concrete Floor Color in the Lobby area.)
ASTM C 979/C 979M, synthetic mineral-oxide pigments or colored water-reducing admixtures;
color stable, free of carbon black, nonfading, and resistant to lime and other alkalis.
1. Color: 242 Sandstone, loading requirement and selection pending samples provided by contractor
G. Water: Potable and complying with ASTM C 94.
2.3 CURING MATERIALS
A. Absorptive Cover: AASHTO M 182, Class 3, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. dry.
B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.
C. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.
D. White, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 2, Class B, dissipating.
2.4 JOINT SEALANTS
A. Compatibility: Provide joint sealants, backing materials, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer, based on testing and field experience.
B. Cold-Applied Joint Sealants
1. Single-Component, Nonsag, Silicone Joint Sealant: ASTM D5893
C. Hot-Applied Joint Sealants
1. Hot-Applied, Single-Component Joint sealant: ASTM D6690.
2.5 RELATED MATERIALS
A. Joint Fillers: ASTM D 1751, asphalt-saturated cellulosic fiber in preformed strips.
2.6 CONCRETE MIXTURES
A. Prepare design mixtures, proportioned according to ACI 301, for each type and strength of normal-weight concrete, and as determined by either laboratory trial mixtures or field experience.
1. Use a qualified independent testing agency for preparing and reporting proposed concrete design mixtures for the trial batch method.
2. When automatic machine placement is used, determine design mixtures and obtain laboratory test results that comply with or exceed requirements.
Page | 15
B. Add air-entraining admixture at manufacturer's prescribed rate to result in normal-weight concrete at point of placement having an air content as follows:
1. Air Content: 6 percent plus or minus 1-1/2 percent for 3/4-inch nominal maximum aggregate size.
C. Chemical Admixtures: Use admixtures according to manufacturer's written instructions.
1. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.
D. Color Pigment: Add color pigment to concrete mixture according to manufacturer's written instructions and to result in hardened concrete color consistent with approved mockup.
E. Concrete Mixtures: Normal-weight concrete.
1. Compressive Strength (28 Days): 4000 psi for sidewalks, pavement, curbs and gutters.
2. Maximum W/C Ratio at Point of Placement: 0.45.
3. Slump Limit: 3 inches, plus or minus 1 inch.
2.7 CONCRETE MIXING
A. Ready-Mixed Concrete: Measure, batch, and mix concrete materials and concrete according to ASTM C 94. Furnish batch certificates for each batch discharged and used in the Work.
1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.
B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94. Mix concrete materials in appropriate drum-type batch machine mixer.
1. For concrete batches of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released.
2. For concrete batches larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd.
3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixing time, quantity, and amount of water added.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine exposed subgrades and subbase surfaces for compliance with requirements for dimensional, grading, and elevation tolerances.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
Page | 16
3.2 PREPARATION
A. At least 48 hours prior to actual placement, notify the COR and nonslip material manufacturer's representative of the intention to deliver and place concrete.
B. Before placing concrete, broom clean structural slab surfaces and install bond breaker membrane where indicated.
3.3 PLACING AND FINISHING
A. Placement and Finishing Standards: Concrete topping slabs shall be placed, consolidated, and finished in accordance with applicable requirements of ACI 301.
B. Placement:
1. Topping slabs shall be placed and finished monolithically. Strike off and screed slabs to true, plane surfaces at required elevations, and thoroughly compact concrete with vibrators, floats, and tampers to force coarse aggregate below the surface. Finish slab within four hours of concrete placement.
C. Finishes:
1. Topping slabs shall receive a "troweled finish" or fine "broom finish" in combination with a "nonslip finish," as selected by the Engineer from Contractor-prepared mock-ups, with “flat” tolerance, as specified in ACI 117.
2. Application of the nonslip material and finishing of the topping slabs shall conform with the nonslip material manufacturer's application instructions and recommendations.
3.4 CURING
A. Curing of concrete topping slabs shall conform with applicable requirements of ACI 301, except that the duration of the curing period shall be ten days minimum.
3.5 FLOAT FINISHING
A. General: Do not add water to concrete surfaces during finishing operations.
B. Float Finish: Begin the second floating operation when bleedwater sheen has disappeared and concrete surface has stiffened sufficiently to permit operations. Float surface with power-driven floats or by hand floating if area is small or inaccessible to power units. Finish surfaces to true planes. Cut down high spots and fill low spots. Refloat surface immediately to uniform granular texture.
1. Medium-to-Fine-Textured Broom Finish: Draw a soft-bristle broom across float-finished concrete surface, perpendicular to line of traffic, to provide a uniform, fine-line texture.
3.6 PAVING TOLERANCES
A. Comply with tolerances in ACI 117 and as follows:
Page | 17
1. Elevation: 3/4 inch.
2. Thickness: Plus 3/8 inch, minus 1/4 inch.
3. Surface: Gap below 10-feet-long; unleveled straightedge not to exceed 1/2 inch.
4. Joint Spacing: 3 inches.
5. Contraction Joint Depth: Plus 1/4 inch, no minus.
6. Joint Width: Plus 1/8 inch, no minus.
3.7 INSTALLATION OF JOINT SEALANTS
A. Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated unless more stringent requirements apply.
B. Cleaning of Joints: Clean out joints immediately to comply with joint-sealant manufacturer's written instructions.
C. Joint Priming: Prime joint substrates where indicated or where recommended in writing by joint-sealant manufacturer.
D. Joint-Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions.
E. Install joint-sealant backings to support joint sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of joint-sealant backings.
2. Do not stretch, twist, puncture, or tear joint-sealant backings.
3. Remove absorbent joint-sealant backings that have become wet before sealant application and replace them with dry materials.
F. Install joint sealants immediately following backing installation, using proven techniques that comply with the following:
1. Place joint sealants so they fully contact joint substrates.
2. Completely fill recesses in each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.
G. Tooling of Nonsag Joint Sealants: Immediately after joint-sealant application and before skinning or curing begins, tool sealants according to the following requirements to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint:
1. Remove excess joint sealant from surfaces adjacent to joints.
2. Use tooling agents that are approved in writing by joint-sealant manufacturer and that do not discolor sealants or adjacent surfaces.
H. Provide joint configuration to comply with joint-sealant manufacturer's written instructions unless otherwise indicated.
Page | 18
I. Clean off excess joint sealant as the Work progresses, by methods and with cleaning materials approved in writing by joint-sealant manufacturers.
3.8 REPAIR AND PROTECTION
A. Remove and replace concrete paving that is broken, damaged, or defective or that does not comply with requirements in this Section. Remove work in complete sections from joint to joint unless otherwise approved by COR.
B. Maintain concrete free of stains, discoloration, dirt, and other foreign material. Sweep paving not more than two days before date scheduled for Substantial Completion inspections.
SECTION 09 68 16
SHEET CARPETING
Page | 19
1.1 SCOPE OF WORK
C. Project Location: The work is located at the Indiana Dunes National Park, Paul H. Douglas Environmental Learning Center Building # 314. Located at 100 North Lake St. Gary, Indiana.
D. Building(s) Name/Identifier: Building B-314 (Paul H. Douglas Environmental Learning Center )
1.2 SUMMARY
E. Section Includes:
1. Tufted carpet.
1.3 PREINSTALLATION MEETINGS
1.3.A.1.1 Preinstallation Conference: Conduct conference at Project site.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For carpet installation, showing the following:
1. Columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts are required in carpet.
2. Carpet type, color.
3. Locations where dye lot changes occur.
4. Seam locations, types, and methods.
5. Type of subfloor.
6. Type of installation.
7. Pattern type, repeat size, location, direction, and starting point.
8. Pile direction.
9. Types, colors, and locations of edge, transition, and other accessory strips.
10. Transition details to other flooring materials.
C. Samples: For each exposed product and for each color and texture required.
1.5 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Sample warranties.
C. Product Data: For adhesives, indicating VOC content of 50 g/L or less.
Page | 20
1.6 CLOSEOUT SUBMITTALS
A. Maintenance data.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: Certified by the International Certified Floorcovering Installers Association at the Commercial II certification level.
1.8 WARRANTY
A. Special Warranty for Carpet: Manufacturer agrees to repair or replace components of carpet installation that fail in materials or workmanship within specified warranty period.
1. Warranty Period: Non-prorated Lifetime Limited from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 TUFTED CARPET
A. Basis of Design: Basis of Design: Tarkett (formerly Tandus-Centiva) Forward Motion 03853 Roll 6’ with Powerbond Cushion.
1. Products of other manufacturers in compliance with criteria are acceptable based on prior approval by Contracting Officer’s Representative (COR).
a. Acceptable Manufacturers:
1. J&J Industries
2. Interface
3. Mohawk
4. Other approved equals
B. Construction: Level Loop.
C. Color: Match existing carpet colors.
D. Fiber Type: Dynex SD Nylon.
E. Density: 10,080 oz./cu. yd.
F. Pile Thickness: 0.050 inches
G. Total thickness: 0.290 inches
H. Dye Method: Solution Dyed / Yard Dyed.
I. Stitches: 8.8 per inch.
J. Gauge: 1/13
Page | 21
K. Tuft Density: 112.64 tufts/sq. in.
L. Face Weight: 14.0 oz/sq. yd.
M. Backing System: Synthetic Non-Woven primary backing Powerbond Cushion secondary backing.
1. Total Weight: 72.7 oz./sq. yd. +/- 5%
2. Delamination: No delamination per ASTM D3936
N. Size: 6 foot roll.
O. Applied Treatments:
1. Soil Release Treatment:
2. Stain Release Rating: GSA pass.
P. Sustainable Design Requirements:
1. Sustainable Product Certification: Gold level certification according to ANSI/NSF 140.
Q. Performance Characteristics:
1. Appearance Retention Rating: Severe traffic, 3.5 minimum according to ASTM D5252.
2. Flammability: ASTM E 648 Class I (glue down)
3. Smoke Density: ASTM E 662 less than 450.
4. Electrostatic Propensity: Less than 2.0 kV according to AATCC 134.
2.2 INSTALLATION ACCESSORIES
A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet manufacturer.
B. Adhesives: Water-resistant, mildew-resistant, nonstaining type to suit products and subfloor conditions indicated, that complies with flammability requirements for installed carpet and is recommended or provided by carpet manufacturer.
1. Adhesives shall have a VOC content of 50g/L or less.
C. Seam Adhesive: Hot-melt adhesive tape or similar product recommended by carpet manufacturer for sealing and taping seams and butting cut edges at backing to form secure seams and to prevent pile loss at seams.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Concrete Slabs:
Page | 22
1. Moisture Testing: Perform tests so that each test area does not exceed 1000 sq. ft. (304.8
sq. m), and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas.
a. Anhydrous Calcium Chloride Test: ASTM F1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000 sq. ft.
(1.36 kg of water/92.9 sq. m) in 24 hours.
b. Relative Humidity Test: Using in situ probes, ASTM F2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.
c. Perform additional moisture tests recommended in writing by adhesive and carpet manufacturers. Proceed with installation only after substrates pass testing.
2. PH Testing: ASTM F-710-05. Proceed with installation only on substrates with pH range of 9.0 or less.
B. Wood Subfloors: Verify that underlayment surface is free of irregularities and substances that may interfere with adhesive bond or show through surface.
1.2 PREPARATION
A. General: Comply with the Carpet and Rug Institute's CRI 104 and with carpet manufacturer's written installation instructions for preparing substrates.
B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch (3 mm) wide or wider, and protrusions more than 1/32 inch (0.8 mm), unless more stringent requirements are required by manufacturer's written instructions.
C. Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by adhesive and carpet manufacturers.
D. Broom and vacuum clean substrates to be covered immediately before installing carpet.
1.3 INSTALLATION
A. Comply with the Carpet and Rug Institute's CRI 104 and carpet manufacturer's written installation instructions for the following:
B. Carpet with attached-cushion installation.
C. Stair installation.
1.4 Comply with carpet manufacturer's written instructions and Shop Drawings for seam locations and direction of carpet; maintain uniformity of carpet direction and lay of pile. At doorways, center seams under the door in closed position.
A. Install borders with mitered corner seams.
Page | 23
2. Do not bridge building expansion joints with carpet.
A. Cut and fit carpet to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet manufacturer.
B. Extend carpet into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.
C. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on carpet as marked on subfloor. Use nonpermanent, nonstaining marking device.
D. Protect carpet against damage from construction operations and placement of equipmenT and fixtures during the remainder of construction period. Use protection methods recommended in writing by carpet manufacturer and carpet adhesive manufacturer.
SECTION 09 91 23
INTERIOR PAINTING
Page | 24
PART 1 - GENERAL
1.1 SCOPE OF…