APPENDIX_E_-_TABLE_1_PAINTING.pdf

PDF 83 KB Posted

Attached to
INDU Interior Painting & Flooring Replacement Federal contract opportunity
Solicitation number
140P6422Q0059
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to INDU Interior Painting & Flooring Replacement, newest first.
File Type Posted
Wage_Determination.pdf PDF
Vaccination_Certification_Notification_Template.pdf PDF
Project_Specifications.pdf PDF
APPENDIX_F_-_TABLE_3_DOORS.pdf PDF
APPENDIX_D_-_TABLE_2_FINISH_SCHEDULE.pdf PDF
APPENDIX_B_-_DRAWINGS.pdf PDF
Certification_of_Vaccination_Form.pdf PDF
APPENDIX_A_-_AS-BUILT_DRAWINGS.pdf PDF
Experience_Questionnaire.pdf PDF
APPENDIX_C_-_PHOTOGRAPHS.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet
Submittal_List.pdf PDF
Price_Schedule.pdf PDF
Experience_Questionnaire.xls XLS spreadsheet
Sol_140P6422Q0059.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Line Item Description Area or Length

UNITS

1 Paint First Floor Perimeter Interior Building Walls North 3,926 S.F.

2 Paint First Floor Perimeter Interior Building Walls South 3,926 S.F.

3 Paint First Floor Perimeter Interior Building Walls East 3,980 S.F.

4 Paint First Floor Perimeter Interior Building Walls West 3,980 S.F.

5 Total First Floor Perimeter Interior Building Walls r Walls 15,811 S.F.

6 All Other Interior Walls 9,383 S.F.

7 Paint Basement Interior Walls (B1 Stairs, B2 Staff / Work Room and B3 Storage Room) 1,117 S.F.

8 Paint all Drywall Ceiling First Floor 2,576 S.F.

9 Replace with Grade A Tongue and Groove wood ceiling on 22 Woman Restroom and stain 50 S.F.

Paint all interior doors and door trim see locations on sheet drawings C03 and C04. Color:

Townhall Tan SW 7690

2,498 S.F.

11 Multipurpose Room: Trees to be paint: Woodsy Brown SW 2924 (19 SF). 170 S.F.

12 Wall Screen to be paint with: Digital Image Ultra White (High Definition Screen Paint) (70 S.F.) 70 S.F.

13 Corridor 9: Trees to be paint: Woodsy Brown SW 2924. Fence to remain. 170 S.F.

Replace Flexible Polyurethane Base Molding 4"x1/2" Color: Caraibe SW 9090. All Corridors, Activities I, Multipurpose Room, Staff Room and All Storage Rooms.

1,622 L.F.

15 Paint wood base molding in the Lobby: Color: Caraibe SW 9090. 153 L.F.

Paint Fire Sprinkler Galvanized Pipe to "Red" Rooms: 22 woman Rest Room, 21 Corridor, 20 Memn's Restroom, 25 Activities II, 11 Multipurpose Room, 12 Stogare, 7 Staff Room, 10 Projection Room, B2 Staff Room, 5 Lobby.

700 L.F.

Include moving boxes and furniture for painting and flooring installtion. The contractor shall coordinate the relocation of boxes and furniture to prevent any conflict with the painting and floor installation.

1 L.S.

See Table 2 Appendix D - Floor Finish Schedule and Painting Colors.

All quantities have been estimated and the contractor shall field verified all the dimensions.

TABLE 1