Price_Schedule_-_Fence_Replacement.pdf

PDF 141 KB Posted

Attached to
Fence Replacement Federal contract opportunity
Solicitation number
140P6425Q0010
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This is a price schedule template for a fence replacement project at the William Howard Taft Historic Site in Cincinnati, OH (2038 Auburn Ave), managed by the National Park Service, U.S. Department of Interior. The template is structured as a firm-fixed price contract with line items for construction activities.

The schedule includes three main work categories: Mobilization/Demobilization, Demolition (removal and disposal of existing fence), and Installation of new fence. Each category breaks down costs into materials, equipment, and labor components, with quantities listed as "LS" (Lump Sum) units. The template also includes lines for Overhead, Profit, and Bonds (all as percentages), leading to a Grand Total. A key note emphasizes that contractors are responsible for verifying all quantities/measurements and providing a comprehensive price covering the entire project scope under the firm fixed price contract structure.

View the file

Other files for this federal contract opportunity

Other files attached to Fence Replacement, newest first.
File Type Posted
Revised_Specifications_-_25_Feb_2025_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Sol_140P6425Q0010_Amd_0001.pdf PDF
Wage_Determination_-_Hamilton_Co.pdf PDF
Attachment_-_Provisions_to_be_Completed.pdf PDF
Specifications_-_Fence_Replacement.pdf PDF
Technical_Questionnaire.pdf PDF
Sol_140P6425Q0010.pdf PDF
Attachment_-_Construction_Contract_Administration.pdf PDF
Technical_Questionnaire.docx DOCX document
Price_Schedule_-_Fence_Replacement.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

Install: Installation of new fence and all associated work/items

- Equipment

- Labor

** It is the responsibility of the contractor to verify all the quantities/measurements and to provide a price that will cover the completion of the entire project for this firm fixed price contract. **

- Materials

Grand Total

Overhead

Subtotal

Bonds Profit

- Labor

Mobilization/Demobilization

- Mob/Demob Costs

Demolition: Removal and disposal of the existing fence and all associated work/items

- Equipment

- Materials

Construction Items

National Park Service U.S. Department of Interior

William Howard Taft Historic Site

2038 Auburn Ave.

Cincinnati, OH

PRICE SCHEDULE

PROJECT: Fence Replacement

Sheet1

File details come from the government source that posted it. Updated .