Price_Schedule_-_Fence_Replacement.pdf
PDF 141 KB Posted
- Attached to
- Fence Replacement Federal contract opportunity
- Solicitation number
- 140P6425Q0010
About this file
This is a price schedule template for a fence replacement project at the William Howard Taft Historic Site in Cincinnati, OH (2038 Auburn Ave), managed by the National Park Service, U.S. Department of Interior. The template is structured as a firm-fixed price contract with line items for construction activities.
The schedule includes three main work categories: Mobilization/Demobilization, Demolition (removal and disposal of existing fence), and Installation of new fence. Each category breaks down costs into materials, equipment, and labor components, with quantities listed as "LS" (Lump Sum) units. The template also includes lines for Overhead, Profit, and Bonds (all as percentages), leading to a Grand Total. A key note emphasizes that contractors are responsible for verifying all quantities/measurements and providing a comprehensive price covering the entire project scope under the firm fixed price contract structure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Specifications_-_25_Feb_2025_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6425Q0010_Amd_0001.pdf | ||
| Wage_Determination_-_Hamilton_Co.pdf | ||
| Attachment_-_Provisions_to_be_Completed.pdf | ||
| Specifications_-_Fence_Replacement.pdf | ||
| Technical_Questionnaire.pdf | ||
| Sol_140P6425Q0010.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Price_Schedule_-_Fence_Replacement.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Unit Quantity Price/ Unit Subtotal
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
Install: Installation of new fence and all associated work/items
- Equipment
- Labor
** It is the responsibility of the contractor to verify all the quantities/measurements and to provide a price that will cover the completion of the entire project for this firm fixed price contract. **
- Materials
Grand Total
Overhead
Subtotal
Bonds Profit
- Labor
Mobilization/Demobilization
- Mob/Demob Costs
Demolition: Removal and disposal of the existing fence and all associated work/items
- Equipment
- Materials
Construction Items
National Park Service U.S. Department of Interior
William Howard Taft Historic Site
2038 Auburn Ave.
Cincinnati, OH
PRICE SCHEDULE
PROJECT: Fence Replacement
Sheet1
File details come from the government source that posted it. Updated .