Price Schedule.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Y1DA--Replace Security Camera Surveillance System Federal contract opportunity
Solicitation number
36C24920R0074_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document contains a price schedule template and instructions for a federal contract opportunity to replace a security camera surveillance system at the Memphis VA Medical Center. The opportunity is solicitation number 36C24920R0074_1 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. Offerors are required to provide pricing breakdowns for all applicable divisions of work using the provided template, including general requirements, site work, finishes, conveying equipment, fire suppression, HVAC, electrical, communications, electronic safety and security, and with labor, material, equipment, and total costs specified. Pricing is requested for both a base offer scope of 180 calendar days and bid item number one scope of 270 calendar days to replace existing cameras and associated cabling. Instructions emphasize that lump sums will not be accepted and divisions must be priced to the greatest level of detail, even if not applicable.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Replace Security Camera Surveillance System, newest first.
File Type Posted
Past Performance Questionnaire.pdf PDF
S06 Amendment 36C24920R0074 0003.pdf PDF
614-18-107 Security Camera and Surveillance Addendum and RFI Responses.pdf PDF
S06 Amendment 36C24920R0074 0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer-Breakdown

JOB NAME: TBD LOCATION: Memphis, TNSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$0.00
10 14 00Signage$0.00$0.000.00$0.00
10 26 00Wall and Door Protection$0.00$0.000.00$0.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Base OfferINSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
The contractor shall provide all resources necessary to accomplish and furnish all labor, material, equipment, transportation and expert supervision necessary for project #614-18-107, replace security camera surveillance system at the Memphis VA Health Care System located at 1030 Jefferson Ave Memphis, TN 38104 in accordance with the statement of work, project specifications and drawings. Work includes general construction, alterations, necessary removal of existing structures and construction.

The period of performance for the work in the base offer 180 calendar days from receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold"PROJECT 614-18-107 &"-,Bold"Replace Security Camera Surveillance System &"-,Bold"MEMPHIS VA MEDICAL CENTER

Bid Item No.1

JOB NAME: TBD LOCATION: Memphis, TNSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$0.00
10 14 00Signage$0.00$0.000.00$0.00
10 26 00Wall and Door Protection$0.00$0.000.00$0.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Bid Item NO. 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.
Work for Bid Item #1 is the same as for Base Offer, except for the replacement of existing cameras, which includes:

Provide all work described in base offer above, for replacement of existing cameras with new, including associated CAT 6 cabling work, as identified on the supplemental Camera Schedule and supplemental drawings.

The period of performance for the work in Bid Item #1 is 270 calendar days from receipt of notice to proceed.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.