PRESENT-PAST PERFORMANCE SURVEY.docx
DOCX document 24 KB Posted
- Attached to
- C1DA--608-21-209 Laboratory fresh air Federal contract opportunity
- Solicitation number
- 36C24121R0119
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Laboratory drawings.pdf | ||
| HVAC check list.pdf | ||
| 36C24121R0119.docx | DOCX document | |
| 1984 Laboratory drawings.pdf | ||
| ASHRAE.pdf | ||
| AE Sources Sought Notice.pdf | ||
| HVAC Design Manual.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRESENT/PAST PERFORMANCE SURVEY
A. GENERAL INFORMATION: Please correct any information below known to be inaccurate.
Solicitation Number:
Contractor's Name:
Address:
Telephone:
Point of Contact:
Contractor Performed as the ( ) prime Contractor, or the ( ) Sub-Contractor
1. RESPONDENT INFORMATION:
Name of Respondent:_______________________________________Title:______________________________
Organization: _______________________________________________________________________
Address:____________________________________________________________________________
Telephone Number:_________________________
Fax Number:_________________________________
SIGNATURE______________________________
1. EMAIL COMPLETED SURVEY FORM TO: Richard.coutermarsh@va.gov
Or mail it to
Richard Coutermarsh NCO1/Manchester VAMC 718 Smyth Road BST Suite 105 Manchester, NH 03104
(603) 624-4366 ext. 5802
PAST AND PRESENT PERFORMANCE SURVEY
D. PERFORMANCE INFORMATION: Choose and circle the number on the scale of 1-6 that most accurately describes the contractor's performance or situation.
CODE/PERFORMANCE LEVEL
1 UNSATISFACTORY - Performance did not meet most contractual requirement. There were serious problems and the contractor's corrective actions were ineffective.
2 MARGINAL - Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
3 NONE - No record of past performance or the record is inconclusive.
4 SATISFACTORY - Performance met contract requirements. There were some minor problems and corrective actions taken by the contractor was satisfactory.
5 VERY GOOD - Performance met all contract requirements and exceeded some to the Government's benefit. There were a few minor problems which the contractor resolved in a timely effective manner.
6 EXCEPTIONAL – Performance met all contract requirements and exceeded many to the government’s benefit. Problems, if any, were negligible and were resolved in a timely, highly efficient manner.
The contractor: (1 being Very Bad and 6 being Very Good)
1. Contractor provided adequate supervision. 1 2 3 4 5 6 N/A
2. Contractor provided experienced managers and supervisors with the 1 2 3 4 5 6 N/A technical and administrative abilities to meet contract requirements.
3. Demonstrated ability to hire, maintain, and replace, if necessary, 1 2 3 4 5 6 N/A qualified personnel during the contract period.
4. Corrected deficiencies in timely manner and pursuant to their 1 2 3 4 5 6 N/A quality control procedures.
5. Provided timely resolution of contract discrepancies. 1 2 3 4 5 6 N/A
6. Suggested alternative approaches to problems. 1 2 3 4 5 6 N/A
7. Displayed initiative to solve problems. 1 2 3 4 5 6 N/A
8. Cooperated with Government personnel after award 1 2 3 4 5 6 N/A
9. Contractor’s compliance with contractual terms and conditions. 1 2 3 4 5 6 N/A
10. Rate the overall contractor’s performance under this contract. 1 2 3 4 5 6 N/A
11. Would you award another contract to this contractor? If not, Yes ( ) No ( ) explain in "remarks."
Remarks______________________________________________________________________
File details come from the government source that posted it. Updated .