PR4307107- Combined Synopsis Solicitation.pdf
PDF 11 MB Posted
- Attached to
- Latrine & Shower Ablution Trailers, U. S. Consulate Basrah, Iraq Federal contract opportunity
- Solicitation number
- PR4307107
About this file
PR4307107 - Combined Synopsis Solicitation.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS & SOLICITATION
United States Consulate Basrah, Iraq
LATRINE & SHOWER ABLUTION TRAILERS
SSOOLLIICCIITTAATTIIOONN NNOO.. PPRR44330077110077
Issued by:
American Consulate General Regional Procurement Support Office Giessener Strasse 30 60435 Frankfurt am Main Germany
September 02, 2015
Combined Synopsis and Solicitation Solicitation Number PR4307107
The American Consulate General Frankfurt hereby provides the following Combined Synopsis and Solicitation for:
Fabrication and supply of steel containerized latrine and shower ablution trailers to the American Consulate Basrah, Iraq. The evaluation of proposals will be based on the Lowest-Priced Technically-Acceptable (LPTA) approach.
Synopsis:
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice.
This announcement constitutes the only solicitation; offers are being requested and a written solicitation will not be issued. The solicitation number is PR4307107 and is issued as a Request for Proposals (RFP), unless otherwise indicated herein. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-83, effective August 03, 2015.
Contract Type: The Government intends to award a single, firm fixed-price contract to the responsible offeror whose offer is evaluated as the lowest-priced and technically acceptable.
The total price shall include all labor, travel expenses (if any), materials, overhead, profit, insurance, and all other expenses necessary to deliver the required items. No additional sums will be payable on account of any escalations in the cost of materials, equipment, or labor, or because of the Contractor’s failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract. Nor will the contract price be adjusted on account of fluctuations in currency exchange rates.
Use of Brand Name: References in the specifications and drawings to materials, products or equipment by trade name, make, or catalog number, or to specific processes, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may propose for approval or rejection by the Contracting Officer the substitution of any material, product, equipment or process that the Contractor believes to be equal to or better
AMERICAN CONSULATE GENERAL
Regional Procurement Support Office
Giessener Strasse 30 60435 Frankfurt am Main
Germany
Tel: (49) 69 7535 3350 E-mail: MambaKG@state.gov than that named in the specifications and drawings, except that certain requirements, such as dimensions, must be fulfilled.
DESCRIPTIVE LITERATURE (a) "Descriptive literature" means information (e.g., cuts, illustrations, drawings and original manufacturers' brochures) that is submitted as part of an offer. Descriptive literature is required to establish, for the purpose of evaluation and award, details of the product offered that are specified elsewhere in the solicitation and pertain to significant elements such as (1) design; (2) materials; (3) components; (4) performance characteristics; and (5) methods of manufacture, assembly, construction, or operation. The term includes only information required to determine the technical acceptability of the offered product. It does not include other information such as that used in determining the responsibility of a prospective contractor or for operating or maintaining equipment. (b) Descriptive literature must be (1) identified to show the item(s) of the offer to which it applies and (2) received by the time specified in this solicitation for receipt of offers. (c) Data displaying more than one model or size shall be clearly marked so as to indicate the specific item being offered. (d) Offers which do not present sufficient information to permit complete technical evaluation by the Government may be rejected. It is the bidder’s responsibility to prove that their proposed solution meets or exceeds the requested specifications, subject to any limitations elsewhere in this solicitation.
All or Nothing: The Government is allowing complete offers only; incomplete offers will not be considered.
APPLICABLE CLAUSES AND PROVISIONS
The selected Offeror must comply with the following commercial item terms and conditions, which are incorporated herein by reference: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items; the applicable clauses under paragraph (b) are:
52.203-6 (Alternate I), 52.204-10, 52.223-18, [U.S. firms: 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37], 52.225-13 and 52.232-34. The full text of the referenced FAR clauses may be accessed electronically at https://www.acquisition.gov/far/.
The following clause(s) and provision(s) are provided in full text:
FAR 52.232-40 - Providing Accelerated Payment to Small Business Subcontractors (DEC 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable https://www.acquisition.gov/far/ contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
(End of clause)
FAR 52.225-17 -- Evaluation of Foreign Currency Offers (Feb 2000)
If the Government receives offers in more than one currency, the Government will evaluate offers by converting the foreign currency to United States currency using rates in effect (see http://www.federalreserve.gov/releases/h10/current/ ) as follows:
(a) For acquisitions conducted using sealed bidding procedures, on the date of bid opening.
(b) For acquisitions conducted using negotiation procedures--
(1) On the date specified for receipt of offers, if award is based on initial offers;
otherwise
(2) On the date specified for receipt of proposal revisions.
(End of provision)
52.212-2 Evaluation – Commercial Items (Oct 2014)
(a) The Government will award a contract resulting from this solicitation to the LPTA offer.
The following factors shall be used to evaluate offers:
• Price;
• Technical capability/acceptability;
• Warranty considerations and
• Offeror’s Past Performance.
(End of provision)
652.209-79 REPRESENTATION BY CORPORATION REGARDING AN
UNPAIDDELINQUENT TAX LIABILITY OR A FELONY CRIMINAL CONVICTION
UNDER ANY FEDERAL LAW (DEVIATION PIB 2014-21) (SEPTEMBER 2014)
(a) In accordance with section 7073 of Division K of the Consolidated http://www.federalreserve.gov/releases/h10/current/
Appropriations Act, 2014 (Public Law 113-76) none of the funds made available by that Act may be used to enter into a contract with any corporation that –
(1) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency has direct knowledge of the conviction, unless the agency has considered, in accordance with its procedures, that this further action is not necessary to protect the interests of the Government; or
(2) Has any unpaid Federal tax liability that has been assessed for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency has direct knowledge of the unpaid tax liability, unless the Federal agency has considered, in accordance with its procedures, that this further action is not necessary to protect the interests of the Government.
For the purposes of section 7073, it is the Department of State’s policy that no award may be made to any corporation covered by (1) or (2) above, unless the Procurement Executive has made a written determination that suspension or debarment is not necessary to protect the interests of the Government.
(b) Offeror represents that—
(1) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
(2) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
(End of provision)
PREPARATION OF PROPOSALS
Offerors shall prepare proposals in two (2) separate volumes as listed below:
VOLUME 1:
Pricing
The Unit Price of each Line Item shall contain profit and all required costs, except shipping costs and Value Added Tax (if applicable). Shipping costs from the point-of-origin to destination (U.S. Consulate Basrah, Iraq) and VAT shall be recorded separately on Line Items 0002 and 0003, respectively. Offeror shall complete the table below:
Line Item
Description Unit of Issue Quantity Unit Price Total Cost
0001 Design and fabrication of steel containerized latrine and shower ablution trailers in accordance with the Statement of Work, Drawings, Specification, and terms and conditions as set forth herein. Price includes all labor, travel expenses (if any), materials, overhead, profit, insurance, and all other expenses necessary to furnish the trailers:
Each 16
0002 Cost of deliver (FoB Destination Basrah) for all items in CLIN 0001:
0003 Value Added Tax (if applicable):
Total Firm-Fixed Price:
VOLUME 2:
(i) Technical Capability
The proposed items shall meet all of the technical specifications and the delivery terms contained herein. In addition, the offerors shall provide:
(A) A delivery plan providing for delivery within 180 calendar days of award to the final destination. The 180-day period includes 10 workdays for Government review and approvals. The plan must include the method of shipping and the route on which the items will be shipped.
(B) Warranty provisions.
(C) A written statement acknowledging acceptance of the prototype drawings, images and photographs (except for brand name products) included as Exhibits 1 through 11 as part of the SOW. Any substitutions must be supported with “descriptive literature” in the proposal - there are no exceptions. It is necessary for Government reviewers to know what solution the offeror is proposing. The failure to provide the statement (and/or descriptive literature in case of substitutions) will result in a 'non responsive' offer and removal from award consideration.
(D) New equipment ONLY, NO grey market or refurbished products.
(E) Proposals MUST be dated and signed.
(F) Proposals must be good for 90 calendar days after submission.
(G) Proposals must contain offeror’s DUNS number.
(H) Offeror must be registered in the System for Award Management (SAM) database before submitting an invoice; however, this requirement does not apply to offerors based in Iraq. Offerors may register in SAM under the following address:
https://www.sam.gov/portal/public/SAM/. If the offeror is not based in Iraq, provide evidence of SAM registration.
(I) All proposals and other correspondence must be in the English language.
(ii) Past Performance
A list with a minimum of three contracts and/or subcontracts that they have held over the past three (3) years to demonstrate their prior experience in fabricating and supplying containerized latrines and shower ablution trailers to companies, organizations or other Government entities. Any additional information, such as letters, associations and standards to substantiate the past performance shall be furnished by the offeror. The offeror shall provide the following information for each contract and/or subcontract:
(A) Customer's name, address, and telephone numbers of customer's lead contract and technical personnel;
(B) Contract number;
(C) Contract dollar value; and
(D) Any terminations (partial or complete) and the reason (convenience or default).
Technical capability and past performance must both be satisfactory for the offer to be considered “technically acceptable”.
SUBMISSION OF QUESTIONS:
Time is of the essence. Interested offerors shall submit any questions concerning the solicitation at the earliest time possible to the POC’s email address. Questions not received within a reasonable time prior to the proposal due date may not be considered.
SUBMISSION OF PROPOSALS:
Proposals and any supporting attachments shall be submitted in two (2) separate volumes using the method(s) indicated next to the respective volumes:
Volume 1 – Price Proposal*.
Submit to: MambaKG@state.gov; FrankfurtRPSO@state.gov and fax no. +49 69 7535 3329.
https://www.sam.gov/portal/public/SAM/ mailto:MambaKG@state.gov mailto:FrankfurtRPSO@state.gov
Volume 2 – Technical Proposal*.
Submit to: MambaKG@state.gov and FrankfurtRPSO@state.gov.
*Email submittals shall not exceed 20MB.
Proposals shall be submitted (via email and fax as required above) as soon as possible to reach RPSO Frankfurt not later than 1500 hrs Central European Time (CET) on Monday, September 14, 2015. Late proposals may not be considered.
BASIS FOR AWARD
The Government intends to award a contract resulting from this solicitation to the responsible offeror (as determined within the meaning of FAR Part 9, paragraph 9.104), whose offer conforms to the solicitation, and is determined to be the most advantageous to the Government, price and other factors considered. The evaluation will be based on offerors submission in Volumes 1 and 2.
ADDITIONAL INFORMATION
Contracting Office: Regional Procurement Support Office (RPSO) Frankfurt.
Point of Contact: Kenneth Mamba; RPSO Contract Specialist; Phone: +49 69 7535 3350;
Email: MambaKG@state.gov
Delivery and Acceptance: Partial deliveries are not authorized; all items shall be delivered in a single consignment to U.S. Consulate Basrah, Iraq. The American Consulate Basrah will provide customs clearance support; therefore, the Contractor shall send shipping documents to the requesting office in advance of delivery. Details of the Point of Contact for coordination of delivery will be provided on award.
APPLICABLE LAWS AND REGULATIONS AND EXTENT OF COMPETITION
Solicitation and award will be subject to the laws and regulations of the United States of America. This requirement is being competed utilizing full and open competition procedures.
ATTACHMENTS
Attachment 1, Statement of Work and its Exhibits are herewith incorporated by reference.
mailto:MambaKG@state.gov mailto:FrankfurtRPSO@state.gov mailto:MambaKG@state.gov
U.S. CONSULATE BASRAH - ATTACHMENT 1 of 1 to PR4307107
STATEMENT OF WORK (07212015)
SUPPLY STEEL CONTAINERIZED LATRINE AND SHOWER ABLUTION TRAILERS
SECTION I – GENERAL REQUIREMENTS
The United States Government (USG) on behalf of the United States Consulate General Basrah is seeking the acquisition and delivery of sixteen (16) Steel Containerized Latrine and Shower Ablution Trailers. The intent of this Statement of Work (SOW) is to provide design-build services for 16 Latrine AND Shower Ablution Trailers for the USG Consulate Basrah. These units will be stacked two high, and the manufacturing materials and methodology must accommodate this. All roofs must be flat, no sloped roofs will be allowed, due to the need to stack units. No roof penetration shall be permitted. Units shall conform to, and be delivered in accordance with the following specifications. The attached Exhibits 1 through 11 are included as part of this SOW. Installation is not included as part of this SOW; only manufacture and delivery is included. Air conditioning and heating units are not included as part of this SOW. No wood based products are permitted.
1. GENERAL SCOPE OF WORK
(I). Sixteen (16) Steel Containerized Latrine & Shower Ablution Trailers (See attached Exhibits 1 through 11). The contractor shall provide parts, labor, materials and equipment to design, supply, and deliver 16 modular type buildings (Approx. 10 foot X 40 foot outside to outside dimension). The Ablution Trailers must be designed to be turn-key, containing all required structural, electrical and plumbing elements for a set-in place installation (with the exception of air conditioning and heating units to be supplied by the USG.
Each Ablution Trailer Shall Contain:
1. One metal entryway door and metal door frame with a minimum inside opening dimension of 32” and each door having the following hardware
a. automatic closer
b. Keyed lock without a thumb-turn (lockable from the exterior only)
2. 250 Amp main service electric breaker panel located inside the trailer, with breakers sized appropriately for water heater, hand dryers, interior and exterior lighting and electric outlets.
3. Interior flooring shall be covered with non-slip seamless sheet vinyl flooring in a light neutral color without pattern.
4. Floor drains will be provided in each shower unit with 4-inch (100 mm) deep seal traps.
5. In addition, three (3) general floor drains will be provided, two (2) equally spaced in the shower seating area and one (1) in the lavatory/toilet area.
6. The power supplies to the unit are U.S. standards (240 volt) (See Section 3, Electrical below).
7. Furnish and install a UL rated minimum size 450 liter electric hot water tank and associated piping in each new Latrine Trailer.
8. Note: All exterior walls and roofing shall have insulation as indicated in Section II, part 1, paragraph B below).
9. All interior surface wall material will be finished with a factory applied water-resistant surface in a white color.
10. Four (4) partitioned toilet stalls with in-swing doors containing privacy locks
a. Four (4) wall-hung porcelain sinks
b. Seven (7) one-piece fiberglass/Acrylic shower units
c. One (1) dedicated minimum size 450 liter electric water heater.
11. Showers will consist of:
a. A one-piece fiberglass/Acrylic unit separated by hard partition walls.
b. The shower pan or floor will be incorporated into the one-piece unit.
c. Each shower stall shall have a curtain at the entry of the one-piece shower unit as well as at the entry to the shower stall suspended from a stainless steel rod.
d. Each shower unit shall have a towel hook installed in the dressing area on the wall opposite the fold-down seat.
e. Each shower unit will contain a concealed single-handle mixing valve controlling the water flow to the shower head above.
12. Each single-handle porcelain sink will have:
a. Each sink is required to have a separate shutoff valve for each water line (hot and cold)
b. A soap dispenser located above it.
c. A 15-20 amp GFCI duplex next to each sink
d. A paper towel dispenser based upon tri-fold towels used on the Basrah compound
e. An 18”wide by 24” tall mirror above each sink
13. Each latrine shall contain:
a. An exhaust fan
b. Each commode is required to have a separate shutoff valve for the water line to the reservoir
c. Simple flush-mount dual toilet paper dispenser
The contractor shall abide by the provisions of this SOW.
(II). Manufacturing Details
NOTE: No wood based products are permitted to be used
A. Prior to manufacturing, submit all final manufacturing plans and specifications to the COR for OBO Building Permit Review. Upon granting of OBO Building Permit, manufacturing effort shall start.
B. Contractor is required to provide engineered design drawings. Drawings must contain:
1. Scaled drawings with appropriate dimension details
2. Schedule of all door hardware, toilet and sink plumbing fixtures, water heater, electric panel and GFCI plugs
3. Schedule of finishes
4. Provide gross weight of finished product
C. Construct the 16 latrine trailers in accordance with current US and IBC Standards. The 16 modular units (latrine trailers) will be built offsite, at a location of the contractor’s choice, and delivered to Consulate Basrah. At a point where the first modular unit is approaching 50% completion, the contractor shall inform the Contracting Officer’s Representative (COR) for a possible inspection by USG personnel.
D. The modular units shall be in accordance with the requirements in Section II, TECHNICAL PROVISIONS.
E. All modular units structural framing shall be steel. Trailer footings shall be steel with welded base plates attached. The trailers will be stacked two high so the manufacturing method must be sufficient to carry the load of an additional trailer on top including the live load based upon a maximum of 15 people. The Contractor is responsible for surveying existing site conditions and must satisfy themselves of the particular site conditions at the Basrah Consulate in order to utilize stacked units. Due to the requirement for stacking, no roof penetrations shall be permitted.
F. Prepare and complete manufacturing drawings, specifications, and analysis for all work under this contract. EXCEPT FOR BRAND NAME ITEMS WHICH MERELY
REPRESENT THE EXPECTED QUALITY/STANDARD, THE OFFEROR
MUST STATE IN THEIR PROPOSAL THEIR ACKNOWELDGE MENT AND
ACCEPTANCE OF THE PROTOTYPE DRAWINGS, IMAGES AND
PHOTOGRAPHS INCLUDED AS EXHIBITS 1 THROUGH 11 TO THIS SOW.
CONTRACTOR FURNISHED ITEMS AND SERVICES:
A. The contractor shall furnish all transportation, equipment, tools and any other items and services required to perform operations required by this statement of work.
B. The contractor shall provide a fully qualified manager who shall be responsible for the performance of work and serve as the main point of contact with the COR. The name of the person and all alternates shall be designated in writing by the Contracting Officer
(CO).
SECTION II – TECHNICAL PROVISIONS
a. GENERAL REQUIREMENTS:
Asbestos Containing Materials: Asbestos-containing material (ACM) will not be used in the manufacture of this facility. No ceiling/roof penetrations will be permitted as these units will be stacked one on top of another.
Sixteen (16) Latrine Trailers 10 feet wide x 40 feet long outside to outside dimension).
The contractor shall furnish and install:
1. Steel framing for floors and structural members.
2. No insulation is to be used in walls, ceilings or floors
3. Four (4) Toilets located in separate toilet stalls with painted metal dividers (or DuPont™
Corian® Slid Surface material) with lockable swing-in door, 36” wide by 56” deep
4. Seven (7) 36 inch by 40 inch Shower Fiberglass/Acrylic One-Piece Shower Units with integrated shelf/ledge
5. Four (4) wall-hung porcelain sinks, each to contain a mirror above the sink, and soap dispenser.
6. The sink area will contain 2 general-purpose paper towel dispensers suitable for standard trifold paper towels
7. Exterior Pedestrian Metal Doors with automatic door closer
8. All Interior walls and ceilings shall be either stainless steel or aluminum painted with a white factory applied moisture-resistant coating or white acrylic/fiberglass material with suitable steel blocking material for attaching wall mounted fixtures.
9. Exterior metal walls with an appropriate white weather-resistant coating.
10. One 450 liter hot water tank with appropriate piping supplied to sinks and showers.
11. All toilets and shower units shall have an exhaust fan system within each stall.
See the attached Exhibit 1 for numbers and layout of the toilets, sinks, and shower units/stalls.
b. ARCHITECTURAL/STRUCTURAL:
The floor plans shall be similar to that on the attached Exhibit 1. Sewer lines, lavatory and floor drain lines and floor drains shall be installed for connection by others to the existing septic system, keeping in mind that these trailers will be stacked one on top of the other.
Each unit shall be designed and constructed according to the attached Exhibit 1 with the following specifications:
1. Shower Unit: Approximate 36 inch wide x 40 inch deep seamless fiberglass/Acrylic one-piece shower unit including shower pan and integrated shelf/ledge for toiletries. Each unit shall be contained within a deeper approximate 36.25 inch wide x 70 inch deep walled stall to include a changing area. Therefore, in front of all 7 shower stalls shall be a 36 inch wide passage corridor. Each stall shall contain one towel bar/rack, 2 robe hooks, 2 stainless steel curtain rods, 2 opaque pattern-less shower curtains, and one wall-hung folding water resistant plastic/metal changing bench approximately 18 inches wide x 15 inches deep, that swings up and locks on the wall, mounted in the changing stall (See Exhibit 7).
2. Toilets: Four (4) 36 inch wide x 56 inch deep toilet stalls constructed of metal stainless steel or galvanized powder coated steel in a white color with side panels raised approximately 12 inches from the floor and ending approximately 18 inches from the ceiling. Doors shall be 27 inch wide locking-in swing type
c. Four (4) porcelain western-style flush-toilets contained within each stall described in number 2 above.
d. Four (4) porcelain wall mounted sinks/lavatories with a single handle hot and cold water faucet. Each sink will have access to a 240V,Twin British 13 amp outlet in the vicinity of the sink
e. Electrical requirements as required in Section 2, Part 1.3
f. Vinyl Flooring in a neutral color (no pattern)
g. Exhaust Fans Eleven (11), one above each of the four (4) toilet stall on the rear wall and seven (7) mounted above each shower unit located on the rear wall. No roof penetrations are permitted. The entire fan system shall be designed and sized to provide a minimum of eight (8) air exchanges per hour. The fans shall be wired to a wall switch near the entry door.
h. Quantity of three (3) floor drains (in addition to the 7 shower drains); two (2) placed in the shower seating area and one (1) in the toilet/lavatory area with the floor sloped accordingly
i. The sub-floor floor shall be constructed of cementitious board such as USG Durock® Brand cement board or equivalent. Rust proof steel may also be used if approved by the
USG.
All latrine trailer structural members shall be steel, including all substructure and frame floor joists. Walls shall be heavy-duty metal panels. All roofs shall be steel panels. No roof penetrations permitted.
3. ELECTRICAL:
The electrical system shall be designed to U.S. Standards. All sinks shall contain a 20 amp GFCI electrical outlet adjacent to each sink. One additional 20 amp GFCI wall outlet shall be installed near the floor in the shower area to facilitate general electrical requirements.
Two additional wall-mounted 25 amp outlets shall be installed, one on each of the end walls, seven (7) feet in height from the floor and 2 feet in length from the front wall, to accommodate split-pack evaporators that will be installed by others. Each unit shall contain twelve (12) double-lamp four (4) foot in length fluorescent light fixtures wired to a wall switch near the entry door. Each fixture shall be ceiling mounted parallel to each shower and toilet stall, half in the stall and half out. The electrical panel will be mounted on the interior near the hot water tank. Note: Electrical connection to main power supply will be done by others and is not part of this contract. See the following chart:
ITEM QTY DESCRIPTION CURREN
T RATING
BREAKER
SIZE
Water Heater 1
400 V,3 phase,50 HZ 2 elements @6000watt each maximum wattage 12000 watts
20 A 32A,3P
Outlets, located at lavatory 4 240V,Twin British outlet,13Amps 13A 16A,10mA RCBO breaker
Outlets, near bottom of wall in shower area
1 240V,Twin British outlet,13Amps 13A 16A,10mA
RCBO breaker
AC, located 7 foot height from floor on each end wall (2 feet from front wall)
2 240V,50HZ split unit AC,15Amps each 25A
30A,single pole breaker,2pcs
Lights 12
2x36 watts,4fts wet location light ceiling fixtures(240Volts,50Hz
1A 20A,single pole breaker.
Emergency light 1 2 head spot light emergency light fixture 1A 20A,single pole breaker.
Exhaust Fan 11 Total system to supply 8 air exchanges per hour
15A 20A,single pole breaker.
Exit sign 1 Exit sign 1A
Same circuit with Emergency light
4. MECHANICAL:
Latrine and shower facilities shall be adequately ventilated in accordance with the International Mechanical Code for Ventilation and Exhaust systems. One exhaust fan located above each of the four (4) toilet stalls on the rear wall is required with seven (7) others distributed in each shower stall along the rear wall, eleven (11) total. The entire fan system shall be designed and sized to provide a minimum of eight (8) air exchanges per hour.
The fans shall be wired to a wall switch near the entry door.
1. Plumbing fixtures shall be durable, commercial grade. All facility plumbing will be in accordance with International Plumbing Code.
AB UNIT ELECTRICAL
2. Provide energy efficient electric type 450 liter minimum capacity domestic water heaters for each latrine and shower unit.
3. All water heaters are required to have an automatic thermostat.
4. All water heaters will be 220V/50Hz
5. All water heaters shall have a temperature pressure relief valve piped installed with piping.
The above listed items serve as guidelines for design, installations and requirements.
Contractor will submit types and sizes to the COR at later stages of design but prior to manufacture.
5. GOVERNMENT FURNISHED PROPERTY: None
6. CONTRACTOR FURNISHED PROPERTY:
Contractor shall provide all labor, tools, and equipment required to fulfill requirements of the contract.
7. SUBMITTALS:
The contractor shall submit materials and plans for approval.
SECTION III – OTHER
a. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section. See also Exhibits 1 through 11.
2. QUALITY ASSURANCE
A. Installer Qualifications: Company specializing in performing the work of this section with minimum two years' experience.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
3. ASSEMBLY AND DELIVERY
A. Contractor shall provide delivery to the US Consulate Basrah compound. Delivery shall be made free on board (fob) not later than 180 calendar days after award. The 180-day period includes 10 workdays for Government review and approvals.
4. ELECTRICAL IDENTIFICATION
A. Identification Devices: A single type of identification product for each application category. Use colors prescribed by ANSI A13.1, NFPA 70, and these Specifications.
B. Fixtures and Accessories: Listed and labeled by a testing agency acceptable to authorities having jurisdiction.
C. Comply with NEC Electrical Code and all local ordinances.
5. FINISHES
A. Fixtures: Manufacturer's standard, unless otherwise indicated.
1. Paint Finish: Applied over corrosion resistant treatment or primer, free of defects.
2. Finish: Corrosion resistant.
6. FIELD QUALITY CONTROL
A. Inspect installed components for damage and faulty work, including the following:
1. Supporting devices for electrical components.
2. Electrical identification.
7. CLEANING AND PROTECTION
A. On completion of installation, including outlets, fittings, and devices, inspect exposed finish. Remove burrs, dirt, paint spots, and manufacturing debris.
B. Protect equipment and installations and maintain conditions to ensure that coatings, finishes, and cabinets are without damage or deterioration at time of delivery.
END OF SECTION
BASRAH CO
N
SU
LATE GEN
ERAL ABLU
TIO
N
TRAILERS
EXHIBIT 1, 5-1-2015
BASRAH CONSULATE GENERAL ABLUTION TRAILERS
EXHIBIT 2, 5-1-2015
EXHIBIT 2
Typical Single Handle Thermostatic Shower Mixing Valve
EXHIBIT 3, 5-1-2015
EXHIBIT 3
PROTOTYPE ONE-PIECE SHOWER UNIT
Sterling 72220100-0 ENSEMBLE 48" CURVE ALCOVE SHOWER - HIGH GLOSS by Sterling Collection: Ensemble
1 | P a g e http://www.efaucets.com/sterling-tubs-sinks.asp http://faucets.efaucets.com/nav/se/Ensemble/mn/Sterling/0
2 | P a g e
Maax® 36" 1-Piece Shower Model Number: 103001-000-002 | Menards® SKU: 6714578 Variation: White
3 | P a g e
EXHIBIT 4, 5-1-2015
EXHIBIT 4
TYPICAL STACKING OF ABLUTION UNITS
EXHIBIT 5, 5-1-2015
EXHIBIT 5
TYPICAL SINGLE HANDLE LAVATORY/SINK
FAUCET
EXHIBIT 6, 5-1-2015
EXHIBIT 6
TYPICAL WALL MOUNTED EXHAUST FAN
EXHIBIT 8
ALTERNATE SHOWER VALVE AND SPRAY HEAD
SPEAKMAN®
Exposed Anti-Scald Balanced Pressure Shower
S-1590-AF
FEATURES:
• Sentinel Mark II® exposed anti-scald balanced pressure Showerpac.
• 18 gauge stainless steel outer shielding.
• Stainless steel self-draining soap dish.
• Chrome plated brass lever handle.
• Adjustable temperature limit stop.
• Brass valve body. Integral spring check stops.
• Pressure balancing & ceramic temperature regulating cartridge with built-in check valves.
• Concealed integral mounting lugs.
• S-2292 showerhead with flow control device reduces flow to 2.5 gpm (9.46 L/min) maximum
• ½ in. copper tube inlets through the wall or dropped from ceiling.
• Vandal-resistant construction.
COMPLIANCE:
• Meets ASME A112.18.1 CSA B125.1 standards
• Valve meets ASSE 1016 standards.
FINISH:
• Polished Chrome (standard)
SPEAKMAN
400 ANCHOR MILL ROAD | NEW CASTLE, DE 19720
P: 800-537-2107 | F: 800-977-2747
WWW.SPEAKMANCOMPANY.COM
http://www.speakmancompany.com/
Exposed Anti-Scald Balanced Pressure Showerpac® S-1590-AF
4/02 92-1880 Rev-1
SPEAKMAN COMPANY
S-1590 Installation, Maintenance & Operation Instructions
SENTINEL MARK II ® ROYALE™ SHOWERPAC®
DESCRIPTION
Speakman Sentinel Mark II Royale SHOWERPAC exposed anti-scald balanced pressure SHOWERPAC.
18 gauge stainless steel outer shielding. Stainless steel self-draining soap dish. Chrome plated brass lever handle.
Adjustable temperature limit stop. Brass valve body. Integral spring check stops. ROYALE Pressure balancing module. Concealed integral mounting lugs. S- 2292-AF showerhead with flow control device reduces flow to 2.5 GPM/9.46 LPM maximum to meet existing ANSI A112.18.1M Standard. Standard ½” copper tube inlets through the wall or dropped from the ceiling. Vandal resistant construction. Meets ASSE 1016, 1989 Standard.
SPECIFICATIONS
SUPPLY: ½” COPPER TUBE INLETS
FLOW RATE: SHOWERHEAD, 2.5 GPM/9.46 LPM MAX., FIXED
SHIPPING WEIGHT: XXX LBS.
OPTIONS
INSTALLATION
Note: Refer to the complete installation/roughing-in literature supplied with the valve.
Remove the complete unit from the box. Remove the shield assembly from the valve unit by removing the screw above the showerhead elbow and the screw near the dial cap. Save the two (2) screws.
Determine the horizontal positioning of the valve unit. Determine the floor to showerhead heights from the Recommended Head Heights chart.
Holding the unit against the finished wall in the proper position, mark the location of the top mounting bracket holes (2), and the bottom mounting bracket hole (1). Remove unit from the wall and install any mounting anchors (not provided), as detailed by the individual room specifications.
Position the unit against the wall, secure top mounting bracket screws (2) (not provided). Secure bottom mounting bracket screw (1) (not provided).
Connect the supply lines to the inlets of the units. Supply lines must be on 4-13/16” centers. If unit has top supply lines they must also be 17/32” from center of lines to finished wall. Do not secure top supply lines to wall until complete Showerpac unit with shielding has been installed. Place handle on valve spindle and rotate counter-clockwise. Remove handle, turn both supplies on and check supply line connections for leaks.
Attach bottom/soap dish plate to shield with three (3) 3/8” long screws provided. Make sure back edge of plate is flush with side edges of shield. Tighten screws with 1/8” Allen wrench (provided). Attach top cover plate to shield same as above on unit without a vertical pipe cover (VPC-2). Unit with a VPC-2 does not use the top cover plate.
Attach shield assembly to valving unit by positioning shower head elbow of shield with top flange O-ring and lower large hole of shield with dial cap of unit. Slide shield into place against finish wall. Secure shield to unit with (3) screws provided. Use the 3/8” long screw for the top mounting hole above the showerhead elbow and the two (2) 1-1/4” long screws for the lower mounting holes near the dial cap. Tighten screws with Allen wrench provided.
Apply pipe thread sealant or tape to shower head elbow threads of shield. Attach shower head to elbow.
Wrench tighten.
Properly position handle in the “OFF” position and secure with ½” long screw provided.
With spring check stops fully opened, turn handle to the warm position and check shower head connection for leaks. Turn valve off.
To adjust the temperature limit stop, remove the handle and dial cap from the valve. Remove the rubber retaining ring and the first temperature limit stop (TLS) plate. The second TLS plate should be adjusted so that it comes into contact with the ◊ LH – Less Showerhead ◊ 2 - S-2252-AF – ANYSTREAM® Shower head
◊ 3 - S-2253-AF ANYSTREAM®
Shower head
◊ 4 - S-2220-AF – ADJUSTASPRAY
® Shower head
◊ 5 - S-2270-AF –
COSMOPOLITAN® Shower head
◊ 6 - S-2288-AF -
ANYSTREAM® Shower head ◊ 7 - S-2291-AF - Showerhead ◊ VPC-2 – Stainless steel vertical pipe cover, 2 ft. (610mm) sections.
(Must order as separate item.)
4/02 92-1880 Rev-1 lower side of the bonnet post when the valve is in the “OFF” position. Now turn the valve on to the desired maximum hot water discharge temperature, assemble the first TLS plate so that it contacts the upper side of the bonnet post. Turn valve off and reassemble the retaining ring, cap and handle. Because of fluctuations in the hot and cold water temperatures, it is not recommended that the temperature limit stop be used to preset the unit for showering temperatures.
Back to Back Installation: On this type of installation the regulating disc must be rotated 180° on the valve on which the hot and cold inlets were reversed. Refer to the complete installation/roughing-in literature supplied with the valve and see “Maintenance” for additional instructions.
OPERATION
Note: Both the hot and cold water must be on for the valve to operate properly. The handle of the valve is rotated clockwise to the desired temperature and then counter clockwise to turn the valve off.
MAINTENANCE
The ROYALE® valve relies on plastic and rubber components, quad-rings and O-rings for sealing. There are no seat washers or packings to repair, which reduces the need for routine maintenance. The valve contains a plastic regulating disc with rubber seal and a balancing module. After shutting off the integral stops through the access holes in the bottom/soap dish plate simply remove the valve handle and the shield assembly (total of four (4) screws) from the unit. Unscrew four (4) bonnet screws and remove bonnet assembly. When replacing the balance module, make sure that the quad-ring seals are properly installed within the module and that the module is installed with the seals directly over the body inlet ports. When replacing the regulating disc refer to the complete installation/roughing-in literature supplied with the valve.
It is suggested that the Temperature Limit Stop (TLS) be seasonally adjusted because of variations in the cold supply temperature to ensure the safety and comfort of the users.
Note: When servicing these modules and adjusting the TLS refer to the installation sheet supplied with the valve.
RECOMMENDED HEAD HEIGHTS
MEN
BOYS, SENIOR HIGH
BOYS, JUNIOR HIGH
BOYS, ELEMENTARY
6’0” 5’10” 5’6” 5’4”
WOMEN
GIRLS, SENIOR HIGH
GIRLS, JUNIOR HIGH
GIRLS, ELEMENTARY
5’8” 5’6” 5’4” 5’2”
REPAIR / REPLACEMENT PARTS
ITEM NUMBER
NOT SHOWN
NOT SHOWN
PART OR GROUP NUMBER
RPG03-0371
G05-0412-MO
G05-0413
RPG04-0367
DESCRIPTION
SPINDLE ASSY W/ O-RINGS & WASHERS
CERAMIC REGULATING MODULE ASSY W/ O-RINGS
BALANCING MODULE ASSY W/ QUAD RINGS
HANDLE WITH SCREW
4/02 92-1880 Rev-1
ROUGHING-IN DIMENSIONS
NOTES:
1. ALL DIMENSIONS ARE IN INCHES (MILLIMETERS) AND SUBJECT TO CHANGE WITHOUT
NOTICE.
2. UNIT CAN BE INSTALLED WITH TOP OR THROUGH THE WALL SUPPLIES.
3. ½” COPPER TUBE INLETS. SUPPLY PIPING NOT INCLUDED.
| Solicitation Cover |
| COMBINED SYNOPSIS & SOLICITATION |
| Binder1 |
| Combined Synopsis, PR4307107 |
| Solicitation Number PR4307107 |
| 652.209-79 REPRESENTATION BY CORPORATION REGARDING AN UNPAIDDELINQUENT TAX LIABILITY OR A FELONY CRIMINAL CONVICTION UNDER ANY FEDERAL LAW (DEVIATION PIB 2014-21) (SEPTEMBER 2014) |
| AMERICAN CONSULATE GENERAL |
| Giessener Strasse 30 |
| Germany |
| SOW-FINAL |
| STATEMENT OF WORK (07212015) |
| SECTION I – GENERAL REQUIREMENTS |
| SECTION II – TECHNICAL PROVISIONS |
| See the attached Exhibit 1 for numbers and layout of the toilets, sinks, and shower |
| units/stalls. |
| END OF SECTION |
| Exhibit+1 |
| Exhibit+2 |
| Exhibit+3 |
| Sterling 72220100-0 ENSEMBLE 48" CURVE ALCOVE SHOWER - HIGH GLOSS |
| Maax® 36" 1-Piece Shower |
| Exhibit+4 |
| Exhibit+5 |
| Exhibit+6 |
| Exhibit+7A |
| Exhibit+7B |
| Exhibit+8 |
| Exhibit+9A |
| Exhibit+9B |
| Exhibit+10 |
| Exhibit+11 |
File details come from the government source that posted it. Updated .