This PowerPoint presentation outlines the scope of work for a federal contract to replace and upgrade vehicular barriers at Independence Mall. The contract will involve verifying existing utilities, providing geotechnical and design reports, removing and protecting existing infrastructure, installing bollards and gates in seven designated areas, and reinstalling sidewalks and pavers. Work must be completed within 120 days of the notice to proceed between the hours of 7:00 AM and 5:00 PM Monday through Friday. The contractor will be responsible for securing the site, providing temporary facilities and maintaining at least two access routes. The presentation includes photos and details of the scope of work for each area. Any questions should be directed to the contract specialist via email.

The related federal contract opportunity is a solicitation from the Department of the Interior National Park Service Northeast Region for the Independence Mall vehicle denial barriers project.

View the file

Other files for this federal contract opportunity

Other files attached to INDE - VEHICLE DENIAL BARRIERS PROJECT, newest first.
File Type Posted
Sol_140P4220R0029_Amd_0002.pdf PDF
Drawing L6.3 and L6.4.pdf 9.1_0002.pdf PDF
Q A Response_0001.docx DOCX document
Sol_140P4220R0029_Amd_0001.pdf PDF
COVID for RFP PDF.pdf PDF
PAYMENT BOND SF25A- rvs.pdf PDF
Sol_140P4220R0029.pdf PDF
SPECIFICATIONS.pdf PDF
DENIAL BARRIERS PROJECT - DRAWINGS.pdf PDF
References Worksheet.pdf PDF
PERFORMANCE BOND SF25- rvs.pdf PDF
Wage Determination.txt TXT text file
Bid Guarantee SF24- rvs.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDE 310392: REPLACE AND UPGRADE

VEHICULAR BARRIERS AT INDEPENDENCE MALL

VIRTUAL SITE VISIT

COR: KEVIN VERNIA

EMAIL: KEVIN_VERNIA@NPS.GOV

PHONE: 267-455-9391

SITE PHOTO: SATALLITE VIEW

MISCELLANEOUS NOTES:

- CONTRACT DURATION: 120 DAYS FROM NTP

- WORK HOURS: 7:00 AM – 5:00 PM MON-FRI

- PARKING: NO ON-SITE PARKING, EXCEPT FOR LOADING

- RESTROOMS: CONTRACTOR TO PROVIDE TEMPORARY FACILITIES

- SECURITY: CONTRACTOR SHALL SECURE SITE FROM PARK VISITORS

- SITE ACCESS: CONTRACTOR TO PROVIDE AT LEAST TWO ROUTES TO CONTIOUSULY PROVIDE ACCESS INDEPENDENCE VISITOR CENTER

- PROJECT MEETINGS: WEEKLY OR BIWEEKLY AT COR’S DISCRESSION

CONTRACT SCOPE:

CONTRACTOR TO VERIFY LOCATIONS EXISTING UTILITES

CONTRACTOR TO PROVIDE GEOTECHNICAL REPORT

CONTRACTOR TO PROVIDE DESIGN SOLUTION FOR UTILITY

RELOCATIONS OR ANY FOUNDATION CHANGE

REMOVE EXISTING SIDEWALK AND REMOVE/PROTECT EXISTING

PAVERS

4. INSTALLATION OF BOLLARDS AND ASSOCIATED FOUNDATIONS

PROTECT/RELOCATE EXISTING UTILITIES

INSTALLATION OF GATES IN 3 LOCATIONS

REINSTALL SIDEWALK AND PAVERS

NOTE:THIS VIRTUAL SITE VISIT DOES NOT CHANGE OR COVER THE ENTIRETY OF THE PROJECT SCOPE. SEE

CONTRACT DRAWINGS AND SPECIFICATIONS FOR FULL SCOPE.

STAGING AREA

SCOPE: AREA A

SEE CONTRACT DOCUMENTS FOR MORE INFORMATION

SITE PHOTO: AREA A

SCOPE: AREA B

SITE PHOTO: AREA B

SCOPE: AREA C WEST

SCOPE: AREA C EAST

SITE PHOTO: AREA C LOOKING EAST

SCOPE: AREA D

SITE PHOTO: AREA D

SCOPE: AREA E

SITE PHOTO: AREA E

SCOPE: AREA F

SITE PHOTO: AREA F

SCOPE: AREA G

SITE PHOTO: AREA G

NEW WORK: 3D DETAILS

Area A Gate Bollards Areas B & D Gates

RFI’S: SEND TO CONTRACT SPECIALIST CHERRY SUMMERS AT:

CHERRY_SUMMERS@CONTRACTOR.NPS.GOV

image1.jpeg image2.jpg image3.jpg image4.jpg image5.jpg image6.jpg image7.jpg image8.jpg image9.jpg image10.jpg image11.jpg image12.jpg image13.jpg image14.jpg image15.jpg image16.jpg image17.jpg image18.jpg image19.jpg image20.jpg image21.jpg

File details come from the government source that posted it. Updated .