PMSC SOW PV System - Merida 0614024.docx

DOCX document 80 KB Posted

Attached to
U. S. Consulate Merida - Automatic Transfer Switches Preventive Maintenance Services Federal contract opportunity
Solicitation number
19MX5225Q0010
Issued by
Department of State

About this file

This is a Statement of Work (SOW) for preventive maintenance services of the Photovoltaic System at the U.S. Consulate General in Merida, Mexico. The contract requires semi-annual and annual maintenance of 5 SMA Sunny Tripower Core1 inverters (62.5 KW), 752 Sunpower SPR-X21-470-COM photovoltaic panels (470W), 3 SM Ascender Unirac structures, 10 combiner boxes, weather stations, and associated communications equipment.

The contract will be awarded for a base year plus four one-year options, with payment in Mexican pesos. Services include inspection, cleaning, testing, and preventive maintenance of all system components, with work to be performed between 7:30 AM and 4:30 PM Monday through Friday. The contractor must provide certified technicians, tools, testing equipment, and consumable materials. Repairs are not included in the base contract but will be priced separately. The contractor must submit personnel information and security clearances within 30 days of award, maintain required insurance coverage ($1,000 property damage, $10,000 cumulative), and provide detailed maintenance reports after each service visit. The maintenance schedule includes both semi-annual and annual preventive maintenance procedures for the inverters, photovoltaic modules, and ancillary equipment.

View the file

Other files for this federal contract opportunity

Other files attached to U. S. Consulate Merida - Automatic Transfer Switches Preventive Maintenance Services, newest first.
File Type Posted
SF1449 Page ATS.pdf PDF
Cover Automatic Transfer Switch.docx DOCX document
Merida ATS SOW PMSC 08282024.docx DOCX document
Cover Photovoltaic System Maintenance.docx DOCX document
SF1449 Page.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Consulate Merida UNCLASSIFIED

STATEMENT OF WORK FOR PREVENTIVE MAINTENANCE SERVICE CONTRACT

Photovoltaic System

United States Consulate General Merida

June 2024

TABLE OF CONTENTS

Section

1.DESCRIPTION
2.PRICING
3.NOTICE TO PROCEED
4.EQUIPMENT AND PERFORMANCE REQUIREMENTS
5.HOURS OF PERFORMANCE
6.ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT
7.SCHEDULED PREVENTIVE MAINTENANCE
8.PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES
9.SOFTWARE, LICENSES AND PASSWORDS
10.DELIVERABLES
11.INSURANCE REQUIREMENTS
12.LOCAL LAW REGISTRATION
13.QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
14.TRANSITIONS/CONTACTS
15.SUBMISSION OF INVOICES
16.EXIHIBT A - STATEMENT OF WORK
17.EXIHIBT B - EQUIPMENT DATA

1. DESCRIPTION

The American Consulate Merida requires preventive maintenance services for Photovoltaic System of the compound. These services shall result in all systems being serviced under this agreement being in good operational condition when activated. If this work is to be performed on systems accessing the PCC/CAA areas of the building, please see section 6.2.3 for security requirements.

1.1. Type of Contract

This is a firm fixed price contract payable entirely in Mexican pesos.

The contract price will not be adjusted due to fluctuations in currency exchange rates.

1.2. Period of Performance

The contract will be for a period of one-year, with a maximum of four one-year optional periods of performance.

2. PRICING

The rates below include all costs associated with providing preventive maintenance services in accordance with the attached scope of work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and GST (if applicable).

2.1. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.

CLIN
Description
Quantity of Equipment
Type of services
Unit price / service ($)
Total per year ($)
001
Photovoltaic system preventive maintenance
1
Semiannual
002
Photovoltaic system preventive maintenance
1
Annual

Total Base Year

2.2. Option Year 1. The Contractor shall provide the services shown below for Option Year 1 of the contract and continuing for a period of 12 months.)

CLIN
Description
Quantity of Equipment
Type of services
Unit price / service ($)
Total per year ($)
101
Photovoltaic system preventive maintenance
1
Semiannual
102
Photovoltaic system preventive maintenance
1
Annual

Total First Year

2.3. Option Year 2. The Contractor shall provide the services shown below for Option Year 2 of the contract and continuing for a period of 12 months.)

CLIN
Description
Quantity of Equipment
Type of services
Unit price / service ($)
Total per year ($)
201
Photovoltaic system preventive maintenance
1
Semiannual
202
Photovoltaic system preventive maintenance
1
Annual

Total Second Year

2.3. Option Year 3. The Contractor shall provide the services shown below for Option Year 3 of the contract and continuing for a period of 12 months.)

CLIN
Description
Quantity of Equipment
Type of services
Unit price / service ($)
Total per year ($)
101
Photovoltaic system preventive maintenance
1
Semiannual
102
Photovoltaic system preventive maintenance
1
Annual

Total Third Year

2.3. Option Year 4. The Contractor shall provide the services shown below for Option Year 4 of the contract and continuing for a period of 12 months.)

CLIN
Description
Quantity of Equipment
Type of services
Unit price / service ($)
Total per year ($)
101
Photovoltaic system preventive maintenance
1
Semiannual
102
Photovoltaic system preventive maintenance
1
Annual

Total Fourth Year

2.6. Total for all years:Base Year$
Option Year 1$
Option Year 2$
Option Year 3$
Option Year 4$
TOTAL$

2.7 Repair option. Repairs are Not included under this agreement (see 7.1.4) and are to be done outside this contract. However, the Government desires current labor rates if there is an issue discovered during the preventive maintenance of the specified equipment. Please provide your current labor rates in the Repair Option fields below. As stated in 7.1.4 any necessary repairs or parts will be submitted for approval and then billed against a separate purchase order. The Contractor is not approved to do any additional work without specific authorization from the Contracting Officer.

Repair Labor Rates

Base Year$/hr
Option Year 1$/hr
Option Year 2$/hr
Option Year 3$/hr
Option Year 4$/hr

3. NOTICE TO PROCEED

After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten <10> days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.

4. EQUIPMENT AND PERFORMANCE REQUIREMENTS

4.1. The American Consulate of Merida requires the Contractor to maintain the following equipment in a safe, reliable, and efficient operating condition. Please see equipment list included in Exhibit A for a more detailed description.

Inverters SMA, Model Sunny Tripower Core1, 62.5 KW (62-US-41), Three-phase.

Five (5) Inverters.

PV Modules (Solar Panels):

Sunpower, Model SPR-X21-470-COM, Photovoltaic Module of 470W, Monocrystalline.

752 PV Panels.

Photovoltaic Structure SM Ascender Unirac Structure, distributed on three (3) Parking Lots

Weather Station Rainwise PVMET-200 Sunspec RS482, with SMA Data Manager

4.2. The Contractor shall provide all necessary managerial, administrative, and direct labor personnel, as well as all transportation, equipment, tools, supplies, and materials required to perform inspection, maintenance, and component replacement as required to maintain the systems in accordance with this work statement. Under this Contract the Contractor shall provide:

The services of trained and qualified technicians to inspect, adjust, and perform scheduled preventive maintenance.

4.3. Performance Standards

The equipment shall be clean and in good operating condition upon completion of the service. The preventive maintenance service shall result in the parts of the system serviced being in a condition to operate efficiently and effectively.

5. HOURS OF PERFORMANCE

The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between the hours of 7:30AM and 4:30PM Monday through Friday. Depending on operating conditions, some events could be scheduled during weekend.

6. ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

6.1 General. The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor’s liaison with the American Consulate of Merida. The Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees will be given access to the equipment and equipment areas and will be escorted by Consulate personnel.

6.2 Personnel Security. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data, and police clearance on all Contractor personnel who to be used on this Contract prior to their utilization. Submission of information shall be made within 30 days of award of contract. No technician will be allowed on site without prior authorization. Note: this may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.

6.2.1 Vehicles. Contractor vehicles will not be permitted inside the compound without prior approval. If vehicle access is necessary, submit contractor vehicle information (Make, Model, License Plate #) along with a written justification as to why access is necessary. This shall be submitted to the Facility Manager at least one (1) week prior to the visit.

6.2.2 Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

Government shall issue identity cards to Contractor personnel, after they are approved. Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

6. 3 Security Clearances. All work under this contractor that are designated as non-CAA areas may be performed by un-cleared American or local workers. However, all work done in CAA and PCC areas shall be performed by cleared American Construction personnel as needed to complete the services. The Contractor shall work closely with the COR, the Post Facility Manager (FM) or the General Services Officer (GSO)

6.4 Standards of Conduct

6.4.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

6.4.3 Neglect of Duties. Neglect of duties is unacceptable. This includes sleeping while on duty, unreasonable delays, or failures to carry out assigned tasks, conducting personal affairs during duty hours, and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

6.4.4 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.

6.4.5 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

6.4.6 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.

6.4.7 Key Control. The Contractor will not be issued any keys. The keys will be checked out by a “Cleared American” escort on the day of service requirements.

6.4.8 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.

7. SCHEDULED PREVENTIVE MAINTENANCE

7.1. General

7.1.1. The Contractor shall perform preventive maintenance as outlined in Exhibit A - STATEMENT OF WORK. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown, and deterioration when units are activated/running.

7.1.2. The Contractor shall inventory, supply, and replace expendable parts that have become worn due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (air, fuel, oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor shall inventory the supply after each visit and order replacement supplies and have them delivered on site. Maintenance materials shall be unused and are to be industry standard and intended for the task to be performed. Parts shall be OEM approved.

7.1.3. Exclusion. This contract does Not include repair of equipment and replacement of hardware (e.g. bearings, pistons, piston rings, crankshaft, gears.) Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance. The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.

7.1.4. Replacement/repair of any electronic or electrical parts shall be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.

7.1.5. Stocking of recommended repair parts is at the discretion of the Facility Manager and is dependent upon the nearest location of the Equipment manufacturer, distributor, or dealer. A recommended spare parts list shall be obtained by the contractor from the manufacturer or distributor and provided to the Facility Manager to procure.

7.1.6. Parts/materials/tools procurement and delivery for the CAA/PCC areas shall be at the discretion of the Regional Security Officer (RSO)

7.2 Checklist Approval

The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to perform. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.

7.2.1. The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW. The technician shall sign off on every item of the checklist and leave a copy of this signed checklist with the COR or the COR's designate after each maintenance visit.

7.2.2. It is the responsibility of the Contractor to perform all manufacturers recommended preventive maintenance including preventive maintenance recommended by the manufacturers’ technical manuals for the respective equipment.

7.2.3 Additionally, the maintenance contractor shall obtain and keep at the post O&M binders provided by the manufacturers. These binders shall be placed in a location accessible to post personnel to review as needed.

8. PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES

8.1 The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.

8.2 Contractor furnished materials include but are not limited to appropriate tools, testing equipment, safety shoes and apparel for technicians, hands, hearing, and eye protection, MSDS, cleaning material and oil spill containment kit. Expendable/consumable items (e.g. hoses, belts, oil, chemicals, coolant, filters (air, fuel, oil), generator starting batteries, grease, sealant, thermostat, fuse), shall be maintained in the onsite inventory; see 7.1.2

8.3 Repairs are not included in this contract; see 7.1.3

8.4 Disposal of used oil, fuel, battery, and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.

8.5 Contractor shall provide certified technician(s) on thermal imaging analysis/inspection at level 1 or 2 according to ISO standards.

9. SOFTWARE, LICENSES AND PASSWORDS

Copies of all software and licenses needed to control or to adjust the communications module shall be given to the post upon completion of the work.

10. DELIVERABLES

Provide a typewritten report to Post Facilities Manager containing following:

a) System information (make, model, all device types)

b) Pass/Fail of each feature and type of component tested. If a device fails, note device type, address, and location within Post.

c) Any comments on system (or device) condition pertaining to service life and dependability.

d) Full printout of test from system printer The following items shall be delivered under this contract:

Description
QTY
Delivery Date
Deliver to
Names, biographic data, police clearance on Contractor personnel (see 6.2)
1
30 days after contract award
COR
Certificate of Insurance (see 11.2)
1
30 days after contract award
CO
PM Checklist signed by Contractor’s employee (see 7.2)
1
After completion of each maintenance service
COR
Invoice (see 15)
1
After completion of each maintenance service
COR

11. INSURANCE REQUIREMENTS

11.1 Personal Injury, Property Loss, or Damage (Liability). The Contractor assumes absolute responsibility and liability for all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract. The Contractor’s assumption of absolute liability is independent of any insurance policies.

11.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:

Public Liability Insurance

Property damage:1,000 USD
Cumulative:10,000 USD

12. LOCAL LAW REGISTRATION

If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the Contract shall be payable by the Contractor without Government reimbursement.

13. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

13.1 Plan. This plan is designed to provide an effective surveillance method to promote effective Contractor performance. The QAP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the Contract. The role of the Government is to conduct quality assurance to ensure that Contract standards are achieved.

Performance Objective
SOW
Performance Threshold

Services Performs all services set forth in the Statement of Work (SOW)

1 thru 12 & Exhibit A
All required services are performed and no more than one (1) customer complaint is received per month.

13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

13.3 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.

13.4. Procedures.

13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they will immediately contact the COR.

13.4.2 The COR will complete appropriate documentation to record the complaint.

13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

13.4.4 If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

13.4.6If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor shall notify the COR. The COR will review the matter to determine the validity of the complaint.
13.4.7The COR will consider complaints as resolved unless notified otherwise by the complainant.

13.4.8. Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

14. TRANSITIONS/CONTACTS

Within 30 days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services. The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract. The plan shall assign priority to the selection of all supervisors to be used under the contract.

14.1 On site contact. The following are the designated contact personnel between the Consulate of Merida and the Contractor:

Jaime Guillermo; GuillermoJJ@state.gov Luis Gallardo; GallardoLA@state.gov

15. SUBMISSION OF INVOICES

The Contractor shall submit an invoice after each preventive maintenance service has been performed. Invoices must be accompanied by a signed copy of the Maintenance Checklist for the work performed including parts replacement and break down calls, if any. No invoice for preventive maintenance services will be considered for payment unless accompanied by the relevant documentation.

The Contractor should expect payment 30 days after completion of service or 30 days after receipt of invoice at the American Consulate of Merida payment office, whichever is later. Invoices shall be submitted on dedicated portal: ILMS VENDOR PORTAL.

EXHIBIT A - Statement of Work

I. GENERAL INFORMATION

The American Consulate of Merida requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Photovoltaic System “PV”.

II. PROJECT REQUIREMENTS

DESCRIPTION OF EQUIPMENT:

Quantity
Equipment
Description
5
Inverter
SMA Sunny Tripower Core1, 62.5 KW (62-US-41), Three-phase
752
PV Module
Sunpower Model SPR-X21-470-COM, Photovoltaic Module of 470W, Monocrystalline.
3
PV Structure
SM Ascender Unirac Structure
4
Combiner Box
Beny Model BHS-4/2 with 4 inputs (string), 2 outputs (MPPT), 1000/1500 V
6
Combiner Box
Beny Model BHS-4/1 with 4 inputs (string), 1 output (MPPT), 1000/1500 V
1
Comms, Data Logger
SMA Model Data Manager M Ennexos, for Energy Management
1
Comms, Ethernet Switch
Phoenix Contact Model FL Switch SFNB 8TX, Industrial, with 8-Port RJ45 DIN Rail Mount
2
Comms, Converter
Moxa Ethernet to Fiber Optic Converter Model IMC-21A-S-SC
1
Comms, DAS Enclosure
Metal Cabinet IP66, RAL7035, 1000 x 800 x 300 mm
1
Weather Station
Fracsun Model Ares CS5, Soiling Sensor
1
Weather Station
Rainwise PVMET-200 Sunspec RS485, with SMA Data Manager
1
Hybrid Controller
DEIF ASC-150 Solar Controller and Accesories

III. GENERAL REQUIREMENTS

The Contractor under this SOW shall be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. The technician shall sign off on every task specified in the Statement of Work and will provide a typewritten copy of their report to the COR or the COR's designate within five business days of each maintenance visit. The Government has the following manuals: User Manual, O&M Manual.

IV. SCOPE OF WORK

Contractor shall provide all materials, supervision, labor, tools, and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and/or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO) immediately. Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials. Copies shall be provided to the COR for approval.

The Contractor shall inventory, supply, and replace expendable parts that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, oil, chemicals, grease, sealant, fuses, insolation; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits.

The contractor should inventory the supply after each visit and order replacement supplies and have them delivered on site. Maintenance materials shall be unused and are to be industry standard and intended for the task to be performed. Parts are to be OEM approved.

SAFETY AND SPECIAL INSTRUCTIONS:

Before any work start, all potential sources of energy must be de-energized, locked-out and tagged-out. The key to the lockout shall be given to the COR, Facility Manager or Consulate escort. The lock-out may only be removed once the COR, Facility Manager or Consulate escort approves so.

1. Follow site safety procedures and supervisor’s instructions.

2. Schedule outage with operating personnel.

3. Use extreme caution when climbing access ladders.

4. Perform applicable lockout/tag out steps of site safety procedures.

5. Lockout and disconnect the main power before tightening the main supply lugs to avoid the hazard of electrical shock, which could result in serious personal injury or death.

6. Record and report equipment damage or deficiencies.

7. Review and follow the manufacturer’s O&M instructions.

8. Record results in the equipment history log.

9. Allow only qualified personnel to do maintenance work on this equipment.

10. Record results in the equipment history log.

11. Check manufacturer’s specifications for the maximum number of plugged tubes.

12. Allow only qualified personnel to do maintenance work on this equipment.

Photovoltaic System

Annual Maintenance Procedure.

Inverters (5)

1. Check every inverter and charge controller for correct settings. Record all values.

2. Monitor system voltage and current. Check for alarm conditions.

3. Inspect and clean all electrical equipment.

4. Check for loose or burned connections. Tight lose connections.

5. Inspect and clean the fans and air grills. Run the "Fan-Test" function on the inverter panel for one minute.

6. Check the electronic solar switch for wear.

7. Wipe down inverter. Remove all internal and external dust and debris. Check for any signs of corrosion. Apply corrective measures such as paint, welding paste, enamel.

8. Check continuity of the grounding connection.

9. Make sure inverter automatically disconnects upon loss of grid power supply.

10. Perform an infrared check on the unit with certified technician. Record hot spots for correction.

11. Fill out maintenance log.

Photovoltaic Modules (752)

1. Check for dust or debris on the surfaces of the panels. Wipe clean. Do not use any solvents other than water. All modules surfaces shall be free of dust, animal waste, debris, smudges, mud, or any organic waste.

2. Check for physical damage to any PV module.

3. Report in writing to COR any damage findings.

4. Thoroughly check all cables for damage or burned marks.

5. Check for loose cable terminations between PV modules and PV arrays. Tighten loose connections.

6. Check mounting hardware and rails for tightness. Re-torque where necessary.

7. Inspect mounting hardware for signs of corrosion. Remove corrosion and re-coat.

8. Check continuity of grounding connections.

9. Perform an infrared check on the panels with certified technician. Record hot spots for correction.

10. Provide photo report via email to COR with hot spot pictures "Before" (when detected) and "After" (after correction was applied).

11. Fill out maintenance log.

Other Equipment

1. Check Weather Station for loosen or damaged parts. Tight if necessary and report in writing any issues to the COR.

2. Review Data Manager is working without interruption. Record present alarm(s) and correct alarms.

3. Remove dust: surfaces of the panel and all devices shall be free of dust, debris.

4. Inspect electrical panel board for proper torque and clean. Re-torque where necessary.

5. Check combiner boxes terminals for loosen or damaged parts. Tight as necessary.

6. Remove dust and debris from combiner boxes.

7. Inspect and clean ethernet switches and soiling sensor with appropriate soft brush. Re-tight terminals.

8. Report and log findings and work completed. Send written report to COR.

Semi-Annual Maintenance Procedure.

Inverters (5)

1. Check inverter and charge controller for correct settings. Record all values.

2. Monitor system voltage and current. Check for alarm conditions.

3. Inspect and clean all electrical equipment.

4. Check for loose or burned connections. Tight lose connections.

5. Inspect and clean the fans and air grills. Run the "Fan-Test" function on the inverter panel.

6. Check the electronic solar switch for wear.

7. Wipe down inverter. Remove all internal and external dust and debris. Check for any signs of corrosion. Apply corrective measures.

8. Check continuity of the grounding connection.

9. Check the inverter automatically disconnects upon loss of grid power supply.

10. Fill out maintenance log.

Photovoltaic Modules (752)

1. Check for dust or debris on the surfaces of the panels. Wipe clean. Do not use any solvents other than water. All modules surfaces shall be free of dust, animal waste, debris, smudges, mud, or any organic waste.

2. Check for physical damage to any PV module.

3. Report in writing to COR any damage findings.

4. Thoroughly check all cables for damage or burned marks.

5. Check for loose cable terminations between PV modules and PV arrays. Tighten loose connections.

6. Check mounting hardware and rails for tightness. Re-torque where necessary.

7. Inspect mounting hardware for signs of corrosion. Remove corrosion and re-coat.

8. Check continuity of grounding connections.

9. Perform an infrared check on the panels with certified technician. Record hot spots for correction.

10. Provide photo report via email to COR with hot spot pictures "Before" (when detected) and "After" (after correction was applied).

11. Fill out maintenance log.

Other Equipment

9. Check Weather Station for loosen or damaged parts. Tight if necessary and report in writing any issues to the COR.

10. Review Data Manager is working without interruption. Record present alarm(s) and correct alarms.

11. Remove dust: surfaces of the panel and all devices shall be free of dust, debris.

12. Inspect electrical panel board for proper torque and clean. Re-torque where necessary.

13. Check combiner boxes terminals for loosen or damaged parts. Tight as necessary.

14. Remove dust and debris from combiner boxes.

15. Report and log findings and work completed. Send written report to COR.

EXHIBIT B – Equipment Data Sheet

Quantity
Equipment
Description
5
Inverter
SMA Sunny Tripower Core1, 62.5 KW (62-US-41), Three-phase
752
PV Module
Sunpower Model SPR-X21-470-COM, Photovoltaic Module of 470W, Monocrystalline.
3
PV Structure
SM Ascender Unirac Structure
4
Combiner Box
Beny Model BHS-4/2 with 4 inputs (string), 2 outputs (MPPT), 1000/1500 V
6
Combiner Box
Beny Model BHS-4/1 with 4 inputs (string), 1 output (MPPT), 1000/1500 V
1
Comms, Data Logger
SMA Model Data Manager M Ennexos, for Energy Management
1
Comms, Ethernet Switch
Phoenix Contact Model FL Switch SFNB 8TX, Industrial, with 8-Port RJ45 DIN Rail Mount
2
Comms, Converter
Moxa Ethernet to Fiber Optic Converter Model IMC-21A-S-SC
1
Comms, DAS Enclosure
Metal Cabinet IP66, RAL7035, 1000 x 800 x 300 mm
1
Weather Station
Fracsun Model Ares CS5, Soiling Sensor
1
Weather Station
Rainwise PVMET-200 Sunspec RS485, with SMA Data Manager
1
Hybrid Controller
DEIF ASC-150 Solar Controller and Accesories

File details come from the government source that posted it. Updated .