Plans - NP-BLRI PVT PRES FY22(1).pdf
PDF 12 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- 693C73-23-B-000003
About this file
This solicitation is for thin lift asphalt overlay work on roadways, overlooks, and parking areas along a 74-mile stretch of the Blue Ridge Parkway located in six North Carolina counties. Certified small businesses will competitively bid to provide asphalt patching, crack sealing, pavement markings, and other miscellaneous work in multiple schedules or contract options with total costs expected between $2 million to $5 million. Interested vendors must register at www.sam.gov in order to receive email notifications or bid documents for Solicitation Number 693C73-23-B-000003 issued by the Department of Transportation Federal Highway Administration on or around September 30th, 2022. Bids are due at a date and location specified in the solicitation.
The document outlines registration and certification requirements for prospective contractors on websites like www.sam.gov and http://www.dol.gov/vets/vets4212.htm per FAR provisions. It also provides security protocols for visitors attending bid openings at the specified location.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO - NP-BLRI PVT PRES FY22(1).pdf | ||
| Route ID_BLRI_C4.pdf | ||
| Rip Report_BLRI_C5.pdf | ||
| Pavement Recommendations.pdf | ||
| IFB Solicitation - NP-BLRI PVT PRES FY22(1).pdf | ||
| VETS-4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| FP14_Eng.pdf | ||
| Route ID_BLRI_C5.pdf | ||
| Rip Report_BLRI_C4.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
NP BLRI PVT PRES FY22(1)
NORTH CAROLINA
SWAIN, AND TRANSYLVANIA COUNTIES
BUNCOMBE, HAYWOOD, HENDERSON, JACKSON,
NATIONAL
PARK
SERVICE
Project Manager
Sheila Foronda
Lead Designer
Shoukat Nawaz
Highway Design Manager
Alondra Sierra
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
AUGUST 2022
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
PROJECT LENGTH: 8.22 Miles
SPECIFICATIONS:
LANE MILES:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
Know what'sbelow.
before you dig.Call
R
N
Asheville
Greensboro
Charlotte
Raleigh
Jacksonville
Te nn es se e
Virginia
Blu e
Ri dg e
Pk w y.
At la nt ic O ce an
STATE OF NORTH CAROLINA
KEY MAP
SCALE IN MILES
0 60 120
NP BLRI PVT PRES FY22(1)
MP 394.67- MP 469.50
15.68 Miles
PARKING AREAS
OVERLOOKS
ROADWAYS
SCHEDULE:
WIDTH
Varies
Varies
SURFACE BASE
N/A N/A
SUBGRADE
ACP N/A N/A
ACP
markings, and other miscellaneous work.
patching, crack cleaning and sealing, pavement from MP 394.67 to MP 469.50. Work includes asphalt and parking areas along the Blue Ridge Parkway Thin lift asphalt overlay of roadways, overlooks, DESCRIPTION OF PROJECT
IMPROVEMENT:
A 394.67 to 442.50 8.494.24
Title Sheet
Symbols and Abbreviations
Location Map
Typical Sections
Tabulation of Quantities
Summaries and Schedules
Temporary Traffic Control Closure Plan
DESCRIPTION
SHEET
NO
A01
A02-A03
A04-A07
B01-B02
C01
C02-C08
N01-N03
S01-S10 Standards and Details
M01-M03 Erosion and Sediment Control Narrative
A08-A09 Mileage Tabulation
INDEX TO SHEETS
NP BLRI PVT PRES FY22(1)
MP 394.67- MP 469.50
N
4 & 5
Varies N/A N/AACP
C 408.79 to 408.97 0.61 0.70 4
Public Routes (FLTP)
Non-Public Routes (Non-FLTP)
Schedule Description Milepost to Milepost (Miles)
Length Lane Miles Cycle #
B 443.05 to 469.50 6.493.37 4 & 5Public Routes (FLTP)
See Mileage Tabulation Summary for additional information.
BLUE RIDGE PARKWAY
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
FROM MP 394.67 TO MP 469.50
AND PARKING AREAS
PARKWAY ROADWAYS, OVERLOOKS,
PAVEMENT PRESERVATION FOR BLUE RIDGE
:1
P
M
A u g u s t
A
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
N P
B L
R I
P V
T P
R E
S F
Y
(1 tt l.
d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A01
NPS Dwg No. BLRI 601 180476 PMIS No. 325854 & 325820 pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve original ground outside diameter out to out ordinary high water mark on center nominal maximum size aggregate normal crown north mon.
min.
max.
MP
ML
monument minimum maximum mile post main line spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south spa.
shldr.
sec.
SC
SADT
S
NMSA
NC
N
OG
OD
o. to o.
ohwm
o. c.
pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot sym.
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SS
SRS
sqyd sqft typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed
W west
1 6
1 6
SEC.
SEC.
0.00EL. E
N 0
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SYMBOLS AND ABBREVIATIONS
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CO
CMP
CL
cc or c. to c.
brg.
br.
BP
BM
BK
appr.
AH
ADT
ACP
abut.
double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column contracting officer corrugated metal pipe centerline center to center bearing bridge balance point benck mark back approach ahead average daily traffic asphalt concrete pavement abutment expansion joint excavation edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation elevation with number superelevation rate east flg.
fin.
flange finish exp. jt.
exc.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elev.
e
E θs Ø ∆c spiral central angle diameter curve central angle total central angle ftg.
galv.
ga.
HW
hex.
hdwl.
ID
jt.
footing galvanized gage (gauge) high water hexagon headwall inside diameter joint lat.
lam.
L latitude lamination length of curve
LW
lt. or LT Ls
LPSM
long.
LOD
low water left length of spiral lump sum longitudinal Limits of Disturbance
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
Spring or Seep
Treeline; Individual Trees, Pine
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:5
A
J u ly
S
H E
E T
P
R O
J E
C T
S \b lr i\ P
V T
P R
E S
F Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A -A
N
P B
L R
I P
V T
P R
E S
F Y
(1 s y m
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A02
DI
AREA PATTERN
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION BLUE RIDGE PARKWAY
SYMBOLS AND ABBREVIATIONS
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
Blue Ridge ParkwayBLRI
:5 u ly
S
H E
E T
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
N
P B
L R
I P
V T
P R
E S
F Y
(1 s y m .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A03
MP 469.50
END PROJECT
MP 394.67
BEGIN PROJECT
U.S. DEPARTMENT OF TRANSPORTATION
LOCATION MAP
KEY MAP
BLUE RIDGE PARKWAY
Sheet 1 of 4
NO SCALE
:2
J u ly
A
S h e e t]
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\C A
D D
\A -A
N
P B
L R
I P
V T
P R
E S
F Y
(1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A04
BLRI-0200
BLRI-1157
BLRI-1158CZ
BLRI-1158AZ
BLRI-1158BZ
BLRI-1158EZ
BLRI-1158DZ
N/AN/A-83.14120935.45972WATER ROCK KNOB OVERLOOK PARKING EBLRI-1158EZPUBLICB
N/AN/A-83.1413235.459798WATER ROCK KNOB OVERLOOK PARKING DBLRI-1158DZPUBLICB
N/AN/A-83.14075335.460352WATER ROCK KNOB OVERLOOK PARKING CBLRI-1158CZPUBLICB
N/AN/A-83.14088135.459678WATER ROCK KNOB OVERLOOK PARKING BBLRI-1158BZPUBLICB
N/AN/A-83.14075135.45965WATER ROCK KNOB OVERLOOK PARKING ABLRI-1158AZPUBLICB
N/AN/A-83.14080435.457808BROWNING KNOB OVERLOOKBLRI-1157PUBLICB
-83.14125535.45891-83.14272535.456365WATERROCK KNOB OVERLOOK ACCESS ROADBLRI-0200PUBLICB
LONGITUDELATITUDELONGITUDELATITUDE
ENDBEGIN
LOCATION
ROUTE NAMEROUTE ID
TYPE
ACCESS
SCHEDULE
Schedule B
Schedule B
Schedule B
Schedule B
Schedule B
Schedule B
Schedule B
U.S. DEPARTMENT OF TRANSPORTATION
SITE MAP
Sheet 2 of 4
NO SCALE
:2
J u ly
A
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\C A
D D
\A -A
N
P B
L R
I P
V T
P R
E S
F Y
(1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A05
-82.75459335.40404-82.75639735.402513MOUNT PISGAH CAMPGROUND ACCESS ROADBLRI-0202ZPUBLICA
N/AN/A-82.75568535.402373MOUNT PISGAH RESTAURANT SERVICE ROADBLRI-1106CNON-PUBLICC
LONGITUDELATITUDELONGITUDELATITUDE
ENDBEGIN
LOCATION
ROUTE NAMEROUTE ID
TYPE
ACCESS
SCHEDULE
N
BLRI-0202Z
BLRI-1106C
BLRI-1107
BLRI-1105
BLRI-1106A
BLRI-0202AZ
BLRI-0202BZ
BLRI-0202DZ
BLRI-0202CZ
Schedule A
Schedule C
U.S. DEPARTMENT OF TRANSPORTATION
NO SCALE
Sheet 3 of 4
:2
J u ly
A
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\C A
D D
\A -A
N
P B
L R
I P
V T
P R
E S
F Y
(1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A06
-82.75639235.410569-82.75123335.414472MOUNT PISGAH TREATMENT PLANT ROADBLRI-0422NON-PUBLICC
LONGITUDELATITUDELONGITUDELATITUDE
ENDBEGIN
LOCATION
ROUTE NAMEROUTE ID
TYPE
ACCESS
SCHEDULE
N
BLRI-0422
BLRI-1104
BLRI-1181BZ
BLRI-1181AZ
BLRI-0203
Schedule C
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 4 of 4
:2
J u ly
A
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\C A
D D
\A -A
N
P B
L R
I P
V T
P R
E S
F Y
(1 lo c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A07
Sheet 1 of 2
MILEAGE TABULATION
:2
M a r c h
B a s e .B
.U S
G
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A08
MILEAGE TABULATION
Sheet 2 of 2
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) A09
cross slope Match existing cross slope Match existing
Limits of disturbance
Existing asphalt pavement
Existing aggregate base according to Detail E401-01.
Transition to match existing pavement elevations 10.
between asphalt lifts.
Apply non-tracking polymer asphalt tack coat to placing pavement preservation treatment.
Place non-tracking polymer asphalt tack coat prior 9.
by the CO.
Detail E414-01A and Section 414 as directed
Perform crack sealing and filling according to 8.
applying the pavement preservation treatment.
Perform asphalt pavement patching prior to 7.
on conditions encountered at time of construction.
The CO will determine the patching limits based 6.
stations within project limits.
Do not disturb existing loop detectors or count 5.
pavement preservation treatment.
other deleterious materials prior to placing
Remove thermoplastic pavement markings and 4.
the Government.
construction operations at no additional cost to treatment. Replace curb or gutter damaged during appurtenances from pavement preservation
Protect all curbs, sidewalks, and other roadside 3.
the CO. See Detail E157-04A.
Install fiber rolls for inlet protection as directed by 2.
pavement.
Limit work to the footprint of the existing and extent of pavement preservation treatment.
Refer to the Pavement Summary sheets for area 1.
-inch depth, PG 64-224 <0.3 million ESAL, Gyratory Mix, No. 4 Sieve NMSA, Thin Lift Asphalt Concrete Pavement, (Typ.)
Existing ground
See Note 3
Non-tracking polymer asphalt tack coat
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
NOTES:
PAVEMENT PRESERVATION TREATMENT
Sheet 1 of 2
TYPICAL SECTIONS
:3 u ly
B
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\B
-B
N
P B
L R
I P
V T
P R
E S
F Y
(1 ty p
.d g n
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) B01
C
12" 12"
V a r ie s
L Road to distress
Patch saw cut parallel/perpendicular
ACP patching to edge of pavement of pavement, remove
<24" from the edge
If the patch limit is
PLAN VIEW
ASPHALT PAVEMENT PATCH
m in
Pavement Distress
6"
Existing Ground
Limit of undercut pavement (Typ.)
Existing asphalt concrete face full depth (Typ.)
Saw cut vertical
SECTION A-A
geotextile, class 2, type E Separation-stabilization Aggregate base grading C or D
Backfill with min. 6"
Emulsified asphalt tack coat (Typ.)
a min. of 10"
Remove the pavement base and subgrade
Place in 2 equal lifts, min.
thickness if the existing pavement is less.
(match depth of existing asphalt) or 4" min.
Asphalt concrete, type I
See Typical Section, Sheet 1 of 2.
Pavement preservation treatment.
pavement (Typ.)
Existing asphalt concrete full depth (Typ.)
Saw cut vertical face subbase, or subgrade
Remove pavement to expose
Emulsified asphalt tack coat (Typ.)
3' min.
Varies
SECTION A-A
(match depth of existing asphalt)
Asphalt concrete, type I
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2
See Typical Section, Sheet 1 of 2.
Pavement preservation treatment.
Existing Ground
Non-tracking polymer asphalt tack coat
Non-tracking polymer asphalt tack coat
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
between asphalt lifts.
Apply non-tracking polymer asphalt tack coat 3.
on conditions encountered at time of construction.
The CO will determine the patching limits based 2.
applying the pavement preservation treatment.
Perform asphalt pavement patching prior to 1.
NOTES:
3' min.
Varies
Sheet 2 of 2
TYPICAL SECTIONS
:4
A u g u s t
B
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\B
-B
N
P B
L R
I P
V T
P R
E S
F Y
(1 ty p
.d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) B02
SCHEDULE A
SCHEDULE B
SCHEDULE C
TABULATION OF QUANTITIES
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C01
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 7
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:5
A u g u s t
S u m m a r ie s a n d
S c h e d u le s
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
C
-C
N P
B L
R I
P V
T P
R E
S F
Y
(1 q ty .d g n
SUMMARIES AND SCHEDULES
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C02
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 7
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:5
A u g u s t
S u m m a r ie s a n d
S c h e d u le
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
C
-C
N P
B L
R I
P V
T P
R E
S F
Y
(1 q ty .d g n
SUMMARIES AND SCHEDULES
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C03
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 3 of 7
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:5
A u g u s t
S u m m a r ie s a n d
S c h e d u le
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
C
-C
N P
B L
R I
P V
T P
R E
S F
Y
(1 q ty .d g n
SUMMARIES AND SCHEDULES
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C04
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 4 of 7
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:5
A u g u s t
S u m m a r ie s a n d
S c h e d u le
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
C
-C
N P
B L
R I
P V
T P
R E
S F
Y
(1 q ty .d g n
SUMMARIES AND SCHEDULES
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C05
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 5 of 7
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:5
A u g u s t
S u m m a r ie s a n d
S c h e d u le
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
C
-C
N P
B L
R I
P V
T P
R E
S F
Y
(1 q ty .d g n
SUMMARIES AND SCHEDULES
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C06
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 6 of 7
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:5
A u g u s t
S u m m a r ie s a n d S c h e d u le
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
C
-C
N P
B L
R I
P V
T P
R E
S F
Y
(1 q ty .d g n
SUMMARIES AND SCHEDULES
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C07
SUMMARIES AND SCHEDULES
Sheet 7 of 7
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:5
A u g u s t
S u m m a r ie s a n d
S c h e d u le
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\A
-A
C
-C
N P
B L
R I
P V
T P
R E
S F
Y
(1 q ty .d g n
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) C08
Stabilize all areas that are disturbed due to the removal of sediment control devices-vegetation has not established
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas where-
After the completion of roadway construction do the following as directed by the CO to permanently stabilize disturbed areas:
or 1-202-267-2675.
Report spills large enough to discharge to surface water to the National Response Center (NRC) at 1-800-424-8802-waste materials into the on-site dumpsters. Dispose of material according to Federal, State, and local regulations.
appropriate and clearly marked containers away from other non-waste materials. Do not dispose of hazardous conduct these activities in a covered area to avoid contact with storm water. Store all hazardous waste materials in could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and battery fluid. If feasible, Hazardous waste will not be generated from normal construction activities. Equipment fueling and maintenance-
Collect and store all waste in dumpsters, or in metal or plastic drums as appropriate.
Solid waste resulting from the construction will consist of construction debris, garbage, and empty containers.-
Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.-
In general, preserve existing vegetation, trees, and shrubs.-of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain regularly all mechanized equipment used in or near surface waters to prevent contamination-
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.-measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control-
Do not allow construction vehicles to track sediment outside the project limits.-
Do not drive construction equipment across flowing waterways.-type, size, or location of any control or practice without prior approval from the CO.
Install all erosion and sediment control measures as directed by the Contracting Officer (CO). Do not modify the-in conjunction with the construction of this project. These include:
Temporary Best Management Practices (BMP) to reduce erosion as a result of project work will be implemented
Requirements.
Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 and in the Special Contract
Erosion Control and Turf Establishment measures listed in this narrative are defined and outlined in the Standard
EROSION AND SEDIMENT CONTROLS
The Runoff Coefficient prior to construction and after construction will be the same.
No new impervious surface will be created by the project.
Soil disturbing activities are minimal for this project.
SUMMARY
pavement markings, and other miscellaneous work.
from MP 394.67 to MP 469.50. Work includes asphalt patching, crack cleaning and sealing, This project consists of thin lift asphalt overlay of roadways, overlooks, and parking areas along the Blue Ridge Parkway
PROJECT DESCRIPTION
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
half the height of the device. Replace damaged fiber roll within 24 hours of inspections.
in place and is not damaged or clogged. Remove sediment deposits from the fiber roll when it reaches
Inlet protection - Inspect inlet protection weekly and after each runoff event to ensure it remains firmly end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
MAINTENANCE AND INSPECTION PROCEDURES
Remove all other perimeter controls when directed by the CO.-where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas-
Apply permanent turf establishment to any remaining disturbed areas.-
After completion of roadway construction do the following as directed by the CO:
PHASE III- Final Construction / Stabilization
Do not allow ponded water to encroach into the travel lanes.
according to Section 624 and 625.
As soon as practical, but not to exceed 7 calendar days, apply permanent turf establishment to the finished slopes or as directed by the CO.
Apply temporary turf establishment in completed disturbed areas that will remain exposed for over 7 calendar days, problems.
The CO may direct the installation of certain controls in order to forestall or mitigate potential or existing erosion
PHASE II- Intermediate Controls limits.
not leave the project site. Perimeter controls include fiber roll and other approved measures outside the construction
Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment does
PHASE I Establish Perimeter Controls
EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE
Sheet 1 of 3
U.S. DEPARTMENT OF TRANSPORTATION
NARRATIVE
EROSION AND SEDIMENT CONTROL
:1 u ly
M
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\C A
D D
\M -M
N
P B
L R
I P
V T
P R
E S
F Y
(1 e s c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) M01
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
half the height of the device. Replace damaged fiber roll within 24 hours of inspections.
in place and is not damaged or clogged. Remove sediment deposits from the fiber roll when it reaches
Inlet protection - Inspect inlet protection weekly and after each runoff event to ensure it remains firmly end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
MAINTENANCE AND INSPECTION PROCEDURES
Remove all other perimeter controls when directed by the CO.-where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas-
Apply permanent turf establishment to any remaining disturbed areas.-
After completion of roadway construction do the following as directed by the CO:
PHASE III- Final Construction / Stabilization
Do not allow ponded water to encroach into the travel lanes.
according to Section 624 and 625.
As soon as practical, but not to exceed 7 calendar days, apply permanent turf establishment to the finished slopes or as directed by the CO.
Apply temporary turf establishment in completed disturbed areas that will remain exposed for over 7 calendar days, problems.
The CO may direct the installation of certain controls in order to forestall or mitigate potential or existing erosion
PHASE II- Intermediate Controls limits.
not leave the project site. Perimeter controls include fiber roll and other approved measures outside the construction
Prior to any clearing, grubbing, and excavation, construct perimeter controls to ensure that disturbed sediment does
PHASE I Establish Perimeter Controls
EROSION & SEDIMENT CONTROL CONSTRUCTION SEQUENCE
Sheet 2 of 3
U.S. DEPARTMENT OF TRANSPORTATION
:1 u ly
M
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\C A
D D
\M -M
N
P B
L R
I P
V T
P R
E S
F Y
(1 e s c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) M02
Sheet 3 of 3
U.S. DEPARTMENT OF TRANSPORTATION
:1 u ly
M
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\C A
D D
\M -M
N
P B
L R
I P
V T
P R
E S
F Y
(1 e s c .d g n
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) M03
Sheet 1 of 3
OFFICE OF FEDERAL LANDS HIGHWAY
the Temporary Traffic Control Closure Plan.
Perform roadway and parking area closures as shown in3.
simultaneously.
No consecutive overlooks or parking areas may be closed
Do not close more than three roadways at the same time.2.
from the CO at least two weeks prior to closures.
Obtain approval for roadway or parking area closures1.
NOTES:
U.S. DEPARTMENT OF TRANSPORTATION
CLOSURE PLAN
TEMPORARY TRAFFIC CONTROL
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:3
A u g u s t
T
T C
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\N
-N
N
P B
L R
I P
V T
P R
E S
F Y
(1 tt c .d g n
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) N01
Sheet 2 of 3
OFFICE OF FEDERAL LANDS HIGHWAY
the Temporary Traffic Control Closure Plan.
Perform roadway and parking area closures as shown in3.
simultaneously.
No consecutive overlooks or parking areas may be closed
Do not close more than three roadways at the same time.2.
from the CO at least two weeks prior to closures.
Obtain approval for roadway or parking area closures1.
NOTES:
U.S. DEPARTMENT OF TRANSPORTATION
:2
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c e l
:4
A u g u s t
T
T C
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\C A
D D
\N
-N
N
P B
L R
I P
V T
P R
E S
F Y
(1 tt c .d g n
STATE PROJECT
NUMBER
SHEET
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) N02
Barricade Type 3 (typ.)
Varies
500'
500'
CLOSED
PARKING CLOSED
PARKING
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
(Mounted on Type 3 Barricade)
48"x30"
R11-2 (Modified)
AHEAD
CLOSED
PARKING
36"x36" W20-3 (Modified)
AHEAD
CLOSED
PARKING
36"x36" W20-3 (Modified)
TYPICAL PARKING AREA CLOSURE
Barricade Type 3 (typ.)
500' 500'
CLOSED
ROAD
(Mounted on Type 3 Barricade)
48"x30"
R11-2
AHEAD
CLOSED
ROAD
36"x36" W20-3
CLOSED
ROAD
(Mounted on Type 3 Barricade)
48"x30"
R11-2
AHEAD
CLOSED
ROAD
36"x36" W20-3 depending on width of the entrance or exit.
2. Number of barricades required may vary entrances and exits or as directed by the CO.
1. Place barricades across parking areas and roadways
NOTES:
TYPICAL ROADWAY CLOSURE
NO SCALE Sheet 3 of 3
M a r c h
B a s e .B
E n g in e e ri n g
S o ft w a re
\c a d d \B e n tl e y
S o ft w a re
\O p e n
R o a d s D e s ig n e r\
C O
N F
IG
\O p e n
R o a d s D e s ig n e r
C E
W S
V
\O p e n
R o a d s
D e s ig n e r_
C E
\C o n fi g u ra ti o n
\O rg a n iz a ti o n
-C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S
V \C e ll
\F L
H -C e ll s .c l
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) N03
2%
3%
4%
5%
33'
22'
16'
13'
INLET PROTECTION
set under drain inlet.
Non-woven filter fabricFl ow
FlowFlow
Fl ow
F lo w
F lo w
PLAN VIEW
Area
Undisturbed
Flow
Flow
** Adjust spacing as approved based on site conditions
* Do not install check dams on grades below 2%
50'
33'
25'
20'
PLAN VIEW
FIBER ROLL CHECK DAM
20 ft
15 ft
10 ft1V:2H or Steeper
1V:4H - 1V:2H downslope stakes equidistant between
Upslope stake, place
Flow
8' max
Flow
4' max
Contour line (typ.)
E157-04A height of roll2 1to
Wood mulch or compost
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
See Note 11 ends and 36" o.c. (typ.)
Gravel bag weights at
See Note 6
Wood stake (typ.)
FIBER ROLL CHECK DAM CROSS SECTIONS
V-DITCH TRAPEZOIDAL DITCH
ENTRENCHED INSTALLATION
FIBER ROLL ISOMETRIC VIEW
requirements of Subsection 713.13.
Provide gravel bag weights meeting the inlet protection detail.
use gravel bags to support them as shown on the
When fiber rolls are required on paved surfaces, months after installation.
installation and photodegradable fiber rolls 12
Replace biodegradable fiber rolls 6 months after one-half the height of the exposed fiber roll.
Remove sediment deposits when accumulation is ends 12 inches minimum and stake.
When more than one fiber roll is needed, overlap
Subsection 713.08(a).
Furnish wood stakes meeting the requirements of ground and 3 inches protruding above the roll.
length to attain a minimum of 12 inches into the section of 2-inch x 2-inch and of sufficient
Use wood stakes with a minimum nominal cross alignment.
least 8 feet upslope at 45 degrees to the main contours. Extend both ends of the fiber roll at
Place fiber rolls on level grade and parallel to along the fiber roll.
mulch or compost on uphill side of the slope
For untrenched installation, blow or hand place the fiber roll.
1-inch that may interfere with proper function of including rocks, clods, and debris greater than
Prior to installation, clear all obstructions a minimum 12-inch diameter.
For drain inlet protection, use fiber rolls with
Use fiber rolls with a minimum 8-inch diameter.
Subsection 713.12.
Provide fiber rolls meeting the requirements of
NOTES:
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
UNTRENCHED INSTALLATION
SLOPE MAX INTERVAL
1V:4H or Flatter
LENGTH ABOVE FIBER ROLLS
MAXIMUM ALLOWABLE SLOPE
SPACING TABLE
FIBER ROLL CHECK DAM
*GRADE
DITCH SPACING (S)
CHECK DAM
8" HIGH 12" HIGH
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, the diameter of the roll (max.)
1Trench into ground
1' (min.)
12" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 2' (max.)
(typ.)
Fiber roll
FIBER ROLL OVERLAP
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
FIBER ROLL
PLAN VIEW
TYPE 4A AND 6A CURB OPENING INLETS
INLET PROTECTION FOR
Fl ow
Face of vertical opening at edge of ditch material to stake excess sock
Draw and tie off opening as directed by the CO.
the fiber roll and the inlet
Place concrete block between
8" dia. min.
Fiber roll, :4
J u n e
S h e t
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S
-E
A
F ib e r
R o ll
In le t P ro te c ti o n d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
EFLHD DETAIL
SHEET
NC NP BLRI PVT PRES FY22(1) S01
K VALUE TABLE (ft/in)
30 35 40 45 50 55 60 65 70 75
30 32.5 35 37.5 40 42.5 45 47.5 50 52.5
* Use a K Value of 30 for speeds less than 30 MPH.
K
(MPH) *
POSTED SPEED
NOTE:
2 inches x 42.5 ft./in. = 85 feet.
Then the minimum transition length =
Effective overlay thickness = 2 inches
If the posted speed is 55 MPH
Example :
(Minimum transition length=30 feet) applies), to obtain the transition length.
Use K*[e1-e2]=T, or K*[d1-d2]=T (whichever the posted speed of the roadway.
elevations) by the K value from the Table for
(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying
Provide a transition length in feet that is not
E401-01
NO SCALE
Existing asphalt pavement
Existing base course
New asphalt pavement
New base course
Existing asphalt pavement
Existing base course
Remove pavement (mill)
NEW PAVEMENT
(Final course)
Asphalt overlay
(Depth equals overlay thickness)
Saw cut
Existing elevation (e2)
Overlaid elevation (e1)
(Full depth of existing asphalt pavement Saw cut
K Transition length variable (See table)
(for table e - e = effective overlay thickness)
OVERLAY
d
Existing asphalt pavement
Existing base course d1
OVERLAY - DEPTH TRANSITIONS
(depth 2)
Asphalt overlay
(depth 1)
Asphalt overlay
K Transition length (Variable, see Table)
(for Table, d - d = effective overlay thickness)
1 PAVEMENT TRANSITIONS
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: FEBRUARY 2013
:5
J u n e
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -E
P a v e m e n t
T ra n s it io n s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) S02
CRACK SEALING AND FILLING
CRACK SEALING CRACK FILLING
from the existing surface
Squeegee excess material
1" and greater
See Note 3
Less than 1"
Seal crack with hot applied crack sealant
" below existing surface 4 " to8
Fill crack with hot applied crack filler to below existing surface " 4
" to8
Screed material to
ASPHALT PAVEMENT
CRACK SEALING AND FILLING
E414-01A
NO SCALE
NOTES:
4.
3.
2.
1.
Do not overband cracks.
filling material left above the surface.
Squeegee excess crack sealing and crack width.
See Subsection 414.06 for minimum to ensure adhesion to existing surface.
Force crack repair material into cracks sealing and filling cracks.
manufacturer's recommendations for according to Section 414. Follow
Prepare cracks for sealing and filling
:3
J u n e
E
-0
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S
-E
A
C ra c k
S e a li n g a n d F il li n g
A s p h a lt
P a v e m e n t.
d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
NC NP BLRI PVT PRES FY22(1) S03
SYMBOLS AND WORDS
PAVEMENT MARKINGS
E634-01
14"12"14"
12"30"30"
33"
27"
R
12"30"30"
33"
R
R
27"
8"
6'
(V
M
P H
(V
M
P H
(V
M
P H
(V
M
P H
4" (typ.)
4" (min.)
7'
6'
(t y p
8'
(t y p
4" (min.)
4" (typ.)
(m in
24" (min.)
3" (min.)9" R
3"R
3"R
3"R
TURN ARROW SYMBOLSTRAIGHT ARROW SYMBOL
COMBINATION SYMBOL
STRAIGHT/TURN ARROW
TRIANGLE SYMBOL
YIELD AHEAD
See Note 3 Blue background
ACCESSIBILITY SYMBOL
See Note 3 White border
NOTES:
3.
2.
1.
(typ.
R 6"
(typ.)
TYPE
PAVEMENT MARKING AREAS
SQFT
See Note 3 Accessibility symbol
NO SCALE
"STOP" WORD MESSAGE "YIELD" WORD MESSAGE "ONLY" WORD MESSAGE
"AHEAD" WORD MESSAGE "SCHOOL" WORD MESSAGE
6'-9"
9'-9"
3'-9" (typ.)
"YIELD" Word Message Marking
"STOP" Word Message Marking
"SCHOOL" Word Message Marking
"ONLY" Word Message Marking
"AHEAD" Word Message Marking
Yield Ahead Triangle Symbol (V≥45 mph)
Yield Ahead Triangle Symbol (V<45 mph)
Turn Arrow Symbol
Straight/Turn Arrow Combination Symbol
Straight Arrow Symbol w/ Symbol, blue background, and white border w/ Symbol and blue background w/ Symbol only
Accessibility Symbol:
(c) w/ Symbol, blue background, and white border
(b) w/ Symbol and blue background; or
(a) w/ Symbol only;
of the following configurations:
in the plans or directed otherwise by the CO in one Provide Accessibility Symbol marking as indicated latest edition.
accordance with the "Standard Highway Signs", Place all letters, numerals, and symbols in
Control Devices'' (MUTCD), latest edition.
accordance with the ''Manual on Uniform Traffic Place pavement word and symbol markings in
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
REVISED: FEBRUARY 2020
APPROVED: MAY 2011
DETAIL APPROVED FOR USE
:5
J u n e
S h e
P R
O J E
C T
S \b lr i\ P
V T
P R
E S
F Y
(1
H W
Y
D E
S \C
A D
D \S td -D e t\
S
-E
P a v e m e n t
M a rk in g s S y m b o ls a n d
W o rd s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
NC NP BLRI PVT PRES FY22(1) S04
R7-8
R7-8P
R7-8
R7-8P
R7-8
R7-8
R7-8P
R7-8
R7-8
R7-8P
R7-8
R7-8P
R7-8
RESERVED
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
ACCESSIBLE
VAN
PARKING
RESERVED
ACCESSIBLE
VAN
RESERVED
PARKING
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
ACCESSIBLE
VAN
RESERVED
PARKING
RESERVED
RESERVED
PARKING
45 60 75 90 o o o o
25' 22' 20' 18.5'
9.3' 9.0'
CHART B
A A
NO SCALE
SINGLE PARKING SPACE
HEAD-ON PARKING WITH VAN ACCESSIBLE AISLE
DOUBLE PARKING SPACE
ANGULAR PARKING WITH VAN ACCESSIBLE AISLE
DOUBLE PARKING SPACESINGLE PARKING SPACE
See Note 3
Install perpendicular curb ramp
" (typ
" (typ
(t yp
(t yp
See Note 3
Install perpendicular curb ramp
See Note 3
Install perpendicular curb ramp
Van accessible aisle
HEAD-ON PARKING ANGULAR PARKING
5' (min.)
See Note 2
Wheelstop (typ.)
See Note 2
Wheelstop (typ.)
See Note 2
Wheelstop
S e e N o te
W h e e lsto p
' (m in
B
5' (min.)
11' (min.) 9' (min.)
2' (typ.)
6'' (min.)
S e e N o te
W h e e lsto p
See Note 2
Wheelstop
See Note 6 space symbol (typ.)
Accessibility parking
.5
NOTES:
SIGNING IN PARKING AREAS
PAVEMENT MARKINGS AND
Top of existing ground striping (typ.)
4" solid white
4" solid white striping (typ.)
striping (typ.)
4" solid white striping (typ.)
4" solid white
Sign post (typ.)
SIGN MOUNTING
H e ig h t*
* See Notes 4 and 5
6.
5.
4.
3.
2.
1.
Mounting view
See Sign
Mounting view
See Sign
Mounting view
See Sign
CHART A
Spaces
Van-Accessible
Minimum Number of
1 to 25
26 to 50
51 to 75
76 to 100
101 to 150
151 to 200
201 to 300
301 to 400
401 to 500
501 to 1,000 Spaces
2% of Total Parking
Over 1,000 100 over 1,000
20 Plus 1 for each
Accessible Spaces
One out of every 6
Accessible Spaces
One out of every 6 of Accessible Spaces
Minimum Number
Angle (A)
Minimum Length of Stall (B)
Stall Width (C), Parallel to Aisle 12.7' 10.4'
11' (min.)
in Parking Facility
Total Parking Spaces
MINIMUM NUMBER OF ACCESSIBLE PARKING SPACES*
Special Report 125 (Figure 6.2)".
* Chart B based on dimensions recommended in "Parking Principles, and "2015 ABA Standards (Table F208.2)".
Accessible Design Standard (Table 208.02)"
* Chart A based on "2010 ADA Standards for
5' (min.) walkway5' (min.) walkway
PARKING LAYOUT DIMENSIONS FOR 9-FOOT STALLS*
S e e N o te s p a c e s y m b o l
A c c e s s ib il it y p a r k in g
See Note 6 space symbol
Accessibility parking
' (m in
Van accessible aisle
See Note 3
Install perpendicular curb ramp
4" solid white striping (typ.)
See Note 6 space symbol (typ.)
Accessibility parking parking space symbol details.
Refer to Detail E634-01 for accessibility additional sign mounting information.
Refer to Section 2A.18 of the MUTCD for height of 7 feet.
residential areas, provide a minimum sings installed in business, commercial, or provide a minimum height of 5 feet. For details. For signs installed in rural areas, Refer to Detail E633-01 for sign mounting for curb ramps details.
and the walkway. Refer to Detail ET 615-1 is located between the van accessible aisle
Install perpendicular curb ramp when curb recommendations.
according to the manufacturer's plastic and other types of wheelstops
Section 609 and Detail E609-03. Install
Install concrete wheelstops according to
(MUTCD), latest edition.
on Uniform Traffic Control Devices" markings in accordance with the "Manual
Install pavement striping and symbol
Van accessible aisle
Van accessible aisle
B '-7
'-7
6'-7' 6'-7' 6'-7'
6'-7'
C
9'
.5
B
'-7
'-7
.5
See Chart B See Chart B See Chart B m in w a lk w a y
5' (min.) walkway
B
(typ.)
6" (min.)
Mounting view
See Sign
Mounting view
See Sign
Mounting view
See Sign
A
90 90
A
E634-05
REVISED: AUGUST 2021
APPROVED: MAY 2011
DETAIL APPROVED FOR USE
:0
J u n e
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -E
P a v e m e n t
M a rk in g s a n d S ig n in g i n P a rk in g A re a s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) S05
PORTABLE SIGNS
FIXED ROADWAY SIGNS
RURAL AREA URBAN AREA
BREAKAWAY SIGN SUPPORT
4'' x 4''
4'' x 6''
6'' x 6''
6'' x 8''
1.5''
3''
2''
None Required
D
4'
4'
5'
5'
10 20
1 Post 2 Post 3 Post 4 Post
165125
Sign panel
Traffic
Wood post (Fixed)
Holes (See Table) m in m in
Roadway m in m
D m
Sidewalk m
6' to 12' m
(See Notes 3 and 4)
POST SIZE
DIAMETER
HOLE (SQFT)
MAXIMUM SIGN AREA
POST SIZE TABLE
(min.)
6'-0''
(min.)
2'-0''
(min.)
2'-0''
NOTES:
7.
6.
5.
4.
3.
2.
1.
apart.
cannot be spaced a minimum of 7 feet multiple posts are required and the posts posts are considered non-breakaway if
Signs requiring 6- by 6-inch and greater non-breakaway signs.
Do not place holes in posts of the clearzone or shield with a barrier.
to post spacing, place the sign outside breakaway design cannot be used due the Breakaway Sign Support View. If
For 4- by 6-inch and greater posts, see sign mounting.
Company, utility poles may be used for
When approved by the CO and the Utility
7 feet above the pavement surface.
of the sign, mount the sign a minimum of
When parking is permitted within 200 feet
NCHRP Report 350 for crashworthiness.
sign supports meet the requirements of the approved by the CO. Ensure all portable mounted lower than fixed signs when vertical plane. Portable signs may be
Ensure sign mounts hold the sign face in a
Submit alternate details for portable signs.
All lumber dimensions are nominal.
larger than 10 square feet on double posts.
Mount signs that are wider than 3 feet or
(See Notes 6 and 7)
FIXED SIGNS 4'' X 6'' AND GREATER POSTS)(
E635-01
NO SCALE
SIGN MOUNTING
TEMPORARY TRAFFIC CONTROL
ROAD
AHEAD
WORK
DETOUR
AHEAD
M PH.. .
M PH.. .
ROAD
CLOSED
DETOUR
M PH.. .
CLOSED
AHEAD
LANE
RIGHT
DETAIL APPROVED FOR USE
REVISED: SEPTEMBER 2020
APPROVED: MAY 2011
:0
J u n e
S h e
P R
O J E
C T
S \b lr i\
P V
T P
R E
S F
Y (1
H
W Y
D
E S
\C A
D D
\S td
-D e t\
S -E
C o n s tr u c ti o n T ra ff ic C o n tr o l
S ig n M o u n ti n g .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) S06
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS (LNFT)
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
See Note 10
W20-1
See Note 10
W20-1
G20-2
Expressway / Freeway
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
C
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
ET 635-1
NO SCALE
NOTES:
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
sheeting types.
Refer to the Section 635 for allowable retroreflective approved by the CO.
State standards may be used as an alternative if has been obtained.
the client agency, verify that an encroachment permit
If signing on a roadway under a jurisdiction other than mile.
the distance on the G20-1 sign to the nearest whole install G20-1 signs at each end of the project. Show
For work zones that are 2 miles or more in length, Spacing Table.
two W20-1 signs "B" feet apart according to the Sign approach speeds exceed 50 MPH. When used place the feet or in miles. Install an additional W20-1 sign when
AHEAD" or may specify the distance to the work area in
The message on the W20-1 signs may be "ROAD WORK roads only).
on which the construction does occur (applies to major supplementary plaque indicating the name of the road which the actual construction work occurs, include a
If W20-1 is placed on a roadway other than that on applicable.
when not in use. Cover post-mounted signs when not
Do not store traffic control devices along the roadway except as approved by the CO.
Maintain two-way traffic during all non-work hours crashworthiness.
meet the requirements of NCHRP-350 or MASH for
Ensure all sign supports exposed to impact by traffic recommended speed through the construction area.
warning signs as needed to indicate a maximum
Install advisory speed plates under the W20 series to fit the actual construction conditions.
Additional or different message signs may be required messages as required.
signs as determined by the CO for best results. Vary interfere with permanent signs, locate the warning
Where advance warning signs, placed as shown, necessary to accommodate actual operations.
information and details in this traffic control plan as sheets may be applicable to this project. Add or delete
Not all details shown on the temporary traffic control construction work.
Erect all project advance warning signs before starting
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional) W13-1P
(optional) W13-1P xx
MPH
xx
MPH
REVISED: 6/2014 3/2016 9/2019 9/2020
STANDARD APPROVED FOR USE 6/2005
:0
J u n e
S h e
P
R O
J E
C T
S \b lr i\ P
V T
P R
E S
F Y
(1
H
W Y
D
E S
\C A
D D
\S td
-D e t\ S
-E
T E
F L T
E M
P T e m p o ra ry T ra ff ic
C o n tr o l A d v a n c e S ig n in g .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
NC NP BLRI PVT PRES FY22(1) S07
2' 18'
40'
2' 18'
40'
2' 38'
4" Broken yellow
4" Broken yellow
4" Solid double
4" Solid double
4" Broken yellow and
Curves < 500' Radius Tangents or Curves ≥ 500' Radius
4" Broken yellow centerline
2' 38'
20'
20'
DETAIL A DETAIL B
Two-way traffic Passing zone both directions
DETAIL B1
Two-way traffic Passing zone both directions
DETAIL A1
Two-way traffic No passing zone one direction
DETAIL A2
Two-way traffic No Passing zone one direction
DETAIL B2
Two-way traffic No passing zone both directions
DETAIL A3
Two-way traffic No Passing zone both directions
DETAIL B3
yellow centerline
Shoulder
Shoulder and solid yellow centerline
Shoulder yellow centerline
Shoulder yellow centerline solid yellow centerline
Shoulder
Shoulder
NOTES:
3.
2.
1.
period.
as an alternate for the full 14 day temporary marking For ADT of 1000 or less, Detail ET 635-3 may be used or less, Detail ET 635-3 may be used as an alternate.
For ADT of greater than 1000 and periods of 3 days by side, spaced on 10 feet centers.
Double solid line: two pavement markers, side on 10 feet centers.
Single solid line: pavement markers spaced based on curvature.
spaced 2 feet apart allowed by the gap shown 2 feet broken line: two pavement markers the following patterns:
To substitute raised pavement markers for lines, use zones for each direction of travel.
designated in the contract to determine no passing Use permanent pavement marking layout as
ET 635-2
NO SCALE
PAVEMENT MARKINGS
TEMPORARY
Traffic flow Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow
Traffic flow Traffic flow
Traffic flow
2' 18'
40'
2' 18'
40'
2' 38'
4" Broken yellow
4" Broken yellow
4" Solid double 4" Solid double
4" Broken yellow and
Curves < 500' Radius Tangents or Curves ≥ 500' Radius
4" Broken yellow centerline
2' 38'
20'
20'
DETAIL A DETAIL B
Two-way traffic Passing zone both directions
DETAIL B1
Two-way traffic Passing zone both directions
DETAIL A1
Two-way traffic No passing zone one direction
DETAIL A2
Two-way traffic No Passing zone one direction
DETAIL B2
Two-way traffic No passing zone both directions
DETAIL A3
Two-way traffic No Passing zone both directions
DETAIL B3
yellow centerline
Shoulder
Shoulder and solid yellow centerline
Shoulder yellow centerline
Shoulder yellow centerline solid yellow centerline
Shoulder
Shoulder
NOTES:
3.
2.
1.
period.
as an alternate for the full 14 day temporary marking For ADT of 1000 or less, Detail ET 635-3 may be used or less, Detail ET 635-3 may be used as an alternate.
For ADT of greater than 1000 and periods of 3 days by side, spaced on 10 feet centers.
Double solid line: two pavement markers, side on 10 feet centers.
Single solid line: pavement markers spaced based on curvature.
spaced 2 feet apart allowed by the gap shown 2 feet broken line: two pavement markers the following patterns:
To substitute raised pavement markers for lines, use zones for each direction of travel.
designated in the contract to determine no passing Use permanent pavement marking layout as
ET 635-2
NO SCALE
PAVEMENT MARKINGS
TEMPORARY
STANDARD APPROVED FOR USE 6/2005
REVISED: 9/2011 3/2016 9/2019 9/2020
STANDARD APPROVED FOR USE 6/2005
REVISED: 9/2011 3/2016 9/2019 9/2020
:1
J u n e
S h e
P R
O J E
C T
S \b lr i\ P
V T
P R
E S
F Y
(1
H W
Y
D E
S \C
A D
D \S td -D e t\
S
-E
T
E
F L
T
E M
P
T e m p o ra ry P a v e m e n t
M a rk in g s .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
SHEET
NC NP BLRI PVT PRES FY22(1) S08
cycle length
40' cycle length
40' cycle length
40'
500'
500'
500'
500'
500'
500'
Traffic flow
Traffic flow
W8-12
Traffic flow
Traffic flow
Traffic flow
Traffic flow
W8-12
W8-12
W8-12
W8-12
W8-12
(optional)
W14-3
(optional)
W14-3
(optional)
W14-3
TABLE A
Markings Are Required
Maximum Duration Before
ADT
See Note 2
See Note 2
See Note 2
3 Days
14 Days
> 1000
≤ 1000
R4-1
R4-1
R4-1
See Note 6 R4-2
See Note 6 R4-2
See Note 6 R4-2
Two-way traffic