Plans.pdf
PDF 24 MB Posted
- Attached to
- CA ER 511(1), Trinity County Ruth-Zenia Road Federal contract opportunity
- Solicitation number
- 6982AF20B000032
About this file
This document provides details for a federal contract opportunity to repair storm damage on roads in Trinity County, California. The Trinity County Ruth-Zenia Road project consists of emergency repair work at 12 sites spread across 5 routes. Work includes slope scaling, excavation, embankment, reinforced slopes, micropiles, drainage repairs, riprap, asphalt paving, pavement markings, erosion control and revegetation. Quantities estimated include 15,500 cubic yards of excavation and 5,500 cubic yards of embankment. The opportunity is set aside for small businesses. The anticipated schedule is to award the contract in March 2021, with construction occurring from Spring to Fall 2021. The estimated cost range is between $4 million and $6 million. The solicitation is being conducted by the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids-CA ER 511(1) Trinity County Ruth-Zenia Road.pdf | ||
| Bid Opening Summary - CA ER 511(1) Trinity County Ruth-Zenia Road.pdf | ||
| Interested Vendors List 2 26 2021.pdf | ||
| Quick Start Guide_Opportunities 4 Contractors including Interested Vendor List info.pdf | ||
| QnA 2 25 2021.pdf | ||
| QnA 2 24 2021.pdf | ||
| Amendment A001.pdf | ||
| QnA 2 23 2021.pdf | ||
| Interested Vendors List 2 22 2021.pdf | ||
| QnA 2 10 2021.pdf | ||
| Interested Vendors List 02 03 2021.pdf | ||
| QnA 2 2 2021.pdf | ||
| Hydraulics Report.pdf | ||
| fp14.pdf | ||
| 6982AF20B000032 IFB.pdf | ||
| Geotech Report.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Forest Shasta-Trinity
National Forest Six Rivers
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
T it
T R I .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
D E P
A R T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A
PLANS FOR PROPOSED
PROJECT MANAGER
DENVER, COLORADO
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
FOR
PLANS PREPARED BY
APPROVED:
DATE:
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Slopes are expressed as RISE:RUN
U.S. CUSTOMARY DIMENSIONS:
Know what'sbelow.
before you dig.Call
R www.call811.com
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS
SPECIFICATIONS:
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
CHIEF OF ENGINEERING
N
Eureka
San
Francisco
Los
Angeles
San
Diego
Sacramento
OREGON
N
EV
A D
A
ARIZONA
I-40
I-10
I-8
I-5 U
S
MEXICO
Redding
CALIFORNIA
STATE OF CALIFORNIA
KEY MAP
20100
Scale in Miles
CA ER 511(1)
CA ER 511(1)
A1
Bridgeville
BridgevilleBridgeville
Ruth Lake
Redway
Hayfork
H u m b o ld t
C o u n ty
T r in it y C o u n ty
LENGTH 0.53 miles
TRINITY COUNTY
SIX RIVERS NATIONAL FOREST
TRINITY NATIONAL FOREST
DUSTIN ROBBINS
Total of 12 separate sites.
Van Duzen Road and Alderpoint Bluff Road.
Road, Mad River Road, Hyampom Road, Storm damage repair work on Ruth-Zenia
TYPE OF CONSTRUCTION:
TRINITY COUNTY RUTH-ZENIA ROAD
LEAD DESIGNER
JACOBS
6%
55 MPH
12%
60%
46 (15% OF ADT)
CA ER 511(1)
Van Duzen Rd
Site 001e(max) ---------------
V --------------------
T --------------------
D --------------------
DHV ------------------
ADT (2042) -----------
ADT (2017) -----------
DESIGN DESIGNATIONS (VAN DUZEN ROAD):
CA ER 511(1)
PM 11.4
Hyampom Rd
Site 006
CA ER 511(1)
PM 7.5
Mad River Rd
Site 007
CA ER 511(1)
PM 8.0
Mad River Rd
Site 008
CA ER 511(1)
PM 17.7
Ruth-Zenia Rd
Site 012
CA ER 511(1)
PM 18.1
Ruth-Zenia Rd
Site 013
CA ER 511(1)
PM 18.75
Ruth-Zenia Rd
Site 014
CA ER 511(1)
PM 6.5
Alderpoint Bluff Rd
Site 015
CA ER 511(1)
PM 16.3
Ruth-Zenia Rd
Site 011
CA ER 511(1)
PM 15.4
Ruth-Zenia Rd
Site 010
CA ER 511(1)
PM 0.15
Mad River Rd
Site 009
CA ER 511(1)
PM 20.2
Hyampom Rd
Site 016
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
08/28/2020
DI
SPRING
U.S. CUSTOMARY
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 1 of 2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
Riprap
Rolled Erosion Control Product (RECP)
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching (Seeding)
A2A2
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A S y m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
36 31
36 31
6 1
ˆ
U.S. CUSTOMARY
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
A3
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A S y m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
Sheet 1 of 2
SURVEY CONTROL
U.S. CUSTOMARY
A4
STATE PROJECT
A
M d e n p w p d p w ic s w o r k in g A S u v T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
STATE PROJECT
A
M d e n p w p d p w ic s w o r k in g A S u v T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
National Forest Six Rivers
M a d R iv e r R d
SURVEY CONTROL MAP
H u m b o ld t
C o u n ty
T r in it y C o u n ty
Zenia d R n e z u
D n a V
Ruth Lake
Ruth
Mad River dao R ai ne
Z-ht uR
20,000'10,0000
Scale in Feet
To Fortuna
To R ed Bl uff d a o R ai n e Z ht u R
A5
Mad River Road PM 0.15: Site 009
Ruth-Zenia Road PM 16.3: Site 011
Ruth-Zenia Road PM 17.7: Site 012
Ruth-Zenia Road PM 18.75: Site 014
Van Duzen Road PM 4.1: Site 001
Mad River Road PM 7.5: Site 007
P
M d e n p w p d p w ic s w o r k in g A S u v T
R I .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
HYAMPOM ROAD PM 20.2 SITE 016-0 SURVEY CONTROL
A6
FOR SITE 016-0 ONLY.
SURVEY CONTROL INFORMATION
AND IS INTENDED TO PROVIDE
OTHERS FOR TRINITY COUNTY D.O.T.
THIS DRAWING WAS PREPARED BY
National Forest Six Rivers
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
M A
P T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
VICINITY MAP
40,000'20,0000
Scale in Feet
M a d R iv e r R d
Hayfork
Hyampom
Bridgeville d R n e z u
D n a V d a o R ai neZ-htu
R d R ni at n u o M e k a L ai n e Z dR mopmayH
Redway
H u m b o ld t
C o u n ty
T r in it y C o u n ty
Alderpoint
Zenia
Dinsmore
Garberville dR ffulB tnioP redlA
To Weav erv ille
To Fortuna
Ruth
Ruth Lake
To Red Bluff
Mad River
A7 see sheet A8 for Site Map
Hyampom Road PM 11.4: Site 006, see sheet A8 for Site Map
Hyampom Road PM 20.2: Site 016, see sheet A9 for Site Map
Mad River Road PM 0.15: Site 009, see sheet A9 for Site Map
Van Duzen Road PM 4.1: Site 001, see sheet A9 for Site Map
Mad River Road PM 7.5: Site 007, see sheet A9 for Site Map
Mad River Road PM 8.0: Site 008, see sheet A10 for Site Map
Ruth-Zenia Road PM 15.4: Site 010, see sheet A10 for Site Map
Ruth-Zenia Road PM 18.1: Site 013, Ruth-Zenia Road PM 17.7: Site 012, see sheet A10 for Site Map
Ruth-Zenia Road PM 16.3: Site 011, see sheet A10 for Site Map
Ruth-Zenia Road PM 18.75: Site 014, see sheet A10 for Site Map
Alderpoint Bluff Road PM 6.5: Site 015, C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
P
M d e n p w p d p w ic s w o r k in g A
M A
P T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
3.4
4'
8.2
8'
122.58'
.9
1'
15.90' 16+00
10+00
24+00
25+00
26+00
+00
POT 2
4+00.
PC 2
6+93.
PT
+71 .72
POT 2
9+
.00
PT 15+84.10
POT 16+00.00
PC
4+ .9
PC 10+64.91
POT 10+00.00
PT
2+ .4
Sheet 1 of 3
SITE MAP
6,000'3,000'0
Scale in Feet
E 6164365.94
N 2112799.37
Hyampom Rd
CA ER 511(1)
24+30.00
Begin Site 016
E 6164487.50
N 2113017.83
Hyampom Rd
CA ER 511(1)
26+80.00
End Site 016
E 6198335.20
N 2111706.94
Hyampom Rd
CA ER 511(1)
14+09.00
End Site 006 dR mop may H keerC krofyaHHyampom
18 17 16 15
25 30 28 27 26 25
2423 19 20
13 14 13 18 17
29 2930 kr o
F ht u o
S r e vi
R y ti ni r
T
To Hayfork
T
N R
E
T
N R
E
T
N R
E
T
N R
E
To H ya m po m
A8
Staging Area
E 6198214.47
N 2111685.92
Hyampom Rd
CA ER 511(1)
12+87.00
Begin Site 006
See D Series
Staging Area
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
AP
N
-22 0-0 5-0
AP
N
-22 0-0 6-0
AP
N
-22 0-0 6-0
AP
N
-22 0-0 6-0
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
M A
P T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
Sheet 2 of 3
SITE MAP
6,000'3,000'0
Scale in Feet
E 6139061.28
N 2037960.73
Van Duzen Rd
CA ER 511(1)
23+05.49
End Site 001
E 6138217.07
N 2037214.33
Van Duzen Rd
CA ER 511(1)
11+74.14
Begin Site 001
E 6145600.93
N 2048497.68
Mad River Rd
CA ER 511(1)
14+00.00
End Site 009
E 6164175.36
N 2018879.74
Mad River Rd
CA ER 511(1)
23+00.00
End Site 007
E 6164222.69
N 2018791.65
Mad River Rd
CA ER 511(1)
22+00.00
Begin Site 007
E 6165422.15
N 2018100.72
Mad River Rd
CA ER 511(1)
33+20.00
End Site 008
E 6165405.33
N 2017987.34
Mad River Rd
CA ER 511(1)
31+60.00
Begin Site 008
Mad River
Ruth Lake
Mad River Road
Van Duzen Road reviR da M
T0 1N
R0 6E
T0 1S R
E
T0 1N
R0 7E
T0 1S R
E
To Fortuna
To Red Bluff r e vi R n e z u
D n a V
R oad
To R uth-Zenia
A9
Staging Area
E 6145825.86
N 2048275.87
Mad River Rd
CA ER 511(1)
10+80.00
Begin Site 009
See D Series
Staging Area
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
ti ll w e ll H il li a rd K T s te e
A P
N
S ti ll w e ll H il li a rd K T s te e
A P
N
Stillwell Hilliard K Tstee
APN 020-190-29-00
S E
C T I O
N L I N
E
SECTION LINE
S E
C T I O
N L
IN
E
SECTION LINE
SECTION LINE
SECTION LINE
SECTION LINE
S E
C T I O
N L I N
E S
E C
T I O
N L I N
E
N a ti o n a l F o re s t
S ix R iv e rs
N at io na l F or es t
S ix R iv er s
N a ti o n a l F o re s t
S ix R iv e rs
N at io na l F or es t
S ix R iv er s
National Forest Six Rivers
National Forest Six Rivers
National ForestSix Rivers
National ForestSix Rivers
N a ti o n a l F o re st
S ix R iv e rs
N a ti o n a l F o re st
S ix R iv e rs
N a ti o n a l Fo re st
S ix R iv e rs
N a ti o n a l Fo re st
S ix R iv e rs
N a ti o n a l Fo re st
S ix R iv e rs
N a ti o n a l Fo re st
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
Natio nal Fo rest
Six Rivers
Natio nal Fo rest
Six Rivers
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re st
S ix R iv e rs
N a ti o n a l F o re st
S ix R iv e rs
N a ti o n a l F o re st
S ix R iv e rs
N a ti o n a l F o re st
S ix R iv e rs
Na tio na l F or es t
Si x
Ri ve rs
Na tio na l F or es t
Si x
Ri ve rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o r e s t
S ix R iv e r s
N a ti o n a l F o r e s t
S ix R iv e r s
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N at io na l F or es t
Si x
Ri ve rs
N at io na l F or es t
Si x
Ri ve rs
N a ti o n a l F o re s t
S ix R iv e rs
N a ti o n a l F o re s t
S ix R iv e rs
N at io na l F or es t
S ix R iv er s
N at io na l F or es t
S ix R iv er s
T S R
E
T S R
E
T S R
E
T S R
E
T S R
E
T S R
E
T03S R06E
T02S R06E
N a ti o n a l F o re s t
S ix R iv e rs
Na tio na l F or es t
Si x
Ri ve rs
F o re s t
N a ti o n a l
S ix R iv e rs
S ti ll w e ll H il li a rd K T s te e
A P N
-1
-2
-0
St ill w el l H ill ia rd K T st ee
APN
-1
-2
9-
S tillw e ll H illia rd K T ste e
A P N -1
-2
-0
S ti ll w e ll H il li a rd K T s te e
A P N
-1
-2
-0
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
M A
P T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
Sheet 3 of 3
SITE MAP
6,000'3,000'0
Scale in Feet
E 6158562.43
N 1981280.65
Ruth-Zenia Rd
CA ER 511(1)
997+30
End Site 010
E 6158606.64
N 1981257.30
Ruth-Zenia Rd
CA ER 511(1)
996+80
Begin Site 010
E 6158131.90
N 1977289.46
Ruth-Zenia Rd
CA ER 511(1)
946+50.00
Begin Site 011
E 6158186.51
N 1977384.79
Ruth-Zenia Rd
CA ER 511(1)
947+60.00
End Site 011
E 6158838.61
N 1972895.75
Ruth-Zenia Rd
CA ER 511(1)
875+85.00
Begin Site 012
E 6158696.53
N 1972947.02
Ruth-Zenia Rd
CA ER 511(1)
877+51.86
End Site 012
E 6159427.00
N 1971673.63
Ruth-Zenia Rd
CA ER 511(1)
855+30.00
End Site 013 E 6159498.92
N 1971565.97
Ruth-Zenia Rd
CA ER 511(1)
854+00.00
Begin Site 013
E 6160534.46
N 1969509.75
Ruth-Zenia Rd
CA ER 511(1)
826+10.00
End Site 014
E 6160479.62
N 1969403.37
Ruth-Zenia Rd
CA ER 511(1)
824+41.00
Begin Site 014
R u th -Z e n ia R o a d daoR ff ul
B t ni o p r e dl
A
T02S R06E
T03S R06E T03S R07E
T02S R07E
6 5 4 3 2 1 6
313635
1211109
26 25 30
15 14 13
24232221
H u m b o ld t
C o u n ty
T r in it y C o u n ty
Zenia
US 101
To M ountain R oad
Z enia Lake
T o S
R
E 6130592.20
N 1957240.00
Alderpoint Bluff Rd
CA ER 511(1)
10+85.27
Begin Site 015
E 6130659.17
N 1957284.85
Alderpoint Bluff Rd
CA ER 511(1)
11+66.00
End Site 015
A10
Staging Area
Staging Area
See D Series
Staging Area
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
U.S. CUSTOMARY
1:4
DETAIL A
30°
Asphalt concrete pavement roadway)
(Detail applies to both right and left sides of
Shoulder up with roadway aggregate, method 2
Construct 30° pavement edge (safety edge)
Typical 24 ft
Traveled Way
Match existing Match existing
(between lifts)
Tack coat
1' Shldr
Prime coat
Ground
Existing pavement placed in two lifts
3" asphalt concrete
11'11'
Method 2
6" roadway aggregate, Existing width varies
5"
4" Pulverized asphalt and aggregate base material
2" Aggregate Base
3" Asphalt Concrete
Existing asphalt pavement section:
ON G SERIES
BUTTRESS FILL DETAILS
SEE SPECIAL
Clearing and Construction Limits, Width Varies
NOTES:
1' Shldr
Clear Zone Varies Clear Zone Varies
A11
RUTH - ZENIA ROAD
TYPICAL SECTIONS
2.
1.
riprap at site 012-0. See C10 and Z2 for layout.
Removal of loose material and placement of geotextile and assure adequate drainage and stability.
and embankment slope ratios may be adjusted by the CO to
The gradient and width of roadway ditches and the excavation
See Detail A
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
TOTALS (ft)
(ft)
Roadway Location
996+80.00 to 997+30.00
946+50.00 to 947+60.00
875+85.00 to 877+52.00
854+00.00 to 855+30.00
824+41.00 to 826+10.00
10+80.00 to 14+00.00
10+85.00 to 11+66.00
11+74.14 to 23+05.49
22+00.00 to 23+00.00
31+60.00 to 33+20.00
24+30.00 to 26+80.00
12+87.00 to 14+09.00
Mad River Rd Site 009
Van Duzen Rd Site 001
Mad River Rd Site 007
Mad River Rd Site 008
Hyampom Rd Site 016
Hyampom Rd Site 006
Alderpoint Bluff Rd Site 015
Ruth-Zenia Rd Site 010
Ruth-Zenia Rd Site 011
Ruth-Zenia Rd Site 013
Ruth-Zenia Rd Site 014
Ruth-Zenia Rd Site 012
1,131
0.53
2,790
995+00.00 TO 999+00.00 (Site 010, PM 15.4)
943+00.00 TO 950+00.00 (Site 011, PM 16.3)
872+00.00 TO 879+33.00 (Site 012, PM 17.7)
851+00.00 TO 857+00.00 (Site 013, PM 18.1)
823+00.00 TO 830+00.00 (Site 014, PM 18.75)
RUTH-ZENIA ROAD
EXISTING TYPICAL SECTION
946+50.00 TO 947+60.00 (Site 011, PM 16.3)
875+85.00 TO 877+52.00 (Site 012, PM 17.7)
824+41.00 TO 826+10.00 (Site 014, PM 18.75)
RUTH-ZENIA ROAD
PROPOSED TYPICAL SECTION
Aggregate
Roadway
2.
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
T y p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
NOTES:
Traveled Way
Match existing Match existing
Ground
Existing
1' Shldr11'11"
(between lifts)
Tack coat
1' Shldr
Traveled Way
Clearing and Construction Limits, Width Varies
Varies Clear Zone
Varies Clear Zone
2.
Traveled Way pavement placed in two lifts
3" asphalt concrete Ground
Existing
1' Shldr
(between lifts)
Tack coat
Varies Clear Zone
11'
Width Varies Construction Limits, Clearing and existing
Match
See Detail A
2.See Detail A
See sheet A11 for Detail A.
assure adequate drainage and stability.
and embankment slope ratios may be adjusted by the CO to
The gradient and width of roadway ditches and the excavation
2.
1.
Method 2 6" Roadway Aggregate, A12
RUTH-ZENIA ROAD
TYPICAL SECTIONS
See Detail C204-51
Subexcavation, 996+80.00 TO 997+30.00 (Site 010, PM 15.4)
RUTH-ZENIA ROAD
PROPOSED TYPICAL SECTION
854+00.00 TO 855+30.00 (Site 013, PM 18.1)
RUTH-ZENIA ROAD
PROPOSED TYPICAL SECTION
Prime coat
Prime coat pavement placed in two lifts
3" asphalt concrete
Method 2 6" Roadway Aggregate, See Detail C204-51 Subexcavation, C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
T y p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
from 20 ft to 24 ft
Existing width varies
Average 22 ft
Traveled Way Traveled Way
Match existingMatch existing
1' Shldr
Prime coat
Ground
Existing pavement placed in two lifts
3" asphalt concrete
11' 11'
Clearing and Construction Limits, Width Varies
Method 2
6" roadway aggregate, Average 18 ft
ON G SERIES
BUTTRESS FILL DETAILS
SEE SPECIAL
6" Base Course Material
3" Asphalt Pavement
Existing asphalt pavement section:
6" Base Course Material
3" Asphalt Pavement
Existing asphalt pavement section:
Ground
Existing
Traveled Way Traveled Way
Match existing
1' Shldr1' Shldr
Prime coat pavement placed in two lifts
3" asphalt concrete
11' 11'
Method 2
6" roadway aggregate, Ground
Proposed for details restoration, see G Series
Slope scaling and ditch
3'±
1:4
EOP
Exist
1:4
EOP
Exist
Ground Existing
14'±
Clearing and construction limits
6'
See Detail A
1' Shldr
A13
2.See Detail A
2.
Varies Slope from 17 ft to 20 ft
Existing width varies
HYAMPOM ROAD
ALDERPOINT &
TYPICAL SECTIONS
(between lifts)
Tack coat
14' Clear Zone
NOTES:
See sheet A11 for Detail A.
assure adequate drainage and stability.
slope ratios may be adjusted by the CO to and the excavation and embankment
The gradient and width of roadway ditches
2.
1.
See Detail C204-51
Subexcavation, see G Series Slope Rounding for details see G Series
Proposed Ground
Varies
10+00.00 TO 13+00.00 (Site 015, PM 6.5)
ALDERPOINT BLUFF ROAD
EXISTING TYPICAL SECTION
10+85.00 TO 11+66.00 (Site 015, PM 6.5)
ALDERPOINT BLUFF ROAD
PROPOSED TYPICAL SECTION
24+00.00 TO 29+00.00 (Site 016, PM 20.2)
10+00.00 TO 16+00.00 (Site 006, PM 11.4)
HYAMPOM ROAD
EXISTING TYPICAL SECTION
16' Clear Zone
12+87.00 TO 14+09.00 (Site 006, PM 11.4)
HYAMPOM ROAD
PROPOSED TYPICAL SECTION
25+60.00 TO 26+80.00 (Site 016, PM 20.2)
HYAMPOM ROAD
PROPOSED TYPICAL SECTION
1:1.3 Typ
(between lifts)
Tack coat
Match existing
24+30 TO 25+10
See Detail C204-51 Subexcavation, C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
T y p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
A14
MAD RIVER ROAD
TYPICAL SECTIONS
NOTES:
See sheet A11 for Detail A.
stability.
adjusted by the CO to assure adequate drainage and excavation and embankment slope ratios may be
The gradient and width of roadway ditches and the
2.
1.
Match existing
(between lifts)
Tack coat
Prime coat
Method 2
6" roadway aggregate, See Detail G Series
Micropile Cap pavement placed in two lifts
3" asphalt concrete from Past Project
Existing Geogrid
4' 4' Shld 11' Traveled Way
11+60 TO 13+00.00 (Site 009, PM 0.15)
MAD RIVER ROAD
PROPOSED TYPICAL SECTION
2.75'
Average 55 ft from 40 ft to 67 ft
Existing width varies
6" Base Course Material
3" Asphalt Pavement
Existing asphalt pavement section:
10+00.00 TO 14+44.00 (Site 009. PM 0.15)
MAD RIVER ROAD
EXISTING TYPICAL SECTION
from 20 ft to 24 ft
Existing width varies
6" Base Course Material
3" Asphalt Pavement
Existing asphalt pavement section:
30+00.00 TO 35+00.00 (Site 008-0, PM 8.0)
20+00.00 TO 23+00.00 (Site 007-1, PM 7.5)
MAD RIVER ROAD
EXISTING TYPICAL SECTION
Average 22 ft
Traveled WayTraveled Way
Match existing Match existing
(between lifts)
Tack coat
1' Shldr 1' Shldr
Prime coat
Ground
Existing pavement placed in two lifts
3" asphalt concrete
11'11'
Method 2
6" roadway aggregate, Traveled WayTraveled Way
Match existing
(between lifts)
Tack coat
1' Shldr 1' Shldr
Prime coat
11'11'
Method 2
6" roadway aggregate, Ground
Existing
ON G SERIES
BUTTRESS FILL DETAILS
SEE SPECIAL
pavement placed in two lifts
3" asphalt concrete
Clearing and Construction Limits, Width Varies
Clearing and Construction Limits, Width Varies
See Detail A2. See Detail A 2.
See Detail C204-51
Subexcavation, Slope 1:5 Min For Driveway
STA 32+20 to STA 32+80
22+00.00 TO 23+00.00 (Site 007, PM 7.5)
MAD RIVER ROAD
PROPOSED TYPICAL SECTION
31+60.00 TO 33+20.00 (Site 008, PM 8.0)
MAD RIVER ROAD
PROPOSED TYPICAL SECTION
compacted fill per FP-14.
Remove and replace with
M in D e p th
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
T y p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
2%2%
See plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
NO SCALE
NOTE:
Min. superelevation 2% 6% Max. superele vation
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for pavement)
(top of
Profile grade
See Detail A first asphalt lift)
(applied prior to
Prime coat shldr
2'
Width Varies
Method 2 6" Roadway Aggregate, Clear Zone
Varies
6' ditch
1:4
Varies ditch
1:4
Cut
4' 6'
1:4
Cut
4'
Traveled way
11'
Traveled way
11' shldr
2'
Clear Zone
(placed in two lifts) concrete pavement 3" Asphalt
(applied between lifts)
Tack coat
VAN DUZEN ROAD
TYPICAL SECTIONS
1.5'1.5'
13' to 22.5 ft
Existing K-Rail
Van Duzen River
2.
1:4
Existing width varies
A15
5.
4.
3.
2.
1.
ditches.
See the C Series for additional grade control on the roadside and cut and fill slope ratios.
See the superelevation diagram and cross sections for cross slope and F dimensions to the actual cut height.
Round all earth slopes for cut heights less than B, reduce the B
See sheet A11 for Detail A.
assure adequate drainage and stability.
and embankment slope ratios may be adjusted by the CO to
The gradient and width of roadway ditches and the excavation
6'' Base Course Material
3" Asphalt Concrete
Existing asphalt pavement section:
4.4.
3. 3.
16+30.00 to 22+47.19
LIFT DITCH
19+62.85 to 21+73.49
RIGHT DITCH
limit stake
Slope ground
Existing cut slope
Rounded cut slope
Rounded ground
Existing
F=1'F=1' limits stake
Slope
Clearing and construction limits
B=1'
11+74.14 to 23+05.49
VAN DUZEN ROAD (SITE 001, PM 4.1)
EXISTING TYPICAL SECTION
11+74.14 to 23+05.49
VAN DUZEN ROAD (SITE 001, PM 4.1)
PROPOSED TYPICAL SECTION
B=1'
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g A
T y p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
Sheet and Description
B7 B7 B6 B8 B4 B7 B9 B6
Drainage Summary
Micropile, Curb and Guardrail Summary
Removals Summary
Pavement Markings Summary
Grading Summary
Re- Vegetation Summary
Misc Summary
Surfacing Summary Allowance Bid
Schedule
A1000 15101-0000 MOBILIZATION LPSM ALL
A1010 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A1020 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A1030 15401-0000 CONTRACTOR TESTING LPSM ALL
A1040 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A1050 15701-0000 SOIL EROSION CONTROL
(SEDIMENT CONTROL) LPSM ALL
A1060 15701-0000 SOIL EROSION CONTROL (EROSION
CONTROL) LPSM ALL
A1070 15701-0000 SOIL EROSION CONTROL
(NON-STORM WATER CONTROL) LPSM ALL
A1080 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
A1090 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A1100 20101-0000 CLEARING AND GRUBBING ACRE 2.1 0.4 2.5
A1110 20301-1400 REMOVAL OF INLET EACH 1 1
A1120 20301-1900 REMOVAL OF PIPE CULVERT EACH 4 4
A1130 20302-1200 REMOVAL OF GUARDRAIL LNFT 150 25 175
A1140 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS LPSM ALL
A1150 20401-0000 ROADWAY EXCAVATION CUYD 7209 291 7,500
A1160 20402-0000 SUBEXCAVATION CUYD 661 139 800
A1170 20420-0000 EMBANKMENT CONSTRUCTION
(REINFORCED SOIL SLOPE) CUYD 5611 389 6,000
A1180 20420-0000 EMBANKMENT CONSTRUCTION CUYD 3667 333 4,000
A1190 20441-0000 WASTE CUYD 6722 778 7,500
A1200 20703-0000 GEOGRID SQYD 9494 506 10,000
A1210 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 705 95 800
A1220 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 63 7 70
A1230 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2099 401 2,500
A1240 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 970 30 1,000
A1250 41102-1000 PRIME COAT, METHOD 1 SQYD 5935 565 6,500
A1260 41202-0000 TACK COAT GAL 594 56 650
A1270 55201-0200 STRUCTURAL CONCRETE, CLASS A
(AE) CUYD 50 5 55
A1280 55401-1000 REINFORCING STEEL LB 4270 230 4,500
A1290 56701-0000 MICROPILE LNFT 3260 140 3,400
MileStone: 100% Master Estimate Date Completed: 08/26/20 Report Date: 08/26/20
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
-A ug
-2
6:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
C
U se rs \t ho w ar d2
.J
EG
\D es kt op
\T ri ni ty
\E st im at es \1 pe r\ [1 pe r_ S O
Q s.
xl sm
]S he et
STATE PROJECT
B1CA ER 511(1)CA
SHEET
NUMBER
Drainage Summary
Micropile, Curb and Guardrail Summary
Removals Summary
Pavement Markings Summary
Grading Summary
Re- Vegetation Summary
Misc Summary
Surfacing Summary Allowance Bid
Schedule
A1300 56705-0000 MICROPILE LOAD VERIFICATION
TEST EACH 2 2
A1310 56706-0000 MICROPILE PROOF LOAD TEST EACH 7 7
A1320 60201-0400 12-INCH PIPE CULVERT LNFT 19 1 20
A1330 60201-0600 18-INCH PIPE CULVERT LNFT 84 6 90
A1340 60201-0800 24-INCH PIPE CULVERT LNFT 41 9 50
A1350 60210-0400 END SECTION FOR 12-INCH PIPE
CULVERT EACH 2 2
A1360 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT EACH 3 3
A1370 60210-0800 END SECTION FOR 24-INCH PIPE
CULVERT EACH 1 1
A1380 60403-0000 INLET EACH 2 2
A1390 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 39 11 50
A1400 60901-2100 CURB, ASPHALT, 4-INCH DEPTH LNFT 140 35 175
A1410 61701-1250 GUARDRAIL SYSTEM G4, TYPE 2,
CLASS A WOOD POSTS LNFT 150 25 175
A1420 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A1430 62201-0350 BACKHOE HOUR 40 40
A1440 62201-0850 WHEEL LOADER, 1 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40 40
A1450 62201-2750 MOTOR GRADER HOUR 40 40
A1460 62201-3000 HYDRAULIC EXCAVATOR HOUR 40 40
A1470 62301-0000 GENERAL LABOR HOUR 40 40
A1480 62302-0100 SPECIAL LABOR, SLOPE SCALING HOUR 72 8 80
A1490 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 80 80
A1500 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 40 40
A1510 62405-0200 PLACING CONSERVED TOPSOIL,
3-INCH DEPTH SQYD 6,101 299 6,400
A1520 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 6,854 346 7,200
A1530 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 6,854 346 7,200
A1540 62901-1100 ROLLED EROSION CONTROL
PRODUCT, TYPE 4 SQYD 3,199 301 3,500
A1550 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID LNFT 13,430 570 14,000
A1560 63401-0400 PAVEMENT MARKINGS, TYPE B,
BROKEN LNFT 3,284 716 4,000
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
6:
P M
MileStone: 100% Master Estimate Date Completed: 08/26/20 Report Date: 08/26/20
C
U se rs \t ho w ar d2
.J
EG
\D es kt op
\T ri ni ty
\E st im at es \1 pe r\ [1 pe r_ S O
Q s.
xl sm
]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
STATE PROJECT
B2CA ER 511(1)CA
SHEET
Drainage Summary
Micropile, Curb and Guardrail Summary
Removals Summary
Pavement Markings Summary
Grading Summary
Re- Vegetation Summary
Misc Summary
Surfacing Summary Allowance Bid
Schedule
A1570 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A1580 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 3632 68 3,700
A1590 63701-0000 FIELD OFFICE
EACH 1 1
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
6:
P M
MileStone: 100% Master Estimate Date Completed: 08/26/20 Report Date: 08/26/20
C
U se rs \t ho w ar d2
.J
EG
\D es kt op
\T ri ni ty
\E st im at es \1 pe r\ [1 pe r_ S O
Q s.
xl sm
]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number
STATE PROJECT
B3CA ER 511(1)CA
SHEET
P
M d e n p w p d p w ic s w o r k in g B S u m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
B4
GRADING SUMMARY
C74036
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
B5
REPRESENTATIONS
EARTHWORK
LEGEND
Roadway Excavation
Roadway Excavation
Roadway Excavation
Embankment (RSS)
Embankment (RSS)
Embankment
Embankment
Embankment
Embankment (RSS)
Embankment
Roadway Excavation
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g B S u m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
ROADWAY EXCAVATION
ROADWAY EXCAVATION EMBANKMENT/EMBANKMENT (RSS)
EMBANKMENT
EMBANKMENT (RSS)
ROADWAY EXCAVATION
B6
SUMMARIES
REMOVAL AND SURFACING
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g B S u m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
B7
GUARDRAIL SUMMARIES
AND MICROPILE, CURB AND
DRAINAGE, RE-VEGETATION,
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g B S u m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
B8
SUMMARY
PAVEMENT MARKING
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g B S u m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
B9
MISCELLANEOUS SUMMARY
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
S
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g B S u m T
R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
CA
Superelevation Diagram
CA ER 511(1)
IN
V E
IN
V E
S T O P
P C
C
.1
P T
.5
V P I
.1
E L
.9
-0.506%
Lt. EOP
Rt. EOP axis of rotation
Profile grade and 11+74
Match Existing 3.7%±
11+74
Match Existing -3.7%±
12+28
12+28
6.00%
-6.00%
14+69
14+69
15+62
16+09 16+56
-2.00%
100'50'0
Scale in Feet
Q
C D
E S I G
N S
U B
M I T
T A
L N
O T F
O R C
O N
S T
R U
C T I O
N
-10%
0%
VAN DUZEN ROAD 11+00.00 TO 17+50.00
L = 123.10'(1) L = 341.37'(2)
T = 243.78'(1) T = 227.45'(2)
R = 1280.00'(1) R = 1060.00'(2)
PI = 12+94.82
Curve = C01
11+00 12+00 13+00 14+00 15+00 16+00
-10%
0%
Proposed Grade
Existing Ground
17+00
E 6138217.07
N 2037214.33
Van Duzen Rd
CA ER 511(1)
11+74.14
Begin Site 001
E 6138217.07
N 2037214.33
Van Duzen Rd
CA ER 511(1)
11+74.14
Begin Site 001
10%10%
LVan Duzen Rd C
Van D uzen
Road
VanDuzen River C1
FL EL 2567.17
23.90' Rt.
13+25.00, Begin Shoulder Taper 11+74.14, 11.29' Rt.
FL EL 2566.68
23.84' Rt.
14+25.00, 14+73.09, 13.00' Rt.
'R
Match Existing 14+83.22, 32.68' Rt.
N et u o R t s e r o F
13.00' Rt.
15+03.76, 10'R
Match Existing 14+93.54, 32.73' Rt.
.0
FL EL 2565.81
16+00.00, 25.83' Rt.
Ditch Flowline
FL EL 2565.31
25.80' Rt.
17+00.00, FL EL 2564.98
25.79' Rt.
17+66.00, 18" CMP Culvert Remove Existing
S lo p e
V a rie s
Existing EOP
Existing Road Obliterate
End Shoulder Taper 12+24.14, 13.00' Lt.
Begin Shoulder Taper.
Begin 1:4 Fill.
11+74.14, 11.18' Lt.
Begin 2.00% Fill.
End 1:4 Cut.
16+37.00, 23.14' Lt.
731.91'
Begin Variable Slope.
End 1:4 Fill.
13+71.71, 17.81' Lt.
NOTE:
1.
based on precise survey data.
shown are approximate and not
Existing Right-of-Way Lines
4'' Width (Typ.)
Type B, Solid White, Pavement Markings, Begin Ditch
FL EL 2567.66
23.59' Rt.
12+25.00, 4'' Width Type B, Broken Yellow, Pavement Markings, Begin Ditch
FL EL 2567.00
21.00' Lt.
16+30.99, 12''x19' CMP
Per Detail 602-4 Flared End Section
INV EL 2566.31
14+99.68, 24.47' Rt.
Per Detail 602-4 Flared End Section
INV EL 2566.42
14+77.17, 24.00' Rt.
Road Access (6'' Roadway Aggregate)
End Shoulder Taper 12+24.14, 13.00' Rt.
End Variable Slope 16+25.08, 55.83' Lt.
Begin 1:4 Cut 23.38' Lt.
16+30.14, under proposed fill aggregate base asphalt and Remove existing
14+93.54, 23.05' Rt.14+83.31, 23.14' Rt.
0.49%
0.53%
0.50% staging area.
Place in adjacent existing K-Rail.
Remove and salvage staging area.
Place in adjacent and salvage.
Remove sign
Begin 1:4 Cut End 2.00% Fill 16+55.94, 23.56' Lt.
Begin 2.00% Fill End 1:4 Cut 16+87.00, 23.01' Lt.Existing EOP
Match
Per Detail 251-A Placed Riprap, Class 2
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
U s e r D
E N
P W
P
NUMBER
SHEET
CA
Superelevation Diagram
CA ER 511(1)
N O
IN
FO
731.91'
P C
.4
V P I
.4
E L
.2
-0.506%
-2.00%
21+74 22+21
22+67
-2.00%
22+67
23+05
Match Existing 3.6%±
23+05
Match Existing -3.6%± axis of rotation
Profile grade and
Lt. EOP
Rt. EOP
100'50'0
Scale in Feet
18+00 19+00 20+00 21+00 22+00 23+00
-10%
0%
-10%
0%
L = 392.91'
T = 201.03'
R = 754.00'
PI = 24+48.45
Curve = C02
E 6139061.28
N 2037960.73
Van Duzen Rd
CA ER 511(1)
23+05.49
End Site 001
E 6139061.28
N 2037960.73
Van Duzen Rd
CA ER 511(1)
23+05.49
End Site 001
10% 10%
Van Duzen Rd
Van Duzen Rd CL
Proposed Grade
Existing Ground
Van Duzen River
VAN DUZEN ROAD 17+50.00 TO 24+00.00
C2
17+95.00, 13.00' Rt.
Match Existing
EL 2565.41±
18+20.00, 38.00' Rt.
.2
.3
FL EL 2564.12
21+73.68, 21.00' Rt.
Begin Shoulder Taper 22+55.49, 13.00' Rt.
Ditch Flowline
Begin Shoulder Taper 22+55.49, 13.00' Lt.
Existing EOPBegin 1:4 Cut.
End 2.00% Fill.
18+17.00, 23.59' Lt.
Existing Road Obliterate
Match Existing El 2566.47± 19+40.00, 38.00' Rt.
End Shoulder Taper 23+05.49, 10.94' Lt.
End Shoulder Taper 23+05.49, 11.20' Rt.
FL EL 2563.75
22+47.19, 21.00' Lt.
13.00' Rt.
19+65.00, 'R
25'R
End Ditch
FL EL 2564.98
17+66.00, 25.79' Rt.
4'' Width (Typ.)
Type B, Solid White, Pavement Markings, End Ditch Match Existing
FL EL 2563.36±
23+22.83, 40.15' Rt.
Begin Ditch
FL EL 2565.18
19+62.85, 21.00' Rt.
Aggregate)
Access (6'' Roadway
Maintenance Pullout
4'' Width Type B, Broken Yellow, Pavement Markings, End Ditch Match Existing
FL EL 2563.64±
22+66.29, 24.97' Lt.
Existing CL level field. Final dimensions as directed by CO.
Staging area is location in the graveled area of a and not based on precise survey data.
Existing Right-of-Way Lines shown are approximate
2.
1.
NOTES:
2.Area Limits, Typ.
Approximate Staging
0.53%
0.50% 0.49%
0.58 staging area.
Place in adjacent existing K-Rail.
Remove and salvage
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
122.58'
.9
.9
16+00
10+
PT 15+84.10
POT 16+00.00
P C
.9
PC 10+
64.91
POT 10+
00.00
P T
.4
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
L = 166.12'
T = 109.47'
R = 100.00'
PI = 15+27.45
Curve = C02
L = 230.49'
T = 190.75'
R = 110.00'
PI = 12+55.65
Curve = C01 d a o R m o p m a y
H
100'50'0
Scale in Feet
LHyampom Rd C
C3
NOTES:
E 6198335.20
N 2111706.94
Hyampom Rd
CA ER 511(1)
14+09.00
End Site 006 data.
approximate and not based on precise survey
Existing Right-of-Way Lines shown are necessary to fit field conditions.
based on precise survey data. Adjust as the existing and proposed features are not
The horizontal alignment and the location of
2.
1.
See G Series for details
Excavation Limits
12+87 to 14+09 Rt.
Existing
Match
See Detail C204-51
Subexcavation
13+40.00 to 13+70.00 Lt.
Staging Area
H a y fo r k
T o
H y a m p o m
T o
10+00 TO 16+00
SITE 006
HYAMPOM ROAD PM 11.4
4" width (typ.)
Type B, Solid White, Pavement Markings, Existing
Match
Construction Limits E 6198214.47
N 2111685.92
Hyampom Rd
CA ER 511(1)
12+87.00
Begin Site 006
100.00' Rt.
12+87.29, 180.00' Rt.
12+86.65, 180.00' Rt.
14+10.73, C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
16601660
17101
011-220-21 U.S.F.S.
293.44'
128.28'
P O
T
.0
P C
.4
P T
.7
P O
T
.0
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
L = 78.29'
T = 39.24'
R = 450.00'
PI = 27+32.68
Curve = C01
C4
E 6164487.50
N 2113017.83
Hyampom Rd
CA ER 511(1)
26+80.00
End Site 016 dR mopmayH
Match Existing of Road
Existing Edge
Pavement Reconstruction
25+60 to 26+80 Lt & Rt.
NOTE:
1.
precise survey data.
are approximate and not based on
Existing Right-of-Way Lines shown
Existing
Match Hayfork
To
H ya m po m To
Staging Area
24+00 TO 29+00
SITE 016
HYAMPOM ROAD PM 20.2
Hyampom Rd CL of Road
Existing Edge staging area.
Place in adjacent
Remove And Salvage Sign
Construction Limit
See Detail C204-51
Subexcavation, 24+30 to 25+10 Lt.
Broken Yellow, 4" width (Typ.)
Pavement Markings, Type B, 24+30 to 26+80
E 6164365.94
N 2112799.37
Hyampom Rd
CA ER 511(1)
24+30.00
Begin Site 016
90.00' Lt.
26+98.59, 90.00' Lt.
25+40.63, See G Series
Construction, Embankment staging area.
Place in adjacent
Salvage Sign
Remove And staging area.
Place in adjacent
Salvage Sign
Remove And
Construction Easement
120' x 40' Temporary Solid White, 4" width (Typ.)
Pavement Markings, Type B, 24+30 to 26+80 Lt.
4" width (typ.)
Type B, Solid White, Pavement Markings, 25+60 to 26+80 Rt.
Place in adjacent staging area.
Remove And Salvage K-Rail
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
T O E
T O E
T O E
T O E
T O E
T O E
T O E
T O E
T O P
T O P
T O P
T O P
T O P
T O P
T O E
T O P
T O P
T O P
T O P
T O P
T O P
T O P
T O P
LIP
O
F G
U T T E R
T O P
LIP
O
F G
U T T E R
T O P
LIP
O
F G
U T T E R
T O P
LIP
O
F G
U T T E R
D I
T O P
LIP
O
F G
U T T E R
T O P
T O P
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E
RT
O P
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R T O P
T O P
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
N O N
O T E S
LIP
O
F G
U T T E R
LIP
O
F G
U T T E R
D I
T O P
T O E
130.
70'117.61'
P O
T
.0
P C
.6
P T
.3
P O
T
.0
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
LMad River C
C5
E 6145600.93
N 2048497.68
Mad River Rd
CA ER 511(1)
14+00.00
End Site 009
10+00 TO 14+44
SITE 009
MAD RIVER ROAD PM 0.15
4" width (typ.)
Type B, Solid White, Pavement Markings, NOTE:
1.
precise survey data.
are approximate and not based on
Existing Right-of-Way Lines shown
E 6145825.86
N 2048275.87
Mad River Rd
CA ER 511(1)
10+80.00
Begin Site 009
W id th V a r ie s
L Existing C
Construction Limits
To Ruth To H
WY 36
Pavement Reconstruction
11+60 to 13+00 Lt.
No Direct Payment
See Special 609-A, Match Curb Rundown, 11+78 staging area.
Place in adjacent existing K-Rail.
Remove and salvage
Remove Existing Guardrail dR reviR d aM
See G Series
Micropile Cap, Sta 12+95, 17.75' Lt.
STA 11+60, 17.75' Lt. to
Tie to Existing
Curb, Asphalt 4-inch depth, End Guardrail and
13+00, 15' Lt. +/-
Staging Area
Tie to Existing
Curb, Asphalt, 4-inch depth, Begin Guardrail and
11+60, 15' Lt. +/-
Paved Pullout
Existing Edge of Road/ Pavement Markings
Remove Existing
Match Existing
Begin Pavement Markings, Lt., Rt., CL
11+10 ±
Match Existing
End Pavement Markings, Lt., Rt., CL
13+70 ±
L = 195.69'
T = 99.35'
R = 460.00'
PI = 12+16.96
Curve = C01
Solid Double Yellow, 4" width
Pavement Markings, Type B, C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
T O
E
27902
N O N
O T E S
T O
E
T O
P
N O N
O T E S
T O
P
T O
E
T O
E
T O
P
28052805
87.31'
207.51'66.51'
P O
T
.0
P C
.5
P T
.1
P C
.6
P T
.7
P C
.0
PT
28+
30.
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
Mad River Rd CL
L = 318.95'
T = 179.30'
R = 280.00'
PI = 26+91.31
Curve = C03L = 112.08'
T = 56.10'
R = 1000.00'
PI = 23+68.72
Curve = C02
L = 38.60'
T = 19.30'
R = 1000.00'
PI = 20+85.81
Curve = C01
C6
Mad River Rd
E 6164222.69
N 2018791.65
Mad River Rd
CA ER 511(1)
22+00.00
Begin Site 007
E 6164175.36
N 2018879.74
Mad River Rd
CA ER 511(1)
23+00.00
End Site 007
Match Existing of Road
Existing Edge
NOTE:
1.
precise survey data.
are approximate and not based on
Existing Right-of-Way Lines shown
Staging Area
Reconstruction
Pavement
22+00 to 23+00 Lt.
Existing
Match
In Place
Power, Protect
Existing OH
T o H
W Y
See G Series
Construction, Embankment
20+00 TO 28+30
SITE 007
MAD RIVER ROAD PM 7.5
Construction Limits
To Ruth
Construction Easement
135'x40' Temporary
Construction Easement
275'x45' Temporary width
Broken Yellow, 4"
Type B, Pavement Markings, 4" width (typ.)
Type B, Solid White, Pavement Markings, staging area.
Place in adjacent
Salvage K-rail.
Remove And
80.00 Lt.
21+93.74,
80.00 Lt.
23+27.55,
85.00 Lt.
25+16.70,
85.00 Lt.
27+27.66, C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
P O
T
.0
P T
.0
P C
.7
411.70'
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
Mad River Rd CL
C7
Mad River Rd
4" width (typ.)
Type B, solid white, Pavement Markings, ' Match Existing
Match Existing
NOTES:
data.
approximate and not based on precise survey
Existing Right-of-Way Lines shown are field conditions.
precise survey data. Adjust as necessary to fit existing and proposed features are not based on
The horizontal alignment and the location of the
2.
1.
E 6165422.15
N 2018100.72
Mad River Rd
CA ER 511(1)
33+20.00
End Site 008
E 6165405.33
N 2017987.34
Mad River Rd
CA ER 511(1)
31+60.00
Begin Site 008
(typ.)
Yellow, 4" width
Type B, Broken
Pavement Markings, To HWY 36
30+00 TO 35+00
SITE 008
MAD RIVER ROAD PM 8.0
Construction Limits
L = 88.30'
T = 44.47'
R = 300.00'
PI = 34+56.17
Curve = C01
To Ruth
See Detail C204-51
Subexcavation
31+60 to 33+20
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
232.00' 116.03'
P O
E
.0
P T
.9
P C
.0
P O
B
.0
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
L = 51.97'
T = 26.02'
R = 400.00'
PI = 997+58.02
Curve = C01
LRuth-Zenia Rd C
Ruth-Zenia Rd
C8
995+00 TO 999+00
SITE 010
RUTH-ZENIA ROAD PM 15.4
NOTES:
data.
approximate and not based on precise survey
Existing Right-of-Way Lines shown are necessary to fit field conditions.
based on precise survey data. Adjust as the existing and proposed features are not
The horizontal alignment and the location of
2.
1.
E 6158562.43
N 1981280.65
Ruth-Zenia Rd
CA ER 511(1)
997+30
End Site 010
E 6158606.64
N 1981257.30
Ruth-Zenia Rd
CA ER 511(1)
996+80
Begin Site 010
Match Existing
Existing
Match
4'' Width (Typ.)
type B, Solid White, Pavement Markings, To Zenia
To HWY 36
Yellow, 4" width (typ.)
Type B, Solid Double
Pavement Markings, See Detail C204-51
Subexcavation
996+80 to 997+30 Rt.
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
TOP
TOP
TOP
TOP
TOP
TOP
TOPTOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
NO NOTES
TOP
TOP
.9 9'
95.28'
102.78'
P O
B
.0
P C
.7
P C
.8
3 P T
.7
P O
E
.0
P T
.8
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
L = 254.06'
T = 147.40'
R = 200.00'
PI = 945+50.18
Curve = C01
L = 179.90'
T = 96.55'
R = 200.00'
PI = 948+21.37
Curve = C02
LRuth-Zenia Rd C
C9 of Road
Existing Edge
943+00 TO 950+00
SITE 011
RUTH-ZENIA ROAD PM 16.3
E 6158131.90
N 1977289.46
Ruth-Zenia Rd
CA ER 511(1)
946+50.00
Begin Site 011
E 6158186.51
N 1977384.79
Ruth-Zenia Rd
CA ER 511(1)
947+60.00
End Site 011 dR aineZ-htuR
Buttress Fill Limits
See G Series for Details
Construct Buttress Fill, 946+55 to 947+55 Rt, Match Existing
Match Existing
Pavement Reconstruction
946+50 to 947+60 Lt & Rt, 12'
Staging Area
To Zenia
To HWY 36
4'' Width (Typ.)
Type B, Solid White, Pavement Markings, NOTES:
survey data.
approximate and not based on precise
Existing Right-of-Way Lines shown are 1.
Yellow, 4'' Width
Type B, Solid Double
Pavement Markings,
96.20 Rt.
946+42.78,
105.65 Rt.
947+71.19, C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
INVERT
INVERT
(NO INFO)
1007 1007 1007
21.6 9'
3.82'
190.26'
39.71'
P O
B
.0
P C
.8
P T
.0
P O
E
.8
P T
.1
P C
.3
P T
.0
P C
.6
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
Ruth-Zenia Rd
C10
LRuth-Zenia Rd C
L = 152.84'
T = 76.91'
R = 550.00'
PI = 878+18.25
Curve = C03
L = 202.25'
T = 101.41'
R = 1100.00'
PI = 874+50.24
Curve = C02
E 6158838.61
N 1972895.75
Ruth-Zenia Rd
CA ER 511(1)
875+85.00
Begin Site 012
E 6158696.53
N 1972947.02
Ruth-Zenia Rd
CA ER 511(1)
877+52.00
End Site 012
L = 123.32'
T = 62.54'
R = 300.00'
PI = 872+84.23
Curve = C01
Existing
Match edge of road
Existing
NOTE:
1.
precise survey data.
are approximate and not based on
Existing Right-of-Way Lines shown
To Zeni a
See G Series for Details Construct Buttress Fill, 875+86 to 877+30, Rt, To HWY 36
18''x39' CMP
4'' Width (Typ.)
Type B, Solid White, Pavement Markings, 18" CMP culvert replace existing Remove and
Reconstruction
Pavement
877+50, Lt & Rt, 875+85 to
Buttress Fill Limits
20'
872+00. TO 879+33
SITE 012
RUTH-ZENIA ROAD PM 17.7
Per Standard 602-4
Flared End Section
4'' Width (Typ.)
Type B, Solid Double Yellow, Pavement Markings, Existing
Match by CO.
Final Limits to be Determined on Type I Woven Geotextile.
Thick Layer of Class 2 Riprap disturbed slope by placing a 2'
Directed by the CO. Stabilize
Remove Loose Material as
75.97 Rt.
877+34.90,
76.00 Rt.
875+84.90, Per Detail 251-A
Placed Riprap, Class 2
C74036 R E
E
NI
G
NE
L
ANOISSEFORP DERET
SI
G E
R
LIVIC
D R
A
WOH SEMAJ SI
V A
R T
AI
NROFILAC FO E
TAT
.49
124.39'
P T
.1
P O
E
.0
P T
.6
P C
.6
P O
B
.0
STATE PROJECT
P
M d e n p w p d p w ic s w o r k in g C p n p
T R I .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r D
E N
P W
P
NUMBER
SHEET
CA CA ER 511(1)
100'50'0
Scale in Feet
Ruth-Zenia Rd
L = 238.12'
T = 125.73'
R = 300.00'
PI = 852+25.73
Curve = C01
L = 103.00'
T = 52.67'
R = 200.00'
PI = 855+25.28
Curve = C02
LRuth-Zenia Rd C
C11
851+00 TO 857+00
SITE 013
RUTH-ZENIA ROAD PM 18.1
E 6159498.92
N 1971565.97
Ruth-Zenia Rd
CA ER 511(1)
854+00.00
Begin Site 013
E 6159427.00
N 1971673.63
Ruth-Zenia Rd
CA ER 511(1)
855+30.00
End Site 013
Existing
Match
NOTES:
not based on precise survey data.
Existing Right-of-Way Lines shown are approximate and data. Adjust as necessary to fit field conditions.
and proposed features are not based on precise survey
The horizontal alignment and the location of the existing
2.
1.
Existing
Match existing 24" CMP culvert
Remove and replace
4'' Width
Type B, Solid Double Yellow, Pavement Markings, Begin 6'' Underdrain
854+51.68, 24.7', Lt, End 6'' Underdrain
854+88.16, 17.45', Lt, To Zenia
To HWY 36
4'' Width (Typ.)
Type B, Solid White, Pavement Markings, Match existing location.
604-3.
Per Standard 604-1 and
Install Inlet
854+90.00, 17.62', Lt, Match existing location.
Per Standard 602-4.
With Flared End Section
Culvert…