Tabulation of Bids-CA ER 511(1) Trinity County Ruth-Zenia Road.pdf
PDF 670 KB Posted
- Attached to
- CA ER 511(1), Trinity County Ruth-Zenia Road Federal contract opportunity
- Solicitation number
- 6982AF20B000032
About this file
This document summarizes a request for bid for storm damage repair work along rural roads in Trinity County, California. The solicitation number is 6982AF20B000032 and involves repairing damage at 12 sites along 5 routes including Ruth-Zenia Road, Mad River Road, Hyampom Road, Van Duzen Road and Alderpoint Bluff Road caused by storms in 2016-2017. The work includes slope scaling, excavation, embankment construction, reinforced slopes, potential micropile installation, drainage repairs, riprap placement, asphalt paving, pavement markings, erosion control and revegetation. Approximate quantities include 15,500 cubic yards of roadway excavation, 500 cubic yards of subexcavation, 5,500 cubic yards of embankment construction, 2,200 tons of roadway aggregate, 1,100 tons of asphalt concrete pavement and 4,500 linear feet of micropiles. The anticipated cost is between $4,000,000 to $6,000,000. The bid response date is not provided, but construction is scheduled from Spring 2021 to Fall 2021. The procurement will be a total small business set-aside conducted by the Department of Transportation Federal Highway Administration.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary - CA ER 511(1) Trinity County Ruth-Zenia Road.pdf | ||
| Interested Vendors List 2 26 2021.pdf | ||
| Quick Start Guide_Opportunities 4 Contractors including Interested Vendor List info.pdf | ||
| QnA 2 25 2021.pdf | ||
| QnA 2 24 2021.pdf | ||
| Amendment A001.pdf | ||
| QnA 2 23 2021.pdf | ||
| Interested Vendors List 2 22 2021.pdf | ||
| QnA 2 10 2021.pdf | ||
| Interested Vendors List 02 03 2021.pdf | ||
| QnA 2 2 2021.pdf | ||
| Hydraulics Report.pdf | ||
| fp14.pdf | ||
| Plans.pdf | ||
| 6982AF20B000032 IFB.pdf | ||
| Geotech Report.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 03/04/21
1 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF20B000032
Division: Central Federal Lands
State: CA County: Trinity
Federal Land: National Forest Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 03/02/21
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Steelhead Constructors JV $4,474,474.00 PO Box 536 Palo Cedro, CA 96073
Judd Buick Construction Inc. $4,481,257.50 242 Hartnell Ave. Suite C Redding, CA 96002
Coleman Environmental Engineering Inc $4,607,657.73 85 East Highway 20 Upper Lake, CA 95485
Hat Creek Construction & Materials, Inc. $4,989,989.00 24339 Highway 89 N Burney, CA 96013
West Coast Contractors, Inc. $6,251,670.00 61050 Highway 101 Coos Bay, OR 97420
Conway Construction Company $6,891,925.00 6620 NW Whitney Road Vancouver, WA 98665
McCullough Construction Inc. $6,933,483.50 57 Alder Grove Road Arcata, CA, CA 95521
Engineer's Estimate $4,786,000.00
2 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1000 15101-0000 MOBILIZATION
Steelhead Constructors JV Lump Sum $877,439.00 Judd Buick Construction Inc. Lump Sum $369,600.00 Coleman Environmental Engineering Inc Lump Sum $125,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $498,000.00 West Coast Contractors, Inc. Lump Sum $625,000.00 Conway Construction Company Lump Sum $1,392,000.00 McCullough Construction Inc. Lump Sum $798,239.00 Engineer's Estimate ALL LPSM Lump Sum $435,625.00
A1010 15201-0000 CONSTRUCTION SURVEY AND STAKING
Steelhead Constructors JV Lump Sum $100,000.00 Judd Buick Construction Inc. Lump Sum $85,800.00 Coleman Environmental Engineering Inc Lump Sum $90,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $54,065.00 West Coast Contractors, Inc. Lump Sum $54,000.00 Conway Construction Company Lump Sum $70,000.00 McCullough Construction Inc. Lump Sum $138,235.00 Engineer's Estimate ALL LPSM Lump Sum $80,000.00
A1020 15301-0000 CONTRACTOR QUALITY CONTROL
Steelhead Constructors JV Lump Sum $200,000.00 Judd Buick Construction Inc. Lump Sum $190,000.00 Coleman Environmental Engineering Inc Lump Sum $44,100.00 Hat Creek Construction & Materials, Inc. Lump Sum $546,653.00 West Coast Contractors, Inc. Lump Sum $160,000.00 Conway Construction Company Lump Sum $20,000.00 McCullough Construction Inc. Lump Sum $272,612.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00
A1030 15401-0000 CONTRACTOR TESTING
Steelhead Constructors JV Lump Sum $150,000.00 Judd Buick Construction Inc. Lump Sum $126,700.00 Coleman Environmental Engineering Inc Lump Sum $125,774.00 Hat Creek Construction & Materials, Inc. Lump Sum $336,497.00 West Coast Contractors, Inc. Lump Sum $108,000.00 Conway Construction Company Lump Sum $300,000.00 McCullough Construction Inc. Lump Sum $323,348.00 Engineer's Estimate ALL LPSM Lump Sum $75,000.00
3 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1040 15501-0000 CONSTRUCTION SCHEDULE
Steelhead Constructors JV Lump Sum $20,000.00 Judd Buick Construction Inc. Lump Sum $5,000.00 Coleman Environmental Engineering Inc Lump Sum $50,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $10,000.00 West Coast Contractors, Inc. Lump Sum $5,000.00 Conway Construction Company Lump Sum $250,000.00 McCullough Construction Inc. Lump Sum $41,499.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A1050 15701-0000 SOIL EROSION CONTROL (SEDIMENT CONTROL)
Steelhead Constructors JV Lump Sum $30,000.00 Judd Buick Construction Inc. Lump Sum $12,000.00 Coleman Environmental Engineering Inc Lump Sum $6,700.00 Hat Creek Construction & Materials, Inc. Lump Sum $30,000.00 West Coast Contractors, Inc. Lump Sum $5,000.00 Conway Construction Company Lump Sum $125,000.00 McCullough Construction Inc. Lump Sum $24,047.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A1060 15701-0000 SOIL EROSION CONTROL (EROSION CONTROL)
Steelhead Constructors JV Lump Sum $5,000.00 Judd Buick Construction Inc. Lump Sum $6,000.00 Coleman Environmental Engineering Inc Lump Sum $8,400.00 Hat Creek Construction & Materials, Inc. Lump Sum $25,000.00 West Coast Contractors, Inc. Lump Sum $2,000.00 Conway Construction Company Lump Sum $50,000.00 McCullough Construction Inc. Lump Sum $53,094.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A1070 15701-0000 SOIL EROSION CONTROL (NON-STORM WATER CONTROL)
Steelhead Constructors JV Lump Sum $5,000.00 Judd Buick Construction Inc. Lump Sum $5,000.00 Coleman Environmental Engineering Inc Lump Sum $4,280.00 Hat Creek Construction & Materials, Inc. Lump Sum $25,000.00 West Coast Contractors, Inc. Lump Sum $5,500.00 Conway Construction Company Lump Sum $50,000.00 McCullough Construction Inc. Lump Sum $12,024.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
4 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1080 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Steelhead Constructors JV Lump Sum $10,000.00 Judd Buick Construction Inc. Lump Sum $5,000.00 Coleman Environmental Engineering Inc Lump Sum $42,762.00 Hat Creek Construction & Materials, Inc. Lump Sum $2,500.00 West Coast Contractors, Inc. Lump Sum $3,000.00 Conway Construction Company Lump Sum $10,000.00 McCullough Construction Inc. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A1090 15802-0000 WATERING FOR DUST CONTROL
Steelhead Constructors JV Lump Sum $30,000.00 Judd Buick Construction Inc. Lump Sum $45,300.00 Coleman Environmental Engineering Inc Lump Sum $80,000.00 Hat Creek Construction & Materials, Inc. Lump Sum $16,000.00 West Coast Contractors, Inc. Lump Sum $40,000.00 Conway Construction Company Lump Sum $40,000.00 McCullough Construction Inc. Lump Sum $14,000.00 Engineer's Estimate ALL LPSM Lump Sum $110,000.00
A1100 20101-0000 CLEARING AND GRUBBING
Steelhead Constructors JV $35,000.00 $87,500.00 Judd Buick Construction Inc. $9,880.00 $24,700.00 Coleman Environmental Engineering Inc $26,000.00 $65,000.00 Hat Creek Construction & Materials, Inc. $16,000.00 $40,000.00 West Coast Contractors, Inc. $30,000.00 $75,000.00 Conway Construction Company $7,000.00 $17,500.00 McCullough Construction Inc. $70,188.00 $175,470.00 Engineer's Estimate 2.5 ACRE $7,000.00 $17,500.00
A1110 20301-1400 REMOVAL OF INLET
Steelhead Constructors JV $750.00 $750.00 Judd Buick Construction Inc. $1,000.00 $1,000.00 Coleman Environmental Engineering Inc $6,128.00 $6,128.00 Hat Creek Construction & Materials, Inc. $1,000.00 $1,000.00 West Coast Contractors, Inc. $2,000.00 $2,000.00 Conway Construction Company $800.00 $800.00 McCullough Construction Inc. $1,350.00 $1,350.00 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
5 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1120 20301-1900 REMOVAL OF PIPE CULVERT
Steelhead Constructors JV $1,500.00 $6,000.00 Judd Buick Construction Inc. $900.00 $3,600.00 Coleman Environmental Engineering Inc $9,215.25 $36,861.00 Hat Creek Construction & Materials, Inc. $500.00 $2,000.00 West Coast Contractors, Inc. $1,250.00 $5,000.00 Conway Construction Company $800.00 $3,200.00 McCullough Construction Inc. $3,262.50 $13,050.00 Engineer's Estimate 4 EACH $2,000.00 $8,000.00
A1130 20302-1200 REMOVAL OF GUARDRAIL
Steelhead Constructors JV $20.00 $3,500.00 Judd Buick Construction Inc. $21.00 $3,675.00 Coleman Environmental Engineering Inc $23.43 $4,100.25 Hat Creek Construction & Materials, Inc. $10.00 $1,750.00 West Coast Contractors, Inc. $25.00 $4,375.00 Conway Construction Company $18.00 $3,150.00 McCullough Construction Inc. $18.50 $3,237.50 Engineer's Estimate 175 LNFT $10.00 $1,750.00
A1140 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Steelhead Constructors JV Lump Sum $20,000.00 Judd Buick Construction Inc. Lump Sum $4,500.00 Coleman Environmental Engineering Inc Lump Sum $30,310.00 Hat Creek Construction & Materials, Inc. Lump Sum $15,000.00 West Coast Contractors, Inc. Lump Sum $5,000.00 Conway Construction Company Lump Sum $50,000.00 McCullough Construction Inc. Lump Sum $70,210.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A1150 20401-0000 ROADWAY EXCAVATION
Steelhead Constructors JV $45.00 $337,500.00 Judd Buick Construction Inc. $87.54 $656,550.00 Coleman Environmental Engineering Inc $52.98 $397,350.00 Hat Creek Construction & Materials, Inc. $50.00 $375,000.00 West Coast Contractors, Inc. $141.00 $1,057,500.00 Conway Construction Company $70.00 $525,000.00 McCullough Construction Inc. $244.93 $1,836,975.00 Engineer's Estimate 7,500 CUYD $75.00 $562,500.00
6 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1160 20402-0000 SUBEXCAVATION
Steelhead Constructors JV $105.00 $84,000.00 Judd Buick Construction Inc. $119.25 $95,400.00 Coleman Environmental Engineering Inc $59.60 $47,680.00 Hat Creek Construction & Materials, Inc. $180.00 $144,000.00 West Coast Contractors, Inc. $139.00 $111,200.00 Conway Construction Company $110.00 $88,000.00 McCullough Construction Inc. $78.71 $62,968.00 Engineer's Estimate 800 CUYD $150.00 $120,000.00
A1170 20420-0000 EMBANKMENT CONSTRUCTION (REINFORCED SOIL SLOPE)
Steelhead Constructors JV $95.00 $570,000.00 Judd Buick Construction Inc. $95.00 $570,000.00 Coleman Environmental Engineering Inc $74.36 $446,160.00 Hat Creek Construction & Materials, Inc. $140.00 $840,000.00 West Coast Contractors, Inc. $212.00 $1,272,000.00 Conway Construction Company $180.00 $1,080,000.00 McCullough Construction Inc. $49.19 $295,140.00 Engineer's Estimate 6,000 CUYD $80.00 $480,000.00
A1180 20420-0000 EMBANKMENT CONSTRUCTION
Steelhead Constructors JV $50.00 $200,000.00 Judd Buick Construction Inc. $56.00 $224,000.00 Coleman Environmental Engineering Inc $77.62 $310,480.00 Hat Creek Construction & Materials, Inc. $70.00 $280,000.00 West Coast Contractors, Inc. $139.00 $556,000.00 Conway Construction Company $75.00 $300,000.00 McCullough Construction Inc. $53.10 $212,400.00 Engineer's Estimate 4,000 CUYD $75.00 $300,000.00
A1190 20441-0000 WASTE
Steelhead Constructors JV $27.50 $206,250.00 Judd Buick Construction Inc. $42.88 $321,600.00 Coleman Environmental Engineering Inc $64.53 $483,975.00 Hat Creek Construction & Materials, Inc. $25.00 $187,500.00 West Coast Contractors, Inc. $32.00 $240,000.00 Conway Construction Company $50.00 $375,000.00 McCullough Construction Inc. $35.23 $264,225.00 Engineer's Estimate 7,500 CUYD $50.00 $375,000.00
7 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1200 20703-0000 GEOGRID
Steelhead Constructors JV $2.25 $22,500.00 Judd Buick Construction Inc. $2.35 $23,500.00 Coleman Environmental Engineering Inc $2.09 $20,900.00 Hat Creek Construction & Materials, Inc. $4.00 $40,000.00 West Coast Contractors, Inc. $3.00 $30,000.00 Conway Construction Company $2.00 $20,000.00 McCullough Construction Inc. $4.72 $47,200.00 Engineer's Estimate 10,000 SQYD $10.00 $100,000.00
A1210 21101-1000 ROADWAY OBLITERATION, METHOD 1
Steelhead Constructors JV $8.00 $6,400.00 Judd Buick Construction Inc. $16.00 $12,800.00 Coleman Environmental Engineering Inc $44.33 $35,464.00 Hat Creek Construction & Materials, Inc. $8.00 $6,400.00 West Coast Contractors, Inc. $3.00 $2,400.00 Conway Construction Company $9.00 $7,200.00 McCullough Construction Inc. $24.46 $19,568.00 Engineer's Estimate 800 SQYD $12.00 $9,600.00
A1220 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Steelhead Constructors JV $250.00 $17,500.00 Judd Buick Construction Inc. $81.50 $5,705.00 Coleman Environmental Engineering Inc $392.45 $27,471.50 Hat Creek Construction & Materials, Inc. $275.00 $19,250.00 West Coast Contractors, Inc. $225.00 $15,750.00 Conway Construction Company $240.00 $16,800.00 McCullough Construction Inc. $300.00 $21,000.00 Engineer's Estimate 70 CUYD $180.00 $12,600.00
A1230 30202-2000 ROADWAY AGGREGATE, METHOD 2
Steelhead Constructors JV $57.50 $143,750.00 Judd Buick Construction Inc. $56.92 $142,300.00 Coleman Environmental Engineering Inc $114.65 $286,625.00 Hat Creek Construction & Materials, Inc. $75.00 $187,500.00 West Coast Contractors, Inc. $62.00 $155,000.00 Conway Construction Company $67.00 $167,500.00 McCullough Construction Inc. $74.43 $186,075.00 Engineer's Estimate 2,500 TON $60.00 $150,000.00
8 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1240 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Steelhead Constructors JV $300.00 $300,000.00 Judd Buick Construction Inc. $321.80 $321,800.00 Coleman Environmental Engineering Inc $377.00 $377,000.00 Hat Creek Construction & Materials, Inc. $250.00 $250,000.00 West Coast Contractors, Inc. $365.00 $365,000.00 Conway Construction Company $320.00 $320,000.00 McCullough Construction Inc. $275.00 $275,000.00 Engineer's Estimate 1,000 TON $200.00 $200,000.00
A1250 41102-1000 PRIME COAT, METHOD 1
Steelhead Constructors JV $5.50 $35,750.00 Judd Buick Construction Inc. $1.45 $9,425.00 Coleman Environmental Engineering Inc $5.00 $32,500.00 Hat Creek Construction & Materials, Inc. $2.00 $13,000.00 West Coast Contractors, Inc. $6.00 $39,000.00 Conway Construction Company $1.50 $9,750.00 McCullough Construction Inc. $8.40 $54,600.00 Engineer's Estimate 6,500 SQYD $2.00 $13,000.00
A1260 41202-0000 TACK COAT
Steelhead Constructors JV $3.50 $2,275.00 Judd Buick Construction Inc. $13.25 $8,612.50 Coleman Environmental Engineering Inc $3.00 $1,950.00 Hat Creek Construction & Materials, Inc. $10.00 $6,500.00 West Coast Contractors, Inc. $4.00 $2,600.00 Conway Construction Company $14.00 $9,100.00 McCullough Construction Inc. $27.00 $17,550.00 Engineer's Estimate 650 GAL $5.00 $3,250.00
A1270 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Steelhead Constructors JV $1,100.00 $60,500.00 Judd Buick Construction Inc. $1,000.00 $55,000.00 Coleman Environmental Engineering Inc $180.00 $9,900.00 Hat Creek Construction & Materials, Inc. $1,100.00 $60,500.00 West Coast Contractors, Inc. $1,000.00 $55,000.00 Conway Construction Company $1,000.00 $55,000.00 McCullough Construction Inc. $1,343.00 $73,865.00 Engineer's Estimate 55 CUYD $1,700.00 $93,500.00
9 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1280 55401-1000 REINFORCING STEEL
Steelhead Constructors JV $3.00 $13,500.00 Judd Buick Construction Inc. $4.45 $20,025.00 Coleman Environmental Engineering Inc $2.00 $9,000.00 Hat Creek Construction & Materials, Inc. $3.00 $13,500.00 West Coast Contractors, Inc. $4.00 $18,000.00 Conway Construction Company $4.00 $18,000.00 McCullough Construction Inc. $3.06 $13,770.00 Engineer's Estimate 4,500 LB $5.00 $22,500.00
A1290 56701-0000 MICROPILE
Steelhead Constructors JV $95.00 $323,000.00 Judd Buick Construction Inc. $87.18 $296,412.00 Coleman Environmental Engineering Inc $102.28 $347,752.00 Hat Creek Construction & Materials, Inc. $45.25 $153,850.00 West Coast Contractors, Inc. $140.00 $476,000.00 Conway Construction Company $50.00 $170,000.00 McCullough Construction Inc. $89.50 $304,300.00 Engineer's Estimate 3,400 LNFT $110.00 $374,000.00
A1300 56705-0000 MICROPILE LOAD VERIFICATION TEST
Steelhead Constructors JV $2,250.00 $4,500.00 Judd Buick Construction Inc. $3,250.00 $6,500.00 Coleman Environmental Engineering Inc $12,240.00 $24,480.00 Hat Creek Construction & Materials, Inc. $900.00 $1,800.00 West Coast Contractors, Inc. $11,000.00 $22,000.00 Conway Construction Company $1,000.00 $2,000.00 McCullough Construction Inc. $10,500.00 $21,000.00 Engineer's Estimate 2 EACH $15,000.00 $30,000.00
A1310 56706-0000 MICROPILE PROOF LOAD TEST
Steelhead Constructors JV $2,250.00 $15,750.00 Judd Buick Construction Inc. $2,929.00 $20,503.00 Coleman Environmental Engineering Inc $960.00 $6,720.00 Hat Creek Construction & Materials, Inc. $600.00 $4,200.00 West Coast Contractors, Inc. $1,500.00 $10,500.00 Conway Construction Company $700.00 $4,900.00 McCullough Construction Inc. $7,000.00 $49,000.00 Engineer's Estimate 7 EACH $3,500.00 $24,500.00
10 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1320 60201-0400 12-INCH PIPE CULVERT
Steelhead Constructors JV $85.00 $1,700.00 Judd Buick Construction Inc. $100.00 $2,000.00 Coleman Environmental Engineering Inc $431.85 $8,637.00 Hat Creek Construction & Materials, Inc. $200.00 $4,000.00 West Coast Contractors, Inc. $250.00 $5,000.00 Conway Construction Company $220.00 $4,400.00 McCullough Construction Inc. $150.00 $3,000.00 Engineer's Estimate 20 LNFT $100.00 $2,000.00
A1330 60201-0600 18-INCH PIPE CULVERT
Steelhead Constructors JV $175.00 $15,750.00 Judd Buick Construction Inc. $128.80 $11,592.00 Coleman Environmental Engineering Inc $487.20 $43,848.00 Hat Creek Construction & Materials, Inc. $235.00 $21,150.00 West Coast Contractors, Inc. $400.00 $36,000.00 Conway Construction Company $230.00 $20,700.00 McCullough Construction Inc. $215.00 $19,350.00 Engineer's Estimate 90 LNFT $180.00 $16,200.00
A1340 60201-0800 24-INCH PIPE CULVERT
Steelhead Constructors JV $185.00 $9,250.00 Judd Buick Construction Inc. $155.00 $7,750.00 Coleman Environmental Engineering Inc $484.88 $24,244.00 Hat Creek Construction & Materials, Inc. $235.00 $11,750.00 West Coast Contractors, Inc. $425.00 $21,250.00 Conway Construction Company $250.00 $12,500.00 McCullough Construction Inc. $225.00 $11,250.00 Engineer's Estimate 50 LNFT $200.00 $10,000.00
A1350 60210-0400 END SECTION FOR 12-INCH PIPE CULVERT
Steelhead Constructors JV $300.00 $600.00 Judd Buick Construction Inc. $1,000.00 $2,000.00 Coleman Environmental Engineering Inc $2,708.50 $5,417.00 Hat Creek Construction & Materials, Inc. $75.00 $150.00 West Coast Contractors, Inc. $600.00 $1,200.00 Conway Construction Company $1,000.00 $2,000.00 McCullough Construction Inc. $750.00 $1,500.00 Engineer's Estimate 2 EACH $650.00 $1,300.00
11 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1360 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
Steelhead Constructors JV $325.00 $975.00 Judd Buick Construction Inc. $1,200.00 $3,600.00 Coleman Environmental Engineering Inc $2,139.66 $6,418.98 Hat Creek Construction & Materials, Inc. $125.00 $375.00 West Coast Contractors, Inc. $675.00 $2,025.00 Conway Construction Company $1,000.00 $3,000.00 McCullough Construction Inc. $800.00 $2,400.00 Engineer's Estimate 3 EACH $700.00 $2,100.00
A1370 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Steelhead Constructors JV $400.00 $400.00 Judd Buick Construction Inc. $1,500.00 $1,500.00 Coleman Environmental Engineering Inc $3,471.00 $3,471.00 Hat Creek Construction & Materials, Inc. $175.00 $175.00 West Coast Contractors, Inc. $1,200.00 $1,200.00 Conway Construction Company $1,100.00 $1,100.00 McCullough Construction Inc. $850.00 $850.00 Engineer's Estimate 1 EACH $900.00 $900.00
A1380 60403-0000 INLET
Steelhead Constructors JV $5,000.00 $10,000.00 Judd Buick Construction Inc. $6,400.00 $12,800.00 Coleman Environmental Engineering Inc $7,580.50 $15,161.00 Hat Creek Construction & Materials, Inc. $5,000.00 $10,000.00 West Coast Contractors, Inc. $2,800.00 $5,600.00 Conway Construction Company $2,000.00 $4,000.00 McCullough Construction Inc. $6,987.00 $13,974.00 Engineer's Estimate 2 EACH $5,000.00 $10,000.00
A1390 60501-0000 STANDARD UNDERDRAIN SYSTEM
Steelhead Constructors JV $75.00 $3,750.00 Judd Buick Construction Inc. $20.00 $1,000.00 Coleman Environmental Engineering Inc $465.68 $23,284.00 Hat Creek Construction & Materials, Inc. $185.00 $9,250.00 West Coast Contractors, Inc. $40.00 $2,000.00 Conway Construction Company $51.00 $2,550.00 McCullough Construction Inc. $100.00 $5,000.00 Engineer's Estimate 50 LNFT $120.00 $6,000.00
12 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1400 60901-2100 CURB, ASPHALT, 4-INCH DEPTH
Steelhead Constructors JV $40.00 $7,000.00 Judd Buick Construction Inc. $30.00 $5,250.00 Coleman Environmental Engineering Inc $65.00 $11,375.00 Hat Creek Construction & Materials, Inc. $75.00 $13,125.00 West Coast Contractors, Inc. $70.00 $12,250.00 Conway Construction Company $65.00 $11,375.00 McCullough Construction Inc. $15.00 $2,625.00 Engineer's Estimate 175 LNFT $7.00 $1,225.00
A1410 61701-1250 GUARDRAIL SYSTEM G4, TYPE 2, CLASS A WOOD POSTS
Steelhead Constructors JV $45.00 $7,875.00 Judd Buick Construction Inc. $51.00 $8,925.00 Coleman Environmental Engineering Inc $48.00 $8,400.00 Hat Creek Construction & Materials, Inc. $85.00 $14,875.00 West Coast Contractors, Inc. $80.00 $14,000.00 Conway Construction Company $80.00 $14,000.00 McCullough Construction Inc. $40.00 $7,000.00 Engineer's Estimate 175 LNFT $50.00 $8,750.00
A1420 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Steelhead Constructors JV $200.00 $8,000.00 Judd Buick Construction Inc. $166.00 $6,640.00 Coleman Environmental Engineering Inc $160.00 $6,400.00 Hat Creek Construction & Materials, Inc. $125.00 $5,000.00 West Coast Contractors, Inc. $180.00 $7,200.00 Conway Construction Company $150.00 $6,000.00 McCullough Construction Inc. $140.00 $5,600.00 Engineer's Estimate 40 HOUR $175.00 $7,000.00
A1430 62201-0350 BACKHOE
Steelhead Constructors JV $170.00 $6,800.00 Judd Buick Construction Inc. $150.00 $6,000.00 Coleman Environmental Engineering Inc $185.00 $7,400.00 Hat Creek Construction & Materials, Inc. $130.00 $5,200.00 West Coast Contractors, Inc. $100.00 $4,000.00 Conway Construction Company $200.00 $8,000.00 McCullough Construction Inc. $150.00 $6,000.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00
13 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1440 62201-0850 WHEEL LOADER, 1 CUBIC YARD MINIMUM RATED CAPACITY
Steelhead Constructors JV $220.00 $8,800.00 Judd Buick Construction Inc. $196.00 $7,840.00 Coleman Environmental Engineering Inc $185.00 $7,400.00 Hat Creek Construction & Materials, Inc. $185.00 $7,400.00 West Coast Contractors, Inc. $150.00 $6,000.00 Conway Construction Company $230.00 $9,200.00 McCullough Construction Inc. $170.00 $6,800.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
A1450 62201-2750 MOTOR GRADER
Steelhead Constructors JV $230.00 $9,200.00 Judd Buick Construction Inc. $240.00 $9,600.00 Coleman Environmental Engineering Inc $225.00 $9,000.00 Hat Creek Construction & Materials, Inc. $205.00 $8,200.00 West Coast Contractors, Inc. $150.00 $6,000.00 Conway Construction Company $260.00 $10,400.00 McCullough Construction Inc. $150.00 $6,000.00 Engineer's Estimate 40 HOUR $230.00 $9,200.00
A1460 62201-3000 HYDRAULIC EXCAVATOR
Steelhead Constructors JV $240.00 $9,600.00 Judd Buick Construction Inc. $260.00 $10,400.00 Coleman Environmental Engineering Inc $200.00 $8,000.00 Hat Creek Construction & Materials, Inc. $170.00 $6,800.00 West Coast Contractors, Inc. $150.00 $6,000.00 Conway Construction Company $240.00 $9,600.00 McCullough Construction Inc. $180.00 $7,200.00 Engineer's Estimate 40 HOUR $300.00 $12,000.00
A1470 62301-0000 GENERAL LABOR
Steelhead Constructors JV $80.00 $3,200.00 Judd Buick Construction Inc. $100.00 $4,000.00 Coleman Environmental Engineering Inc $108.00 $4,320.00 Hat Creek Construction & Materials, Inc. $75.00 $3,000.00 West Coast Contractors, Inc. $105.00 $4,200.00 Conway Construction Company $100.00 $4,000.00 McCullough Construction Inc. $75.00 $3,000.00 Engineer's Estimate 40 HOUR $80.00 $3,200.00
14 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1480 62302-0100 SPECIAL LABOR, SLOPE SCALING
Steelhead Constructors JV $500.00 $40,000.00 Judd Buick Construction Inc. $696.25 $55,700.00 Coleman Environmental Engineering Inc $108.00 $8,640.00 Hat Creek Construction & Materials, Inc. $1,000.00 $80,000.00 West Coast Contractors, Inc. $1,054.00 $84,320.00 Conway Construction Company $830.00 $66,400.00 McCullough Construction Inc. $580.00 $46,400.00 Engineer's Estimate 80 HOUR $1,200.00 $96,000.00
A1490 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Steelhead Constructors JV $225.00 $18,000.00 Judd Buick Construction Inc. $113.75 $9,100.00 Coleman Environmental Engineering Inc $245.00 $19,600.00 Hat Creek Construction & Materials, Inc. $150.00 $12,000.00 West Coast Contractors, Inc. $250.00 $20,000.00 Conway Construction Company $240.00 $19,200.00 McCullough Construction Inc. $190.00 $15,200.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00
A1500 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Steelhead Constructors JV $225.00 $9,000.00 Judd Buick Construction Inc. $250.00 $10,000.00 Coleman Environmental Engineering Inc $250.00 $10,000.00 Hat Creek Construction & Materials, Inc. $460.00 $18,400.00 West Coast Contractors, Inc. $460.00 $18,400.00 Conway Construction Company $460.00 $18,400.00 McCullough Construction Inc. $190.00 $7,600.00 Engineer's Estimate 40 HOUR $210.00 $8,400.00
A1510 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
Steelhead Constructors JV $4.50 $28,800.00 Judd Buick Construction Inc. $4.18 $26,752.00 Coleman Environmental Engineering Inc $13.39 $85,696.00 Hat Creek Construction & Materials, Inc. $14.00 $89,600.00 West Coast Contractors, Inc. $1.00 $6,400.00 Conway Construction Company $4.00 $25,600.00 McCullough Construction Inc. $5.37 $34,368.00 Engineer's Estimate 6,400 SQYD $4.00 $25,600.00
15 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1520 62511-2000 SEEDING, HYDRAULIC METHOD
Steelhead Constructors JV $2.00 $14,400.00 Judd Buick Construction Inc. $3.65 $26,280.00 Coleman Environmental Engineering Inc $6.72 $48,384.00 Hat Creek Construction & Materials, Inc. $1.80 $12,960.00 West Coast Contractors, Inc. $3.00 $21,600.00 Conway Construction Company $3.50 $25,200.00 McCullough Construction Inc. $3.30 $23,760.00 Engineer's Estimate 7,200 SQYD $2.00 $14,400.00
A1530 62516-2000 MULCHING, HYDRAULIC METHOD
Steelhead Constructors JV $0.80 $5,760.00 Judd Buick Construction Inc. $2.58 $18,576.00 Coleman Environmental Engineering Inc $2.22 $15,984.00 Hat Creek Construction & Materials, Inc. $0.62 $4,464.00 West Coast Contractors, Inc. $2.00 $14,400.00 Conway Construction Company $2.50 $18,000.00 McCullough Construction Inc. $3.65 $26,280.00 Engineer's Estimate 7,200 SQYD $2.00 $14,400.00
A1540 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4
Steelhead Constructors JV $7.50 $26,250.00 Judd Buick Construction Inc. $14.00 $49,000.00 Coleman Environmental Engineering Inc $13.53 $47,355.00 Hat Creek Construction & Materials, Inc. $6.50 $22,750.00 West Coast Contractors, Inc. $12.00 $42,000.00 Conway Construction Company $10.00 $35,000.00 McCullough Construction Inc. $8.55 $29,925.00 Engineer's Estimate 3,500 SQYD $8.00 $28,000.00
A1550 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Steelhead Constructors JV $0.60 $8,400.00 Judd Buick Construction Inc. $0.58 $8,120.00 Coleman Environmental Engineering Inc $0.71 $9,940.00 Hat Creek Construction & Materials, Inc. $0.50 $7,000.00 West Coast Contractors, Inc. $0.55 $7,700.00 Conway Construction Company $0.60 $8,400.00 McCullough Construction Inc. $0.50 $7,000.00 Engineer's Estimate 14,000 LNFT $1.50 $21,000.00
16 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1560 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
Steelhead Constructors JV $0.40 $1,600.00 Judd Buick Construction Inc. $0.50 $2,000.00 Coleman Environmental Engineering Inc $0.79 $3,160.00 Hat Creek Construction & Materials, Inc. $0.35 $1,400.00 West Coast Contractors, Inc. $0.40 $1,600.00 Conway Construction Company $0.60 $2,400.00 McCullough Construction Inc. $0.35 $1,400.00 Engineer's Estimate 4,000 LNFT $1.50 $6,000.00
A1570 63501-0000 TEMPORARY TRAFFIC CONTROL
Steelhead Constructors JV Lump Sum $10,000.00 Judd Buick Construction Inc. Lump Sum $137,300.00 Coleman Environmental Engineering Inc Lump Sum $47,400.00 Hat Creek Construction & Materials, Inc. Lump Sum $115,000.00 West Coast Contractors, Inc. Lump Sum $35,000.00 Conway Construction Company Lump Sum $600,000.00 McCullough Construction Inc. Lump Sum $654,450.00 Engineer's Estimate ALL LPSM Lump Sum $185,000.00
A1580 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Steelhead Constructors JV $80.00 $296,000.00 Judd Buick Construction Inc. $93.25 $345,025.00 Coleman Environmental Engineering Inc $132.00 $488,400.00 Hat Creek Construction & Materials, Inc. $75.00 $277,500.00 West Coast Contractors, Inc. $85.00 $314,500.00 Conway Construction Company $88.00 $325,600.00 McCullough Construction Inc. $75.00 $277,500.00 Engineer's Estimate 3,700 HOUR $90.00 $333,000.00
A1590 63701-0000 FIELD OFFICE
Steelhead Constructors JV $25,000.00 $25,000.00 Judd Buick Construction Inc. $14,500.00 $14,500.00 Coleman Environmental Engineering Inc $45,500.00 $45,500.00 Hat Creek Construction & Materials, Inc. $42,000.00 $42,000.00 West Coast Contractors, Inc. $25,000.00 $25,000.00 Conway Construction Company $75,000.00 $75,000.00 McCullough Construction Inc. $8,000.00 $8,000.00 Engineer's Estimate 1 EACH $28,000.00 $28,000.00
17 out of 17
Project No: CA ER 511(1)
Project Name: Trinity Cty Ruth-Zenia Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Steelhead Constructors JV $4,474,474.00 Judd Buick Construction Inc. $4,481,257.50 Coleman Environmental Engineering Inc $4,607,657.73 Hat Creek Construction & Materials, Inc. $4,989,989.00 West Coast Contractors, Inc. $6,251,670.00 Conway Construction Company $6,891,925.00 McCullough Construction Inc. $6,933,483.50 Engineer's Estimate $4,786,000.00