This document is a Requirements Document detailing the assembly and placement requirements for 240 heavy-duty expanded metal picnic tables and 30 heavy-duty expanded metal ADA-compliant picnic tables for the National Park Service (NPS) Southeast Region. The contractor will be responsible for assembling the tables according to manufacturer instructions, transporting the assembled tables to designated campground locations, and properly disposing of old tables and packing materials. The NPS will verify the correct assembly and placement of the tables. This effort is related to a federal contract opportunity, Solicitation Number 140P5224Q0066, for installing fire rings and assembling/replacing picnic tables at Fort Pickens and Davis Bayou Campgrounds. The contract is being issued by the Department of the Interior, National Park Service Southeast Region.

View the file

Other files for this federal contract opportunity

Other files attached to GUIS FIRE RING REPLACED CAMPGROUND FP, newest first.
File Type Posted
Sol_140P5224Q0066_Amd_0001.pdf PDF
About_Us___Mia_General_Contracting_0001.pdf PDF
Screenshot_2024-08-06_090512_0001.png PNG image
SOW_Replace_Fire_Rings_in_Davis_Bayou_Campgrounds.doc DOC document
SOW_Replace_Fire_Rings_in_Fort_Pickens_Campgrounds.doc DOC document
Sol_140P5224Q0066.pdf PDF
Fire_Ring_Specs_0001.pdf PDF
Assembly_Instructions_-_Picnic_Table.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements Document: Assembly of Heavy-Duty Expanded Metal Picnic Tables Project Overview The purpose of this document is to outline the requirements for a Contractor to assemble 240 heavy-duty expanded metal picnic tables and 30 heavy-duty expanded metal ADA-compliant picnic tables. The contractor will also be responsible for transporting assembled tables from staging/assembly location to Campground placement/removal locations, and for the proper disposal of old tables and all packing materials.

Scope:

Table Assembly:

· Assemble 240 standard heavy-duty picnic tables.

· Assemble 30 ADA-compliant heavy-duty picnic tables.

Follow manufacturer-supplied assembly instructions for proper assembly.

· Ensure all components are securely fastened.

· Verify that tables are structurally sound and stable.

Transportation and Placement:

· Transport assembled tables from staging location to designated campground locations.

· Place tables in accordance with site locations provided by the National Park Service.

· Coordinate with the Contracting Officer Representative (COR) for final placement approval.

Disposal:

· Safely remove currently installed picnic tables.

· Properly dispose of old tables and associated debris.

· Properly dispose of all packing material associated with new tables.

· Dispose of packing materials in a State or City approved off Park location.

· All equipment, material and waste generated by work of this contract shall be properly disposed of offsite by the contractor.

· Remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

· Except as otherwise specified, do not allow waste materials that are to be disposed of to accumulate on-site.

· Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

· All affected areas must be restored to their original condition from before the work began. Any damages will be fixed and repaired at no cost to the government.

· Park visitors can be expected to be present during all working hours for the duration of the project. The contractor must consider managing a compact construction site that minimizes intrusion (noise, traffic, material staging, and dust) of visitor activities.

Responsibilities:

· Contractor:

· Assemble 270 tables according to supplied specifications.

· Transport tables from campground staging location and place in NPS approved Campsite.

· Dispose of old tables and debris.

· Adhere to safety guidelines during assembly and transportation.

· Address any questions or concerns related to the contract.

· National Park Service (NPS):

· Verify correct assembly and placement.

· Oversee the project.

Points of Contact:

Contracting Officer (CO):

Andre Ward Contract Officer – West MABO O: 850-934-2614 C: 850-232-4630 Email: Andre_ward@nps.gov

Contract Officer Representative (COR):

Pete Seagriff Construction Control Representative C: 850-281-2165 Email: peter_seagriff@nps.gov image1.jpeg image2.emf

Assembly Instructions - Picnic Table.pdf

Essential Products of America, Inc. 140P5224Q0041

Table 6 – Assembly InstructionsAssembly Instructions