Performance_Standards.pdf
PDF 2 MB Posted
- Attached to
- Main Conference Room A/B Phoenix District Federal contract opportunity
- Solicitation number
- 140L6322Q0044
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AV_Brand_Name_ClearOne.pdf | ||
| Standards_AV15_6_2022.pdf | ||
| AV_Brand_Name-Kramer.pdf | ||
| PDO__AV_Statement_of_Work.pdf | ||
| Design_Standards.pdf | ||
| Sol_140L6322Q0044.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Audiovisual Systems Performance Verification
ANSI/INFOCOMM 10:2013
© 2013 by InfoComm International® ISBN: 978-0-939718-36-8
Licensed to purchaser. Single user license only. Copying and networking prohibited.
Audiovisual Systems Performance Verification
InfoComm International Standard
ICS 33.160
2013-12-20
Abstract
This Standard provides a framework and supporting processes for determining elements of an audiovisual system that need to be verified; the timing of that verification within the project delivery cycle; a process for determining verification metrics, and reporting procedures. Consultants, integrators, manufacturers, technology support staff, owners, third-party commissioning agents, and architects who have verification processes in place can integrate those existing processes into the framework this Standard provides, adding customized items to those already defined in the Standard.
Keywords audio, audio performance, audio system, audio/video performance, audiovisual integration, audiovisual system, AV operations, AV system installation, AV system serviceability, cable labeling, cable management, cable termination, contrast ratio, control, control performance, documentation, electrical, evaluation, information technology (IT), measurement, metrics, network, PoE, procedures, verification, video, video performance, visual system, wireless microphone, wireless system operation
Disclaimer
The application of this Standard is strictly voluntary. InfoComm International recommends its use but does not assume responsibility for misinterpretation or misapplication. InfoComm International does not assume liability for disputes resulting from the non-conformance to this Standard. Conformance does not imply certification of a system.
Copyright
© 2013 by InfoComm International®. This Standard may not be reproduced in whole or in part in any form for sale, promotion, or any commercial purpose, or any purpose not falling within the provisions of the U.S. Copyright Act of 1976, without prior written permission of the publisher. For permission, address a request to the Director of Standards, InfoComm International.
© 2013 by InfoComm International® Page ii
Foreword
This Standard provides a framework and supporting processes for determining elements of an audiovisual system that need to be verified, the timing of that verification within the project delivery cycle, a process for determining verification metrics, and reporting procedures.
As audiovisual systems have increased in complexity, the chances of misconfiguration, improper installation, and failure to conform to project requirements increase. Managing expectations and verifying conformance with stated project requirements of audiovisual (AV) systems is the major goal of this Standard. While many organizations have internal processes and verification procedures, there is an industry-wide need to utilize project documentation along with this Standard to identify elements within an AV system that require measurement and verification. Use of this Standard supports a comprehensive, systematic, and practical approach to verifying performance of AV systems.
This Standard requires that project documentation has been created for the project being verified.
Documentation will vary from project to project and the standard does not prescribe the nature and extent of the project documentation. Conformance to the Standard is not possible without project documentation.
This Standard assumes that a project owner’s operational specifications have been established in the system/project documentation.
This Standard does not provide a “one size fits all” verification pathway, but a means to enable the user of the Standard to develop a project-specific list of system performance verification items based on performance requirements defined in the project’s documentation. Being able to assess the performance of the audiovisual system based on what was defined in the project’s documentation should reduce dissatisfaction at the end of the project.
Using the Standard, consultants, integrators, manufacturers, technology support staff, owners, third-party commissioning agents, and architects who have system performance verification processes in place can integrate those existing processes into the framework this Standard provides, adding customized items to those already defined in the Standard.
Benefits of using this Standard are not limited to but include:
Ability to streamline verification tests and reporting;
Providing a verifiable outcome;
Creating a common language between all parties;
Aligning outcome and performance expectations at an early stage in the project;
Creating reporting that completes the project documentation; and Reducing project risk through early identification of problems, thereby reducing the likelihood of remedial work.
This Standard should be used in conjunction with ANSI/INFOCOMM 2M-2010 Standard Guide for Audiovisual Systems Design and Coordination Processes as well as other relevant performance standards.
About InfoComm International
InfoComm International® is the leading non-profit association serving the professional AV communications industry worldwide. Founded in 1939, the association offers industry expertise and market research serving press and others seeking information about the industry. Through activities that include trade shows, education, certification, government relations, outreach, and information services, InfoComm promotes the industry and enhances members’ ability to conduct business successfully and competently. InfoComm International is the ANSI Accredited Standards Developer (ASD) dedicated to the dissemination of the knowledge of audiovisual systems performance parameters.
© 2013 by InfoComm International® Page iii
About ANSI
The American National Standards Institute, Inc. (ANSI) is the national coordinator of voluntary standards development and the clearinghouse in the United States for information on national and international standards. An American National Standard implies a consensus of those substantially concerned with its scope and provisions. Consensus is established when, in the judgment of the ANSI Board of Standards Review, substantial agreement has been reached by directly and materially affected interests. Substantial agreement means much more than a simple majority, but not necessarily unanimity. Consensus requires that all views and objections be considered and that a concerted effort be made toward their resolution. The use of an American National Standard is completely voluntary. Its existence does not in any respect preclude anyone, whether he or she has approved the standard or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not conforming to the standard.
InfoComm International Standards Development
InfoComm International maintains a Standards Steering Committee that provides oversight to the standards development task groups responsible for specific standards. The Steering Committee reports to the InfoComm International Board of Directors, whose approval is required before standards may be submitted to ANSI.
© 2013 by InfoComm International® Page iv
InfoComm International Standards Program Developers
At the time of this Standard’s development and approval, contributors’ names and affiliations are as shown:
Audiovisual Systems Performance Verification Standard Task Group
Matthew Silverman, CTS, PMP, George Mason University, Moderator John Bailey, CTS-D, CTS-I, Whitlock Jason Brameld, BSc (Hons) ARCS, MInstSCE, PTS Consulting, LLP Greg Bronson, CTS-D, Cornell University Paul Depperschmidt, CTS, Cisco Richard Derbyshire, CTS, Shen Milsom & Wilke, LLC Dan Doolen, MS, ISF-C, CQT, University of Illinois Tristan Gfrerer, Google, CTS, BEng (Hons) Mike Izatt, CTS-D, Spectrum Engineers, Inc.
Thomas Kopin, CTS, ISF-C, Kramer Electronics USA Richard Morrison, CTS, Prince2, CPEng, BE (Computer Systems), Norman Disney & Young Mike Quinn, BEng, CEng, MIET, CTS-D
InfoComm International Standards Steering Committee
Matthew Silverman, CTS, PMP, George Mason University, Chair Jason Antinori, CTS-D, TELUS David Barnett, CTS-D, The Sextant Group Michael Bialas, CVE, ITIL, Anadarko Petroleum Corporation Jason Brameld, BSc (Hons) ARCS, MInstSCE, PTS Consulting, LLP Joy Caspar, CTS, Real Time Services Richard Derbyshire, CTS, Shen Milsom & Wilke, LLC Ratnesh Javeri, CTS-D, Innovative Systems & Solutions Pvt. Ltd.
Jeffrey Lipp, CTS-D, Lipp AV Design, Inc.
Peter Pekurar, Christie Digital Systems USA, Inc.
Peter Swanson, CTS, AMX Australia Read Wineland, CTS, Biamp
InfoComm International Staff
David Labuskes, CTS, RCDD (Executive Director and CEO) Joseph Bocchiaro III, Ph.D., CStd, CTS-D, CTS-I, ISF-C (Vice President of Standards and Industry Innovations) Aron Abrams (Standards Resources Coordinator) Jessica Drennon (Standards Development Coordinator) Ann E. Brigida, CTS, AStd (Director of Standards)
The task group would like to thank the following organizations for providing documentation samples:
Compass Group George Mason University Northeastern University proAV, UK Pro AV Solutions, Australia Providence University PTS Consulting Partners LLP Sharp’s Audio Visual, Canada Whitlock
© 2013 by InfoComm International® Page v
Table of Contents
Abstract ............................................................................................................................................. i Keywords .......................................................................................................................................... i Disclaimer ......................................................................................................................................... i Copyright ........................................................................................................................................... i Foreword ...........................................................................................................................................ii About InfoComm International ..........................................................................................................ii About ANSI ...................................................................................................................................... iii InfoComm International Standards Development ............................................................................ iii InfoComm International Standards Program Developers ................................................................iv
1 Scope, Purpose, and Application
1.1 Scope
1.2 Purpose
1.3 Application
1.4 Exceptions
2 Referenced Publications
2.1 Normative References
2.2 Informative References
3 Definitions
3.1 Abbreviations
3.2 Definitions
4 Verification Framework
4.1 Overview
4.2 Implementation
5 Verification Item Selection Process Group
5.1 Overview
5.2 Implementation
5.3 Reference Verification Items
5.4 Functional Categories
5.5 Verification Phases and Milestones
5.6 Verification Phases Implementation
6 Verification Metric Selection Process Group
6.1 Overview
6.2 Selection Process Implementation
7 Performance Verification Process Group
7.1 Implementation
8 Verification Reporting Process Group
8.1 Overview
8.2 Reporting Format and Implementation
© 2013 by InfoComm International® Page vi
9 Reference Verification Items by Functional Category and Verification Phase
9.1 Audio System Performance Reference Verification Items
9.2 Video System Performance Reference Verification Items
9.3 Audio/Video System Performance Reference Verification Items
9.4 Cable Management, Termination, and Labeling Reference Verification Items
9.5 Control Performance Reference Verification Items
9.6 System and Record Documentation Reference Verification Items
9.7 Electrical Reference Verification Items
9.8 Information Technology Reference Verification Items
9.9 Operations and Support Reference Verification Items
9.10 Physical Environment Reference Verification Items
9.11 Physical Installation Reference Verification Items
9.12 Serviceability Reference Verification Items
9.13 Wireless Reference Verification Items
10 Acknowledgment of Conformance to the Standard
11 Annexes
11.1 Annex 1: Master List of Reference Verification Items by Verification Phase
11.2 Annex 2: Table of Figures
11.3 Annex 3: Bibliography
© 2013 by InfoComm International® Page 7
1 Scope, Purpose, and Application
1.1 Scope
1.1.1 This Standard provides a comprehensive evaluation framework and associated processes to verify functionality and performance of an audiovisual system in accordance with the system’s project documentation. The Standard identifies the timing of verification; a list of reference items to be considered, delineated by their function as related to the system; a process for determining verification metrics; and reporting procedures.
1.1.2 This Standard identifies audiovisual system performance-evaluation requirements for the following 13 functional categories:
Audio Performance Video Performance Audio/Video Performance Cable Management, Termination, and Labeling Control Performance Electrical Information Technology Operations and Support Physical Environment Physical Installation Serviceability Wireless System and Record Documentation
1.2 Purpose
1.2.1 The purpose of this Standard is to provide a framework for the verification and reporting of the performance of an audiovisual system based on the requirements specified in the system’s project documentation. The Standard defines 160 potential verification items; a process for determining which items are germane to the project and a way to incorporate additional items; a process for defining the evaluation metrics for verification; a process for verifying the items; and a process for how and when to report those results.
1.3 Application
1.3.1 This Standard can be utilized by all parties involved in the audiovisual system installation process including consultants, integrators, manufacturers, technology support staff, owners, third-party commissioning agents, and architects to verify the performance of audiovisual systems throughout the integration process.
1.3.2 Planning for the use of this Standard should begin with the project’s initiation. The framework provided by this Standard should be integrated into the project’s project management and/or quality management processes. For organizations that have existing project management and/or quality management programs, the framework provided by this Standard can be integrated into existing processes. Conformance to the Standard shall require that all requirements of the Standard are included; this Standard does not provide for partial conformance.
© 2013 by InfoComm International® Page 8
1.3.3 This Standard is aligned with ISO 21500:2012:Guidance on project management, where the activities of this Standard take place within the Implementing, Controlling, and Closing process groups. The Standard is aligned with ANSI/INFOCOMM 2M-2010, Standard Guide for Audiovisual Design and Coordination Processes, where the activities of the Standard take place within the construction phase. For projects where it is known that this Standard is being implemented at project initiation, it is recommended that users of this Standard begin planning for conformance to the Standard at that time.
Figure 1 – Illustration of Implementation Phases
1.3.4 This Standard can be applied to any size (scope and/or value) audiovisual system as long as its project documentation clearly cites (and completes) a project-specific verification list during initiation and then subsequently documents verification through the project phases.
1.4 Exceptions
1.4.1 Specific measurement metrics
This Standard does not provide measurement metrics for any defined reference verification items in Section 9. Metrics (beyond pass/fail) should be determined by following the process in section 6.2 of this Standard.
1.4.2 Measurement methodology
This Standard does not prescribe any specific methodology for achieving the required metrics. Comparable measurement techniques and methods exist in many cases, and the user of this Standard shall choose a method by using the metrics selection process hierarchy as defined in Section 7 of this Standard once a project-specific reference verification item is identified.
1.4.3 This Standard does not include prescription for corrective action.
1.4.4 In addition, this document is not designed as a technical training manual or roadmap for specific actions. It is expected that all parties using this Standard have or will obtain the necessary training and experience through other means.
© 2013 by InfoComm International® Page 9
2 Referenced Publications
2.1 Normative References
2.1.1 There are no normative references for this Standard.
2.2 Informative References
2.2.1 The following publications contain information that supports the design and application of this Standard, but are not required provisions of the Standard:
American National Standards Institute. 2005. ANSI E1.8-2005 Entertainment Technology – Loudspeaker Enclosures Intended for Overhead Suspension – Classification, Manufacture and Structural Testing. New York, NY: American National Standards Institute.
Churcher, David. 2012. BSRIA Design Framework for Building Services. 3rd ed. Berkshire, UK: The Building Services Research and Information Association.
InfoComm International®. 2009. ANSI/INFOCOMM 1M-2009 Audio Coverage Uniformity in Enclosed Listener Areas. Fairfax, VA: InfoComm International®.
InfoComm International®. 2010. ANSI/INFOCOMM 2M-2010 Standard Guide for Audiovisual Design and Coordination Processes. Fairfax, VA: InfoComm International®.
InfoComm International®. 2011. ANSI/INFOCOMM 3M-2011 Projected Image System Contrast Ratio. Fairfax, VA: InfoComm International®.
InfoComm International®. 2012. ANSI/INFOCOMM 4:2012 Audiovisual Systems Energy Management. Fairfax, VA: InfoComm International®.
InfoComm International®. 2009. AV Installation Handbook. 2nd ed. Fairfax, VA: InfoComm International®.
InfoComm International®. 2012. AV Implementation Handbook. Fairfax, VA: InfoComm International®.
International Organization for Standardization. 2012. ISO 21500:2012 Guidance on project management. Geneva, Switzerland: International Organization for Standardization.
Royal Institute of British Architects. 2007. RIBA Outline Plan of Work. London, UK: RIBA Publishing.
Schluter, Bob. 2002-2010. Controlling the Temperature Inside Equipment Racks. Fairfield, NJ: Middle Atlantic Products.
© 2013 by InfoComm International® Page 10
3 Definitions
As used in this document, “shall” and “must” denote mandatory provisions of the Standard.
“Should” denotes a provision that is recommended, but not mandatory.
For the purposes of this Standard, the following definitions and abbreviations apply:
3.1 Abbreviations
AHJ Authority Having Jurisdiction AV Audiovisual DSP Digital Signal Processing EDID Extended Display Identification Data HDCP High-bandwidth Digital Content Protection ID Identification (alternative: remove abbreviation in body text) IP Internet Protocol IEEE Institute of Electrical and Electronics Engineers IEEE 802 Wired and Wireless Ethernet Standards Suite IT Information Technology OEM Original Equipment Manufacturer PDF Adobe™ Portable Document Format QoS Quality of Service PoE Power over Ethernet SPL Sound Pressure Level SSID Service Set Identification TX Transmit UPS Uninterruptable Power Supply
3.2 Definitions
Battery Management Plan: Documented plan for how batteries for battery powered devices will be recharged or replaced.
Divisible Space: A single program space which can be divided into multiple program spaces through the use of movable walls.
Endpoint: A source (e.g., computer, microphone, camera) or receiver (e.g., projector, display, recorder) device at a terminal point in the signal flow of an audiovisual system.
Invasive: References a test procedure type, which requires special configuration of the systems and their configuration to enable the test to be completed outside of normal operating procedures.
Metric: A criterion or set of criteria stated in quantifiable terms.
Midpoint: A device within an audiovisual system (e.g., matrix switch, distribution amplifier, DSP, signal converter) through which an audiovisual signal from a source is routed to a receiver.
Non-invasive: References a test procedure, which can be applied without any changes to the systems and/or configuration and is unlikely to affect another part of the system.
Owner: A person or organization contracting the completion of the audiovisual system.
Project Documentation: A group of documents specific to the project being verified that define scope, resources, and schedule. These documents contain all governance, contractual, process, and technical information related to the project being verified.
© 2013 by InfoComm International® Page 11
Record Documentation: Documentation that provides a record of the audiovisual system installation details at the completion of the project. This may include system schematics, equipment schedules, location drawings, etc. Record documentation is usually passed to the owner on completion to enable the system to be maintained.
Regulatory Authority: The municipal, local, county, state, national, or international authority that has governance over the geographic location in which the system is being installed. May also be defined as Authority Having Jurisdiction (AHJ).
System Verifier: The person using this Standard to verify an audiovisual system’s performance.
User-facing Controls: Controls (e.g., knobs, buttons, switches) that are readily accessible by the user of the AV system that are not part of the defined user interface of the system.
Verifier – see System Verifier
4 Verification Framework
4.1 Overview
4.1.1 This Standard provides a customizable methodology that yields project-specific performance verification reporting for an audiovisual system. While there is an overarching methodology for the framework, there is no “one size fits all” approach when it comes to system performance verification. This framework is intended to be used with existing project and quality management processes implemented by the organization. Additionally, existing organizational verification processes can be adapted to be in conformance with the Standard.
Figure 2 – Framework Process Groups
4.2 Implementation
4.2.1 Implementation of the Standard requires that project documentation shall exist. If project documentation does not exist, then it shall be created prior to the application of this framework.
4.2.2 ANSI/INFOCOMM 2M-2010, Standard Guide for Audiovisual System Design and Coordination Processes, provides descriptions for audiovisual system project documentation and can be used as a guideline for creating project-specific documentation.
4.2.3 This Standard and ANSI/INFOCOMM 2M-2010 are complementary and not mutually exclusive.
Verification Item Selection Process
Group
Verification Metrics Selection Process
Group
Performance Verification Process
Group
Verification Reporting Process
Group
© 2013 by InfoComm International® Page 12
4.2.4 Users of this Standard shall create a project-specific verification report at verification phases utilizing the processes outlined in this Standard. Workflow for the application of the Standard can be subdivided into four sequential process groups:
4.2.4.1 Verification Item Selection Process Group
The first group defines the process for selection of verification items that are germane to the system. Selection is based on the performance requirements as defined in the project documentation. All reference verification items included in the reference verification list in this Standard may not be applicable to project-specific performance requirements.
Additionally, the Standard provides for the ability to include project-specific verification items not defined in this Standard but defined by performance requirements in the project documentation.
4.2.4.2 Verification Metrics Selection Process Group
The second group defines the process for selection of project-specific verification metrics for each item selected as defined in 4.2.4.1. The specific verification metric shall be based on the stated requirements in the project documentation and determined using relevant sources identified by the process outlined in this section.
4.2.4.3 Performance Verification Process Group
The third group defines the process for completing the performance verification for the project. Performance verification shall occur multiple times throughout the project. During this process, testing of performance and conformance with metrics as defined in 4.2.4.2 will occur.
4.2.4.4 Verification Reporting Process Group
The fourth group defines the process for issuance of a verification report based on the outcome of the system’s performance. Reports shall be issued multiple times during the project to provide the most up to date verification information as the project progresses. The verifier shall be required to acknowledge conformance to the Standard with each report issued.
5 Verification Item Selection Process Group
5.1 Overview
This process, as noted in 4.2.4.1, defines the means that will be utilized to determine which reference verification items will be included within the project-specific verification.
The items selected serve as the basis for establishing metrics (4.2.4.2) and verifying the system’s performance.
Verification Item Selection Process
Group
Verification Metrics Selection Process
Group
Performance Verification Process
Group
Verification Reporting Process Group
© 2013 by InfoComm International® Page 13
Figure 3 – Verification Item Selection Process in the Systems Performance Verification Process Flow
5.2 Implementation
5.2.1 The system verifier shall be responsible for conducting this process in consultation with all applicable stakeholders for the project.
5.2.2 Verification items shall be selected based on the information and requirements defined in the project documentation.
5.2.3 In all cases, items mandated by regulatory requirements shall be included.
5.2.4 The Standard provides a reference list of 160 potential verification items. Verification items are organized by both functional categories and verification phases. The functional categories group verification items by system function. The verification phases identify at what point in a project verification should take place. Certain items identified as reference verification items require verification during multiple verification phases.
5.2.5 The reference verification items provided shall not be regarded as an exhaustive list when a project’s documentation outlines the need for additional specific requirements or an organization’s processes require additional items. Provisions are made to include these additional verification items in the project-specific verification process and reporting.
5.2.6 To determine which verification items are required:
1) Review regulatory requirements relating to the audiovisual system (e.g., requirements for the system to respond to an emergency condition), identify applicable reference verification list items, and include these items on the project-specific verification item list.
2) Review project documentation to determine specific performance requirements, identify applicable reference verification list items, and include these items on the project-specific verification item list.
3) Review manufacturer-provided information for equipment on the project, identify applicable reference verification list items, and include these items on the project-specific verification item list.
4) Review remaining reference verification list items, identify all additional applicable verification list items which were not included in the project documentation but are necessary to ensure the system performs as specified and include these items on the project-specific verification item list.
5) Identify any specific client-/owner-required tests not already covered and include these items on the project-specific verification item list.
5.2.7 The above process shall be applied for each system on the project.
5.2.8 A separate verification list shall be completed for each system.
5.2.9 All reference verification items in the Standard shall be included in verification reports.
Items identified as not applicable (N/A) shall be listed either in sequence or as a list at the end of the verification report.
5.3 Reference Verification Items
5.3.1 Overview
This Standard defines 160 reference verification items that exist within 13 functional categories, four verification phases, and two milestones. Although each reference
© 2013 by InfoComm International® Page 14 verification item exists within only one functional category, some items are included in multiple verification phases. A comprehensive reference verification list has been provided;
however, specific projects may include systems, technology, or functional requirements that require additional verification items. Users of the Standard may add customized verification items to the items identified during the Verification Item Selection Process (see 4.2.4.1) and include additional tests that exceed items required in each functional category. A complete list of reference verification items identified by functional category and verification phase is found in Section 11.
5.3.2 Implementation
5.3.2.1 For consistency, users of this Standard shall maintain the exact numbering scheme for verification items as defined in this Standard.
5.3.2.2 For applications that require project-specific verification items, those items shall be numbered as PROJ-XXX where XXX is the incremental number of each additional project-specific item, numerically starting with 100 (i.e., PROJ-100).
5.4 Functional Categories
The functional categories are defined as follows:
5.4.1 Audio System Performance
Verification items within this category verify the audio system’s performance, stability, and conformance to requirements provided within project documentation. Project-specific verification items that address capture, transformation, or reproduction of program audio or voice; audio signal management; acoustic environment; and loudspeaker operations shall be listed in this section.
5.4.2 Video System Performance
Verification items within this category verify the video system’s performance, stability, and conformance to requirements provided within project documentation. Project-specific verification items that address capture, transformation, or reproduction of video; video signal management; and camera operations shall be listed in this section.
5.4.3 Audio/Video System Performance
Verification items within this category verify linked audio and video system elements that cannot be separated due to their functional requirements. These items verify performance, stability, and conformance to requirements provided within project documentation. Project-specific verification items that address linked audio and video system elements shall be listed in this section.
5.4.4 Cable Management, Termination, and Labeling
Verification items within this category verify the workmanship for installation and management of all systems’ cabling, labels, and connections conformance to requirements provided within project documentation. Project-specific verification items that address site cabling, rack cabling, furniture cabling, and loose cables shall be listed in this section.
In this context, “cable” refers to all cabling including fiber and copper (e.g., twisted pair, multicore, coaxial).
5.4.5 Control System Performance
Verification items within this category verify the control system’s performance, usability, stability, and conformance to requirements provided within project documentation. Project-specific verification items that address system communications, interface and control devices, mobile device integration, external system integration (e.g., life safety, security, environmental), automated system functions, and user interface operations shall be listed in this section.
© 2013 by InfoComm International® Page 15
5.4.6 System and Record Documentation
Verification items within this category verify that the system’s project-specific record documentation has been completed. Any documentation should be delivered in electronic format wherever possible and practical. Project-specific verification items that address drawings and specifications, test reports, manuals, and acceptance reports shall be listed in this section.
5.4.7 Electrical
Verification items within this category verify the system’s interaction with mains voltage distribution and DC power distribution within the system are in conformance with the regulatory authority and project documentation. Project-specific verification items that address power distribution, monitoring, and sequencing shall be listed in this section.
This category specifically excludes testing of the building’s fixed electrical installation, which is deemed the responsibility of others as defined in the project documentation or by regulatory authority.
5.4.8 Information Technology
Verification items within this category verify the Information Technology elements of the system perform, provide stability, and conform to requirements provided within project documentation. Project-specific verification items that address network integration and performance, IT systems integration, IT security, unified communications, and software licensing shall be listed in this section.
This category specifically excludes testing of the owner’s information technology systems unless specified in the project documentation.
5.4.9 Operations and Support
Verification items within this category verify that operational planning and handover of elements of the system have been conducted and conform to requirements provided within project documentation. Project-specific verification items that support planning for operations or address handover elements shall be listed in this section.
5.4.10 Physical Environment
Verification items within this category verify that built elements that interact with a system perform and conform to requirements provided within project documentation. Project-specific verification items that address structural reinforcement, lighting, enclosures, finishes, and other built elements shall be listed in this section.
5.4.11 Physical Installation
Verification items within this category verify that the workmanship for installation of all the equipment within the system except cabling conforms to requirements provided within project documentation. Project-specific verification items that address containment, installation, security, and equipment cleanliness shall be listed in this section.
5.4.12 Serviceability
Verification items within this category verify that the system is serviceable in conformance with the requirements provided within project documentation. Project-specific verification items that address system accessibility, access panels, and rack clearance shall be listed in this section.
5.4.13 Wireless
Verification items within this category verify that all aspects of wireless audio, video, and control systems perform and conform to the requirements provided within project documentation. Project-specific verification items that address radio frequency, infrared, Bluetooth®, Digital Enhanced Cordless Telephony (DECT), and proprietary wireless systems shall be listed in this section.
© 2013 by InfoComm International® Page 16
5.5 Verification Phases and Milestones
Figure 4 – Verification Phases and Milestones
The verification phases and milestones are defined as follows:
5.5.1 Pre-Integration
Verification items that take place prior to systems integration. These items will generally verify existing conditions or coordinated trades activities required for AV system installation (e.g., device enclosures, backing/blocking/framing).
5.5.2 Systems Integration
Verification items that take place while the audiovisual system(s) is/are being integrated or built, including off-site and on-site work. These items will generally verify proper operation or configuration so that the system can function (e.g., equipment mounted level and plumb, phantom power, termination stress, AV rack thermal gradient performance).
5.5.3 Post-Integration
Verification items that take place after the audiovisual system(s) has been completed.
These items will generally verify system performance against verification metrics as defined in the project documentation (e.g., projected image contrast ratio, audio and video recording, control system automated functions).
5.5.3.1 Substantial/Practical Completion
Verification milestone that indicates conditional acceptance of the project has been issued by the owner or owner's representative, acknowledging that the project or a designated portion is substantially/practically complete and ready for use by the owner, however some requirements and/or deliverables defined in the project documentation may not be complete. This milestone occurs at the end of the post-integration verification phase.
5.5.4 Closeout
Verification items involved with closing out the project. These items will generally be related to documenting the As-Built/As-Is status of the system(s) and transfer of system software, among other (e.g., control system test reporting, As-Built drawings complete, warranties) items.
5.5.4.1 Final Acceptance
Verification milestone that acceptance of the project has been issued by the owner or owner's representative, acknowledging that the project is 100% complete and all required deliverables, services, verification lists, testing, verification, and signoffs have been received, and all requirements defined in the project documentation have been satisfied and completed that occur at the completion of the closeout verification phase. No further project activity will take place after this milestone is verified.
© 2013 by InfoComm International® Page 17
5.6 Verification Phases Implementation
5.6.1 Certain verification items may need verification at multiple times during a project.
5.6.2 The reference verification items provided in this Standard define the verification phases at which those items should be tested. Where additional items are added on a project-specific basis, these shall also be allocated a verification phase.
6 Verification Metric Selection Process Group
6.1 Overview
6.1.1 Once the verification items have been identified, each item shall require a pass/fail verification.
6.1.2 There are 16 (out of 160) specific verification items identified in this Standard that require a measurement in addition to pass/fail to validate performance. These verification items are identified in Section 9 item descriptions. The item descriptions include a sentence that reads, “This verification item shall require a metric to be verified.”
6.1.3 There are 11 (out of 160) specific verification items identified in this Standard that it is recommended include a measurement in addition to pass/fail to validate performance.
These verification items are identified in Section 9 in the reference verification list item descriptions. The item descriptions include a sentence that reads, “This verification item should require a metric to be verified.”
6.1.4 This Standard does not identify the method or measure beyond pass/fail; this should be identified and defined by the user of the Standard.
6.2 Selection Process Implementation
6.2.1 Each project-specific verification item that has been identified and requires a metric in addition to pass/fail shall follow this selection process:
1) Review client/owner’s key priorities – in terms of cost, quality, time, functionality, and performance.
2) Start with the best-case metrics for the given type of installation (e.g., general meeting room, boardroom, video conferencing, stadium).
3) Review metrics with owner, building designers and/or equipment manufacturers to confirm that best-case metrics are achievable.
4) Modify metrics to suit project and define target metrics for the project.
Selection Process
Group
Verification Metrics Selection
Process Group
Performance Verification
Process Group
Verification Reporting Process
Figure 5 – Verification Metrics Selection Process Group
© 2013 by InfoComm International® Page 18
Figure 6 – Verification Metric Selection Factors
6.2.2 The sources of information that shall be referenced are indicated in order of importance in Figure 7 – Hierarchy of Metric Selection. In the case of conflict or variance between requirements, the higher listed item shall take precedence.
6.2.3 In all cases, regulatory authority requirements shall be adhered to.
Figure 7 – Hierarchy of Metric Selection
Regulatory Requirements
Project Documentation
National and International Standards
Manufacturer Documentation
Standard Guide
Other ‘Best Practices’ Documentation
© 2013 by InfoComm International® Page 19
6.2.4 In many instances, best-case metrics may not be achievable as part of a system installation due to the existing or planned building environment. When conflict exists between the building environment and best-case metrics for the audiovisual system, a discussion should take place between the system verifier and the owner to determine an agreeable metric.
7 Performance Verification Process Group
Figure 8 – Systems Performance Verification Process Group Flow
7.1 Implementation
7.1.1 This process shall be followed for performance verification in accordance with project documentation:
1) Prepare
a. Identify parties responsible for verification and stakeholders who wish to be involved in the process.
b. Identify when verification is to be performed.
c. Identify invasive and non-invasive test procedures.
d. Define methods of measurement and test equipment.
2) Execute
a. Confirm system availability and provide notice prior to performing verification.
b. Perform verification.
8 Verification Reporting Process Group
Figure 9 – Verification Reporting Process Group Flow
Selection Process
Group
Verification Metrics Selection Process
Group
Performance Verification Process
Group
Verification Reporting Process
Group
Verification Item Selection Process
Group
Verification Metrics Selection Process
Group
Performance Verification Process
Group
Verification Reporting Process
© 2013 by InfoComm International® Page 20
8.1 Overview
8.1.1 The system verifier shall provide reporting to the client/owner and/or the contractually identified stakeholder(s) throughout all verification phases of the project. At a minimum, the system verifier shall issue reports at the end of the pre-integration, integration, post integration, and closeout verification phases.
8.1.2 If project reports are issued only once per verification phase, the reports shall include the results of all project-specific verification items for that verification phase in a completed and documented manner to be considered in conformance with this Standard.
8.1.3 Reports may be issued multiple times per verification phase based on project requirements. When considered together, the reports shall include results of all project-specific verification items for that verification phase in a completed and documented manner to be considered in conformance with this Standard.
8.1.4 If an event (e.g., change order, remediation work, audiovisual system design changes, building design changes, program scope change) causes a project-specific verification item to be verified additional times, the system verifier shall reissue the verification report for all project-specific verification items that have been verified again.
8.1.5 At the conclusion of the project, the system verifier shall issue a verification report for the final acceptance milestone. This report shall be cumulative and contain all required report elements and the results of all project-specific verification items that have been verified in all verification phases of the project. After the final acceptance report has been issued, no further reports shall be issued. This report shall be organized by the sequential verification phases.
8.2 Reporting Format and Implementation
8.2.1 The format of the report shall be either printed, electronic, or both. Electronically formatted reports shall be issued in a format that prevents subsequent editing.
8.2.2 Each issuance of the verification report shall include the following:
8.2.2.1 Report Header
1) Project name
2) Name of system verifier
3) Date of issuance of report
4) Verification phase covered by report
5) To whom the report is being issued
8.2.2.2 Project-specific verification items from the verification phase covered by the report
1) Verification item number
2) Verification item name
3) Verification item-defined metric (e.g., visual inspection, measure image contrast ratio of 7:1, SPL at least-favored listener measured at 80 dBSPL)
4) Verification item measurement result (if required – see section 6.1)
5) Verification item pass/fail result
6) Name of the verifier/party completing item
7) Date of the verification
8) Notes and comments (if necessary)
© 2013 by InfoComm International® Page 21
8.2.2.3 List of reference verification items not verified on this project for the verification phase covered by the report
8.2.2.4 Signed acknowledgment of conformance to the Standard as required in
Section 10
8.2.3 The reports shall organize the verification items in the same categorical order as they are presented in the Standard. Verification items shall be ordered according to the following hierarchy:
1) Functional category
2) Item number
8.2.4 Optional elements may be included in the reporting that are required for the project. Items such as report version numbers, traceability, item descriptions, recommendations for remedial actions, and change logs may be included at the discretion of the system verifier or as required by project documentation.
8.2.5 In the event that the project is suspended or delayed indefinitely, a report shall be issued noting that the process cannot be continued, and all relevant and supporting files that are used to track, monitor, and/or note the verification process and status shall be transferred to the owner for future use.
© 2013 by InfoComm International® Page 22
9 Reference Verification Items by Functional Category and Verification Phase
9.1 Audio System Performance Reference Verification Items
AP-100 Emergency Muting X X X AP-101 Loudspeaker Zoning X X AP-102 Alignment of Multiple Audio Source Levels X X AP-103 Audio Buzz and Rattles X X AP-104 Audio Routes X X AP-105 AV Room Reverberation Time X X AP-106 DSP Programming X X AP-107 Loudspeaker Physical Alignment X X AP-108 Loudspeaker Polarity X X AP-109 Loudspeaker Time Alignment X X AP-110 Phantom Power X X AP-111 Loudspeaker Transformer Tap Setting X AP-112 Acoustical Ambient Noise X AP-113 Assistive Listening Devices X AP-114 Audio Coverage in Listener Areas X AP-115 Audio Dynamics X AP-116 Audio Level Exceeds Background Noise Level X AP-117 System Electronic Frequency Response X AP-118 Audio System Equalization for Spectral Balance X AP-119 Audio System Latency X AP-120 Audio System Speech Reproduction at Listener
Positions
X
AP-121 Audio System Total Harmonic Distortion X AP-122 Conferencing Audio Levels X AP-123 Conferencing Echo Suppression Performance X AP-124 Loudspeaker Impedance X AP-125 Microphone Physical Alignment and Placement X AP-126 Microphone Gain Before Feedback X AP-127 Microphone Level Alignment X AP-128 Multi-channel Loudspeaker System Output X AP-129 Sound Masking X AP-130 Audio Reinforcement System Headroom X AP-131 Audio System Signal-to-Noise Ratio X
© 2013 by InfoComm International® Page 23
9.1.1 Audio System Performance Reference Verification Item Numbers and Descriptions
AP-100 – Emergency Muting o Verify that any required muting or operational change of the installed sound system(s) has been made in accordance with local regulations in the event of a life safety or similar emergency.
AP-101 – Loudspeaker Zoning o Verify that loudspeaker zones are wired as defined in the project documentation.
AP-102 – Alignment of Multiple Audio Source Levels o Verify calibration of permanent audio system inputs such that the difference between any input signal level after the first common gain adjustment meets the requirements of the project documentation. This verification item should require a metric to be verified.
AP-103 – Audio Buzz and Rattles o Verify that no audible noise caused by improper installation of any equipment provided in completed system(s) is present.
AP-104 – Audio Routes o Verify that all audio routes are tested from endpoint to endpoint via the appropriate midpoint(s) for operation and routing as defined in the project documentation.
AP-105 – AV Room Reverberation Time o Verify reverberation time meets the requirement defined in the project documentation. This verification item shall require a metric to be verified.
AP-106 – DSP Programming o Verify that all DSP-based products have been programmed as defined in the project documentation.
AP-107 – Loudspeaker Physical Alignment o Verify that loudspeakers are placed and aimed as defined in the project documentation.
AP-108 – Loudspeaker Polarity o Verify that all loudspeakers have correct polarity as defined in the project documentation.
AP-109 – Loudspeaker Time Alignment o Verify that loudspeaker time alignment performs as defined in the project documentation. This verification item shall require a metric to be verified.
AP-110 – Phantom Power o Verify that phantom power is provided at the correct voltage and correct locations as defined in the project documentation.
AP-111 – Loudspeaker Transformer Tap Setting o Verify the loudspeaker transformer tap setting in constant voltage systems is as defined in the project documentation.
AP-112 – Acoustical Ambient Noise o Verify that the background acoustic noise levels within audiovisual spaces are within the required limits as detailed in the project documentation. This test is specifically related to ambient noise levels and not audio system quiescent noise, which is tested separately.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .